{
    "id": 21843,
    "slug": "punjab-urban-planning-and-development-building-rules-2018",
    "title": "Punjab Urban Planning and Development Building Rules, 2018",
    "short_title": "Punjab Urban Planning and Development Building Rules, 2018",
    "act_number": "Published vide Notification No. G.S.R. 43/P.A.11/1",
    "act_year": 2018,
    "act_type": "STATE",
    "location": "Punjab",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "Punjab Urban Planning and Development Building Rules, 2018",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short titles, commencement and application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Definitions.",
            "chapter": null,
            "content": "(1) \"abut\" means to be positioned juxtaposed to a road, lane, open space, park, building in such a way that the outer face of any of the external walls or boundary of a building or plot touches a street or road boundary;\n(2) \"access or approach road\" means a clear approach to a plot or a building;\n(3) \"accessory use\" means any use of the premises subordinate to the principal use and customarily incidental to the principal use;\n(4) \"Act\" means the Punjab Regional and Town Planning and Development Act, 1995;\n(5) \"advertising\" means any surface or structure or structure with characters, letters or illustrations applied thereto and displayed in any manner whatsoever outdoors for the purpose of advertising or giving information or to attract the public to any place, person, public performance, article, or merchandise, and which surface or structure is attached to, forms part of , or is connected with any building, or is fixed to a tree or to the ground or to any pole, screen, fence or hoarding or displayed in a space, or in or over any water body included in the jurisdiction of the Authority;\n(6) \"air conditioning\" means the process of treating air so as to simultaneously control its temperature, humidity, purity, distribution and air movement and pressure to meet the requirements of the conditioned space;\n(7) \"alteration or addition or renovation\" means a structural change, such as an addition to the area or height, or the removal of part of a building, or any change to the structure, such as the construction of, cutting into or removal of any wall, partition, column, beam, joist, floor (including a mezzanine floor) or other support, or a change to or closing of any required means of ingress or egress or a change to the fixtures or equipment;\n(8) \"amenities\" means any one or more than one utilities such as roads, streets, open spaces, parks, recreational, grounds, play grounds, water and electric supply, street lighting, sewerage, drainage, public works and other utilities, services and conveniences ;\n(9) \"ancillary zone\" in the buildings means the building ancillary to and serving the main building and includes meter room, security room, Sewerage Treatment Plant, godown, guard room, cycle shed, dispensary, canteen, electric substation and labour quarters for watch and ward staff but shall not include residential accommodation for supervisory staff;\n(10) \"apartment\" whether called block, chamber, dwelling unit, flat, lot, premises, suite, tenement, unit by any other name, means a separate and self-contained part of any property, including one or more rooms or enclosed spaces, located on one or more floors, or, any part or parts thereof, in a building, or in a plot of land, used or intended to be used for residence, office, shop, showroom, or godown or for carrying on any business, industry, occupation, profession or trade, or for any other type of independent use ancillary to the purpose specified above and with a direct exit to a public street, road or highway or to a common area leading to such street road or highway, and includes any garage or room whether or not adjacent to the building in which such apartment is located, provided by the promoter for the use by the allottee for parking any vehicle or, as the case may be, for the residence of any domestic servant employed in such apartment;\nNote. - If a basement, cellar, garage, room, shop or storage space is sold separately from any apartment, it shall be treated as an independent apartment and not as part of any other apartment or of the common areas and facilities;\nNote.\n(11) \"applicant\" means a person who submits the application to the Competent Authority to erect or re-erect a building and also includes his legal representatives and authorized person;\n(12) \"application\" means an application made in such form as may be specified by the competent authority, by an owner or certified professional, who intends to develop, erect, re-erect or make alterations or additions in a plot or site or premises or part thereof, along with the requisite documents, for seeking approval of the Building or Service or Completion or Partial Completion Plans;\n(13) \"approved \" means approved Building Plans or Service Plans or Completion or Partial Completion Plans of a building by the Competent Authority under these rules;\n(14) \"Architect\" means a person holding a degree in Bachelor of Architecture from any recognised university or institute recognised by the Council of Architecture (COA) and has his name entered in the register of Council of Architecture for the time being, with a valid Council of Architecture Registration number. (CA/Year/Reg. No.)\n(15) \"architectural control and architectural control sheets\" means control of horizontal/vertical projections from the walls of the building and to restrict the height of any site exposed to the view from the street/road. Similarly, Architectural Control Sheets shall mean sheets/drawings with directions, signed and retained by the Competent Authority showing the measure of Architectural Controls, which shall be observed in the special areas;\n(16) \"assembly buildings\" means any building or part of a building, where at least fifty persons can congregate or gather for amusement, recreation, social, religious, patriotic, civil, travel and similar purposes, for example, theatres, motion picture houses, assembly halls, marriage palaces, auditoria, exhibition halls, museums, skating rinks, gymnasiums, recreation piers and stadia, hotels and restaurants, places of worship, dance halls, club rooms, passenger stations and terminal of air, surface and marine public transportation services or like activities if considered so by the competent authority;\n(17) \"atria or atrium\" means a large open air or skylight covered space surrounded by a building like an open central courtyard, or where floor slabs on several stories are cut through a middle to create a void connecting these stories;\n(18) \"Authority\" means the Authority which has been created by a statute and which, for the purpose of administering the Bye-Laws/Part, may authorize a committee or an official or an agency to act on its behalf; hereinafter called the 'Authority'. Authority can be the Punjab Urban Planning and Development Authority constituted under section 17 or the Special Urban Planning and Development Authority constituted under section 29 or the New Town Planning and Development Authority constituted under section 31 of the Punjab Regional and Town Planning and Development Act, 1995;\n(19) \"balcony\" means a horizontal projection from the wall cantilevered or otherwise, having a balustrade or railing or a parapet wall to serve as a passage or sit out place intended for human use;\n(20) \"barsati\" means a habitable single room on the roof of the building with or without kitchen and toilet;\n(21) \"basement\" means the storey which is next below the ground storey or which is in any part more than half of its height below the mean level of the street or ground adjoining the building;\n(22) \"bathroom\" means a room containing a bath or shower, washroom and a toilet;\n(23) \"boundary wall\" means a wall which is erected to enclose the site boundary, may also carry security;\n(24) \"bressummer\" means the beam of a girder that carries the load of wall of slab;\n(25) \"building\" means any structure for whatsoever purpose and of whatsoever materials constructed and every part thereof, whether used as human habitation or not and includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms, veranda, balcony, cornice or projection, part of a building or anything affixed thereto or any wall enclosing or intended to enclose any land or space and signs and outdoor display structures, tanks constructed or fixed for storage of chemicals/water/effluent, swimming pools etc. Tents, shamianas, tarpaulin shelters, etc, erected for temporary and ceremonial occasions with the permission of the Competent Authority, if required, shall not be considered as a building;\n(26) \"building envelope\" means the horizontal spatial limits up to which a building is/ or is to be constructed on a plot or site;\n(27) \"building height\" means the vertical distance measured in the case of flat roofs, from the average level of the front road and contiguous to the building or as decided by the Authority to the terrace of last liveable floor of the building adjacent to the external walls; and in the case of pitched roofs, up to the point where the external surface of the outer wall intersects the finished surface of the sloping roof; and in the case of gables facing the road, the mid-point between the eaves level and the ridge. Architectural features serving no other function except that of decoration shall be excluded for the purpose of measuring heights;\n(28) \"building line\" means a fixed line specified for a site beyond which no building within that site other than permitted projection and compound wall shall project;\n(29) \"building plans\" means plans showing the details of building with respect to its building footprint, building blocks, ground coverage, floor area ratio, total covered area, height, numbers of storeys, elevations, sections, setbacks, parking, boundary walls, gates and other building details as per these rules and submitted to the Competent Authority as enclosed with the application by the owner or professional engaged in construction of the said building for seeking approval thereof;\n(30) \"building regulations\" means the rules or bye-laws or regulations or Zoning regulations made under any law for the time being in force for the erection or re-erection of buildings or parts thereof;\n(31) \"building scrutiny fee\" means a fee to be charged or levied by the Competent Authority for approval of Building or Service Plan;\n(32) \"cabin\" means a non-residential enclosure constructed of non-load bearing partition;\n(33) \"canopy\" means a cantilevered projection from the face of the wall over an entry to the building at the lintel or slab level provided that:\n(i) it shall not be lower than 2.3 m when measured from the ground;\n(ii) it shall not project beyond the plot line;\n(34) \"cantilever\" means a long projecting structure, beam or girder fixed or supported at only one end and carries a load at the other end or along its length;\n(35) \"carpet area\" means the covered area of the usable rooms of a building or at any floor excluding the area of the walls;\n(36) \"chajja\" means a continuous cantilevered horizontal or sloping projection from the outer wall of the building primarily intended to give protection from weather;\n(37) \"chimney\" means an upright shaft containing one or more flues provided for the conveyance to the outer air of any product of combustion resulting from the operation of heat producing appliance or equipment employing solid, liquid or gaseous fuel;\n(38) \"clear height\" means height from the top surface of ground or any floor to the bottom of beam or ceiling, as the case may be;\n(39) \"commercial building\" means a building used or constructed or adapted to be used either ordinarily or occasionally as; multiplex, cinema, marriage palace, office, bank, hotel, restaurant, shop, shopping complex or a building primarily used for display and sale of merchandise or any similar purpose or any other building being used for commercial purpose;\n(40) \"commercial use\" means the use of any land or building or part thereof for purposes of commerce or for storage of goods, or as an office, though attached to any building;\n(41) \"common areas and facilities in relation to a building\" means all parts of the building or the land on which it is located and all easements, rights and appurtenances belonging to the land or the building, which are not in the exclusive possession of an apartment owner;\n(42) \"competent authority\" means any person or authority appointed by the State Government, by notification in the Official Gazette, to exercise and perform all or any of the powers and functions of the Competent Authority under these rules;\n(43) \"completion certificate\" means a Certificate issued by the Competent Authority on written request of the applicant or promoter after completion of building works includes finishing of all common services and utilities as provided in the approved Building Plans and Service Plans;\n(44) \"conservation\" means all the processes of looking after a place so as to retain its historical and/or architectural and/or aesthetic and/or cultural significance and includes maintenance, preservation, restoration, reconstruction and adoption or a combination of more than one of these;\n(45) \"construction\" means any erection of a structure or a building, including any addition or extension thereto either vertically or horizontally, but does not include, any reconstruction, repair and renovation of an existing structure or building, or, construction, maintenance and cleansing of drains and drainage works and of public latrines, urinals and similar conveniences, or, the construction and maintenance of works meant for providing supply of water for public, or, the construction or maintenance, extension, management for supply and distribution of electricity to the public; or provision for similar facilities for publicity;\n(46) \"conversion\" means the change from one occupancy to other occupancy or any change in building structure or part thereof resulting in a change of space and use requiring additional permission from the competent authority;\n(47) \"cooking alcove\" means a cooking space having direct access from the main room without any inter-communicating door;\n(48) \"courtyard\" means an area open to the sky but within the boundary of a plot, which is enclosed or partially enclosed by buildings, boundary walls or railings. It may be at ground floor level or any other level within or adjacent to a building;\n(49) \"covered area\" means the built-up area of the building(s) without deducting area of walls, projections, corridors and passage-ways, stairs, closets, toilets, columns, lifts and building shafts or other features;\n(50) \"damp proof course\" means a course consisting of some appropriate water proofing material provided to prevent penetration of dampness or moisture to any part of the structure from within or outside;\n(51) \"density\" means the number of persons per acre;\n(52) \"detached building\" means a building with walls and roofs independent of any other building and with open spaces on all sides within the same plot;\n(53) \"development works\" means internal development works and external development works;\n(54) \"dhaba\" means an eating joint building having single storey structure with temporary roof such as corrugated sheets or asbestos sheet or