(a) prepare and implement a well servicing plan or work-over plan for each well to be serviced, detailing all activities to be done during the operations and a copy of the plan shall be kept at well site;
(b) ensure that pre-work-over conference to examine and ensure safe operations and other related activities are held before commencement of well servicing operation,.
(c) ensure that the casing is hermetically test at a pressure at least ten percent higher than the formation pressure is conducted prior to perforation and before lowering completion assembly;
(d) ensure that well servicing operation is done under the direct supervision of a competent person authorised for the purpose.
(e) ensure that every person keeps clear of the wire line between the drum and floor block;
(f) ensure that every person remains at a safe distance from the bailing line during swabbing and scraping operations;
(g) ensure that a master gate valve and tubing hanger are pre-assembled and kept readily available at the well for immediate use in case the well kicks during pulling out or running in tubings;
(h) ensure that no well servicing operation is carried out at any livewell unless proper blowout preventer assembly is securely installed and maintained;
(i) ensure pressure and function testing of the blowout preventer assembly before commencement of well servicing operation;
(j) ensure that no tubing is pulled out of any well unless the well is properly killed.
Section 77 • The Oil Mines Regulations, 2017
77. Well servicing operations.
the-oil-mines-regulations-2017-sec-77.json
•
Section 77
{
"act_title": "The Oil Mines Regulations, 2017",
"act_slug": "the-oil-mines-regulations-2017",
"section_label": "Section",
"section": {
"number": "77",
"title": "77. Well servicing operations.",
"chapter": null,
"content": "(a) prepare and implement a well servicing plan or work-over plan for each well to be serviced, detailing all activities to be done during the operations and a copy of the plan shall be kept at well site;\n(b) ensure that pre-work-over conference to examine and ensure safe operations and other related activities are held before commencement of well servicing operation,.\n(c) ensure that the casing is hermetically test at a pressure at least ten percent higher than the formation pressure is conducted prior to perforation and before lowering completion assembly;\n(d) ensure that well servicing operation is done under the direct supervision of a competent person authorised for the purpose.\n(e) ensure that every person keeps clear of the wire line between the drum and floor block;\n(f) ensure that every person remains at a safe distance from the bailing line during swabbing and scraping operations;\n(g) ensure that a master gate valve and tubing hanger are pre-assembled and kept readily available at the well for immediate use in case the well kicks during pulling out or running in tubings;\n(h) ensure that no well servicing operation is carried out at any livewell unless proper blowout preventer assembly is securely installed and maintained;\n(i) ensure pressure and function testing of the blowout preventer assembly before commencement of well servicing operation;\n(j) ensure that no tubing is pulled out of any well unless the well is properly killed.",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
"prev_section": "76",
"next_section": "78"
}