(a) all permeable formations are isolated with cement plug;
(b) a cement plug of minimum length of fifty metre is placed at the bottom of the well or proper bridge plug;
(c) a cement plug of a minimum length of fifty metre is placed across the shoes of the surface casing or bridge plug;
(d) the cellar or pit around the well are filled up and the land shall be restored to the original level; and
(e) a bridge-plug above the top of perforations capped with a thirty metre cement plug is placed in case of cased well.
Chapter -VII
Transport by Pipeline
Section 80 • The Oil Mines Regulations, 2017
80. Plugging requirements for abandonment of wells.
the-oil-mines-regulations-2017-sec-80.json
•
Section 80
{
"act_title": "The Oil Mines Regulations, 2017",
"act_slug": "the-oil-mines-regulations-2017",
"section_label": "Section",
"section": {
"number": "80",
"title": "80. Plugging requirements for abandonment of wells.",
"chapter": null,
"content": "(a) all permeable formations are isolated with cement plug;\n(b) a cement plug of minimum length of fifty metre is placed at the bottom of the well or proper bridge plug;\n(c) a cement plug of a minimum length of fifty metre is placed across the shoes of the surface casing or bridge plug;\n(d) the cellar or pit around the well are filled up and the land shall be restored to the original level; and\n(e) a bridge-plug above the top of perforations capped with a thirty metre cement plug is placed in case of cased well.\nChapter -VII\nTransport by Pipeline",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
"prev_section": "79",
"next_section": "81"
}