thatch;\n(55) \"drain\" means a conduit, channel or pipe for the carriage of storm water, sewage, waste water or other water borne wastes in a building drainage system;\n(56) \"drainage system\" means a system or a line of pipes, with their fittings and accessories, such as manholes, inspection chambers, traps, gullies, floor traps used for drainage of building or yards appurtenant to the buildings within the same cartilage; and includes an open channel for conveying surface water or a system for the removal of any waste water;\n(57) \"duct\" means an enclosed passage, channel, tube, canal, pipe or conduit by which a fluid, air, electric cables or other substance is conducted or conveyed;\n(58) \"dwelling unit\" means a building or a portion thereof which is designed or used or intended to be used wholly or partially for residential purposes for one family for habitation comprising of kitchen, toilet and a room at least;\n(59) \"dwelling unit area \" means an area of a dwelling excluding area of balconies or projections and common area such as staircase, lift lobby, corridor, public toilet;\n(60) \"educational building\" means a building exclusively used for a school or college, recognized by the appropriate Board or University, or any other Competent Authority involving assembly for instruction, education or recreation incidental to educational use, and including a building for such other uses as research institution or university. It shall also include quarters for essential staff required to reside in the premises, and building used as a hostel captive to an educational institution whether situated in its campus or outside;\n(61) \"enclosed staircase\" means a staircase separated by fire resistant walls and doors from the rest of the building;\n(62) \"engineer\" means a person holding any of the qualification eligible to become Associate Member of the Institution of Engineers;\n(63) \"erect or re-erect\" means any material alteration or enlargement of any building ; the conversion by structural alteration into a place for habitation of any building not originally constructed for human habitation; the conversion into more than one place for human habitation of a building originally constructed any such place; the conversion of two or more places of human habitation into a greater number of such places; such alterations of a building as effect an alteration of its drainage or sanitation arrangements, or materially affect its security; the addition of any rooms, buildings, out-houses or other structure to any building; the construction in a wall adjoining a street or a land not belonging to the owner of the wall, of a door opening on such street or land;\n(64) \"escalator\" means a power driven, inclined, moving stairway used for raising or lowering passengers;\n(65) \"existing building\" means a building or structure existing with or without the approval of the Competent Authority;\n(66) \"existing use\" means a use of a building or structure existing with or without the approval of the Competent Authority;\n(67) \"exit\" means a passage channel or means of egress from the building, its storey or floor to a street or, other open space of safety; whether horizontal, outside and vertical exits;\n(68) \"external wall\" means an outer wall of a building not being a party wall even though adjoining to a wall of another building and also means a wall abutting on an interior open space of any building;\n(69) \"factory\" has the same meaning as assigned to it in the Factories Act,1948 ;\n(70) \"fire and/or emergency alarm system\" means Fire alarm system comprises of components for manually or automatically detecting a fire, initiating an alarm of fire and initiating other actions as appropriate;\n(71) \"fire exit\" means a way out leading to an escape route having panic bar hardware provided on the door;\n(72) \"firefighting shaft (Fire Tower)\" means an enclosed shaft having protected area of 120 min fire resistance rating comprising protected lobby, staircase and fireman's lift, connected directly to exit discharge or through exit passageway with 120 min fire resistant wall at the level of exit discharge to exit discharge. These shall also serve the purpose of exit requirement/ strategy for the occupants. The respective floors shall be approachable from fire-fighting shaft enabling the fire fighters to access the floor and also enabling the fire fighters to assist in evacuation through fireman's lift. The fire fighting shaft shall be equipped with 120 min fire doors. The fire fighting shaft shall be equipped with firemen talk back, wet riser and landing valve in its lobby, to fight fire by fire fighters;\n(73) \"fire lift\" means a special lift designed for the use of fire service personnel in the event of fire or other emergency;\n(74) \"fire proof door\" means a door or shutter fitted to a wall opening, and constructed and erected with the requirement to check the transmission of heat and fire for a period;\n(75) \"fire resistant building\" means a building in which appropriate degree of fire resistance material is used;\n(76) \"fire separation\" means the distance in metres measured from the external wall of the building concerned to the external wall of any other building on the site, or from other site, or from the opposite side of a street or other public space for the purpose of preventing the spread of fire;\n[(77) \"flatted industry\" means a building 15m or more in height and constructed for industrial purpose;]\n(78) \"floor area gross\" means the area of the floor within the inside perimeter of the outside walls of the floor of the building under consideration without deduction for corridors and passage-ways stairs, closets, thickness of interior walls, columns, lifts and building shafts or other features;\n(79) \"floor\" means the lower surface in a storey on which one normally walks in a building, and does not include a mezzanine floor unless it is to be used for habitable purpose. The floor at ground level with direct access to a street or open space shall be called the ground floor; the floor above it shall be termed as first floor, with the next higher floor being termed as second floor, and so on upwards;\n(80) \"floor area ratio (FAR)\" means the quotient obtained by dividing the total covered area on all floors by the area of the plot: Floor Area Ratio (FAR) = Total Covered Area of all floors Plot Area\n(81) \"flue\" means a duct for smoke or waste gases produced by fire, a gas heater or a power station or other fuel burning installations from a furnace or fireplace to a chimney of a building;\n(82) \"frame control drawing\" means the numbered sheet of drawing signed by the Competent Authority and kept in his office defining boundaries of building plots, compulsory building lines, permissible heights of buildings to be realised in prescribed stages, site and floor coverage, restrictions on treatment of external facades including the permissible sizes of openings and such other restrictions on the development of sites as may be specified;\n(83) \"front setback\" means the peripheral area formed by the minimum horizontal distance between edge of the front building line and of the plot or site line facing it, within which any constructions other than exempted by the Competent Authority, are prohibited and is meant to provide light, air, ventilation and fire safety to the building and landscaping in the plot;\n(84) \"front\" as applied to a building means a portion facing the existing road or road proposed from the existing road from which the access to the building or project has been provided or as determined by the Competent Authority;\n(85) \"gallery\" means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor area, or additional seating accommodation and includes the structures provided for seating in stadia;\n(86) \"garage\" means a building or portion thereof, designed and used for parking of vehicles;\n(87) \"Government\" means the Government of the State of Punjab in the Department of Housing and Urban Development ;\n(88) \"ground coverage\" means built-up area at ground level prescribed as percentage to the total site area;\n(89) \"group housing\" means a building unit constructed or to be constructed with one or more floors having more than two dwelling units having common service facilities where land is owned jointly (as in the case of co-operative societies or the public agencies, such as local authorities or housing boards, etc) and the construction is undertaken by one Agency;\n(90) \"guest house\" means any premises or part of a premises with not more than seven rooms, providing lodging with/without boarding or with minimum nine rooms providing lodging without boarding;\n(91) \"habitable room\" means a room occupied or designed for occupancy by one or more persons for study, living, sleeping, eating, kitchen but not including bathrooms, water-closet compartments, laundries, serving and store pantries, corridors, cellars, attics, and spaces that are not used frequently or during extended periods;\n(92) \"heritage building\" means and includes any building of one or more premises or any part thereof and/or structure and/or artifact which requires conservation and/or preservation for historical and/or architectural and/or artisanry and/or aesthetic and/or cultural and/or environmental and/or ecological purpose and includes such portion of land adjoining such building or part thereof as may be required for fencing or covering or in any manner preserving the historical and/or architectural and/or aesthetic and/or cultural value of such building;\n(93) \"heritage precincts\" means and includes any space that requires conservation and/or preservation for historical and/or architectural and/or aesthetic and/or cultural and/ or environmental and/or ecological purpose. Walls or other boundaries of a particular area or place or building or may enclose such space by an imaginary line drawn around it;\n(94) \"hospital\" means a building where indoor patients are admitted and various types of clinical or surgical procedures are carried out;\n(95) \"hostel\" means a building which provides food and lodging to a specific group of people such as students, workers etc., where the guest can rent a bed in single or shared room or dormitory, and share a bathroom, lounge and kitchen;\n(96) \"hotel\" means any premises or part of a premises having more than eight rooms, which are commercially let out, and providing lodging, with or without board, or serving any kind of eatables or beverages or other services, by way of business, for a monetary consideration and having at least one restaurant with a capacity of a minimum thirty guests or a bar or a banquet hall;\n(97) \"hazardous building\" means any building or part thereof which is used for the storage, handling, manufacture or processing of highly combustible or explosive materials or products which are liable to burn with extreme rapidity or which may produce poisonous fumes or explosions for storage, handling, manufacturing or processing which involve highly corrosive, toxic or noxious alkalis, acids or other liquids or chemicals producing flame, fumes and explosive, poisonous, irritant or corrosive gases; and for the storage, handling or processing of any material producing explosive mixtures of dust which result in the division of matter into fine particles subject to spontaneous ignition;\n(98) \"illuminated exit signs\" means a device for indicating the means of escape during normal circumstances and power failure;\n(99) \"independent floors\" means a building used or intended to be used for residential purpose, where every floor of the building is a separate and independent dwelling unit with common stair and services;\n(100) \"industrial building\" means a building used or constructed or adapted to be used either ordinarily or occasionally for fabrication, assembly, manufacturing or processing of products or materials of all kinds;\n(101) \"information technology(IT)\" means a building used or constructed or adapted to be used for Software architecture design and development, software maintenance and implementation, operation of software systems, provision of software services, management of data bases, maintenance of computer networks and telecommunication networks, network services, network administration, business process out sourcing or providing information technology enabled services;\n(102) \"information technology enabled services\" means digital communication services, digital information content provision, digital data base management and updation, remote digital office services, software operations and other information work that relies primarily and substantially on digital communication including data centres, call centres and back offices operations using Information Technology but not direct sales and marketing;\n(103) \"institutional building\" means a building constructed by Government, Semi- Government Organizations or Registered Trusts or any private person/organization and is used for medical or other treatment, or for an auditorium or complex for cultural and allied activities or for an hospice, care of persons suffering from physical or mental illness, handicap, disease or infirmity, care of orphans, abandoned women, children and infants, convalescents, destitute or aged persons and for penal or correctional detention with restricted liberty of the inmates ordinarily providing sleeping accommodation and includes dharamshalas, hospitals, sanatoria, custodial and penal institutions such as jails, prisons, mental hospitals, houses of correction, detention and reformatories etc. It shall also include quarters for essential staff required to reside in the premises, and building used as a hostel captive to an institution whether situated in its campus or outside;\n(104) \"intermittent floor\" means a floor left vacant in high rise building(s) for evacuation, play area or green area;\n(105) \"layout plan\" means a plan of the entire site showing location of plots or building blocks, roads, open spaces, entry or exit, parking, landscaping etc. indicating activity of all land or part of it;\n(106) \"ledge or tand\" means a shelf-like projection, supported in any manner whatsoever, except by means of vertical supports within a room itself but not having projection wider than 1 meter;\n(107) \"lift\" means an appliance designed to transport persons or materials between two or more levels in a vertical or substantially vertical direction by means of a guided car or platform. The word 'elevator' is also synonymously used for 'lift';\n(108) \"lift lobby\" means a space from which people directly entered a lift car(s) and into which people directly enter upon exiting a lift car(s) ;\n(109) \"lobby\" means a covered space in which all the adjoining rooms open;\n(110) \"loft\" means an intermediate space between two floors on a residual space with maximum height of 1.5 metres and which is constructed or adopted for storage purposes only;\n(111) \"louvere\" means a window blind or shutter with horizontal slats that are angled to admit light and air, but to keep out rain and direct sunshine, the angle of which may be adjusted, usually in blinds and windows or may be fixed;\n(112) \"lower ground floor\" means a floor which is more than half of its height above the mean ground level and rest of the height below the mean ground level;\n(113) \"marriage palace\" means premises built up or open or both or any part thereof, where