1. Short title, commencement, application and extent.
Section 12. Definitions.
Section 23. Notice of opening.
Section 34. Annual returns.
Section 45. Notice of abandonment, closure or discontinuance or reopening of mine.
Section 56. Notice of change in ownership, appointments, etc.
Section 67. Notice of dangerous occurrence or accident.
Section 78. Notice of disease.
Section 89. Plans.
Section 910. Preparation of plans, etc., by surveyor.
Section 1011. Qualification for Inspector.
Section 1112. Definition of mine for purposes of this Chapter.
Section 1213. Appointment of agent.
Section 1314. Qualification and appointment of manager.
Section 1415. Qualifications and appointment of deputy manager.
Section 1516. Qualification and appointment of installation manager.
Section 1617. Qualification and appointment of safety officer.
Section 1718. Qualification and appointment or authorisation of surveyors.
Section 1819. Qualification and appointment of fire officer.
Section 1920. Qualification and authorisation of competent persons for well perforation.
Section 2021. Appointment of officials and competent persons.
Section 2122. General management.
Section 2223. Duties and responsibilities of owner.
Section 2324. General responsibilities of supplier, manufacturer and designer.
Section 2425. Duty of contractor.
Section 2526. Duty of persons employed in mine.
Section 2627. Duty and Responsibility of manager.
Section 2728. Duty and Responsibility of deputy manager.
Section 2829. Duty and responsibility of installation manager.
Section 2930. Duties of safety officer.
Section 3031. Duty of fire officer.
Section 3132. Duty and responsibility of competent person for well perforation.
Section 3233. Duty of competent person.
Section 3334. Derricks.
Section 3435. Derrick platform and floor.
Section 3536. Ladders.
Section 3637. Safety belt and life line.
Section 3738. Emergency escape device.
Section 3839. Weight indicator.
Section 3940. Escape exit.
Section 4041. Guardrails, handrails and covers.
Section 4142. Draw-works.
Section 4243. Cat-head and cat-line.
Section 4344. Tongs.
Section 4445. Safety chains or wirelines.
Section 4546. Casing lines.
Section 4647. Rigging equipment for material handling.
Section 4748. Storage of materials.
Section 4849. Construction and loading of pipe-racks.
Section 4950. Rigging-up and rig dismantling.
Section 5051. Mud tanks and pumps.
Section 5152. Well control equipment and operation.
Section 5253. Selection of well control equipment.
Section 5354. Periodic inspection and maintenance of well control equipment.
Section 5455. Control system for blowout preventers.
Section 5556. Testing of blowout preventer assembly.
Section 5657. Precautions against blowout.
Section 5758. Precautions after occurrence of a blowout.
Section 5859. Drilling and work-over operation.
Section 5960. Drill stem test.
Section 6061. Well perforation.
Section 6162. Well testing and activation.
Section 6263. Production facility.
Section 6364. Storage tank.
Section 6465. Dyked enclosures.
Section 6566. General requirement for storage tank and dyked enclosures.
Section 6667. Safety precaution in oil dispatch pump area.
Section 6768. Manifold area.
Section 6869. Process area.
Section 6970. Generator area.
Section 7071. Gas compressor shed or house.
Section 7172. General safety for production facility and installation.
Section 7273. Precautions during acidising operations.
Section 7374. Precautions during fracturing operations.
Section 7475. Precautions during loading and unloading of petroleum tankers.
Section 7576. Effluent Treatment Plant for water produced from wells.
Section 7677. Well servicing operations.
Section 7778. Artificial lifting of oil.
Section 7879. Temporary closure of producing well.
Section 7980. Plugging requirements for abandonment of wells.
Section 8081. Application.
Section 8182. Procedure for laying of pipeline.
Section 8283. Design of pipeline and fittings.
Section 8384. Construction, laying and maintenance of pipeline.
Section 8485. Preparatory works before commissioning of pipelines.
Section 8586. Re-lay, renew or repair of pipeline.
Section 8687. Maintenance of Right of Way or Right of Use and inspection of crossings.
Section 8788. Patrolling of Right of Way or Right of Use.
Section 8889. Maintenance Procedure or Manual of pipeline system.
Section 8990. Pipeline replacement and revalidation policy.
Section 9091. Abandonment or discontinuation of pipeline.
Section 9192. Documentation.
Section 9293. Emergency procedure for pipelines.
Section 9394. Storage and use of flammable material.
Section 9495. Precaution against noxious and flammable gas.
Section 9596. Safe distance.
Section 9697. Precautions against fire.
Section 9798. Precautions during welding, cutting or grinding.
Section 9899. Permit to work system for electrical installations.
Section 99100. Fire-fighting equipment.
Section 100101. Use of fire-fighting equipment.
Section 101102. Emergency plan.
Section 102103. Use of certain machinery and equipment.
Section 103104. Use of mobile cranes.
Section 104105. Lifting appliance and gears.
Section 105106. Classification of hazardous area.
Section 106107. Use of electrical equipment in hazardous area.
Section 107108. General provisions about construction and maintenance of machinery.
Section 108109. Maintenance system.
Section 109110. Internal combustion engines.
Section 110111. Apparatus under pressure.
Section 111112. Precautions regarding moving parts of machinery.
Section 112113. Engine rooms and exits.
Section 113114. Working and examination of machinery.
Section 114115. Code of practice.
Section 115116. Housekeeping.
Section 116117. General lighting.
Section 117118. Electric lighting.
Section 118119. Standards of lighting.
Section 119120. Emergency lighting.
Section 120121. Supply and use of protective footwear.
Section 121122. Supply and use of protective helmet.
Section 122123. Protective equipment.
Section 123124. Protection against noise.
Section 124125. Communication.
Section 125126. Safety while working at height.
Section 126127. Precautions against dust, toxic gases and ionizing radiations.
Section 127128. Safety warning signs.
Section 128129. Protection against pollution of environment.
Section 129130. Fencing.
Section 130131. Safety Management Plan.
Section 131132. Contractors, designer and service providers.
Section 132133. General safety.
Section 133134. Safety and health education and instructions.
Section 134135. Place of accident not to be disturbed.
Section 135136. Pointing out of contraventions detected during inspections.
Section 136137. Chief Inspector of Mines to exercise power of Regional Inspector.
Section 137138. Signing of Returns, Notices and Correspondence.
Section 138139. Reports, records and registers.
Section 139140. Permissions, etc. granted by the manager.
Section 140141. Publication of orders, forms and instructions.
Section 141142. Power to relax.
Section 142143. Appeal to Chief Inspector of Mines.
Section 143144. Appeal to Committee.
Section 144
the-oil-mines-regulations-2017.json
•
144 Sections
•
India (Central)
{
"id": 12664,
"slug": "the-oil-mines-regulations-2017",
"title": "The Oil Mines Regulations, 2017",
"short_title": "The Oil Mines Regulations, 2017",
"act_number": "Published vide Notification No. G.S.R. 1029(E), da",
"act_year": 2017,
"act_type": "CENTRAL",
"location": "India (Central)",
"law_status": "unknown",
"enactment_date": null,
"description": "The Oil Mines Regulations, 2017",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, commencement, application and extent.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Mines Act, 1952 (35 of 1952);\n(b) \"acidising\" means the treatment of hydrocarbon bearing formation by chemical reaction with acid in order to increase productivity or injectivity;\n(c) \"annular space\" means the space surrounding pipe suspended in the well, in which the outer wall of the annular space may be an open hole or it may be a string of larger pipe;\n(d) \"bleed\" means to drain off liquid or gas generally through a valve and to bleed off means a controlled release of the pressure of a well or the pressurised equipment;\n(e) \"blowout\" means uncontrolled sudden violent escape of fluid from a well;\n(f) \"blowout preventer\" means a device attached above the well head-\n(i) to control pressure or to prevent uncontrolled escape of fluid from the annular space between tubing and casing or between drill pipe and casing or between wire line and tubing; or\n(ii) to shut-off the well if no drill pipe or tubing is in the hole; in case a kick or blowout occurs;\n(g) \"casing\" means a steel pipe lowered into a well during drilling to prevent caving of the well and to hold back fluids from entering the well;\n(h) \"casing line\" means steel wire rope used for lowering and raising of pipes in the well through crown block and travelling block;\n(i) \"cat-head\" means a device mounted on the draw-works for making or breaking pipe connections or for operation of cat-line with the help of power from draw-works;\n(j) \"cat-line\" means a rope used to lift a pipe, drilling tool and other equipment from ground or base, pipe rack, tool platform or cat-walk on to the derrick floor;\n(k) \"cat-walk\" means a ramp giving access to rig floor for drill pipe, tubing, casing and drilling or other tools;\n(l) \"cellar\" means an excavation under the derrick to provide space for items or equipment at the top of the well which serves as a pit to collect drainage of water and other fluids under the floor for subsequent disposal;\n(m) \"cementing\" means an operation by which cement and water mixture is pumped down through the casing in such a way that it fills the space between casing and walls of the well to a pre-determined height above the bottom of the well;\n(n) \"christmas tree\" means the valves and fittings assembled at the top of a well head to control the flow of the fluid;\n(o) \"coal bed methane\" means a natural gas trapped in a coal seam or adjacent strata;\n(p) \"cold work\" means an activity which does not produce adequate heat to ignite a flammable airhydrocarbon mixture or a flammable substance;\n(q) \"competent person\" in relation to any work or any machinery, plant or equipment means a person who has been duly appointed in writing by the manager as a person competent to supervise or perform that work, or to supervise the operation or maintenance of that machinery, plant or equipment, and who is responsible for the duties assigned to such person;\n(r) \"completed well\" means a well in which the petroleum bearing formations or effluent disposal formation is open to the well, complete with equipment installed in the well and at the well-head thereby it is physically able to perform as a petroleum producer, injector or disposal well;\n(s) \"contractor\" means an individual, association of individuals, company, firm, local authority or local body who on contract basis provides for the services or operations in an oil mine, and includes a sub-contractor;\n(t) \"crown block\" means a multi-sheaved assembly mounted at the top of the derrick or mast and used in conjunction with a travelling block for raising and lowering of equipment in drilling and servicing a well;\n(u) \"day light hours\" means the period from sunrise to sunset;\n(v) \"deputy manager\" means a person possessing qualifications as provided under these regulations and who is appointed in writing by the owner, agent or manager of a mine to assist the manager in the control, management, direction and supervision of the mine or part thereof, and who takes rank immediately below the manager;\n(w) \"derrick\" means a compound latticed structure used over the well for drilling or well servicing purposes, and includes a mast;\n(x) \"designer\" means an individual, association of individuals, company or institution who designs an oil or gas mining system, method of oil or gas mining, machinery, plant, equipment, appliance or substances for use in oil or gas mines;\n(y) \"District Magistrate\" in relation to any mine means the District Magistrate or the Collector or the Deputy Commissioner, as the case may be, who is vested with the executive powers of maintaining law and order in the revenue district in which the mine is situated;\n(z) \"draw-works\" means an assembly of shafts, sprockets, chains, pulleys, belts, clutches, cat-heads or other mechanical devices, suitably mounted and provided with control for hoisting, operating and handling the equipment used for drilling a well or servicing a producing well;\n(za) \"drilling\" means perforation of the earth's crust by mechanical or other