50. Rigging-up and rig dismantling.

(a) the raising and installation of heavy load is performed during daylight hours unless adequate general lighting arrangement is provided at the place of work;
(b) every loose part and tool of the rig is securely fastened;
(c) guy lines, cat lines, snub lines and such other lines are not installed within six metre of any electric overhead transmission lines;
(d) the exhaust of internal combustion engine is provided with water quench or other effective spark arrestors;
(e) high pressure circulating fluid line and steam line are securely anchored;
(f) during rigging-up and rig dismantling, the wellhead is protected against damage from sliding or falling objects of the rig and associated material;
(g) the components from a loft including nuts, bolts and cleats are lowered safely to the ground either singly, bundled or in containers; and
(h) the code of practice for rigging-up and dismantling is framed and implemented and kept updated by a deputy manager or an installation manager authorised in this behalf.