accommodation or space is used for marriage, receptions, social gatherings, meetings on regular or periodical or occasional basis and where atleast fifty persons can congregate or gather;\n(114) \"means of egress\" means a continuous and unobstructed way of travelling or escape route provided in a building for safe evacuation of occupants;\n(115) \"mechanical parking\" means a parking system designed to minimise the total area required for parking the vehicles by adopting methods like multi-storey garages, automated parking system, stack parking etc. and are generally powered by hydraulic or electrical instruments;\n(116) \"mechanical ventilation\" means supply of outside air either by positive ventilation or by infiltration by reduction of pressure inside due to exhaust of air, or by a combination of positive ventilation and exhaust of air;\n(117) \"mezzanine floor\" means an intermediate floors between two floors of any storey forming an integral part of floor below;\n(118) \"mixed occupancy or mixed use of building\" means a buildings in which more than one occupancy or use is present;\n(119) \"motel\" means a roadside hotel designed primarily for motorists or travellers with lodging and parking facilities on short term basis, typically having rooms arranged in low blocks with parking directly outside but adjacent to the rooms may have small amusement facilities also;\n(120) \"multi-level car parking\" means a building partly or wholly below ground level having two or more basements or multiple stories above ground level, primarily to be used for parking of cars, scooters or any other type of light motorized vehicle;\n(121) \"multiplex\" means an integrated entertainment and shopping centre having at least four cinema halls, each having minimum occupancy of 100 seats with total minimum seating capacity of one thousand seats;\n(122) \"miniplex\" means an integrated entertainment and shopping centre having maximum four cinema halls with maximum total seating capacity not exceeding 999 seats;\n(123) \"multi-storeyed building or high rise building\" means a building above four stories, or a building of fifteen meters or above in height;\n(124) \"natural ventilation\" means supply of outside air into a building through window or other openings due to wind outside and convection effects arising from temperature or vapour pressure differences (or both) between inside and outside of the building;\n(125) \"nursing home\" means a building where persons suffering from illness, injury or infirmity are usually received or accommodated or for both the purposes, for the purpose of observation, nursing and treatment with number of beds upto ten, it may include a maternity home;\n(126) \"occupancy\" means the main purpose for which a building or a part of building is used or intended to be used;\n(127) \"occupancy or use of building\" means the principal occupancy or use for which a building or a part of a building is intended to be used. For the purposes of classification of a building according to occupancy, occupancy shall also include the subsidiary occupancies which are contingent upon it;\n(128) \"occupation certificate\" means a certificate issued by the competent authority to occupy a building or part of the building or any portion whatsoever,\n(129) \"occupant load\" means maximum numbers of persons that might occupy a building or portion thereof at any one time;\n(130) \"open space\" means an area forming an integral part of a site left open to the sky;\n(131) \"orientation\" means the positioning of a building in relation to seasonal variations in the sun's path as well as prevailing wind patterns;\n(132) \"owner\" means the person or body having a legal interest in land or building thereon. This includes free holders, leaseholders or those holding a sub-lease which both bestows a legal right to occupation and gives rise to liabilities in respect of safety or building condition. In case of lease or sub-lease holders, as far as ownership with respect to the structure is concerned, the structure of a flat or structure on a plot belongs to the allottee or lessee till the allotment/lease subsists;\n(133) \"parapet\" means a low wall or railing built along the edge of a roof or floor;\n(134) \"parking\" means a space enclosed or unenclosed, to park vehicles together with a driveway connecting the parking space with a street permitting ingress and egress of the vehicles;\n(135) \"partial completion certificate\" means a certificate or approval issued by the Competent Authority to the application submitted by the owner or professional engaged in construction of part of the said building along with the partial completion plans and other requisite documents and after the satisfaction of panel of the officials that this part of building is constructed on site as the approved building plans, in such cases where a project has not been completed at one stretch but constructed in different stages but fulfils the minimum area and other conditions;\n(136) \"partition\" means vertical division of space between two areas in a building with an interior non-load bearing barrier, either one storey or part-storey in height;\n(137) \"partition wall\" means a wall forming part of a building and being used or constructed to be used in any part of the height or length of such wall for separation of adjoining buildings belonging to different owners or constructed or adopted to be occupied by different persons; or a wall forming part of a building and standing in any part of the length of such wall, to a greater extent than the projection of the footing on one side or ground of different owners;\n(138) \"party wall\" means a wall partly constructed on one plot of land, and partly on an adjoining plot and serving both structurally;\n(139) \"PECBC\" means the Punjab Energy Conservation Building Code, 2016 amended from time to time;\n(140) \"pergola\" means set of beams spaced apart without sheet or slab and not to be considered as covered area;\n(141) \"permission or permit\" means a valid permission or authorization in writing by the competent authority to carryout development or a work regulated by these rules;\n(142) \"person\" includes a company, firm, co-operative society, joint family and an incorporated body of persons;\n(143) \"plinth\" means the portion of a structure between the surface of the surrounding ground and surface of the floor, immediately above the ground;\n(144) \"plinth area\" means the built up covered area measured at the floor level of the basement or of any storey;\n(145) \"plinth level\" means the level of the ground floor of a building with respect to the crown of front street;\n(146) \"plot or site\" means a parcel or piece of land enclosed by definite boundaries;\n(147) \"plotted development\" means a type of development layout wherein a stretch of developed land is divided into regular sized plots for uniform controlled building volumes;\n[(147A) \"plotted industry\" means a building below 15m in height and constructed for industrial purpose;] .\n(148) \"plumber\" means a person holding any of the qualifications specified in the Schedule and registered as such under these rules;\n(149) \"podium\" means a horizontal projection (platform) extending beyond the building footprint on one or more sides, and may consist of one or more levels;\n(150) \"podium parking\" means parking of vehicles provided under podium of a building;\n(151) \"porch\" means a covered structure supported on pillars or otherwise for the purpose of pedestrian or vehicular approach to a building;\n(152) \"preservation\" means and includes maintaining the fabric of a place in its existing state and retarding deterioration;\n(153) \"prohibited area\" means any area specified or declared to be a prohibited area under The Punjab Land Preservation Act, 1900 or the Forest Area or Defence Area or under section 20A of the Ancient Monuments and Archaeological Sites and Remains Act, 2010 or any area declared by the State or Central Government for any purpose under any statute;\n(154) \"projection\" means a cantilevered horizontal slab from the wall of a building;\n(155) \"protected monument\" means an ancient monument which is declared to be of national importance by or under the Ancient and Historical Monuments and Archaeological Sites and Remains Act, 2010, or by section 126 of the States Reorganisation Act, 1956;\n(156) \"public building\" means a building used or constructed or adapted to be used either ordinarily or occasionally as a place open to general public and it includes a hospital, college, school, restaurant, theatre, public concert room, public lecture room, marriage palace, public exhibition hall or as a public place of assembly or entertainment for persons admitted there to by tickets or otherwise, or used or constructed or adapted to be used either ordinarily or occasionally for any similar public purposes;\n(157) \"public sewer\" means a sewer laid by the Government or any Authority;\n(158) \"rain water harvesting\" means the process of harvesting of rainwater, which involves the collection of water from the surface(s) on which rain falls and subsequently storing this water for direct use or can be recharged into the underground aquifers;\n(159) \"rain water pipe\" means a pipe or drain situated wholly above ground and used or constructed to be used solely for carrying off rain water directly from roof surfaces;\n(160) \"ramp\" means a sloping surface joining two different levels, as at the entrance or between different floors of a building;\n(161) \"reconstruction\" means and includes returning a place as nearly as possible to a known earlier state and distinguished by the introduction of materials (new or old) into the fabric. This shall not include either recreation or conjectural reconstruction;\n(162) \"refuge area or floor\" means a location in a building or floor in a high rise building/ block/ tower designed to hold occupants during a fire or other emergency, when evacuation may not be safe or possible and where occupants can wait until rescued or relieved by fire fighters;\n(163) \"rental housing\" means a building to be used for providing accommodation on rental basis and having facilities like kitchen with dining, common room for entertainment or indoor games, first aid room, laundry, security guard room;\n(164) \"residential building\" means a building in which sleeping and living accommodation is provided for normal residential purposes, with cooking facilities and includes one or more family dwelling units, apartment houses, flats and private garages of such buildings;\n(165) \"restoration\" means returning the existing fabric of a place to a known earlier state by removing accretions or by reassembling existing components without introducing new materials;\n(166) \"road or street\" means any highway, street, lane, pathway, alley, stairway, passageway carriageway, footway, square, place or bridge whether a thorough-fare or over which the public have a right of passage or access or have passed and have access uninterruptedly for specified period, whether existing or proposed in any scheme and includes all bends, channels, ditches, storm water drains, culverts sidewalks, traffic islands, roadside trees and hedges, retaining walls fences, barriers and railing within the street lines;\n(167) \"road or street level or grade\" means the officially established elevation or grade of the centre line of street upon which a plot fronts, and if there is no officially established grade, the existing grade of street at its mid-point;\n(168) \"road or street line\" means the line defining the side limits of a road or street;\n(169) \"road width\" means the whole extent of space within the boundaries of a road, when applied to a new road/street as laid down in the city survey or development plan or prescribed road lines by any law and measured at right angles to the course or intended course of direction of such road;\n(170) \"room height\" means the vertical distance measured from the finished floor surface to the finished ceiling surface. Where a finished ceiling is not provided, the underside of the joists or beams or tie beams shall determine the upper point of measurement;\n(171) \"row buildings\" means a row of buildings with only front, rear and interior open spaces;\n(172) \"self-certification\" means seeking approval of building plans duly prepared and certified by Architect himself on behalf of the owner of the building and shall be responsible if there is any contravention of relevant building rules or from the approved plans, zoning plan and as per parameters/ policies issued by the Competent Authority from time to time;\n(173) \"semi-detached building\" means a building detached on three sides with open space as specified in these rules;\n(174) \"service apartments\" means a fully furnished apartment available for both short term as well as long term stays, is provided with minimum a habitable room and provided with facilities or amenities including parking area and 24 hour front desk service;\n(175) \"service floor\" means the floor of a building with maximum height of 2.4 metres, where service equipment, such as utility lines and various machinery are located;\n(176) \"service plans\" means the plans showing the details of building and plumbing services and also plans, elevations and sections of private water supply, sewage disposal system, rain water harvesting, if any, and other services and submitted to the Competent Authority as enclosed with the application by the owner or professional engaged in construction of the said building for seeking approval thereof;\n(177) \"service road\" means a road/lane provided at the front, rear or side of a plot for service purpose;\n(178) \"service zone\" means a zone on the terrace for services related to building;\n(179) \"service studio\" means studio consisting of one room, and a bathroom available for short or long-term stay. The building consisting of serviced studios shall provide amenities like laundry space, common kitchen, common room for indoor games or entertainment. It shall be permissible in shopping arcades or projects in Municipal areas;\n(180) \"setback\" means the peripheral area formed by the minimum horizontal distance between edge of the property line of the plot/site and building or part thereof facing it, within which any constructions other than exempted by the Competent Authority, are prohibited and is meant to provide light, air, ventilation and fire safety to the building and landscaping in the plot;\n(181) \"sewage drain\" means a drain for conveying solid or liquid filth and waste liquids, such conduit or pipe being the property of or vested in the Government or public authority responsible for the disposal of such sewage;\n(182) \"site corner\" means a site at the junction of and fronting on two or more intersecting roads or streets/open space;\n(183) \"site depth\" means horizontal distance between the front and rear site boundaries;\n(184) \"site plan\" means a detailed Plan showing the proposed placement of structures, parking areas, open space, landscaping, and other development features, on a parcel of land, as required under these rules;\n(185) \"site with double frontage\" means a site other than corner plot having frontage on two streets;\n(186) \"sky bridge or skywalk\" means an elevated path-way consisting of an enclosed or covered bridge between two or more building blocks of a site/ plot, in order to protect the pedestrians from weather;\n(187) \"solar panel\" means a panel which absorb the sunlight as a source of energy to generate electricity or heat;\n(188) \"special area\" means the areas shown as such on the Zoning Plan;\n(189) \"special building\" means any building of special nature, which is not covered under the category of buildings mentioned in these rules;\n(190) \"spiral staircase\" means a staircase forming winding curve around a central point or axis;\n(191) \"staircover (or mumty) \" means a structure with a roof covering a staircase and its landing built to enclose only the stairs for the purpose of providing protection from weather and not used for human habitation;\n(192) \"standalone project\" means any project which is independent with regard to its location, approach and is not a part of any other project;\n(193) \"stilt\" means poles, posts or pillars or columns used to allow a structure or building to stand at a distance above the ground and which is of non-habitable height;\n(194) \"storage and warehouse building\" means a building used or constructed or adapted to be used either ordinarily or occasionally for the storage or sheltering of goods, wares, merchandise or any other similar activity, including servicing, processing or repairs incidental to such storage;\n(195) \"storey\" means the portion of a building included between the surface of any floor and the surface of the floor next above it, or if there be no floor above it, then the space between any floor and the ceiling next above it.