means and includes all operations for preventing collapse of the sides of such hole or for preventing such hole from being filled with extraneous material including water;\n(zb) \"drilling rig\" means the complete structure and machinery required for drilling purposes at the bore hole site;\n(zc) \"elevator\" means a steel mechanical device used in connection with the hoisting equipment suspended from the travelling block, for holding in suspension, pipe or rod being lowered into or pulled from a well;\n(zd) \"emergency-escape device\" means an inclined wire line to carry a safety carriage or slide running from a point above the monkey board to a ground anchor and includes such carriage or slide;\n(ze) \"explosimeter\" means an instrument to measure the concentration of flammable gas;\n(zf) \"explosive\" shall have the same meaning as assigned to that term in the Explosives Act, 1884 (4 of 1884);\n(zg) \"flame proof enclosure\" shall have the same meaning as assigned to it under the Central Electricity Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010;\n(zh) \"flammable\" means capable of being easily ignited, burning intensely or having a rapid rate of flame spread;\n(zi) \"flash point\" means the lowest temperature at which any petroleum liquid yields vapour in sufficient concentration to form an ignitable mixture with air and gives a momentary flash on application of a small pilot flame under specified conditions of test as per standard, that is, IS 1448 [P:21] or its revised version;\n(zj) \"flare\" means a flame used to dispose off gas as per process requirement;\n(zk) \"floor block\" means a single sheave pulley or snatch block fixed at or near floor level by means of which the direction of pull on a rope may be varied;\n(zl) \"form\" means a form specified by the Chief Inspector of Mines under these regulations;\n(zm) \"fracturing\" means the process of forcing a fluid in the sub-surface strata with the purposes of enhancing flow passages;\n(zn) \"gas\" means the vapour state of the hydrocarbons occurring in or derived from petroleum and includes natural gas;\n(zo) \"gas free\" means an environment in which-\n(i) the percentage of flammable gas does not exceed the limit specified under the Central Electricity Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010 for cutting off power supply in case of existence of such gas;\n(ii) the percentage of oxygen is not less than nineteen, and\n(iii) noxious gas is within the permissible limit specified in accordance with the Oil Industry Safety Directorate Standard, that is, OISD-STD-114 or its revised version;\n(zp) \"gas well\" means a well which is on continuous production from a gas bearing zone or a well in which casing is run for continuous production of gas;\n(zq) \"hazardous area\" means an area where hazardous atmosphere exists or is likely to occur;\n(zr) \"hazardous atmosphere\" means an atmosphere containing any flammable gas in a concentration capable of ignition or containing noxious gas beyond permissible limits specified as per the Oil Industry Safety Directorate Standard, that is, OISD-STD-114 or its revised version;\n(zs) \"hot work\" means an activity that can produce a spark or flame or other source of ignition having adequate energy to cause ignition, where the potential for flammable vapours, gas, or dust exist;\n(zt) \"Indian Standards (IS)\" means the standards formulated by the Bureau of Indian Standards under the Bureau of Indian Standard Act, 1986 (63 of 1986) which have been concurred by the Chief Inspector of Mines by a general order;\n(zu) \"installation\" means any fixed set up or structure or vessel or part thereof which is maintained within the mine or is to be established therein in connection with exploration or with exploitation of petroleum or natural gas with a view to such exploitation, production, storage or transport thereof;\n(zv) \"installation manager\" means a person appointed in writing by the owner, agent or manager of a mine to be in-charge of and responsible for all operations and activities on or in connection with the installation;\n(zw) \"ionising radiation\" means emission due to self-disruptive fission of atomic nucleus of any radioactive substance which is hazardous to health;\n(zx) \"kelly cock\" means a valve installed between swivel and kelly or kelly and drill pipe to control pressure, should a high pressure backflow of fluids occur, and to keep the pressure off the swivel and rotary hose;\n(zy) \"kick\" means a sudden pressure-surge of short duration caused by influx of formation fluids entering well being drilled;\n(zz) \"lifting appliance\" means a combined unit with or without horizontal movement used for hoisting or lowering cargo;\n(zza) \"lifting gear\" means every type of equipment placed on loading hook of a lifting appliance and includes container, steel basket, lifting yoke, multi slings or chain or wire;\n(zzb) \"living accommodation\" means the part of the installation comprising of personnel living rooms, conference room, gallery and offices attached thereto;\n(zzc) \"lubricator\" means a device fitted on top of a christmas tree and consists of a pressure sealing device at its upper end thereby afford an effective seal on the wire-line or other connection attached to tools run into the well;\n(zzd) \"machinery\" means -\n(i) any apparatus, appliance or combination of appliances intended for developing, storing, transmitting, converting or utilising energy, which is; or\n(ii) any stationery or portable engine, air or gas compressor, boiler or steam apparatus, which is; or\n(iii) any such apparatus or appliance if any power developed, stored, transmitted, converted or utilised thereby, is, under use or intended for use in connection with mining operations;\n(zze) \"major accident\" means an occurrence including in particular, a major emission of fire or explosion from uncontrolled developments in the course of drilling and for production, storage, handling or transportation of petroleum or machinery or owing to natural events leading to serious effects (both immediate and delayed and inside or outside the installation) causing or likely to cause substantial loss of life or property;\n(zzf) \"major fire\" means any incident of fire not extinguished within fifteen minutes;\n(zzg) \"manager\" means a person appointed under regulation 14;\n(zzh) \"manufacturer\" means an individual, association of individuals, company or institution who manufactures machinery, plant, equipment, appliance or substances for use in oil mines;\n(zzi) \"monkey board\" means a movable or fixed platform installed above derrick floor on which work-persons stand to handle pipes or other equipment racked on the derrick;\n(zzj) \"mud\" means a liquid that is circulated through the well during drilling or work-over operations or in case of temporary closure so that the hydrostatic pressure of the fluid column overbalances the formation pressure to prevent leakage of petroleum at the wellhead;\n(zzk) \"mud-pump\" means a pump used to circulate mud or well fluid on a drilling rig or Work-over rig;\n(zzl) \"mud tank\" means the reservoir or tank through which the drilling mud is cycled to allow sand and fine sediments to settle out where additives are mixed with mud and where the fluid is temporarily stored before being pumped back into the well;\n(zzm) \"official\" means a person appointed in writing by the owner, agent or manager to perform duties of supervision in a mine or part thereof and includes deputy manager, installation manager, safety officer, fire officer and surveyor;\n(zzn) \"oil\" means mineral oil which includes natural gas and petroleum;\n(zzo) \"oilfield\" shall have the meaning assigned to it in the Oilfields (Regulation and Development) Act, 1948 (53 of 1948);\n(zzp) \"oilfield pipeline\" means a pipeline or pipeline network used for transporting petroleum or other commodities in an oilfield;\n(zzq) \"Oil Industry Safety Directorate-Standard (OISD-STD)\", \"Oil Industry Safety Directorate- Recommended Practice (OISD-RP)\" and \"Oil Industry Safety Directorate- Guideline (OISD-GDN)\" means respectively, the standard, recommended practice and guidelines formulated by the Oil Industry Safety Directorate constituted by the Government of India, Ministry of Petroleum and Natural Gas, which have been concurred and notified by the Chief Inspector of Mines by a general order;\n(zzr) \"oil well\" means a well which is producing or is capable of producing petroleum;\n(zzs) \"out-line\" means a rope used to carry pipes, drilling tools or other equipment from a derrick to the derrick walk or other location outside the derrick;\n(zzt) \"petroleum\" means naturally occurring hydrocarbons in a free state whether in the form of natural gas or in a liquid, viscous or solid form but does not include helium occurring in association with petroleum;\n(zzu) \"pipe-rack\" means a structure located adjacent to but usually below the level of the rig floor, on which pipe or casing may be stored or racked;\n(zzv) \"platform\" means a working space for persons, elevated above the surrounding floor or ground or sea for the operation of machinery and equipment;\n(zzw) \"racked\" refers to tubular goods or rods standing in the derrick or mast or stored on a pipe rack;\n(zzx) \"racking platform\" means a platform in the derrick or mast at an elevation where a derrick man is normally required to handle stands being racked;\n(zzy) \"railway\" means a railway as defined in the Railways Act, 1989 (24 of 1989);\n(zzz) \"Regional Inspector\" means the inspector of mines in-charge of the region or local area or areas in which the mine is situated or the group or class of mines to which the mine belongs, over which he exercises his powers under the Act;\n(zzza) \"rigging-up\" means an act of assembling a drilling or work-over rig and auxiliary equipment prior to commencement of drilling or work-over operation and includes jacking up and positioning;\n(zzzb) \"river\" means any stream or current of water whether seasonal or perennial and includes its banks extending up to the highest known flood level;\n(zzzc) \"rotary hose\" means the hose that conducts the circulating fluid from the stand pipe to the swivel and kelly;\n(zzzd) \"rotary table\" means a power operated turn-table on the rig floor primarily used for rotating the drilling string;\n(zzze) \"safety management system\" means, collectively, those elements in the management system that are applied to identify or assess or control a hazard or recover therefrom;\n(zzzf) \"Schedule\" means the Schedule appended to these regulations;\n(zzzg) \"stand\" means sections of pipe consisting of two or more made-up lengths which are racked in a derrick;\n(zzzh) \"standard railing\" means a vertical barrier erected along exposed edges of a floor opening, wall opening, ramps, platform or walk-way to prevent fall of person;\n(zzzi) \"sub-structure\" means the foundation on which normally the derrick and engines are placed;\n(zzzj) \"supplier\" means an individual, association of individuals, company or institution who supplies a technology, machinery, plant, equipment, appliance or substance for use in an oil mine;\n(zzzk) \"surface casing\" means a steel pipe to cover unconsolidated formations, to provide protection against shallow gas flow, seal off water bearing formations, protect fresh water sands from contamination, case-off lost circulations zones and to provide structural support for the well head;\n(zzzl) \"swabbing\" means the operation of activation on a wire-line to bring well fluid to the surface when the well does not flow naturally;\n(zzzm) \"toe board \"means a vertical barrier at floor level erected along exposed edges of a floor opening, wall opening, platform, walk-way or ramp to prevent fall of materials;\n(zzzn) \"toxic gas\" means any gas which may cause a reversible or irreversible disturbance of the normal physiological process of one or more bodily systems;\n(zzzo) \"travelling block\" means a multi-sheaved pulley block used in conjunction with the fixed crown block for raising and lowering the drilling string, casing, tubing rods and other tools;\n(zzzp) \"well\" means a hole in the earth crust-\n(i) made or being made by drilling, boring or in any other manner from which petroleum is obtained or obtainable or for the purpose of obtaining petroleum or;\n(ii) used, drilled or being drilled for the purpose of water injection or for injecting natural gas, air, water or any other substance into underground formation;\n(zzzq) \"wellhead\" means an assembly on the top of the well casing strings with outlets and valves for controlling flow of fluid;\n(zzzr) \"well perforation\" means perforating well casing, or tubing, or cementing to provide flow passage for production or for testing or well activation purposes;\n(zzzs) \"well servicing\" means one or more type of remedial operations in well with the intention of restoring or increasing production without involving any work-over rig or outfit;\n(zzzt) \"work-over\" means one or more of a variety of remedial operations on a well with the intention of restoring or increasing production;\n(zzzu) `zone \"0\" hazardous area' means an area in which hazardous atmosphere is continuously present;\n(zzzv) `zone \"1\" hazardous area' means an area in which a hazardous atmosphere is likely to occur under normal operating conditions;\n(zzzw) `zone \"2\" hazardous area' means an area in which a hazardous atmosphere is likely to occur only under abnormal operating conditions.\nChapter-II\nReturns, Notices and Plans",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Notice of opening.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Annual returns.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Notice of abandonment, closure or discontinuance or reopening of mine.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Notice of change in ownership, appointments, etc.",
