← Back to The Oil Mines Regulations, 2017

130. Fencing.

(a) provide the protected area surrounding every drilling or work-over rig with fence of not less than one metre and eighty centimetre in height;
(b) provide permanent installation with protective wall of not less than one metre and eighty centimeter in height;
(c) ensure that the well on land is securely fenced and gates are locked;
(d) take precaution to prevent any unauthorised person from access to any place which has been duly fenced; and
(e) ensure that every fence is examined once in every fourteen days by a competent person and a report of every such inspection is maintained at the site by the person who made the examination.