← Back to The Oil Mines Regulations, 2017

79. Temporary closure of producing well.

(a) it shall be filled with mud or water or oil or salt solution or any special chemical so that the hydrostatic pressure of the fluid column over-balances the formation pressure to prevent leakage of petroleum at the wellhead;
(b) the control valves of the Christmas tree shall be completely closed and control wheels be removed;
(c) the Christmas tree shall be examined for leakage at least once in thirty days by a competent person authorised for the purpose and in case any leakage is detected during such examination, the competent person shall take immediate steps to stop it;
(d) a report of every such examination shall be recorded and maintained by the person who made the examination;
(e) the well head shall be preferably covered with suitably designed portable protective cover as a security measure.