"chapter": null,
"content": "(i) of any partner in the case of a firm;\n(ii) of any member in the case of an association;\n(iii) of any director in the case of a public company; or\n(iv) of any shareholder in the case of a private company, shall also be intimated to the Chief Inspector of Mines and the Regional Inspector, within fourteen days from the date of such change.\n(b) When the ownership of a mine is transferred, the previous owner or his agent shall make over to the new owner or his agent, within a period of fourteen days of the transfer of ownership, all plans, reports, registers and other records maintained in pursuance of the Act and the regulations, or orders made thereunder, and all correspondence relating to the working of the mine relevant thereto; and when the requirements of this clause have been duly complied with, both the previous and the new owners or their respective agents shall forthwith inform the Chief Inspector of Mines and the Regional Inspector in writing.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Notice of dangerous occurrence or accident.",
"chapter": null,
"content": "(a) an accident causing loss of life or serious bodily injury in connection with any mining operation;\nor\n(b) a readily identifiable event with potential to cause an injury to persons at work, hereinafter referred to as \"dangerous occurrence\", such as-\n(i) an explosion or ignition;\n(ii) a blowout;\n(iii) an outbreak of major fire;\n(iv) a bursting of any pipeline or equipment containing petroleum, steam, compressed air or other substance at a pressure greater than the atmospheric pressure;\n(v) a major uncontrolled emission of petroleum or chemical spillage;\n(vi) a breakage or fracture of any essential part of draw-works, casing line or failure of emergency brake whereby the safety of persons may be endangered;\n(vii) a breakage, fracture or failure of any essential part of any derrick, machinery or apparatus whereby the safety of persons may be endangered;\n(viii) an influx of noxious gases; and\n(ix) any accident due to explosives,the owner, agent or manager of the mine shall forthwith inform the Regional Inspector about the occurrence by telephone, fax, e-mail or by special messenger; and shall also, within twenty four hours of every such occurrence, give notice thereof in the Form and method specified by the Chief Inspector of Mines for the purpose, to the District Magistrate, the Chief Inspector of Mines and the Regional Inspector and in the case of an accident mentioned in clause (a), also to the competent authority for payment of compensation:",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Notice of disease.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Plans.",
"chapter": null,
"content": "(a) a key plan with reference to the national grid showing the area duly demarcated in which operations for winning of petroleum or natural gas and ancillary operations are carried on;\n(b) a surface plan showing the location of all installations including wells, production facilities and pipe lines with their access routes, railways, power transmission lines, public roads, buildings or other permanent structures not belonging to the owner, rivers and water courses within the mine:\n(a) show the name of the mine and of the owner and the purpose for which the plan is prepared;\n(b) show the true north or magnetic meridian and the date of the later;\n(c) unless otherwise provided, be on a scale having a representative factor of -\n(i) 50,000:1,in case of key plans;\n(ii) 20,000:1,in case of plans such as showing location of oil well, gas well and other installations mentioned in clause (b) of sub-regulation (1):\n(d) be properly inked in on durable paper or a polyester tracing film and be kept in good condition or in electronic form:\n(d) be accurate and maintained up-to-date not later than twelve months.",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Preparation of plans, etc., by surveyor.",
"chapter": null,
"content": "Chapter - III\nInspectors, Management and Competent Persons",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Qualification for Inspector.",
"chapter": null,
"content": "(i) In relation to electrical machinery installed in mines, the Central Government may appoint a person holding a degree in electrical engineering of an educational institution approved by it;\n(ii) In relation to other machinery or mechanical appliance installed in mines, the Central Government may appoint a person holding a degree in mechanical engineering of an educational institution approved by it;\n(iii) In relation to the provisions of the Act and of the rules and regulations which relate to matters concerning the health and welfare of persons, the Central Government may appoint a person holding a degree of bachelor of medicines and bachelor of surgery degree.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Definition of mine for purposes of this Chapter.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 11
},
{
"number": "13",
"title": "13. Appointment of agent.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Qualification and appointment of manager.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Qualifications and appointment of deputy manager.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Qualification and appointment of installation manager.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Qualification and appointment of safety officer.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. Qualification and appointment or authorisation of surveyors.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "19",
"title": "19. Qualification and appointment of fire officer.",
"chapter": null,
"content": "(a) holds degree or diploma in fire and safety engineering of an educational institution recognized by the Central Government and having experience in dealing and management of fire services for a period of one year in case of degree or two years in case in diploma; or\n(b) holds degree or diploma in engineering or degree in science and shall also have undergone divisional officers course of an educational institution recognised by the Central Government and having experience in dealing and management of fire services for a period of one year in case of degree or two years in case in diploma; or\n(c) has undergone station officer's or sub-officer's course from an institute specified by the Chief Inspector of Mines for the purpose and having experience in dealing and management of fire services for a period of ten years.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "20",
"title": "20. Qualification and authorisation of competent persons for well perforation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "21",
"title": "21. Appointment of officials and competent persons.",
"chapter": null,
"content": "(a) adequate inspection of the installation and the equipment thereof;\n(b) a thorough supervision of all operations at the installation;\n(c) the installation, running and maintenance, in safe working order, of all machinery in the mine; and\n(d) the enforcement of the requirements of the Act and these regulations.",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "22",
"title": "22. General management.",
"chapter": null,
"content": "Chapter-IV\nDuties and Responsibilities of Management, Contractors, Manufacturers, Competent Persons and Workmen",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "23",
"title": "23. Duties and responsibilities of owner.",
"chapter": null,
"content": "(a) all provisions made under the regulations and rules pertaining to oil mines framed under the Act are complied with;\n(b) all necessary measures are taken to eliminate or minimise the risks to health and safety of persons employed in mines;\n(c) safety management plan required under these regulations are formulated and implemented in every mine;\n(d) emergency plan specific to each mine required under regulation 102 is prepared for implementation in the event of an emergency;\n(e) first aid, appropriate transportation from the workplace and access to appropriate medical facilities is provided to every person who receives injury or suffers from illness at the workplace;\n(f) adequate training and re-training programs and comprehensible instructions on safety and health matters and on the work assigned are provided for workers, at no cost to them; and\n(g) all accidents and dangerous occurrences connected with mining operations are investigated and appropriate actions taken to prevent recurrence.",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "24",
"title": "24. General responsibilities of supplier, manufacturer and designer.",
"chapter": null,
"content": "(a) ensure that the machinery, equipment or substances do not entail dangers for the safety and health of those using them correctly; and\n(b) make available-\n(i) information concerning their requirement for the correct installation, maintenance and use of machinery and equipment and the correct storage and use of substances;\n(ii) information concerning the hazards of machinery and equipment, the dangerous properties of hazardous substances and physical agents or products; and\n(iii) information on how to eliminate or control risks arising from the identified hazards associated with the products.",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "25",
"title": "25. Duty of contractor.",
"chapter": null,
"content": "(a) establish effective ongoing communication and co-ordination between appropriate levels of supervisors, officials and senior officials of the mine prior to commencing work, which shall include provisions for identifying hazards and the measures to eliminate and control risks;\n(b) ensure arrangements for reporting work related injuries and diseases, ill-health and incidents among the contractor's workers while performing work in the mine;\n(c) provide relevant workplace safety and health hazard awareness and training to their workers prior to commencing work and as the work progresses as necessary; and\n(d) ensure compliance of the provisions of the Act and the rules and regulations framed thereunder.\n(a) the same safety and training requirements apply to the contractors and their workers as to the workers of the establishment;\n(b) where required, only such contractors are deployed who have been duly registered or held licenses; and\n(c) the contract specify safety and health requirements and sanctions and penalties in case of noncompliance and such contract shall include the right for mine officials to stop the work whenever a risk of injury is apparent and to suspend operations until the necessary remedies have been put in place.",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "26",
"title": "26. Duty of persons employed in mine.",
"chapter": null,
"content": "(a) throw any stone or other missile with intent to cause injury; or\n(b) fight or behave in a violent manner; or\n(c) impede or obstruct any other person in the discharge of duties; or\n(d) offer or render any service or use any threat, to any other person with a view to prevent the other person from complying with the provisions of the Act or the regulations, or orders made thereunder or from performing duties faithfully.",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "27",
