{
    "act_title": "The Oil Mines Regulations, 2017",
    "act_slug": "the-oil-mines-regulations-2017",
    "section_label": "Section",
    "section": {
        "number": "77",
        "title": "77. Well servicing operations.",
        "chapter": null,
        "content": "(a) prepare and implement a well servicing plan or work-over plan for each well to be serviced, detailing all activities to be done during the operations and a copy of the plan shall be kept at well site;\n(b) ensure that pre-work-over conference to examine and ensure safe operations and other related activities are held before commencement of well servicing operation,.\n(c) ensure that the casing is hermetically test at a pressure at least ten percent higher than the formation pressure is conducted prior to perforation and before lowering completion assembly;\n(d) ensure that well servicing operation is done under the direct supervision of a competent person authorised for the purpose.\n(e) ensure that every person keeps clear of the wire line between the drum and floor block;\n(f) ensure that every person remains at a safe distance from the bailing line during swabbing and scraping operations;\n(g) ensure that a master gate valve and tubing hanger are pre-assembled and kept readily available at the well for immediate use in case the well kicks during pulling out or running in tubings;\n(h) ensure that no well servicing operation is carried out at any livewell unless proper blowout preventer assembly is securely installed and maintained;\n(i) ensure pressure and function testing of the blowout preventer assembly before commencement of well servicing operation;\n(j) ensure that no tubing is pulled out of any well unless the well is properly killed.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 76
    },
    "prev_section": "76",
    "next_section": "78"
}