\n(196) \"storm water drain or rain water drain\" means a drain used or constructed to be used solely for conveying to any sewer (either directly or through another drain) any rain water of roofs or grounds surfaces either paved or unpaved but shall not include a rain water pipe;\n(197) \"Structural Engineer\" means a person holding the minimum qualifications for a Structural Engineer i.e. Graduate in Civil Engineering of recognized Indian or foreign university, or Corporate Member of Civil Engineering Division of Institution of Engineers (India), and with minimum 3 years experience in structural engineering practice with designing and field work;\n(198) \"structural wall\" means a load bearing wall or a wall that carries load in addition to its own load;\n(199) \"studio apartments\" means a self-contained apartment having, single bedroom with bathroom and kitchenette with or without living room;\n(200) \"Supervisor\" mean a person who shall have minimum qualifications of Diploma in Civil Engineering or Architectural Assistantship, or the qualification in architecture or engineering equivalent to the minimum qualification prescribed for recruitment to non-gazetted service by the Government of India plus 5 years' experience in building design, construction and supervision;\n(201) \"sub-soil drain\" means a drain used or constructed to be used solely for conveying to any sewer (either directly or through another drain) any water that may percolate through the sub-soil;\n(202) \"sun-shade\" means a slope or horizontal or vertical structure over hanging, usually provided over openings on external wall to provide protection from sun and rain and shall not be used for human habitation;\n(203) \"surface drainage\" means arrangement of removal of water that collects on land surface;\n(204) \"temporary building\" means a building built of un-burnt bricks, burnt bricks without mortar, corrugated iron, bamboo, thatch, wood board or plywood but shall not include building built of burnt bricks, cement blocks or stones laid in mortar;\n(205) \"Town Planner\" means a person holding a graduate or post-graduate degree in Urban and Regional Planning/Town and Country Planning with valid Associate Membership of the Institute of Town Planners, India;\n(206) \"travel distance\" means the distance to be travelled from any point in a building to a protected escape route, external escape route or final exit;\n(207) \"underground or overhead tank\" means an installation constructed or placed for storage of water;\n(208) \"ventilation\" means supply of outside air into or the removal of inside air from an enclosed space either naturally or mechanically or both, so as to improve the general environment of the building;\n(209) \"verandah\" means a covered area with at least one side open to the outside with the exception of 1.2 metre high parapet on the upper floors to be provided on the open side;\n(210) \"villa\" means a single family house with one kitchen only;\n(211) \"water closet (W.C) \" means a water flushed plumbing fixture designed to receive human excrement directly from the user of the fixture. The term is used sometimes to designate the room or compartment in which the fixture is placed;\n(212) \"wholesale building\" means a building wholly or partly engaged in wholesale trade and manufacture, wholesale outlets, including related storage facilities, warehouses and establishments engaged in truck transport, including truck transport booking agencies;\n(213) \"window\" means a window opening to the outside other than a door, which provides all or part of the required natural light or ventilation or both to an interior space and not used as a means of egress or ingress;\n(214) \"zoned area\" means the horizontal spatial limits up to which a building may be permitted to be constructed on a plot or site; and\n(215) \"zoning plan\" means the plan approved by the Competent Authority showing the streets, boundaries of building site open spaces position, permissible heights, permissible uses of land and building site coverage and such other restrictions/provisions on the use and development of land or buildings.\nPART-II\nProcedure of Submission Of Applications for Building Plan, Completion Certificate And Occupation Certificate",
            "footnote": "",
            "is_definition": true,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Erection or re-erection without permission.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Design and supervision.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Application to erect or re-erect buildings (without self-certification).",
            "chapter": null,
            "content": "(i) Ownership documents-lease deed/ sale deed or possession letter in the name of owner issued by the allotment authority or permission to use the land issued by Competent Authority;\n(ii) Site plan as detailed in sub- rule (2) of rule 0;\n(iii) Hard copy of Building plan and other plans along with an un-editable Compact Disc/ DVD or any other electronic medium permissible by the Competent Authority from time to time containing the drawings in \".dwg\" format as detailed in sub- rule (3) of rule 0;\n(iv) Details of specifications of the work to be executed in Form 'C' (Annexure 3);\n(v) Structural safety drawings (for record) as per Form 'B' (Annexure 2);\n(vi) Fire safety design as required under Part IV, Fire and Life Safety of National Building Code of India, 2016, as amended from time to time, if applicable;\n(vii) Heating, Ventilation, Air-Conditioning (H.V.A.C.) service plan wherever required;\n(viii) Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height) in the relevant Form 'B'(Annexure 2);\n(ix) Public health services plan in un-editable compact Disc/ DVD or any other electronic medium, containing drawings in \".dwg\" format;\n(x) Scrutiny fees (non-refundable) shall be deposited in favour of Competent Authority through any prescribed payment mode, at the rate as described below:\nTable 1: Scrutiny fees for building plan\n\t\t\t\tapproval\nTable 1: Scrutiny fees for building plan\n\t\t\t\tapproval\nType of Building\nType of Building\nRate in Rupees Per Square meter of the Total Covered Area of\n\t\t\t\tthe Proposed Building\nRate in Rupees Per Square meter of the Total Covered Area of\n\t\t\t\tthe Proposed Building\nResidential\n30\nCommercial buildings and other Public Buildings\n60\nConstruction of boundary wall of plots having\n\t\t\t\tarea more than 1000 sq.mt.\n@Rs. 10 per running meter of the boundary wall.\nNo scrutiny fees for building plan approval of\n\t\t\t\tschool/care centre for disabled persons / mentally challenged\n\t\t\t\tpersons, orphanage and old age home shall be chargeable.\nNote. - (a) The applicant shall submit all kind of plans in electronic format on the online portal of Competent Authority along with hard copies of the plans. Competent Authority shall convey objections/ observations or sanction/ refusal through online portal or as prescribed mode.\nNote.\n(b) Every person applying under this rule shall appoint an Architect/ Engineer for drawing up of building plans/ structural drawings and for the supervision of erection or re-erection of the building. The supervision of erection or re-erection of residential or commercial building up to 15 metres height (G+3 floors including stilt) may be undertaken by the Architect or the Engineer. However, in case of buildings of 15 meters or above height (including stilt), the supervision shall be undertaken by both the Architect and the Engineer. During construction, if appointed Architect/ Engineer notices that violation (except compoundable) are going on, he shall intimate the owner and advise him to stop further construction and remove the violation and will also intimate to the concerned authority.\n(c) The applicant, the Architect and Engineer shall sign the application, plans, structural drawings, specifications and the certificates as required in the relevant forms and documents, before making submission to Competent Authority.\n(d) In case of row type or semi-detached building at the time of re-erection of building the owner shall provide an indemnity bond as per Annexure 21 that in case of any damage caused to the adjoining property during construction, the owner will be bound to get the damages repaired to the satisfaction of the neighbour.\n(1) Size of drawing sheets and colouring of plans.\nTable 2: Size\n\t\t\t\tof drawing sheets\nTable 2: Size\n\t\t\t\tof drawing sheets\nSr. No.\nSr. No.\nSheet name\nSheet name\nSheet size (in mm)\nSheet size (in mm)\nI.\nA0\n841 X1189\nII.\nA1\n594 X 841\nIII.\nA2\n420X594\nIV.\nA3\n297 X 420\nNote. - [(a) All dimensions in plan can be indicated in metric units or feet inches.] .\nNote.\n(b) Various elements of plans (site and building), elevation, section and details shall be shown in different colours and thickness/ type of line, etc., and shall be preferably prepared in layers and as per Bureau of Indian Standard (BIS) Code.\n(c) The prints of drawings shall be on one side of paper only.\n(2) Site plan.\n(i) Boundaries of the site and any contiguous features;\n(ii) Direction of the north point relative to the site of the building;\n(iii) Streets or roads adjoining the site with their width clearly dimensioned and names, if any, giving also all existing roads, trees, lamp posts or any other feature or structure likely to affect the approach to the building;\n(iv) Outlines of the proposed building;\n(v) Immediate neighbours on all sides identified, whether buildings or vacant plots;\n(vi) Levels of the site and the plinths of the building in relation to those of the neighbouring roads and also the level of courtyard and open space;\n(vii) Area calculations such as ground coverage, Floor Area Ratio and Non Floor Area Ratio area, parking calculations, any other relevant calculations as required;\n(viii) All existing buildings or structure on or over or under the site or projecting beyond it;\n(ix) Proposed access points on site boundary for the proposed construction;\n(x) Methods of disposal of waste water, sewerage and storm water;\n(xi) Surroundings up to a distance of fifteen metres on all sides from the boundaries of the site;\n(xii) Prominent trees in the area of the drawing and any important urban service points above/under ground (like sewer/water pipes, gas pipeline, transformers, electric poles/lines, phone distribution boxes, etc.);\n(xiii) Such other particulars as may be specified by the Competent Authority; and\n(xiv) Plot number or revenue particulars of the property on which the building is intended to be erected.\n(3) Building plans, sections and elevations.\n(i) the plans of all the floors including basements and all external elevations and cross sections illustrating distinctly all the different levels and minimum one section through staircase, water closet, bath, kitchen and garage;\n(ii) the plinth level of the building with reference to the level of the mean level of street from where approach to the site is taken;\n(iii) the schedule indicating the size of the doors, windows, openings and other methods of ventilation of each room/ area;\n(iv) the use or occupancy of all parts of the buildings;\n(v) the means of access to the buildings and to its various floors as well as the means of escape in case of fire, if required under the specific law/ code; along with ramps and steps with respect to the building;\n(vi) in case of proposed additions and alterations in the existing building, all new works shall be shown on the drawings in distinctive colours along with index;\n(vii) exact location of essential services, for example, water closet, sink, bath and the like;\n(viii) the method of disposal of waste water, sewage, storm water and water supply in detail;\n(ix) provision of rain water harvesting system as per rule 41 (wherever applicable);\n(x) provision for photovoltaic solar power plant as per rule 40 (wherever applicable);\n(xi) provision for differently-able person as per rule 36 (wherever applicable);\n(xii) indications of the north point relative to the plan.\nNote. - The requirement of 1:100 is permitted to be flexible for specific details needed for further illustration; and also for drawings for these in electronic form. In case any detail in building plan is not readable the same can be shown in enlarged form with clouding of that area.\nNote.\n(4) Standard design and architectural controls.\nNote. - For any urban area within the State of Punjab, notified in the Master Plan as a \"Special Area\" of planning for any special purpose by virtue of historical, functional, natural features or any other significance, for which a Form Based Codes (FBC) /Regulating Plan has been prepared and notified by the concerned Local Authorities, provisions under sub-rules (2), (3) and (4) of rule 0 shall be in accordance with such FBC/ Regulating Plan superseding any other general development norms and standards stipulated in these Building Rules.\nNote.\n(5) Procedure for submitting application through self-certification.\n(i) Residential plot having size upto 1000 sq.yd (836 sq.m);\n(ii) Industrial plots having size upto 1000 sq.yd (836 sq.m); and\n(iii) Commercial plots such as shop cum office (SCO), shop cum flat (SCF), Shops and Booths within approved layout for which standard design has been approved by the Competent Authority.\n(2) Procedure.-\n(2) Procedure.-\n(i) Any person intending to erect or re-erect building shall apply through an architect in Form 'A' along with documents specified in rule 0 to the competent authority for approval of building plans duly signed with stamp of \"sanctioned\", under self-certification by giving thirty days notice to the competent authority for record of building plans intimating the date of start of construction. The construction of proposed building can be started after thirty days, in case any objection is not conveyed to the applicant.