"title": "27. Duty and Responsibility of manager.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "28",
"title": "28. Duty and Responsibility of deputy manager.",
"chapter": null,
"content": "(a) ensure that all operations in the part of the mine assigned to him under sub-regulation (1) are carried out in accordance with the code of practice framed under these regulations;\n(b) subject to the orders of the manager, visit and examine the part of the mine and the installations under his charge or part thereof;\n(c) maintain a detailed report of the result of each of his inspection and also action taken by him to rectify the defects noticed, if any;\n(d) ensure that when any drilling rig, work-over rig and associated equipment, production equipment or pipeline is shifted or newly installed, it is given a trial run before being put into use; and\n(e) in the absence of manager, the deputy manager shall have the same responsibility and discharge the same duty and shall be subjected to same liabilities as manager, but not so as to exempt the manager therefrom.",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "29",
"title": "29. Duty and responsibility of installation manager.",
"chapter": null,
"content": "(a) have charge and control of the installation and shall carry out such duties, as may be assigned to him by the manager or deputy manager;\n(b) ensure that in the installation assigned to him, all work is carried out in accordance with the provisions of the Act and the regulations or the orders made thereunder;\n(c) ensure that all operations in the installation or part of the mine assigned to him under clause (a) are carried out in accordance with the code of practice framed under these regulations;\n(d) ensure that a notice of his appointment is available at site and his name is displayed at a place in the installation in such a position that it may be easily and conveniently read;\n(e) visit and examine the installation or part thereof under his charge on every working day to see that safety in every respect is ensured;\n(f) maintain a detailed record of the results of each of his inspection and also of the action taken by him to rectify the defects noticed, if any;\n(g) ensure that when any drilling rig, work-over rig and associated equipment or production equipment or pipeline is shifted or newly installed, a trial-run is given under his supervision or person so authorised by him before it is put into use;\n(h) ensure that all persons employed at the installation are thoroughly instructed and familiar with the provisions of the standing orders, standard operating procedures, code of practices and emergency plan made under these regulations relating to prevention of blowout and fire;\n(i) ensure that the provisions of the Act and the regulations or orders made thereunder relating to the installation, maintenance, operation or examination of machinery and equipment are properly carried out by himself or by officials or by competent persons or work persons, as the case may be, appointed for the purpose; and\n(j) during the construction of an installation or any operation thereat, when there is an emergency or apprehended emergency endangering the life or safety of any person or the stability and safety of the installation, himself take or cause to be taken such measures as are necessary or expedient to avoid the emergency.",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "30",
"title": "30. Duties of safety officer.",
"chapter": null,
"content": "(a) inspect, as often as may be necessary, the installations of the mine with a view to identify the dangers which may cause bodily injury or impair health of any person or environment;\n(b) advise the manager or deputy manager on measures necessary to prevent dangerous situations;\n(c) enquire into the circumstances and causes of all accidents whether involving persons or not and advise the manager or deputy manager on measures necessary to prevent recurrence of such accidents;\n(d) collect, compile and analyse information in respect of accidents and dangerous occurrences with a view to promote safe practices and improvement of working environment;\n(e) organise regular safety education programmes and safety campaigns to promote safety awareness amongst persons employed in the mine;\n(f) ensure that all new workers and workers transferred to new jobs receive adequate training in safety, firefighting and first aid; and\n(g) maintain a detailed record of work performed by him every day.",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "31",
"title": "31. Duty of fire officer.",
"chapter": null,
"content": "(a) ensure the compliance of the provisions of the Act and the regulations or orders made thereunder concerning fire detection, fire-fighting system and emergency plan and advise the manager and deputy manager on measures necessary to ensure adequate protection against fire;\n(b) ensure that code of practice for fire-fighting is prepared and implemented;\n(c) ensure proper layout, installation and maintenance of fire-fighting equipment;\n(d) ensure that emergency plan for likely fire situations are prepared;\n(e) organise regular training of persons in-charge of fire-fighting duty with particular reference to contingency or emergency plan for fire, correct assessment and handling of fire problem;\n(f) ensure that persons on firefighting duty undertake simulated fire drills at least once in every month to study promptness of response and effective tactics;\n(g) examine at least once in every quarter all devices and equipment of fire detection and firefighting systems in the mine and report any defects in the same to the manager or deputy manager;\n(h) exercise a general supervision and co-ordination during control and extinguishment of any fire in the mine;\n(i) assist the manager or other officials so authorised, to conduct enquiry into the causes and circumstances of all fires with a view to prevent recurrence in the mine; and\n(j) maintain detailed record of work performed by him every day.",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "32",
"title": "32. Duty and responsibility of competent person for well perforation.",
"chapter": null,
"content": "(a) be responsible for the compliance by his assistants, if any, of such provisions and of any direction with a view to safety, which may be given to them by a superior official;\n(b) not hand over any explosive to any unauthorised person;\n(c) be present when shot is being charged and shall himself fire the shot; and\n(d) be responsible when a shot has misfired to see that the gun is safely disarmed.",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "33",
"title": "33. Duty of competent person.",
"chapter": null,
"content": "(a) depute another person to perform his work without the sanction of his superior official;\n(b) absent himself without having previously obtained permission from such official for the period of his absence or without having been relieved by a duly competent person; and\n(c) without permission from such official, perform during his shift, any duties other than those for which he has been appointed.\nChapter - V\nDrilling and Work-Over",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "34",
"title": "34. Derricks.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "35",
"title": "35. Derrick platform and floor.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "36",
"title": "36. Ladders.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "37",
"title": "37. Safety belt and life line.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "38",
"title": "38. Emergency escape device.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "39",
"title": "39. Weight indicator.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "40",
"title": "40. Escape exit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "41",
"title": "41. Guardrails, handrails and covers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "42",
"title": "42. Draw-works.",
"chapter": null,
"content": "(a) the draw-works is fitted with a suitable device with its control near the driller's stand to stop the draw-works in case of an emergency;\n(b) no draw-works is operated unless all guards are in position and maintained;\n(c) the machinery is stopped for oiling and greasing if lubrication fittings are not accessible with guards in place;\n(d) the brakes, linkage and brake flanges of draw-works are examined by a competent person once at least in every twenty four hours and if any defect is found during such examination, the draw-works are not used until such defect is remedied;\n(e) the result of every such examination specified under clause (d)is recorded by the competent person making the inspection;\n(f) the draw-works are provided with an automatic device which shall effectively prevent the travelling block from coming closer than two metres of the crown block on the one end and crashing on the rotary table at the other end;",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "43",
"title": "43. Cat-head and cat-line.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "44",
"title": "44. Tongs.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "45",
"title": "45. Safety chains or wirelines.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "46",
"title": "46. Casing lines.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "47",
"title": "47. Rigging equipment for material handling.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "48",
"title": "48. Storage of materials.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "49",
"title": "49. Construction and loading of pipe-racks.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "50",
"title": "50. Rigging-up and rig dismantling.",
"chapter": null,
"content": "(a) the raising and installation of heavy load is performed during daylight hours unless adequate general lighting arrangement is provided at the place of work;\n(b) every loose part and tool of the rig is securely fastened;\n(c) guy lines, cat lines, snub lines and such other lines are not installed within six metre of any electric overhead transmission lines;\n(d) the exhaust of internal combustion engine is provided with water quench or other effective spark arrestors;\n(e) high pressure circulating fluid line and steam line are securely anchored;\n(f) during rigging-up and rig dismantling, the wellhead is protected against damage from sliding or falling objects of the rig and associated material;\n(g) the components from a loft including nuts, bolts and cleats are lowered safely to the ground either singly, bundled or in containers; and\n(h) the code of practice for rigging-up and dismantling is framed and implemented and kept updated by a deputy manager or an installation manager authorised in this behalf.",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "51",
"title": "51. Mud tanks and pumps.",
"chapter": null,
"content": "(a) the mud tanks are so designed and installed as to provide positive suction to mud pumps;\n(b) the mud pumps connected to a drilling rig are equipped with a pressure relief valve and an operating gauge in the system;\n(c) the pressure relief valve is set to discharge at a pressure not more than ten per cent in excess of the established maximum working pressure of the pump, pipes and fittings;\n(d) the discharge from a pressure relief valve is piped to such a place which does not endanger persons and the discharge line is anchored securely; and\n(e) there is no valve between a pump and its pressure relief valve.",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "52",
"title": "52. Well control equipment and operation.",
"chapter": null,
"content": "(a) well control fluid and equipment are available and installed and used as required;\n(b) well is full of well fluid of adequate specific gravity to overbalance the bottom hole pressure;\n(c) during tripping operation, closely watch to notice any sign of kick in the well and annulus is kept full;\n(d) full opening safety valve with connection for circulation and operating key are readily available and kept in open position on the derrick floor;\n(e) blow out preventer and related equipment like choke and kill manifold, control panel and accumulator are available, maintained and tested regularly;\n(f) blow out preventer equipment is function-tested and pressure-tested when installed and also at the appropriate time during operations to determine that the blow out preventer functions properly;\n(g) instructions of the blow out preventer operating manual of the manufacturer are complied with;\n(h) all connections, valves, fittings, piping, and other equipment have a minimum working pressure equal to the rated working pressure of the blow out preventer;\n(i) bolts, nuts and fittings of correct size are used and tightened to the recommended torque; and all connections are pressure-tested before resuming operation;\n(j) all manually operated valves are equipped with hand wheels, and always kept ready for use; and\n(k) pit drills are carried out regularly.",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "53",
