52. Well control equipment and operation.

(a) well control fluid and equipment are available and installed and used as required;
(b) well is full of well fluid of adequate specific gravity to overbalance the bottom hole pressure;
(c) during tripping operation, closely watch to notice any sign of kick in the well and annulus is kept full;
(d) full opening safety valve with connection for circulation and operating key are readily available and kept in open position on the derrick floor;
(e) blow out preventer and related equipment like choke and kill manifold, control panel and accumulator are available, maintained and tested regularly;
(f) blow out preventer equipment is function-tested and pressure-tested when installed and also at the appropriate time during operations to determine that the blow out preventer functions properly;
(g) instructions of the blow out preventer operating manual of the manufacturer are complied with;
(h) all connections, valves, fittings, piping, and other equipment have a minimum working pressure equal to the rated working pressure of the blow out preventer;
(i) bolts, nuts and fittings of correct size are used and tightened to the recommended torque; and all connections are pressure-tested before resuming operation;
(j) all manually operated valves are equipped with hand wheels, and always kept ready for use; and
(k) pit drills are carried out regularly.