\n(ii) The plan submitted should conform to the provisions of these rules as amended from time to time and approved zoning plan. In this regard, a certificate shall be given on the plan as under:\n\"Certified that the above building plan is as per the zoning plan Drg. No. ........ Dated..... and as per the Punjab Urban Planning and Development Building Rules, 2018 as amended from time to time.\"\nArchitect/ Civil Engineer\nSeal with signature\n(iii) Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height) in the relevant Form.\n(iv) After receiving the above documents, the competent authority issues an auto-generation receipt mentioning that documents have been received and are being kept in the office for record with this understanding that these plans have been prepared as per the provisions of approved zoning plan and these rules. The competent authority shall also convey within 30 days to the applicant regarding discrepancies in the building plans and the applicant shall be bound to rectify the discrepancies in building plans and shall submit the same before start of the construction otherwise submitted plan shall be taken as deemed approved.\n(v) Competent Authority or any other person authorized by him reserves the right to check the building plans and construction at any stage and violations (except compoundable ones), if found shall have to be rectified by the owner/ applicant. In case the owner/ applicant fails to rectify the violations, the competent authority may take necessary steps to remove the violations. Action shall also be taken against the defaulting Architect / Civil Engineer by referring his case to the Council of Architecture or Institute of Engineers of misconduct and for debarring/ blacklisting the Architect/Civil Engineer from doing all practice, especially for State Government Departments/ Authorities. All rectifications shall be at the risk and cost of the owner and no plea of the owner shall be entertained for any default committed by the Architect/ Civil Engineer engaged by him. In all such cases the procedure of self-certification shall stand aborted.\n(vi) If a building is erected or re-erected or construction work is commenced in contravention to any of the building regulations, the Competent Authority or any other person authorized by him shall be competent to require the building to be altered or demolished, by a written notice delivered to the owner. Such notice shall also specify the period during which such alteration or demolition has to be completed and if the notice is not complied with, the Competent Authority or any other person authorized by him may demolish the said building at the expense of the owner.\nNotes. - (a) The decision of Competent Authority, in case of any dispute shall be final and binding on all concerned.\nNotes.\n(b) At any stage during construction, if an Architect / Civil Engineer notices that violations (except compoundable ones) are taking place, he shall intimate to the concerned authority of such violations and stop further supervision. He shall also intimate the allottee about the violations and advise him to stop further construction. Complete details along with photographs shall be submitted to the concerned authority. The Competent Authority shall immediately issue a notice to the owner on the basis of the Architect's / Civil Engineer's certificate to suspend further work and rectify violations. In such cases the owner shall be held responsible for further additions in violations. Such a situation shall automatically annul the process of self-certification and the owner may, after removal of violations, engage an Architect / Civil Engineer for preparing the revised drawings. In such cases completion shall be given only after scrutiny of revised drawings and inspection of site.\n(c) Compoundable changes shall be allowed to be done, provided that at the completion stage all changes are incorporated by the Architect / Civil Engineer in the completion drawings to be submitted by the owner to the Competent Authority. While seeking occupation certificate, the Architect / Civil Engineer shall give a certificate that all changes done are as per these rules and policies of the Government as amended from time to time.\n(d) After submission of application or during the construction of building, if the Owner/ Architect/ Civil Engineer/ Structural Engineer are changed, the applicant shall intimate the Competent Authority by email or online building plan approval system that he is no longer responsible for the project from the date of actual dispatch of the letter. The information must be sent within seven days of occurrence of the change to the Competent Authority by the respective owner/ Architect/ Engineer. The construction work shall have to be suspended until the new owner/ Architect/ Civil Engineer/ Structural Engineer, as case may be, undertakes the full responsibility of the project vide forms and documents submitted at the time of applying for erection/ re-erection of the building within seven days of his taking over. Owner's intimation regarding change of name of professionals shall be considered to be final by the Competent Authority or any other person authorized by him.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Preparation of building plans of Government Departments.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Completion certificate.",
            "chapter": null,
            "content": "(i) Copy of all inspection reports of the Authority e.g. Fire Safety, Structural Safety, Green Building (if applicable) etc;\n(ii) Detail of compoundable violations from the approved building plans, if any in the building, jointly signed by the owner, Architect and Engineer along with demand draft of the due payment for compounding charges of such violations at the rates specified by the competent authority shall be submitted;\n(iii) Complete Completion drawings or as-built drawings - certified by the Architect and Engineer;\n(iv) Photographs of front, side, rear setbacks, front and rear elevation of the building shall be submitted along with photographs of essential areas like cut outs and shafts from the roof top. An un-editable compact disc/ DVD/ any other electronic media containing all photographs shall also be submitted;\n(v) Structural stability certificate duly signed by the Structural Engineer;\n(vi) Certificate of fitness of the lift from concerned Department wherever required;\n(vii) Certificate from the Punjab Energy Development Agency (PEDA) for installation of Rooftop Solar Photo Voltaic Power Plant in accordance to orders/ policies issued by the Renewable Energy Department from time to time;\n(viii) Completion Certificate / Final Certificate/ No Objection Certificate from the rating agencies (GRIHA/LEED/IGBC) for green building or Bureau of Energy Efficiency (BEE), Certified Energy Auditor for Green Building or constructing building in accordance to the provision of PECBC, wherever applicable;\n(ix) No Objection Certificate (NOC) of fire safety of building from concerned Fire Officer or an officer authorized for the purpose;\n(x) Any other information/document that the Authority may deem fit.\n(i) the applicant shall remove or demolish any temporary building which might have been erected and the debris from the site and adjoining roads or vacant site before the completion certificate is issued;\n(ii) the partial completion certificate may be granted for partially constructed building with at least one habitable room, one water closet and one kitchen as per the sanctioned plan and duly functional in case of a residential house;\n(iii) the partial completion certificate may be granted for partially constructed nonresidential buildings subject to the minimum completion of 25 percent construction of the availed total floor area along with all the required public utilities and public safety measures;\n(iv) the partial completion certificate to SCO's (shop- cum- office) or shops may be granted subject to the condition that construction of ground floor is completed along with public safety measure;\n(v) in case of large campus/complex, completion of individual block/building shall be issued by the competent authority in accordance with the construction work completed phase wise;\n(vi) in case of high rise buildings, partial completion certificate shall be issued if the superstructure of the building has been constructed as per approved plans; and\n(vii) the minimum permissible covered area as mentioned below shall have to be constructed to obtain partial completion certificate for industrial buildings:\nTable 3: Minimum permissible covered area to\n\t\t\t\tobtain partial completion certificate for industrial buildings\nTable 3: Minimum permissible covered area to\n\t\t\t\tobtain partial completion certificate for industrial buildings\nSr. No.\nSr. No.\nArea of site\nArea of site\nPercentage of permissible covered area\nPercentage of permissible covered area\nI.\nUpto 2 acre\n25%\nII.\nAbove 2 acre upto 5 acres\n20%\nIII.\nAbove 5 acres and upto 10 acres\n15%",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Occupation certificate.",
            "chapter": null,
            "content": "PART III\nAdministrative Control",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Power of the Competent Authority to sanction or refuse erection or re-erection.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Presumption of sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Pre-approved building applications.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Validity period of sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Submission of revised building plans in case of major alterations.",
            "chapter": null,
            "content": "(1) The building approval is not necessary for compoundable alterations/ violations, which do not otherwise violate any provisions regarding general building requirements, structural stability and fire safety requirements of these rules.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Revocation of sanction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Maintenance of e-register for sanction/ Registration of Building Plans.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Damp proof course certificate.",
            "chapter": null,
            "content": "PART IV\nPlanning and Architectural Controls",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Compliance of zoning plan/standard design/architectural control sheets and master plan/zonal plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Compliance to Special Area development and control as per Master Plan/ Zonal Plan.",
            "chapter": null,
            "content": "(1) Planning authority to delineate \"Form Based Zoning Districts\" within the Master / Zonal Plan for special consideration of planning with integrated Public spaces;\n(2) Form Based Zoning Districts (FBCs) to be formulated for each such Form Based Zoning Districts (FBZDs) with Single or Multiple Regulating Plans as necessary to cover the entire delineated special area;\n(3) Space Use matrix along with Form Based Codes (FBC) development standards, for each Form Based Zoning District (FBZD) as formulated in the Form Based Codes (FBC) are to be used for site layouts and building designs for all types of buildings; and\n(4) Form Based Codes (FBC) standards of flexible and adaptive designs shall be superseding, overriding all stipulations from rule 19 to rule 25 of these rules for all types of buildings in the respective Form Based Zoning Districts (FBZDs).\n19. (A) Residential.\nTable 4: Residential Plots/ Villas; (Except\n\t\t\t\tAffordable and Economical Weaker Section Housing)\nTable 4: Residential Plots/ Villas; (Except\n\t\t\t\tAffordable and Economical Weaker Section Housing)\nS.No.\nS.No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nI.\nMinimum Approach Road\nMinimum Approach Road\n12 meters\nII.\nII.\nMinimum Plot Size\nMinimum Plot Size\n60 sq.m\nIII.\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\nFor first 150 sq.m of plot area\n70%\nFor the next 100 sq.m of plot area\n65%\nFor the next 100 sq.m of plot area\n60%\nFor the next 100 sq.m of plot area\n50%\nFor the next remaining area of plot\n40%\nIV.\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:2.1\nV.\nV.\nMaximum No. of Floors\nMaximum No. of Floors\nGround +2 Floors (excluding basement)\nVI.\nVI.\nMaximum Height of Building\nMaximum Height of Building\n11 meters\nVII.\nVII.\nSetbacks around building\nSetbacks around building\nFront & Rear setback\n1/4th of the height of the building or 2 m,\n\t\t\t\twhichever is more\nSide setback, if left at any point of the\n\t\t\t\tbuilding\n1/5th of the height of building or 1.5 m whichever is more\nVIII.\nVIII.\nParking\nParking\nPlot area\nPlot area\nParking Required\nParking Required\nUpto 100 Sq.m\n2 No.'s Two wheeler parking space\nAbove 100 to 250 Sq.m\n1 Car & 2 nos. Two wheelers\nAbove 250 to 500 Sq.m\n2 Car & 2 nos. Two wheelers\nAbove 500 Sq.m\n3 Car & 2 nos. Two wheelers\nNotes. - (a) The area of the basement should not be more than the ground coverage subject to the safety of adjoining property from all aspects and as per the provision of part V of these rules.\nNotes.\n(b) Basement, if constructed, may be used for parking, household storage, habitable and consultancy services purposes. It shall be counted towards Floor Area Ratio if used for habitable purposes.\n(c) Front boundary wall shall be optional for providing easy access for parking in front setback within plot area for which approval from the Competent Authority concerned shall be obtained.\n(d) No opening is allowed on party wall of properties.\n(e) The maximum permissible ground coverage and Floor Area Ratio is subjected to the fulfilment of the setback, height and parking norms.\n[(f) In small size plot upto 105 sq.m (125 sq.yd) area, front setback may be relaxed upto 1.5m irrespective of building height.]\nTable 5:\n\t\t\t\tResidential Independent Floors\nTable 5:\n\t\t\t\tResidential Independent Floors\nS.No\nS.No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road\nMinimum Approach Road\n12m\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\nFor first 250 sq.mt.\n65%\nFor the next 100 sq. m\n60%\nFor the next 100 sq. m\n50%\nFor the next remaining area\n40%\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nFor first 250 sq.mt.\n1:2.6\nFor the next 100 sq. m\n1:2.4\nFor the next 100 sq. m\n1:2.0\nFor the next remaining area\n1:1.6\nIV.\nMaximum No. of Floors\nMaximum No. of Floors\nStilt +4 Floors\nV.\nMaximum Height of Building\nMaximum Height of Building\nBelow 15 m\nNote: Excluding mumty, parapet, and architectural\n\t\t\t\tfeatures. The stilts shall be compulsory and shall be counted\n\t\t\t\ttowards height of the building.\nNote:\nVI.\nSetbacks around buildings\nSetbacks around buildings\nFront setback\n1/5th of the height of the building or 2 m whichever is more\nRear setback\n1/5th of the height of the building or 2 m whichever is more\nSide setback, if left at any point of building,\n1/5th of the height of the the building or 1.5 m whichever is\n\t\t\t\tmore\nVII.\nParking\nParking\nDwelling Unit (DU) Size\nDwelling Unit (DU) Size\nEquivalent Car Space required (ECS) per DU\nEquivalent Car Space required (ECS) per DU\nUnit Area upto 120 sq.m.\n1.5\nUnit Area above 120 sq.m upto 300 sq.m.\n2.0\nUnit Area Above 300 sq.m.\n3.0\nNotes. - (a) In case of Independent floors, plots shall be in a block of row housing and earmarked for independent floors in the Layout Plan or Zoning Plan.\nNotes.