← Back to The Oil Mines Regulations, 2017

91. Abandonment or discontinuation of pipeline.

(a) the pipeline section and facility are disconnected with positive isolation from all sources of supply prior to abandonment; and
(b) the pipeline system and facility to be abandoned are purged with nitrogen gas, inert materials or inhibited water and after purging, the ends of the pipeline are positively isolated.