"title": "53. Selection of well control equipment.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "54",
"title": "54. Periodic inspection and maintenance of well control equipment.",
"chapter": null,
"content": "(a) establish by taking into consideration the original equipment manufacturer's recommendations for inspection and maintenance procedures of well control equipment; .\n(b) ensure that the well control equipment is cleaned, visually inspected and preventive maintenance performed, before installation at the next well after inspection of each well;.\n(c) ensure that major inspection is carried out at intervals of not more than five years of service or as per Original Equipment Manufacturer's recommendation.\n(d) ensure that the records of every inspection made under clauses(b) and (c) is maintained by the competent person who made the inspection.\n(e) comply with the spare parts requirement as per Original Equipment Manufacturer;\n(f) ensure that separate maintenance history or log book of the entire blow-out preventers, choke manifold and control units are maintained; and\n(g) ensure that all pressure gauges on the blowout preventers control system are calibrated at least once in every six months.",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "55",
"title": "55. Control system for blowout preventers.",
"chapter": null,
"content": "(a) all ram preventers have locking mechanism and instructions for operating the controls are posted prominently near the control unit;\n(b) all controls of power operated blowout preventers are located within easy reach of the driller on the derrick floor;\n(c) a remote control panel for the blowout preventer is installed at ground floor level at a safe distance from the derrick floor; .\n(d) blowout preventers are connected to an accumulator system which shall be capable of providing fluid of sufficient volume to close all the blowout preventers in the stack and open hydraulically operated valve; and\n(e) all controls for blowout preventers are clearly identified with suitable markers;",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "56",
"title": "56. Testing of blowout preventer assembly.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "57",
"title": "57. Precautions against blowout.",
"chapter": null,
"content": "(a) a pit level indicator registering increase or reduction in the drilling mud volume and a visual and audio warning device near the driller's stand;\n(b) a device to accurately measure the volume of mud required to keep the well filled at all times;\n(c) a gas detector or explosimeter at the primary shale shaker and connected to audible or visual alarm near the driller's stand;\n(d) a device to ensure filling of well with mud when the string is being pulled out; and\n(e) a control device near the driller's stand to stop the mud pump when the well kicks.",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "58",
"title": "58. Precautions after occurrence of a blowout.",
"chapter": null,
"content": "(a) a competent person is present on the spot throughout;\n(b) an area within five hundred metre of the well on the down wind direction is demarcated as danger zone, and-\n(i) all electrical installations within the danger zone is de-energised to prevent the ignition;\n(ii) flameproof or intrinsically safe lamp or torch is only be used within the danger zone; and\n(iii) no naked light or vehicular traffic is permitted within the danger zone;\n(c) a competent person ascertains the condition of ventilation and presence of gas with a flameproof or intrinsically safe instrument so far as safety of person is concerned;\n(d) adequate number of self-contained breathing apparatus or any other apparatus of such make in accordance with the standards, that is, IS 10245 Part-2 or IS 10245 Part 1 of the Bureau of Indian Standards or its revised versions are available at or near the place for use in emergency; and\n(e) adequate fire-fighting facility is kept readily available for immediate use.",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "59",
"title": "59. Drilling and work-over operation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "60",
"title": "60. Drill stem test.",
"chapter": null,
"content": "(a) pressure test and function test of the blowout preventer assembly is conducted;\n(b) fire-fighting equipment is kept readily available for immediate use;\n(c) no person other than those required for the test is admitted on the drilling floor;\n(d) the test line is securely anchored at each end and at each nine metre interval;\n(e) thekelly hose is not used as part of the test line; and\n(f) the test line and valves are examined by a competent person and no test is conducted if any defect is discovered until such defect is rectified.\nChapter VI\nProduction",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "61",
"title": "61. Well perforation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "62",
"title": "62. Well testing and activation.",
"chapter": null,
"content": "(a) flow-lines are firmly anchored to the ground;\n(b) the separator safety valve is in good working order and properly adjusted;\n(c) hydro tested separator is used;\n(d) adequate fire-fighting equipment is readily available for immediate use; and\n(e) adequate facility is provided to safely collect the well products in tanks.",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "63",
"title": "63. Production facility.",
"chapter": null,
"content": "(a) the following particulars are shown on the surface plan and a copy thereof is kept at the facility -\n(i) the name and location of any other production facility connected with the facility;\n(ii) the pipelines connected with the facility;\n(iii) the name of each well connected to the facility;\n(iv) the extent of the land over which right of use or right of way has been established; and\n(v) any railway, public road, public works, building or any other surface features lying within sixty metres of such facility;\n(b) the documents, in compliance to all relevant statutory requirement, safety standards and safety guidelines are made available at site;\n(c) the production facility where the quantity of petroleum gas or liquid stored or handled exceeds three hundred tones respectively, and one lakh tonnes, the safety report in the form and method specified by the Chief Inspector of Mines for the purpose are made available at site; and\n(d) the detailed piping and instrumentation diagram of facility is maintained and kept updated and a copy of the same is kept available at the facility.",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "64",
"title": "64. Storage tank.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "65",
"title": "65. Dyked enclosures.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "66",
"title": "66. General requirement for storage tank and dyked enclosures.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "67",
"title": "67. Safety precaution in oil dispatch pump area.",
"chapter": null,
"content": "(a) all moving parts of a pump are adequately guarded;\n(b) the discharge outlet of safety relief valve is fixed with the suction end of the pump;\n(c) the engine exhaust is fixed with spark arrestor;",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "68",
"title": "68. Manifold area.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "69",
"title": "69. Process area.",
"chapter": null,
"content": "(a) discharge line of safety relief valve or pressure safety valve of the pressure vessel is connected to the flare through a common header;\n(b) all bath heaters, indirect heaters and flare line are provided with remote ignition system;\n(c) water level is always above the level of fire tube in operational bath heaters;\n(d) flame arrestor is in place in air intake line of the burners;\n(e) all vessels, equipment, bath heaters or indirect heaters handling petroleum are effectively earthed;\n(f) insulating mat of standard, that is, IS 15652 of the Bureau of Indian Standards or its revised version shall be provided near the electrical control panels;\n(g) records of vessels and testing of safety relief valve or pressure safety valve are inscribed on the vessels and on the safety relief valve and pressure safety valve.",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "70",
"title": "70. Generator area.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "71",
"title": "71. Gas compressor shed or house.",
"chapter": null,
"content": "(a) pressure relief valves on inlet and all stages to prevent pressure build up above the predetermined set point;\n(b) high discharge temperature shut down mechanism and high cooling water temperature switch fitted on cooling water return line to shut the compressor in the event of a fault;\n(c) high inlet, inter stage and discharge pressures shut down mechanisms;\n(d) low lube oil pressure shut down mechanism;\n(e) low cooling water flow switch fitted to the cooling water return line to shut the compressor in the event of fault; and\n(f) a remote isolation switch, wherever applicable, for emergency shutdown with manual reset at control panel.",
"footnote": "",
"is_definition": false,
"sort_order": 70
},
{
"number": "72",
"title": "72. General safety for production facility and installation.",
"chapter": null,
"content": "(a) provide wind sock in the production facility or installations;\n(b) provide facility for washing eyes and display material safety data sheets in the chemical handling shed;\n(c) provide an emergency vehicle in all the time in every production facility or installation;\n(d) ensure that pipelines are painted as per colour code indicated in the standard, that is, IS 2379 of the Bureau of Indian Standards or its revised version and the said colour code are displayed in the installation;\n(e) ensure that display boards are posted in strategic locations for prohibitory messages; and\n(f) ensure that all relevant documents pertaining to new production facility regarding construction and material alterations are maintained and kept available at facility.",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "73",
"title": "73. Precautions during acidising operations.",
"chapter": null,
"content": "(a) acidising operations at a well is carried out under the direct personal supervision of an official authorised for the purpose;\n(b) prior to the acidising operation, all pressure lines and associated equipment are tested to a pressure ten per cent higher than the expected working pressure; and\n(c) a non-return valve in the treating line as close to the wellhead as practicable is installed.\n(a) no person other than those required for acidising operation remains in the vicinity of the well; and\n(b) material safety datasheet is displayed at the site of operation and the requirements of material safety data sheet and personal protective equipment and other protective facilities are provided.",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "74",
"title": "74. Precautions during fracturing operations.",
"chapter": null,
"content": "(a) no person other than those required for fracturing operation remains;\n(b) no naked light or other source of ignition is permitted;\n(c) all electrical equipment is de-energised; and\n(d) adequate fire-fighting equipment is made available for immediate use.",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "75",
"title": "75. Precautions during loading and unloading of petroleum tankers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "76",
"title": "76. Effluent Treatment Plant for water produced from wells.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "77",
"title": "77. Well servicing operations.",
"chapter": null,