\n(b) No individual plot in any block which is not earmarked in the Layout Plan or Zoning Plan for independent floors shall be allowed to be constructed as an independent floor unless the building is detached having minimum plot area 800 square meters.\n(c) The parking required in case of independent floors shall compulsorily be under stilts. However, in case of an independent plot having minimum area of 800 square meters used for independent floors, the parking under stilts shall be optional, provided that the promoter provides surface/ basement parking as per norms within the plot.\n(d) In case of independent floor, common staircase or common elevator is permissible maximum for two plots subject to the condition that the minimum clear width of staircases shall be 1350 mm.\nTable 6:\n\t\t\t\tGroup Housing / Studio Apartments\nTable 6:\n\t\t\t\tGroup Housing / Studio Apartments\nS.No\nS.No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\nStudio Apartment\n2000 sq.m\nGroup Housing\nAs per the Provisions of Master Plan\nII.\nMinimum Approach Road\nMinimum Approach Road\n18m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n30% of Site Area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road 18 m\n1:2.0\nMinimum approach road 24 m\n1:2.5\nMinimum approach road 30 m\n1:3.0\nMinimum approach road 45 m & above\nUnlimited*\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction Subject to clearance from Airport Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of rule of these building rules.\nVII.\nParking Group Housing\nParking Group Housing\nDwelling Unit (D/U) Size\nEquivalent Car Space required (ECS) per D/U\nD/U Area upto 90 sq.m.\n1.0\nD/U Area above 90 sq.m upto 120 sq.m.\n1.5\nD/U Area above 120 sq.m upto 300 sq.m.\n2.0\nD/U Area Above 300 sq.m.\n3.0\nAdditional 10 percent guest parking shall also be provided.\nStudio Apartments\nStudio\nApartments\n[Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\nNotes. - (a) In case of studio apartment, the maximum size of the unit shall be 50 sq.m.\nNotes.\n(b) In case of Group Housing/apartments, minimum 25% of site area shall be kept as green in which 15% of site area shall be in the form organized park/ playground with minimum width of 15m. If the width of the green space is less than 15 m, then it shall not be counted in the area of organized park/ playground.\n(c) In case of Group Housing/apartments, Economical Weaker Section (E.W.S) housing shall be provided as per the government policy dated 24.05.2016 as amended from time to time.\n(d) The F.A.R above 1:2 in case of Group Housing will be chargeable on prorata basis. However, the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter.\n(e) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around the building, parking norms, light and ventilation, height, fire and structural safety.\n(f) Upto 1.0 percent of the total covered area of group housing project shall be allowable for convenient shopping such as grocery shop, vegetable shop, laundry and dry cleaning, medical store, confectionery, bakery, hair cutting saloon, stationery shop, milk booth excluding Club Building.\n(g) access to commercial building in group housing may be allowed from external road subject to the fulfilment of parking, setback and road width etc.\n(h) The Net Residential Density shall be permissible as per the provisions of the respective Master Plans, government notifications as amended from time to time whichever is applicable.\n[***]\nNotes. - (a) Rental housing/Hostel building shall be a detached building.\nNotes.\n(b) It shall provide kitchen with dining hall, common room for indoor games, first aid room, laundry, security guard room.\n(c) In Rental housing, upto 2% of the Floor Area Ratio. availed may be used for canteen, coffee shop, library, ATM, Grocery shop, Pharmacy, office, Mobile shop, Fruit/Vegetable shop, Barber shop or other similar activities for self use of the Users.\n(d) Basement shall be permissible as per sub-rule (6) of rule 31.\n(e) The provisions laid down in the rental housing policy shall be read with building bye laws concurrently.\n(B) Other general control for residential buildings. - (i) For calculation of infrastructure required for the project, the population of villa shall be counted @ 5 persons per villa and plotted development shall be counted @ 15 persons per plot, whereas in case of Independent floors having S+4 or G+3 it shall be @ 20 persons per plot and for group housing it shall be @ 5 persons per Dwelling Unit. where basement is used for habitable purpose then the density of five person per basement shall be added to the permissible density of the plot.\n(B) Other general control for residential buildings.\n(ii) Floating population shall be taken as minimum 100 person per acre for calculation of infrastructural/ services requirements only and shall not be counted towards the regular density of the project/ sector.\n(iii) The population density of Studio Apartments shall be counted as two persons per unit.\n(iv) The Population density of Rental housing shall be counted as one person per 12.5 sq.m of total covered area of the building or as per actual whichever is more.\n(v) The density for each category of flats in case of Group Housing/Apartment/ Studio Apartments shall be calculated separately. The promoter has to clearly indicate the area under each category of flats.\n(vi) The clubbing of two or more plots or plots earmarked for independent floors in row housing may be allowed. The promoter or owner has to get a revised Zoning Plan approved from the Competent Authority.\n(vii) In case of residential plot, it is mandatory to provide indigenous or fruit tree in the premises of plot as per criteria described in Part XI of these rules.\n(viii) In case of Low Density Country Homes Residential, Economical Weaker Section housing, Affordable housing, housing for all, Pardhan Mantri Awas Yojna (PMAY), Punjab Shehri Awas Yojana (PSAY) and any other policy relating to housing issued by State or Central Government, the physical and development norms as prescribed in the said policy as amended from time to time shall be applicable.\n(ix) Professional activity shall be allowed in residential plot and flats on any floor on the following condition:\nPart of the premises shall be permitted to be used upto a maximum of 25 % of FAR or 100 sq.m, whichever is less, for non-nuisance / non service / non-teaching/ non-commercial/ non trading activities for rendering consulting based on professional skills such as charted accountant, architect, planner, advocates, doctors (only consultancy) or other similar activities.\n20. (A) Commercial.\nTable 8:\n\t\t\t\tConvenient Shopping / Neighbourhood Shopping Plotted within\n\t\t\t\tapproved layout plan.\nTable 8:\n\t\t\t\tConvenient Shopping / Neighbourhood Shopping Plotted within\n\t\t\t\tapproved layout plan.\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nCategory\nCategory\nBooths\nBooths\nShops/ shop cum offices\nShops/ shop cum offices\nShops/ shop cum offices\nShops/ shop cum offices\nI.\nWidth of plot\nWidth of plot\nUpto 3m\nAbove 3m to 5m\nAbove 5m\nII.\nMinimum Approach Road\nMinimum Approach Road\n18m\n24m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n100% of plot area\nDepth of Plot\n% of plot area\nDepth of Plot\n% of plot area\nupto 12m\n100\nupto 12m\n100\nmore than 12m\n80\nmore than 12m\n75\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1\n1:2\n1:3\nV.\nNo. of Stories\nNo. of Stories\n1\n2\n4\nNote: Excluding mumty, parapet, lift room and\n\t\t\t\tarchitectural features\nVI.\nMinimum width of corridor/Canopy/Projection\n\t\t\t\tetc. for weather protection\nMinimum width of corridor/Canopy/Projection\n\t\t\t\tetc. for weather protection\n2.2m\n2.5m\n2.5m\nVII.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\nNotes. - (a) The plotted Convenient Shopping / Neighbourhood Shopping development shall be permissible on 18m (60'-0\") wide road subject to the condition that the maximum area of the site shall not be more than 8000 sq.mt. The minimum approach road for area more than 8000 sq. mt. shall be 24m(80'-0\").\nNotes.\n(b) The F.A.R above 1:1.75 in case of commercial building, will be chargeable on pro-rata basis. However, the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter.\n(c) In case of commercial plot having openings on both front and rear, then the ground coverage to be permitted in such cases shall be upto 100% of the plot area carved out shops, shop-cum-shop/offices, shop-cum-flat etc. subject to the conditions that corridors of appropriate width, as specified in Table 8 above shall be provided in front of each opening. The basement shall be restricted under the building excluding the area under corridors. Floor Area Ratio, height, number of storeys, clear width of the corridor shall be governed by the width of the plot and stipulation made under these rules. However, the total coverage shall continue to be governed by the parking requirements mentioned as per Table 8 with adequate provision made both in front and rear of the site.\n[(d) Approach to upper floors in case of double storeyed shops, shop-cum- offices/ shops can also be permitted from the public corridor.]\n(e) Approach to basement floors shall be permitted only from within the booth/ shops/shop-cum-shop/offices.\n(f) Height of booths/ Shops/ shop cum offices shall be governed by control sheets/zoning plan.\n(g) In case of SCO, common staircase or common elevator is permissible maximum for two SCO subject to the condition that the minimum clear width of staircases shall be 1500 mm.\n(h) All Government commercial site planned for retail outlet shall be governed by approved layout plan/ zoning plan / standard architectural control sheets prepared by the development authorities concerned.\nTable 9: Commercials such as Shopping Mall /\n\t\t\t\tShopping Complex or a building primarily used for display and\n\t\t\t\tsale of merchandise or any similar purpose\nTable 9: Commercials such as Shopping Mall /\n\t\t\t\tShopping Complex or a building primarily used for display and\n\t\t\t\tsale of merchandise or any similar purpose\nS.No\nS.No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road\nMinimum Approach Road\n24m\nII.\nMinimum Frontage\nMinimum Frontage\n20m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n45% of Plot Area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road 24 m\n1:2.5\nMinimum approach road 30 m\n1:3.0\nMinimum approach road 45 m & above\nUnlimited*\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nsub-rule (1) of rule 26\nVII.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\nNotes. - (a) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around building, parking norms, light and ventilation, height, fire and structural safety.\nNotes.\n(b) F.A.R above 1:1.75, will be chargeable on pro-rata basis. However the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter.\nTable 10:\n\t\t\t\tMiniplex\nTable 10:\n\t\t\t\tMiniplex\nS.No\nS.No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road & Site Area\nMinimum Approach Road & Site Area\nplot size from 2000 sq.m and below 4000 sq.m\n18 m\nplot size 4000 and above sq.m\n24 m\nII.\nMinimum Frontage\nMinimum Frontage\n24 m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road width 18 m\n1:2.0\nMinimum approach road width 30 m and above\n1:2.5\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nsub-rule (1) of rule 26\nVII.\nParking\nParking\n3.0 Equivalent Car Space per 100 square meters of the covered\n\t\t\t\tarea in respect of miniplex or cinema component and 2 Equivalent\n\t\t\t\tCar Space per 100 square meters of the balance covered area.\nNotes. - (a) F.A.R above 1:1.75, will be chargeable on pro-rata basis. However the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter.\nNotes.\n(b) In case any provision is not specified /covered under these rules then the physical and development norms as specified in the miniplex policy or the Punjab Cinemas (Regulation) Act, 1952, as the case may be shall be applicable.\n(c) In case of Miniplex or Cinema the physical and development norms as specified in the miniplex policy or the Punjab Cinemas (Regulation) Act, 1952, as the case may be, shall be applicable, however, for the provision not specified /covered under above policies, these rules shall be applicable.\n(d) Commercial component such as retail, shopping restaurant, food courts etc. are permissible in miniplex.\nTable 11:\n\t\t\t\tMultiplex\nTable 11:\n\t\t\t\tMultiplex\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum plot size\nMinimum plot size\n4000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\n24 m\nIII.\nMinimum Frontage\nMinimum Frontage\n30 m\nIV.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road 24 m\n1:2.0\nMinimum approach road 30 m\n1:2.5\nMinimum approach road 45 m and above\nUnlimited*\nVI.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nsub-rule (1) of rule 26\nVIII.\nParking\nParking\n3.0 Equivalent Car Space per 100 square meters of the covered\n\t\t\t\tarea in respect of multiplex or cinema component plus 30 percent\n\t\t\t\tof the total covered area of that component i.e (multiplex or\n\t\t\t\tcinema component) and 2 Equivalent Car Space per 100 square\n\t\t\t\tmeters of the balance covered area.\nNotes. - (a) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around building, parking norms, light and ventilation, height, fire and structural safety.\nNotes.\n(b) The F.A.R above 1:1.75 , will be chargeable on pro-rata basis. However the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter.\n(c) In case of Multiplex or Cinema the physical and development norms as specified in the multiplex policy or the Punjab Cinemas (Regulation) Act, 1952, as amended from time to time, shall be applicable, however, for any provision not specified /covered under above policies, these rules shall be applicable.\n(d) In case any provision is not specified /covered under these rules then the physical and development norms as specified in the multiplex policy or the\n(e) Commercial component such as retail, shopping restaurant, food courts etc. are permissible in multiplex.\nTable 12:\n\t\t\t\tHotel or Motel\nTable 12:\n\t\t\t\tHotel or Motel\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road\nMinimum Approach Road\nPlot size from 1000 sq.yd upto 2000 sq.yd\n12m\nPlot size above 2000 sq.yd upto 4000 sq.yd\n18m\nPlot size above 4000 sq.yd\n24m\nNote: In rural areas outside Master Plans, the Hotel activity\n\t\t\t\tupto one acre area shall be permissible on link roads having\n\t\t\t\tminimum width of 22'-0\" (4 karam). However, the developer\n\t\t\t\thas to widen the road to minimum 40 feet or as specified in the\n\t\t\t\tMaster Plan whichever is more, by leaving proportionate area from\n\t\t\t\this own land.\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nFor plot size 1000 sq.yd upto 2000 sq.yd\n1:2.0\nFor plot size above 2000 sq.yd upto 4000 sq.yd\n1:2.5\nFor plot size above 4000 sq.yd\nUnlimited*\nIV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport  Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nV.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nsub-rule (1) of rule 26\nVI.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nNotes. - (a) Commercial use within the Hotel Building envelope shall be permissible as per the policy of State Government, as amended from time to time.\nNotes.\n(b) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around building, parking norms, light and ventilation, height, fire and structural safety.