Punjab Urban Planning and Development Building Rules, 2018

Punjab Urban Planning and Development Building Rules, 2018

Raw JSON API

Sections

1. Short titles, commencement and application.

Section 1

2. Definitions.

Section 2

3. Erection or re-erection without permission.

Section 3

4. Design and supervision.

Section 4

5. Application to erect or re-erect buildings (without self-certification).

Section 5

6. Preparation of building plans of Government Departments.

Section 6

7. Completion certificate.

Section 7

8. Occupation certificate.

Section 8

9. Power of the Competent Authority to sanction or refuse erection or re-erection.

Section 9

10. Presumption of sanction.

Section 10

11. Pre-approved building applications.

Section 11

12. Validity period of sanction.

Section 12

13. Submission of revised building plans in case of major alterations.

Section 13

14. Revocation of sanction.

Section 14

15. Maintenance of e-register for sanction/ Registration of Building Plans.

Section 15

16. Damp proof course certificate.

Section 16

17. Compliance of zoning plan/standard design/architectural control sheets and master plan/zonal plan.

Section 17

18. Compliance to Special Area development and control as per Master Plan/ Zonal Plan.

Section 18

23. Institutional.

Section 23

24. Public Buildings.

Section 24

25. Farm House.

Section 25

26. General Planning/ Development Norms.

Section 26

27. General Notes.

Section 27

28. Occupant Load.

Section 28

29. Clearance zone for buildings near High Tension Electrical Line.

Section 29

30. Part Building requirement.

Section 30

31. Fire protection.

Section 31

32. Structural design.

Section 32

33. Lighting and ventilation.

Section 33

34. Electrical and allied installations.

Section 34

35. Building Materials.

Section 35

36. Applicable provisions.

Section 36

37. Provisions and applicability.

Section 37

38. Energy efficiency.

Section 38

39. Provisions for tree plantation in new building sites.

Section 39

40. Roof Top Solar Photovoltaic Installation.

Section 40

41. Rainwater harvesting.

Section 41

42. Sustainable waste management .

Section 42

43. Applicable provisions.

Section 43

44. Integration of environmental conditions for building plan approval.

Section 44

45. Water Supply.

Section 45

46. Sewerage and Drainage.

Section 46

47. Risk Based Classification of building proposals.

Section 47

48. Registration of Plumbers.

Section 48

49. Grant of registration.

Section 49

50. Renewal of registration.

Section 50

51. Cancellation of registration certificate.

Section 51

52. Relaxation.

Section 52

53. Matters not covered under these rules.

Section 53

54. Repeal and saving.

Section 54

1. Site plan showing the position of site proposed to be built upon as required by these rules;

Section 1

2. Plans, elevations and sections as required by these with rules;

Section 2

3. Water supply, Drainage plans, scheme for fire safety and fire safety system and equipment, electrical scheme for air conditioning and air cooling, as required by these rules;

Section 3

4. Specifications of material of the proposed building;

Section 4

5. Copy of allotment letter/ Change of land use;

Section 5

6. Other document, as required.

Section 6

12. Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height);

Section 12

18. Certificate of conformity of design as per Punjab Energy Conservation Building Code,2016, if applicable, as per its notification.

Section 18

1. Foundations

Section 1

2. Walls

Section 2

3. Damp-proof course

Section 3

4. Floors

Section 4

5. Roofs

Section 5

6. Windows and Doors and other wood-work

Section 6

7. Steel work

Section 7

8. Internal finish

Section 8

9. External finish

Section 9

1. Name of Area ........... Road......... Building/Plot/ House No. ................

Section 1

2. Name of owner ................... Son of .................................

Section 2

3. Name of applicant ......................... Son of .........................

Section 3

4. Size of ferrule .................. Number of taps required.....................

Section 4

5. Name of registered Plumber through whom the work executed...................

Section 5

1. Name of Area ........... Road......... Building/ House No. ................

Section 1

2. Name of owner ................... Son of .................................

Section 2

3. Name of applicant ......................... Son of .........................

Section 3

4. Number of seat..................... Size of line ............................

Section 4

5. Name of registered Plumber through whom the work executed ................

Section 5

1. Hierarchy of roads with proper segregation of vehicular and pedestrian traffic.

Section 1

2. Traffic calming measures.

Section 2

3. Proper design of entry and exit points.

Section 3

4. Parking norms as per local regulation.

Section 4

1. Hierarchy of roads with proper segregation of vehicular and pedestrian traffic.

Section 1

2. Traffic calming measures.

Section 2

3. Proper design of entry and exit points.

Section 3

4. Parking norms as per local regulation.

Section 4

1. Waste management (solid and liquid)

Section 1

2. Water conservation and management

Section 2

3. Resource efficiency including Building materials

Section 3

4. Energy Efficiency and renewable energy

Section 4

5. Environmental planning including air quality management.

Section 5

6. Transport planning and management.

Section 6

1. A person having one year certificate in plumbing from any Industrial Training Institute recognized by the State Government; or

Section 1

2. A person registered as plumber with any local authority or statutory body of the Government of Punjab; or

Section 2

3. Ten years practical experience in sanitary installation with a firm of repute or under a registered plumber.

Section 3