"content": "(a) prepare and implement a well servicing plan or work-over plan for each well to be serviced, detailing all activities to be done during the operations and a copy of the plan shall be kept at well site;\n(b) ensure that pre-work-over conference to examine and ensure safe operations and other related activities are held before commencement of well servicing operation,.\n(c) ensure that the casing is hermetically test at a pressure at least ten percent higher than the formation pressure is conducted prior to perforation and before lowering completion assembly;\n(d) ensure that well servicing operation is done under the direct supervision of a competent person authorised for the purpose.\n(e) ensure that every person keeps clear of the wire line between the drum and floor block;\n(f) ensure that every person remains at a safe distance from the bailing line during swabbing and scraping operations;\n(g) ensure that a master gate valve and tubing hanger are pre-assembled and kept readily available at the well for immediate use in case the well kicks during pulling out or running in tubings;\n(h) ensure that no well servicing operation is carried out at any livewell unless proper blowout preventer assembly is securely installed and maintained;\n(i) ensure pressure and function testing of the blowout preventer assembly before commencement of well servicing operation;\n(j) ensure that no tubing is pulled out of any well unless the well is properly killed.",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "78",
"title": "78. Artificial lifting of oil.",
"chapter": null,
"content": "(a) provide a properly constructed working platform at the well where artificial lift equipment is to be used unless a submersible pump is used for the purpose;\n(b) ensure that repairs, lubrication or greasing are not performed unless the pumping unit is stopped; and\n(c) ensure that all surface control valves for gas lift, intermittent gas lift or free plunger lift systems are clearly marked for ready identification;",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "79",
"title": "79. Temporary closure of producing well.",
"chapter": null,
"content": "(a) it shall be filled with mud or water or oil or salt solution or any special chemical so that the hydrostatic pressure of the fluid column over-balances the formation pressure to prevent leakage of petroleum at the wellhead;\n(b) the control valves of the Christmas tree shall be completely closed and control wheels be removed;\n(c) the Christmas tree shall be examined for leakage at least once in thirty days by a competent person authorised for the purpose and in case any leakage is detected during such examination, the competent person shall take immediate steps to stop it;\n(d) a report of every such examination shall be recorded and maintained by the person who made the examination;\n(e) the well head shall be preferably covered with suitably designed portable protective cover as a security measure.",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "80",
"title": "80. Plugging requirements for abandonment of wells.",
"chapter": null,
"content": "(a) all permeable formations are isolated with cement plug;\n(b) a cement plug of minimum length of fifty metre is placed at the bottom of the well or proper bridge plug;\n(c) a cement plug of a minimum length of fifty metre is placed across the shoes of the surface casing or bridge plug;\n(d) the cellar or pit around the well are filled up and the land shall be restored to the original level; and\n(e) a bridge-plug above the top of perforations capped with a thirty metre cement plug is placed in case of cased well.\nChapter -VII\nTransport by Pipeline",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
{
"number": "81",
"title": "81. Application.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 80
},
{
"number": "82",
"title": "82. Procedure for laying of pipeline.",
"chapter": null,
"content": "(a) keep at the mine a surface plan of the area where the pipeline is proposed to be laid showing the extent of land over which right of use has been established and route of the pipeline clearly indicating the districts and states through which the pipeline would pass;\n(b) forward to the concerned railway administration an intimation accompanying a plan where it is proposed to lay pipeline within forty-five metre of any railway in respect of which this regulation is applicable by reason of any general or special order of the Central Government; and\n(c) forward to such authority as the Central Government may by a general or special order specify, an intimation accompanying a plan where it is proposed to lay pipeline within forty-five metre of any public works in respect of which this regulation is applicable by reason of any general or special order of the Central Government or of any public road or building or of other permanent structure not belonging to the owner of the mine.",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
{
"number": "83",
"title": "83. Design of pipeline and fittings.",
"chapter": null,
"content": "(a) the pipeline is designed in a manner that ensures adequate public safety under all conditions likely to be encountered during installation, testing, commissioning and operating conditions;\n(b) all materials and equipment are selected to ensure safety and suitability for the condition of use;\n(c) all pipes, valves, flanges and other fitting conform to the Oil Industry Safety Directorate Standards, that is, OISD-STD-141 and OISD-STD-226 or their revised versions;\n(d) all underground pipes and their components are protected against corrosion using suitable external anti-corrosion coating or painting and cathodic protection and all above ground pipes and their components are protected against corrosion by providing suitable anti-corrosion coating;\n(e) (i) the sectionalising valves are installed where required for operation and maintenance and control of emergencies;\n(ii) the factors such as topography of the location, ease of operation and maintenance including requirements for section line fill are considered in deciding the location of the valves:\n(iii) the sectionalisation valve is provided based on risk assessment survey to limit the hazard and damage from accidental discharge from pipeline and to facilitate repair and maintenance of pipeline;\n(f) the pressure safety valves or other devices of sufficient capacity and sensitivity is installed to ensure the normal operating pressure in the pipeline network;",
"footnote": "",
"is_definition": false,
"sort_order": 82
},
{
"number": "84",
"title": "84. Construction, laying and maintenance of pipeline.",
"chapter": null,
"content": "(a) all welding and weld inspection are done in accordance with Oil Industry Safety Directorate Standard, OISD-STD-141 or its revised version.\n(b) back filling are carried out after the pipeline has been laid in the trench prior to commissioning of the pipeline.\n(c) pipeline markers to indicate presence of pipeline and chainage are provided all along the pipeline route.\n(d) the markers are provided on each side of national highways or state highways, major district roads, railway crossings, turning points and water body crossings and at other crossings where third party activity is expected and at entrance to stations one marker shall be provided.\n(e) markers of the following types are installed along the pipeline in right of way or right of use, namely:-\n(i) kilometre markers;\n(ii) right of way or right of use boundary pillars on either side at a maximum of two hundred and fifty metre interval; and\n(f) warning signboards and markers at crossings display caution words \"High Pressure Pipeline\", \"name of the operating company\" and \"emergency telephone contact numbers.\" in regional or Hindi and English languages.\n(a) obtain permission from the competent authority while crossing structures such as roads, railways or other public works;\n(b) ensure that the minimum hydraulic test pressure at any point along with the pipeline is maintained 1.25 times the internal design pressure; and\n(c) ensure that the test pressure is maintained for a minimum period of twenty-four hours except where specifically mentioned.",
"footnote": "",
"is_definition": false,
"sort_order": 83
},
{
"number": "85",
"title": "85. Preparatory works before commissioning of pipelines.",
"chapter": null,
"content": "(a) commissioning procedure is in place;\n(b) pressure testing is completed for entire pipeline and associated station piping;\n(c) pressure leak check of the above ground piping and flanged joints is completed;\n(d) pipeline has been cleaned and debris has been removed;\n(e) mainline sectionalising valves are installed as per requirement;\n(f) all Golden joints are inspected and accepted;\n(g) geometric survey of pipeline section is carried out, if applicable; and\n(h) trained and experienced officials in adequate numbers are appointed for supervision of commissioning work of pipelines.",
"footnote": "",
"is_definition": false,
"sort_order": 84
},
{
"number": "86",
"title": "86. Re-lay, renew or repair of pipeline.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 85
},
{
"number": "87",
"title": "87. Maintenance of Right of Way or Right of Use and inspection of crossings.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 86
},
{
"number": "88",
"title": "88. Patrolling of Right of Way or Right of Use.",
"chapter": null,
"content": "(a) inspect the rail, road bridge, suspended crossings once in three months to check support and structure and anti-corrosion coating where pipe exits or enters ground;\n(b) Inspect right of way or right of use of the mine at least once in a year for the entire length of the pipeline preferably to be done after monsoon;\n(c) make the villagers and public along the right of way or right of use adequately aware of the possible consequence of leaks and this shall be included as a part of regular audit; and\n(d) maintain regular liaison with the police stations, local panchayats and district authorities along the right of way and right of use about the possible consequences of leakage and pilferage.",
"footnote": "",
"is_definition": false,
"sort_order": 87
},
{
"number": "89",
"title": "89. Maintenance Procedure or Manual of pipeline system.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 88
},
{
"number": "90",
"title": "90. Pipeline replacement and revalidation policy.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 89
},
{
"number": "91",
"title": "91. Abandonment or discontinuation of pipeline.",
"chapter": null,
"content": "(a) the pipeline section and facility are disconnected with positive isolation from all sources of supply prior to abandonment; and\n(b) the pipeline system and facility to be abandoned are purged with nitrogen gas, inert materials or inhibited water and after purging, the ends of the pipeline are positively isolated.",
"footnote": "",
"is_definition": false,
"sort_order": 90
},
{
"number": "92",
"title": "92. Documentation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 91
},
{
"number": "93",
"title": "93. Emergency procedure for pipelines.",
"chapter": null,
"content": "(a) operational data;\n(b) pipeline patrolling records;\n(c) leak or tapping records;\n(d) routine or unusual inspection records; and\n(e) pipeline repair records.\nChapter-VIII\nProtection Against Gas and Fire",
"footnote": "",
"is_definition": false,
"sort_order": 92
},
{
"number": "94",
"title": "94. Storage and use of flammable material.",
"chapter": null,
"content": "(a) maintain a record of the measures taken by him in respect of the permission referred therein;\n(b) use safety cans for handling and use of flammable liquid;\n(c) ensure that drainage from any fuel storage is in a direction away from the well and equipment;",
"footnote": "",
"is_definition": false,
"sort_order": 93
},
{
"number": "95",
"title": "95. Precaution against noxious and flammable gas.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 94
},
{
"number": "96",
"title": "96. Safe distance.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 95
},
{
"number": "97",
"title": "97. Precautions against fire.",
"chapter": null,
"content": "(a) its exhaust pipe shall be insulated or sufficiently cooled and the end of the exhaust pipe shall be directed away from the well head; and\n(b) its exhaust manifold shall be shielded to prevent its contact with liquid or gas which might otherwise fall on it.\n(a) provide with an air intake shut-off valve with readily accessible remote control arrangement where a diesel engine is located within thirty metre of a well;\n(b) provide with water bath treater, heater treater and flare line, a suitable device for remote ignition of burners; and\n(c) ensure to effectively earth all plant, machinery and derricks for dissipation of any static electric charge.",
"footnote": "",
"is_definition": false,
"sort_order": 96
},
{
"number": "98",