\n(c) F.A.R above 1:3, will be chargeable on pro-rata basis. However for sites allotted or sold by the development authority, the charges shall be applicable as per the terms and conditions of the allotment letter.\nTable 13:\n\t\t\t\tClub\nTable 13:\n\t\t\t\tClub\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road\nMinimum Approach Road\nPlot size from 1000 sq.m upto 2000 sq.m\n18m (60'-0\")\nPlot size above 2000 sq.m\n24m (80'-0\")\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.0\nIV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nV.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nVI.\nParking\nParking\n3 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nTable 14:\n\t\t\t\tGuest House/Lodging & Boarding/Service Apartments\nTable 14:\n\t\t\t\tGuest House/Lodging & Boarding/Service Apartments\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n1000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\nPlot size from 1000 sq.m upto 2000 sq.m\n12m(40'-0\")\nPlot size above 2000 sq.m\n18m (60'-0\")\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nPlot size from 1000 sq.m upto 2000 sq.m\n1:1.0\nPlot size above 2000 sq.m\n1:2.0\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nVII.\nParking\nParking\n1.5 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nTable 15:\n\t\t\t\tDhaba\nTable 15:\n\t\t\t\tDhaba\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nSite area\nSite area\nMinimum 1000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\nPlot size from 1000 sq.m upto 2000 sq.m\n18m (60'-0\")\nPlot size above 2000 sq.m\n24m (80'-0\")\nIII.\nMinimum Frontage\nMinimum Frontage\n20 m\nIV.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nV.\nFloor Area Ratio\nFloor Area Ratio\n1:0.5\nVI.\nHeight\nHeight\n6 m.\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nVIII.\nParking\nParking\n30% of plot area\nNotes. - (a) Maximum 50 sq.mt. area for Kiosks like STD, books, cassettes etc. can be permissible as ancillary uses within F.A.R\nNotes.\n(b) The access permission is required from competent authority if the site is located on scheduled road / State Highway/National Highway.\n(c) Approach from National Highways can be considered if the site fulfils minimum distance norm from intersection/access or abuts 7M wide service road or applicant submits prior permission of access from National Highway Authority of India (NHAI).\nTable 16:\n\t\t\t\tWholesale Trade/ Integrated Freight complex (Standalone)\nTable 16:\n\t\t\t\tWholesale Trade/ Integrated Freight complex (Standalone)\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n1 Ha.\nII.\nMinimum Approach Road\nMinimum Approach Road\n24 m (80'-0\")\nIII.\nMinimum Frontage\nMinimum Frontage\n30 m\nIV.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.0\nVI.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building\n\t\t\t\trules.\nVIII.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nNote. - For Risk based approval of types of Warehouses / Integrated Freight complex (IFC) refer sub-rule (2) of rule 47.\nNote.\nTable 17: Warehouse / Godown (Standalone)\nTable 17: Warehouse / Godown (Standalone)\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n2000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\n12 m (Minimum 22'-0\" widen to 40'-0\")\nIII.\nMinimum Frontage\nMinimum Frontage\n30 m\nIV.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of Plot Area\nV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.0\nVI.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport Authority and\n\t\t\t\tfulfilment of norms such as setbacks around building, ground\n\t\t\t\tcoverage, F.A.R., structural safety and fire safety norms.\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building rules.\nsub-rule (1) of rule 26\nVIII.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] a.\nNote. - For Risk based approval of types of Warehouses / Integrated Freight complex (IFC) refer sub-rule (2) of rule 47.\nNote.\n(B) Petrol pumps / Filling -cum-service stations. - Petrol Pump/ filling-cum-service stations/ two-three wheelers petrol pump shall be governed as per instructions/ guidelines of Indian Roads Congress (IRC)/ Ministry of Road Transport and Highways (MORTH)/ Town and Country Planning Organisation (TCPO)/ Department of Housing and Urban Development, Government of Punjab.\n(B) Petrol pumps / Filling -cum-service stations.\n21. (A) Industry.\n[Table 18: Industry Plotted\n[Table 18: Industry Plotted\nSerial No.\nSerial No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\n1.\nMinimum Approach Road\nMinimum Approach Road\n15m (Min. 16'-6\" widen to 50'-0\") or\n\t\t\t\t\tas per master plan whichever is more\n2.\nMaximum Ground Coverage\nMaximum Ground Coverage\n65 % of the plot area**\n3.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nUnlimited*\n4.\nMaximum Height of Building\nMaximum Height of Building\nBelow 15m\nNote: Excluding equipment, machinery such as\n\t\t\t\t\tchimney, boiler, plant, hammer, silos etc. irrespective of its\n\t\t\t\t\theight.\n5.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these rules.\n6.\nParking\nParking\nGeneral Industry\n1 Equivalent Car Space per 100 sq.m. of the\n\t\t\t\t\ttotal floor area ratio.\nInformational Technology\nFor Site Area upto 2 Acres : 1.0 Equivalent Car\n\t\t\t\t\tSpace per 100 sq.m. of the total floor area ratio.\nFor Site Area above 2 Acres: 2 Equivalent Car\n\t\t\t\t\tSpace per 100 sq.m. of the total floor area ratio.\nNote. - (a) **5% additional ground coverage shall be permitted in case of retail service industry.\nNote.\n(b) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around building, parking norms, light and ventilation, height, fire and structural safety.\n(c) In case of Industrial Estate/ Private Industrial Areas or Conglomeration of Industries opt for central parking then:\n(i) Minimum 20% parking shall be within the premises of the industry.\n(ii) The parking requirement if provided in mechanical/ common pool area shall be duly certified by the concerned association by whom it is being maintained.\n(iii) The share of common parking shall be calculated as per the total area of the industrial plot duly certified by the concerned agency maintaining that parking.\n(iv) In case any false claim regarding common parking is observed then the industrial plot holder has to provide parking in his own premises.] .\nTable 19: General industry flatted\nTable 19: General industry flatted\nS.No\nS.No\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n2000 sq.mt.\nII.\nMinimum Approach Road\nMinimum Approach Road\n18m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40 %\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nUnlimited*\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nVII.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nTable 20: Information Technology flatted\nTable 20: Information Technology flatted\nS. No\nS. No\nParameter\nParameter\nPermissible Limits\nI.\nI.\nMinimum Site area\nMinimum Site area\nAs per I.T. policy\nII.\nII.\nMinimum Approach Road\nMinimum Approach Road\n18m\nIII.\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40%\nIV.\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nUnlimited*\nV.\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from \n\t\t\t\tAirport Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nVII.\nVII.\nParking\nParking\nSite Area upto 2 Acres\n1.0 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\nSite Area above 2 Acres\n2.0 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\n(B) Other controls for Industrial Buildings. - (i) For industrial plots more than 1000 sq.m, 10% of the total plot area shall be reserved as amenity open space. When such amenity open space exceeds 1500 sq.m, the excess area could be utilized for construction of buildings for banks, canteen, welfare centre and such other common purposes.\n(B) Other controls for Industrial Buildings.\n(ii) Upto 15 percent of the total covered area in industrial buildings shall be permissible for the housing of staff or workers.\n(iii) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around building, parking norms, light and ventilation, height, fire and structural safety.\n22. (A) Educational.\nTable 21: Pre Nursery / Nursery School /\n\t\t\t\tcrèche\nTable 21: Pre Nursery / Nursery School /\n\t\t\t\tcrèche\nS. No.\nS.\nNo.\nParameter\nParameter\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n1000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\n12 m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of site area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.0\nV.\nSetbacks around buildings\nSetbacks around buildings\nFront\n6m or 1/3 of the height of the building,\n\t\t\t\twhichever is more\nOther side\n4.5m or 1/3 of the height of the building,\n\t\t\t\twhichever is more\nVI.\nParking\nParking\n1.5 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\nVII.\nMaximum number of Floors\nMaximum number of Floors\nG+1\nNote. - only ground floor shall be used for academics however first floor may be used for residential, office, storage etc.\nNote.\nTable 22: Primary school (class 1 to 5)\nTable 22: Primary school (class 1 to 5)\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\nAs per the norms of the affiliation authority\n\t\t\t\tor 5000 sq mts whichever is more\nII.\nMinimum Approach Road\nMinimum Approach Road\n12m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of site area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.2\nV.\nParking\nParking\n1.5 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio]\nVI.\nMaximum Height of Building\nMaximum Height of Building\nbelow 15m\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nTable 23: High/ Senior secondary school/\n\t\t\t\tCollege or Educational Institute/Universities.\nTable 23: High/ Senior secondary school/\n\t\t\t\tCollege or Educational Institute/Universities.\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nI.\nI.\nMinimum Approach Road\nMinimum Approach Road\nfor School\nWithin Master Plan\n\t\t\t\t-18m (60'-0\")\nOutside Master Plan-12m (40'-0\")\nfor College/university\nWithin Master Plan\n\t\t\t\t-24m (80'-0\")\nOutside Master Plan-18m (60'-0\")\nII.\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of plot area\nIII.\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.5\nIV.\nIV.\nParking\nParking\nSchool, College\n1.5 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nUniversity Campus\n1.0 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nV.\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\n(B) Other controls for Educational Building(s). - (i) In case of new school area of 1 acre or above, the front boundary wall shall be recessed by 6m to accommodate visitors parking within setback area.\n(B) Other controls for Educational Building(s).\n(ii) Minimum 15% of site area shall be kept/developed as playground with minimum width of 15 m.\n(iii) Upto 15 percent of the total covered area in educational buildings shall be permissible for the housing of staff or workers.\n(iv) In case of large Campus/ Universities / Indian Institute of Technology (IIT) / Indian Institute of Management (IIM), upto 30% of the total covered area (F.A.R) can be utilized for residential use for essential staff and fellow accommodations by providing housing for staff, dormitories, guest houses or creche.\n(v) Student Hostel shall not be count in residential component.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "23",
            "title": "23. Institutional.",
            "chapter": null,
            "content": "Table 24: Hospital, Nursing Home, Medical\n\t\t\t\tLaboratory\nTable 24: Hospital, Nursing Home, Medical\n\t\t\t\tLaboratory\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road and Site Area\nMinimum Approach Road and Site Area\nPlot size from 1000 sq.yd upto 2000 sq.yd\n12m (40'-0\")\nPlot size above 2000 sq.yd upto 4000 sq.yd\n18m (60'-0\")\nPlot size above 4000 sq.yd\n24m (80'-0\")\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of site area\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road 12 m\n1:1.50\nMinimum approach road 18 m\n1:1.75\nMinimum approach road 24 m and above\n1:2.25\nIV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\tAuthority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nV.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building\n\t\t\t\trules.\nNotes. - (a) Maximum up to 2% of covered area shall be allowed to be used for community space / crèche / chemist shop/ bank counter on Hospital sites and also Medical College/ Nursing and Paramedic institutes sites.\nNotes.\n(b) In case of Hospitals, 25% of the total covered area (Floor Area Ratio) may be utilized for residential use for staff, dormitory/ hostels for attendants of the patients, crèche etc.\n(c) Adequate arrangements for disposal of hospital waste have to be made as per the Bio- Medical Waste (Management and Handling) Rules, 1998, as amended from time to time along with the instructions/ guidelines issued by the Punjab Pollution Control Board from time to time.\n(d) F.A.R above 1:1.50 will be chargeable on pro-rata basis. However the site allotted or sold by the development authority the charges shall be applicable as per the terms and conditions of the allotment letter.\nTable 25: Orphanage Home, Old Age Home,\n\t\t\t\tChildren's Centre/Care Centre/School/ Institute for Mentally\n\t\t\t\tchallenged or Physically Handicapped Person\nTable 25: Orphanage Home, Old Age Home,\n\t\t\t\tChildren's Centre/Care Centre/School/ Institute for Mentally\n\t\t\t\tchallenged or Physically Handicapped Person\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n1000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\n12m(40'-0\")\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n50%\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.5\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nParking\nParking\n1.0 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building\n\t\t\t\trules.\nNotes. - (a) Minimum 15% of site area shall be kept/developed as playground/green with minimum width of 15 m.\nNotes.\n(b) In case of school for mentally/differently able persons, 25% of the total covered area (Floor Area Ratio) can be utilized for residential use for essential staff and student accommodations.\n(c) In case of Hospitals, 25% of the total covered area (Floor Area Ratio) may be utilized for residential use for staff, dormitory/ hostels for attendants of the patients, crèche etc.\n(d) Adequate arrangements for disposal of hospital waste have to be made as per the Bio- Medical Waste (Management and Handling) Rules, 1998, as amended from time to time along with the instructions/guidelines issued by the Punjab Pollution Control Board from time to time.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "24",
            "title": "24. Public Buildings.",
            "chapter": null,
