{
    "act_title": "The Oil Mines Regulations, 2017",
    "act_slug": "the-oil-mines-regulations-2017",
    "section_label": "Section",
    "section": {
        "number": "79",
        "title": "79. Temporary closure of producing well.",
        "chapter": null,
        "content": "(a) it shall be filled with mud or water or oil or salt solution or any special chemical so that the hydrostatic pressure of the fluid column over-balances the formation pressure to prevent leakage of petroleum at the wellhead;\n(b) the control valves of the Christmas tree shall be completely closed and control wheels be removed;\n(c) the Christmas tree shall be examined for leakage at least once in thirty days by a competent person authorised for the purpose and in case any leakage is detected during such examination, the competent person shall take immediate steps to stop it;\n(d) a report of every such examination shall be recorded and maintained by the person who made the examination;\n(e) the well head shall be preferably covered with suitably designed portable protective cover as a security measure.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 78
    },
    "prev_section": "78",
    "next_section": "80"
}