"title": "98. Precautions during welding, cutting or grinding.",
"chapter": null,
"content": "(a) all flammable material, oil grease, oil-soaked earth are removed from the area;\n(b) no match, lighter, or smoking apparatus or any other source capable of igniting flammable gas is present at or around his place of work:\n(c) adequate precaution is taken to prevent fire being started by spark, slag or hot metal;\n(d) adequate number of suitable type of fire extinguishers and other fire fighting arrangements are made and kept readily available for immediate use;\n(e) when operation is carried out in confined space, adequate ventilation by mechanical means is constantly provided to prevent accumulation of flammable gas; and\n(f) when operation is carried out on pipeline which contain flammable fluid, the pipe be disconnected or blinded, the line be positively isolated, drained or purged with inert gas or water before hot work is undertaken and adequate precaution taken against build-up of pressure in the line while hot work is in progress:",
"footnote": "",
"is_definition": false,
"sort_order": 97
},
{
"number": "99",
"title": "99. Permit to work system for electrical installations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 98
},
{
"number": "100",
"title": "100. Fire-fighting equipment.",
"chapter": null,
"content": "(a) adequate water storage, pumping facility, hose and nozzle; and\n(b) adequate number of appropriate portable fire extinguishers at the derrick floor, main engine area, electrical machinery, mud tank area, diesel storage area and other vulnerable places.\n(a) provide fixed-roof storage tanks with fixed foam connections;\n(b) ensure that all installations, including well head area with Christmas tree, are easily accessible to facilitate external fire fighting assistance without any hindrance; and\n(c) ensure that adequate number of fire tenders and equipment are kept readily available at convenient locations for use in emergency.",
"footnote": "",
"is_definition": false,
"sort_order": 99
},
{
"number": "101",
"title": "101. Use of fire-fighting equipment.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 100
},
{
"number": "102",
"title": "102. Emergency plan.",
"chapter": null,
"content": "(a) fire;\n(b) blowout, explosion, ignition, influx of inflammable or noxious gas;\n(c) bursting of equipment, pipeline or uncontrolled escape of petroleum;\n(d) failure of structures;\n(e) chemical spillage;\n(f) natural calamities;\n(g) medical evacuation; and\n(h) any other emergencies.\n(a) the action to be taken in the event of any major accident including when and how the said action is to be taken;\n(b) organisation plan clearly stating the line of command and the responsibilities of each person involved in case of emergency situation;\n(c) equipment plan such as the make, type, capacity, location, field of operation, and operating procedure in respect of every equipment; and\n(d) strategy plan specifying the number of steps to be taken in any particular case of emergency.\n(a) alarm and communication system;\n(b) system of notifying the authorities;\n(c) the duties and responsibilities of each key personnel including measures to be adopted to avert or minimise the consequences of the emergency;\n(d) when and how the equipment shall be used and when and how the action shall be carried out;\n(e) help or information that would be available from associated and external agencies including Government agencies;\n(f) guidelines for terminating the action; and\n(g) plan for training of personnel and for mock-drills.\n(a) all equipment on the installation provided for compliance with the emergency plan is maintained in a reliable state under efficient working order and in good condition without repair; and\n(b) there is a written scheme prepared for the systematic examination of all emergency equipment by an independent competent person.\n(a) specify the nature and frequency of examination that may be carried out, before first use of the equipment on the installation and also after any modification or repair; and\n(b) review and modify the emergency plan periodically and in particular before any alteration is carried out and submit a copy thereof to the Regional Inspector.\nChapter- IX\nMachinery, Plant and Equipment",
"footnote": "",
"is_definition": false,
"sort_order": 101
},
{
"number": "103",
"title": "103. Use of certain machinery and equipment.",
"chapter": null,
"content": "(a) the appliance, equipment, machinery or other material that are used or may be used in the mine are of sound construction and of a type and specification conforming to an Indian or international standard identified for the purpose:\n(b) the code of practice and standard operating procedure for appliance, equipment, machinery or other material are complied with.",
"footnote": "",
"is_definition": false,
"sort_order": 102
},
{
"number": "104",
"title": "104. Use of mobile cranes.",
"chapter": null,
"content": "(a) a safe load indicator to give warning when overload occurs;\n(b) a load radius indicator to indicate appropriate safe working load and radius which is clearly visible to the operator of the crane;\n(c) motion limit device to limit hoisting, swinging and boom extending; and\n(d) effective audio visual alarm which shall get activated automatically whenever the crane is reversed.",
"footnote": "",
"is_definition": false,
"sort_order": 103
},
{
"number": "105",
"title": "105. Lifting appliance and gears.",
"chapter": null,
"content": "(a) the design, construction and installation of lifting appliance, gear and rope are in accordance with the standard specified by the Chief Inspector of Mines by a general or special order in writing; and\n(b) the selection of appliance and gear are suitable for the purpose for which they are intended for use and shall also be load tested for its rated capacity.",
"footnote": "",
"is_definition": false,
"sort_order": 104
},
{
"number": "106",
"title": "106. Classification of hazardous area.",
"chapter": null,
"content": "(a) a plan referred to in clause (b) of sub-regulation (1) of regulation 9 and also the different classes of hazardous zones of the mine, as classified under sub-regulation (1), shown in distinct colour wash, is maintained;\n(b) different classes of zones are distinctly marked at actual places in the field by suitable notice boards or other effective means; and\n(c) every person employed in the mine is made aware of the dangers associated and precautions to be taken in case of different classified hazardous zones.",
"footnote": "",
"is_definition": false,
"sort_order": 105
},
{
"number": "107",
"title": "107. Use of electrical equipment in hazardous area.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 106
},
{
"number": "108",
"title": "108. General provisions about construction and maintenance of machinery.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 107
},
{
"number": "109",
"title": "109. Maintenance system.",
"chapter": null,
"content": "(a) specify the nature and frequency of examination; and\n(b) provide for an examination to be carried out, where appropriate, before the machinery and equipment is first used on the installation and also after major modification or repair.\n(a) to assess its suitability for the purpose for which these are to be used;\n(b) to assess its actual condition; and\n(c) to determine any remedial measures.",
"footnote": "",
"is_definition": false,
"sort_order": 108
},
{
"number": "110",
"title": "110. Internal combustion engines.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 109
},
{
"number": "111",
"title": "111. Apparatus under pressure.",
"chapter": null,
"content": "(a) subject it to a hydraulic test at a pressure at least one and a half times of the maximum permissible working pressure and similar test shall be made after every renewal or repair and in any case at intervals of not more than five years or at such shorter intervals as may be required by the Regional Inspector; and\n(b) record the result of every such test which shall be countersigned and dated by the manager, deputy manager or installation manager.",
"footnote": "",
"is_definition": false,
"sort_order": 110
},
{
"number": "112",
"title": "112. Precautions regarding moving parts of machinery.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 111
},
{
"number": "113",
"title": "113. Engine rooms and exits.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 112
},
{
"number": "114",
"title": "114. Working and examination of machinery.",
"chapter": null,
"content": "Chapter - X\nGeneral Safety Provision",
"footnote": "",
"is_definition": false,
"sort_order": 113
},
{
"number": "115",
"title": "115. Code of practice.",
"chapter": null,
"content": "(a) safe operating procedures for the machinery or operation to which it relates to;\n(b) examination and testing of the machinery before first use after installation, re-installation, modification, alteration or repair;\n(c) schedule and nature of examination and testing of the machine, including its sub-assemblies, so as to ensure its safe operation; and\n(d) the manner in which the record of examination shall be kept.",
"footnote": "",
"is_definition": false,
"sort_order": 114
},
{
"number": "116",
"title": "116. Housekeeping.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 115
},
{
"number": "117",
"title": "117. General lighting.",
"chapter": null,
"content": "(a) where the natural lighting is insufficient;\n(b) derrick floor;\n(c) driller's stand and control panel;\n(d) monkey board;\n(e) every engine and pump house;\n(f) derrick sub-structure near blowout preventer controls;\n(g) every place where persons are to work; and\n(h) every means of escape, access or egress.",
"footnote": "",
"is_definition": false,
"sort_order": 116
},
{
"number": "118",
"title": "118. Electric lighting.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 117
},
{
"number": "119",
"title": "119. Standards of lighting.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 118
},
{
"number": "120",
"title": "120. Emergency lighting.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 119
},
{
"number": "121",
"title": "121. Supply and use of protective footwear.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 120
},
{
"number": "122",
"title": "122. Supply and use of protective helmet.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 121
},
{
"number": "123",
"title": "123. Protective equipment.",
"chapter": null,
"content": "(a) depending upon the risk, suitable protective equipment including respiratory protective equipment, eye protectors, gloves, overalls and aprons; and\n(b) suitable protective outer clothing for use in rain and extreme weather conditions.",
"footnote": "",
"is_definition": false,
"sort_order": 122
},
{
"number": "124",
"title": "124. Protection against noise.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 123
},
{
"number": "125",
"title": "125. Communication.",
"chapter": null,
"content": "(a) adequate precautions shall be taken to prevent signal and telephone wires coming into contact with other cables and apparatus;\n(b) the voltage used in any one circuit shall not exceed thirty volts;\n(c) contact-makers shall be so constructed as to prevent accidental closing of the circuit; and\n(d) bare conductors, where used, shall be installed in suitable insulators.",
"footnote": "",
"is_definition": false,
"sort_order": 124
},
{
"number": "126",
"title": "126. Safety while working at height.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 125
},
{
"number": "127",
"title": "127. Precautions against dust, toxic gases and ionizing radiations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 126
},
{
"number": "128",
"title": "128. Safety warning signs.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 127
},
{
"number": "129",
"title": "129. Protection against pollution of environment.",
"chapter": null,
"content": "(a) to create hazard to public health and safety;\n(b) to run into or contaminate any fresh water structure or body of water or to remain in a place from which it might contaminate any fresh water or body of water; and\n(c) to run over or damage any land, highway or public road.\n(b) the gas to be burnt, referred to in clause (a) shall be discharged from a flare line in the following manners, namely:-\n(i) flare-stack height shall be in accordance with the standards referred under sub-regulation (1);\n(ii) the flare-line shall be adequately anchored and provided with suitable means to prevent extinction of the flame; and\n(iii) when the gas-flow is intermittent, the flare-line shall be provided with a remote controlled electrical ignition device or any other suitable device to ensure continuous ignition of any gases.",
