← Back to The Oil Mines Regulations, 2017

51. Mud tanks and pumps.

(a) the mud tanks are so designed and installed as to provide positive suction to mud pumps;
(b) the mud pumps connected to a drilling rig are equipped with a pressure relief valve and an operating gauge in the system;
(c) the pressure relief valve is set to discharge at a pressure not more than ten per cent in excess of the established maximum working pressure of the pump, pipes and fittings;
(d) the discharge from a pressure relief valve is piped to such a place which does not endanger persons and the discharge line is anchored securely; and
(e) there is no valve between a pump and its pressure relief valve.