"footnote": "",
"is_definition": false,
"sort_order": 128
},
{
"number": "130",
"title": "130. Fencing.",
"chapter": null,
"content": "(a) provide the protected area surrounding every drilling or work-over rig with fence of not less than one metre and eighty centimetre in height;\n(b) provide permanent installation with protective wall of not less than one metre and eighty centimeter in height;\n(c) ensure that the well on land is securely fenced and gates are locked;\n(d) take precaution to prevent any unauthorised person from access to any place which has been duly fenced; and\n(e) ensure that every fence is examined once in every fourteen days by a competent person and a report of every such inspection is maintained at the site by the person who made the examination.",
"footnote": "",
"is_definition": false,
"sort_order": 129
},
{
"number": "131",
"title": "131. Safety Management Plan.",
"chapter": null,
"content": "(a) the requirements of the Act and of these regulations, bye-laws and orders made thereunder are complied with in relation to any activity or in connection therewith;\n(b) the Safety Management Plan shall be prepared in English and in Hindi, if English is not understood by the relevant employees;\n(c) an organizational structure is in place with the aim of ensuring safety and health performance;\n(d) the risk to safety and health are evaluated and measures are taken to reduce the risk to persons and damage to machinery or equipment likely to be affected;\n(e) appropriate control is in place to ensure promotion of safety and health;\n(f) it provides for-\n(i) safety manuals, rules and regulations;\n(ii) standard operating procedures for all critical activities;\n(iii) the identification of hazards and assessment of risks and measures to eliminate the identified hazards risks;\n(iv) inspection, testing and maintenance of the equipment and machinery;\n(v) the detail procedures for operational activities, pre-start up safety review mechanisms, work permit system, statutory trainings, mechanical integrity program, inspection and testing, incident investigation, off-the job safety, safety records, health hazard data;\n(vi) management of change related to process and equipment as per Oil Industry Safety Directorate Guidelines, that is, OISD-GDN-178;\n(vii) written action plan to implement employees' participation through safety committees;\n(viii) emergency preparedness and response plan;\n(ix) adequate communication and safety displays ;\n(x) any other matter that is necessary to ensure safety and occupational health of the personnel working in the mine;\n(xi) bridging document for contractual works;\n(xii) inspection, monitoring, audit, review, training and continual sustainable improvement as per applicable Indian or international standards and practices; and\n(xiii) any bother activity or operation which the Chief Inspector of Mines may specify in writing.\nChapter - XI\nMiscellaneous",
"footnote": "",
"is_definition": false,
"sort_order": 130
},
{
"number": "132",
"title": "132. Contractors, designer and service providers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 131
},
{
"number": "133",
"title": "133. General safety.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 132
},
{
"number": "134",
"title": "134. Safety and health education and instructions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 133
},
{
"number": "135",
"title": "135. Place of accident not to be disturbed.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 134
},
{
"number": "136",
"title": "136. Pointing out of contraventions detected during inspections.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 135
},
{
"number": "137",
"title": "137. Chief Inspector of Mines to exercise power of Regional Inspector.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 136
},
{
"number": "138",
"title": "138. Signing of Returns, Notices and Correspondence.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 137
},
{
"number": "139",
"title": "139. Reports, records and registers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 138
},
{
"number": "140",
"title": "140. Permissions, etc. granted by the manager.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 139
},
{
"number": "141",
"title": "141. Publication of orders, forms and instructions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 140
},
{
"number": "142",
"title": "142. Power to relax.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 141
},
{
"number": "143",
"title": "143. Appeal to Chief Inspector of Mines.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 142
},
{
"number": "144",
"title": "144. Appeal to Committee.",
"chapter": null,
"content": "Schedule\n[ See regulation 106]\n[ See regulation 106]\nClassification of Hazardous Area in Oil Mine\nClassification of Hazardous Area in Oil Mine\nA. Drilling and Work-Over Operations:\n(i) When the derrick is not enclosed and the sub-structure is open to ventilation, the area in all directions from the base of rotary table extending up to 3.0 metre shall be zone \"2\" hazardous area. Any cellars, trenches and pits below the ground level shall be zone \"1\" hazardous area; the area lying up to 3.0 metre in horizontal direction from the edge of any cellars, trenches on pit and 0.5 metre vertically above the cellars, trenches on pit shall be zone \"2\" hazardous area.\n(ii) When the derrick floor and substructure are enclosed, the enclosed substructure below the derrick floor, including collars, pits or sumps below the ground level, shall be zone \"1\" hazardous area; the enclosed area above the derrick floor shall be zone \"2\" hazardous area.\nThe free space above the level of mud in tank and channel shall be zone \"1\" hazardous area; the area in a radius of 3.0 metre in all direction from the edge of mud tank and channel shall be zone \"2\" hazardous area.\n(i) The area within a radius of 1.5 metre in all directions from the shale shaker in open air shall be zone \"1\" hazardous area. The area beyond 1.5 metre and up to 3.0 metre in all directions from the shale shaker shall be zone \"2\" hazardous area.\n(ii) When the shale shaker is located in an enclosure, the enclosed area shall be zone \"1\" hazardous area to the extent of the enclosure. The area outside the shale shaker and up to 1.5 metre in all directions from the shale shaker shall be zone \"2\" hazardous area.\nThe area within a radius of 1.5 metre from the open end of the vent extending in all directions shall be zone \"1\"; the area beyond 1.5 metre and up to 3 metre in all directions from the open end of vent shall be zone \"2\" hazardous area.\nThe area within a radius of 1.5 metre in all direction from the Desander and Desilter location in open air shall be zone \"2\" hazardous area.\nThe free space above the level of flammable liquid within the effluent pit on sump shall be zone \"1\" hazardous area; the free space lying up to 3.0 metre in hazardous direction form the edge of any effluent pit or sump and 5.0 metre vertically above the effluent pit or open sump shall be zone \"2\" hazardous area.\nB. Oil Wells.\nA well area below the ground level shall be zone \"1\" hazardous area; the area lying up to 3.0 metre in horizontal direction from the edge of any cellars, trenches or pit and 0.5metre vertically above the callers trenches on sump shall be zone \"2\" hazardous area.\n(i) The area in wells equipped with sucker-rod pump to 3.0 metre above the ground level up to 3.0 metre horizontal in all directions from the well head shall be zone - \"2\" hazardous area. In case of cellar, an area below the ground level shall be zone \"1\" hazardous area; the area lying up to 3.0 metre in horizontal direction from the edge of any cellars and 0.5 metre vertically above the cellars shall be zone \"2\" hazardous area.\n(ii) The area in wells equipped with submersible electric motor driven pump or hydraulic subsurface pump or gas lift wells shall be same as specified in clause B(1) when the well is provided with cellar or sump.\nThe area within a radius of 8.0 metre from an open discharge of petroleum bearing fluid from a well under production test shall be zone \"1\" hazardous area. The area beyond zone 1 hazardous area for a future distance of 8 metre in all directions shall be zone \"2\" hazardous area.\nThe area within a radius of 10.0 metre in all direction from a well-pulling and other such well servicing shall be zone \"2\" hazardous area:\nProvided that where cellar or sump is present, the area within the cellar or sump shall be zone \"1\" hazardous area and the area up to 3.0 metre in horizontal direction from the edge of any cellars or sump and 0.5 metre vertically above the cellar or sump shall be zone \"2\" hazardous area.\nThe area within a radius of 1.5 metre from open end of the vent extending in all direction shall be zone \"1\" hazardous area and area lying within a radius beyond zone \"1\" hazardous area up to 3.0 metre of the vent shall be zone \"2\" hazardous area.\nC. Oil and Gas Processing and Storage Equipment.\n(i) the area within a radius of 3.0 metre from any oil-gas separation vessel, fired vessel, dehydrator, stabiliser and hydrocarbon recovery unit shall be zone \"2\" hazardous area;\n(ii) any trench or pit below the ground level shall be zone \"1\" hazardous area and the area lying up to 3.0 metre in horizontal direction from the edge of any trench or pit and 0.5 metre vertically above the trench or pit shall be zone \"2\" hazardous area.\nThe area within a radius of 1.5 metre from open end of the vent extending in all direction shall be zone \"1\" hazardous area and area lying within a radius beyond zone \"1\" hazardous area up to 3.0 metre of the vent shall be zone \"2\" hazardous area.\nThe area within a radius of not less than 3.0 metre from discharge of a relief valve, extending in all direction shall be zone \"2\" hazardous area subject to the conditions that there shall be no electrical equipment in direct path of discharge from relief valve.\nThe area within a radius of 1.5 metre of pig launching or receiving trap extending in all direction shall be zone \"1\" hazardous area. The area lying beyond zone \"1\" hazardous area and up to a radius of 3.0 metre in all directions pig launching/ receiving trap shall be zone \"2\" hazardous area.\n(i) Where a pump handling flammable liquid or a gas compressor located in open air or under well ventilated shed without wells, the area lying up to 3.0 metre in all directions from the pump or compressor shall be zone \"2\" hazardous area.\n(ii) Where a pump or a compressor is located in an adequately ventilated building, the entire interior of such building including an area within 1.5 metre of the vent shall be zone \"2\" hazardous area.\n(iii) Pits, sumps, trenches below the ground level shall be zone \"1\" hazardous area and the area lying up to 3.0 metre in horizontal direction from the edge of any trench or pit and 0.5 metre vertically above the pits, sumps or trenches shall be zone \"2\" hazardous area.\n(i) In case of floating roof tank, the space above the floating roof and inside the enclosures up to top level of the enclosure wall shall be zone \"1\" hazardous area; the area beyond zone \"1\" hazardous area and up to a radius of 4.5 metre in all directions from tank shall and shell top shall be zone \"2\" hazardous area. In case of a dyke, zone \"2\" hazardous area shall extend vertically up to the height of the dyke and horizontally up to the physical boundary of the dyke.\n(ii) In case of fixed roof tank, the area inside the tank and within a radius of 1.5 metre from all opening including breather valve, dip hatch, thief hatch and safety valve shall be zone \"1\" hazardous area; the area zone \"1\" beyond hazardous area and up to a radius of 3.0 metre in all directions from tank shall and rood of the tank be zone \"2\" hazardous area. In case of a dyke, the sump in the dyke shall be zone \"1\" hazardous area and an area extending vertically up to a height of the dyke horizontally to the physical boundary of the dyke shall be zone \"2\" hazardous area.\nD. General.",
"footnote": "",
"is_definition": false,
"sort_order": 143
}
],
"metadata": {
"Act ID": "act3076",
"Act Number": "Published vide Notification No. G.S.R. 1029(E), dated 14th August, 2017",
"Enactment Date": "",
"Act Year": "2017",
"Short Title": "The Oil Mines Regulations, 2017",
"Type": "CENTRAL",
"Location": "India (Central)"
},
"updated_at": "2026-09-29 21:55:18"
}