            "content": "Table 26: Community Centre, Public Concert\n\t\t\t\tHall or Auditorium, Museum, Gymnasium or Public Exhibition\nTable 26: Community Centre, Public Concert\n\t\t\t\tHall or Auditorium, Museum, Gymnasium or Public Exhibition\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n2000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\nWithin Master Plan -18m (60'-0\")\nOutside Master Plan-12m (40'-0\")\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40%\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nParking\nParking\n3 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building\n\t\t\t\trules.\nNotes. - (a) In case of Community Centre, it shall only have banquet hall, kitchen, library, office and reading room, except these if any other activity is proposed then it shall be considered as club.\nNotes.\n(b) Upto 1.0 percent of the total covered area of Community Centre, Public Concert Hall or Auditorium, Museum, Gymnasium or Public Exhibition shall be allowable for commercial activity.\nTable 27: Religious Building\nTable 27: Religious Building\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road and Site area\nMinimum Approach Road and Site area\nPlot size minimum 1000 sq. mts upto 2000 sq.m\n12m (40'-0\")\nPlot size above 2000 sq.m\n18m (60'-0\")\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of site area\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.0\nIV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nV.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nTable 28: Public Offices\nTable 28: Public Offices\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n1000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\n18m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of plot area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road\n\t\t\t\t18m 1:2\nMinimum approach road 30m 1:2.5\nMinimum approach road 45m Unlimited*\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\tAuthority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nNotes. - (a) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around the building, parking norms, light and ventilation, height, fire and structural safety.\nNotes.\n(b) F.A.R above 1:1.75, will be chargeable on pro-rata basis expect State/ Central Government offices. However, the site allotted or sold by the development\n(c) Upto 15 percent of the total covered area in Public buildings shall be permissible for the housing of staff or workers.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "25",
            "title": "25. Farm House.",
            "chapter": null,
            "content": "Table 29: Farm House\nTable 29: Farm House\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n2.5 Acres\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n5%\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:0.05\nIV.\nSetbacks\nSetbacks\nOutside M.C. Limits- Front =15m, Side and Rear=\n\t\t\t\t6m\nV.\nMaximum No. of Floor\nMaximum No. of Floor\nG+1\nVI.\nMaximum Height of Building\nMaximum Height of Building\n9 meter\nVII.\nParking\nParking\n1.5 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nNotes. - (a) The ground coverage and Floor Area Ratio is inclusive of ancillary buildings such as labour/ servant quarters which shall not be more than 25% of the covered area of the site.\nNotes.\n(b) The temporary structure/building like Cattle Shed, Motor Room, covered parking etc. shall be exempted from ground coverage and Floor Area Ratio.\n(c) Basement shall be permitted to the maximum extent of building footprint.\n(d) No subdivision of plot shall be allowed.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "26",
            "title": "26. General Planning/ Development Norms.",
            "chapter": null,
            "content": "Table 30: Minimum Setback or Open Space Around\n\t\t\t\tBuildings\nTable 30: Minimum Setback or Open Space Around\n\t\t\t\tBuildings\nS.No.\nS.No.\nHeight of building (m)\nHeight of building (m)\nSetback all around building (m)\nSetback all around building (m)\nI.\n10\n3\nII.\n14.99\n5\nIII.\n18\n6\nIV.\n21\n7\nV.\n24\n8\nVI.\n27\n9\nVII.\n30\n10\nVIII.\n35\n11\nIX.\n40\n12\nX.\n45\n13\nXI.\n50\n14\nXII.\n55\n16\nXIII.\n70\n17\nXIV.\n120\n18\nXV.\nAbove 120\n20\nNotes. - [(a) In case of industrial buildings (expect I.T. buildings), the open spaces around the building shall not be less than 4.5m for height upto 15 m, with an increase of the open spaces of 0.25 m for every increase of 1 m or fraction thereof in height above 15m. However, for industrial plots (including I.T Buildings) upto 2025 sq.m area where width of the plot is less than 30.50 m (100'-0\"), the front and rear set back shall be ¼ of the height or 2m whichever is more are mandatory. The side setbacks may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard.]\nNotes.\nHowever if the covered area of any floor of the building(s) is 500m 2 or more than the minimum setbacks around building(s) shall be 6 m or as per Table 30 whichever is more.\n(b) Where rooms do not derive light and ventilation from the exterior open space, the width of such exterior open space as given above may be reduced by 1 m subject to a minimum of 3m and a maximum of 8m.\n(c) If the length or depth of the building exceeds 40 m, add to the above Table ten percent of length or depth of building minus 4.0 m subject to maximum requirement of 20 m.\n(d) For high rise buildings and special buildings as specified in rule 31(14) (see Part4 Fire and Life Safety' of the National Building Code of India, 2016 as amended from time to time), the approach to the building and open spaces on all sides shall not be less than 6 m.\n[(e) For buildings other than residential plotted or independent floors, industrial plotted or general industrial buildings, or hazardous building, minimum setback from the boundary shall be 6 m or as shown in zoning plan, whichever is more.\nHowever, for the plots upto 2025 sq.m area where width of the plot is less than 30.50m (100'-0\") and the maximum height of building is below 15m excluding the architectural and symbolism element of religious building like dome, minarets, sikharas, crucifix etc. from building height, then one side setbacks may be relaxed subject to the condition that the owner has to submit a fire safety certificate from the competent authority in this regard.\nHowever, for the corner plot upto 2025 sq.m in size, the side setback adjoining the side road may be relaxed and shall not be less than 3 m from the boundary subject to the following conditions, namely:-\n(i) minimum road width of side road shall not be less than 9m;\n(ii) minimum setback of the building shall be governed as per table above from the centre of the adjoining side road for this side;\n(iii) this relaxation shall be applicable only for one time for one side and not applicable for front and rear side;\n(iv) the height of the boundary wall including railing for this side shall not be more than 2m; and\n(v) no objection certificate from Fire Department is required for this relaxation] ;\n(2) Setback of projected portion of roof level.\n(3) Courtyard/ Open Space.\n(ii) Ventilation Shaft. - For ventilating the spaces for water-closets and bath rooms, if not opening on to front, side, rear or interior open spaces, these shall open on to the ventilation shaft, the size of which shall not be less than the values given below:\nVentilation Shaft.\nTable 31 : Size of Ventilation shaft\nTable 31 : Size of Ventilation shaft\nS.No.\nS.No.\nHeight of building (m)\nHeight of building (m)\nSize of ventilation shaft (m2)\nSize of ventilation shaft (m2)\nMinimum one dimension of the shaft (m)\nMinimum one dimension of the shaft (m)\nI.\n10\n1.2\n0.9\nII.\n12\n2.8\n1.2\nIII.\n18\n4.0\n1.5\nIV.\n24\n5.4\n1.8\nV.\n30\n8.0\n2.4\nVI.\nAbove 30\n9.0\n3.0\nNotes. - (a) For buildings of height above 30 m, a mechanical ventilation system shall be installed besides the provision of minimum ventilation shaft.\nNotes.\n(b) For fully air conditioned residential/business buildings, the ventilation shaft need not be insisted upon, provided the air conditioning system works in an uninterrupted manner, also, provided there is an alternative source of power supply.\n(c) For mechanical ventilation in building shall be as per the provision of the National Building Code of India, 2016, as amended time to time.\n(iii) Outer courtyard/ open space. - The minimum width of the outer courtyard/ open space shall be not less than 2.4 m. If the width of the outer courtyard/ open space is less than 2.4 m, it shall not be treated as a outer courtyard/ open space and the provisions of outer courtyard/ open space shall not apply. However, if the depth of the outer courtyard/ open space is more than the width, the provisions of above sub rule (i) shall apply for the open spaces to be left between the building(s) when any habitable room depends on light and ventilation from such outer courtyard/ open space.\nOuter courtyard/ open space.\n(4) Projection and Balcony.\n[Table 32: Projections\n[Table 32: Projections\nS.No.\nS.No.\nSize of Plot\nSize of Plot\nMaximum allowable projection (free from ground coverage and floor area ratio)\nMaximum allowable projection (free from ground coverage and floor area ratio)\nI.\nUpto 250 sq.mt.\nShall not be more than one-third of the\n\t\t\t\tcorresponding depth of front or rear setback or 0.91 meters\n\t\t\t\t(3'-0\"), whichever is less.\nII.\nAbove 250 sq.mt.\n1.83 meter (6'-0\")\nTable 33: Balcony\nTable 33: Balcony\nS.no.\nS.no.\nSize of Plot\nSize of Plot\nMaximum allowable projection (free from ground coverage and floor area ratio)\nMaximum allowable projection (free from ground coverage and floor area ratio)\nI.\nUpto 250 sq.mt.\nShall not be more than one-third of the\n\t\t\t\tcorresponding depth of front or rear setback or 1.22 meters\n\t\t\t\t(4'-0\"), whichever is less.\nII.\nAbove 250 sq.mt.\n1.83 meter (6'-0\")\nNote. - (a) The projection on door and window shall not exceed 0.91 meters. (3'-0\").\nNote.\n(b) The projection shall not be at a lesser height than 2.06 meters (6'-9\") clear above the plinth level of the building.\n(c) In case of corner plots, sunshade not exceeding 0.60 meters.(2 feet) on window opening on to the side shall be permitted at a height not less than 2.06 meters (6'-9).\n(d) If the projection or balcony is provided more than the provision of above Table 32 or Table 33 then the area of the additional projection shall be counted toward Floor Area Ratio.\n(e) Wrap around continuous balconies will be allowed as long as their area does not exceed 50% of the total open area.]\n(5) Parking.\n(a) Surface Parking.\n(b) Under stilts of building(s).\n(c) Under Basement or Multilevel Basement of the building(s):\nProvided that the provisions of the basement shall be as per sub-rule (6) of rule 30 of these rules.\n(d) Under podium of a building(s):\nProvided that the provisions of the podium shall be as per the National Building Code of India, 2016, as amended from time to time.\n(e) Under separate multi-level parking block maximum up-to 20 percent of the plot area and such area shall not be counted towards FAR (Floor Area Ratio).\n(ii) Minimum 10 per cent of the total required parking shall be surface parking on ground level.\n(iii) 40% of the total required parking shall be allowed as mechanical parking. However above 20% of the mechanical parking, it shall be provided automatic mechanical parking. Mechanical parking shall be permitted subject to mechanical and structural safety and should be covered with permanent or temporary roof structure.\n(iv) Parking in independent floors under stilts shall be permissible beyond stilts within the plot area, if the parking under stilts is not sufficient as per norms. Clear height from the finished level of the ground floor to the under surface of the beam, joint girders or any other horizontal structure member shall be 7'-6\".\n(v) In case parking is provided under stilts or podium or basement, it shall not be counted towards Floor Area Ratio and height.\n(vi) Parking spaces shall be paved and clearly marked for different types of vehicles.\n(vii) In buildings of mercantile (commercial), industrial and storage type, in addition to the parking spaces provided, a space at the rate of 3.5 m × 7.5 m, shall be provided for loading and unloading activities, for each 1000 m2 of floor area or fraction thereof.\n(viii) For the provision of car parking spaces, the space standards shall be as under.-\n(a) For open parking 23 square meters per equivalent car space.\n(b) For ground floor covered parking 28 square meters per equivalent car space.\n(c) For basement or podium 32 square meter per equivalent car space.\n(ix) If there is any doubt regarding the category of any building, for the purpose of calculation of parking the decision of the Government shall be final. Parking for the disabled persons shall comply the provisions of the Persons with Disability (Equal Opportunities, Protection of Rights and Full Participation) Act, 1995.\n(6) Exemptions.\n(a) Canopy/ porch maximum upto 100sq.ft,\n(b) watch and ward cabins upto 100sq.ft along each entry gates;\n(c) Atrium/atria, escalator/travellator well, covered sky bridges in high rise buildings, jogging tracks, swimming pools (open to sky), architectural features/elements such as, coffers, louvers, end wall projected upto 900 mm;\n(d) Pergolas, other sunshade elements, any landscape element;\n(e) Fire Staircase, fire towers, ramp;\n(f) Podium(s)/multi-storey podium, stilt, separate parking block, basement if used for parking and the services like sewerage treatment plant, water treatment plant, garbage collection, electrical sub-station, service ducts,\n(g) Service area block having services such as Diesel Generator (DG) room, Air Conditioning (AC) plant room etc. No habitable rooms are allowed to be made in any of the items above. If they are, then they will be part of the Ground Coverage.\n(ii) Exemptions from Floor Area Ratio (FAR):\nExemptions from Floor Area Ratio (FAR):\n(a) Canopy/projections upto 100 sq.ft.;\n(b) watch and ward cabins upto 100 sq.ft along each entry gates;\n(c) Atrium/atria, covered sky bridges or intermittent floors as relief in high rise buildings;\n(d) Area on habitable floor for providing services like Heating, Ventilation and Air Conditioning (HVAC), Mechanical Electrical and Plumbing (MEP) installations, Janitor rooms, Air Handling Unit (AHU) room, Air Conditioning (AC) plant room, electric installations, Low Tension (LT) panel room, Closed Circuit Television (CCTV) room or any other similar services;\n(e) Architectural features such as coffers, louvers, end wall projected upto 900 mm, pergolas, other sunshade, elements;\n(f) Any landscape element, podium(s)/ multistory podium/basement or stilts of building(s) if used for parking and services like water tank/ water works, sewerage treatment plant, water treatment plant, garbage collection, electrical sub-station, Diesel Generator (DG) room and service ducts,\n[(g) Ramp, fire exit stair cases/ fire towers, fire refuse area (as per the National Building Code of India, 2016 as amended from time to time), toilet blocks for visitors/ drivers/ guards on ground floor only, cupboards upto depth of 0.6m and 1.8m length shall be exempted from Floor Area Ratio.] .\n(h) The width of corridors and staircases provided in addition to their minimum required shall be exempted from floor area ratio:\nProvided that the area of lift wells, service shaft shall be taken on one floor:\n(iii) Exemptions to projections into open spaces. - Every open space provided either interior or exterior shall be kept free from any erection thereon and shall be open to the sky, except as given below:\nExemptions to projections into open spaces.\n(a) Cornice, roof or weather shade not more than 0.75 m wide;\n(b) Sunshades over windows/ventilators or other openings not more than 0.75 m wide;\n(c) Canopy not to be used as a sit out with clearance of 1.5 m between the plot boundary and the canopy;\n(d) Projected balcony at higher floors of width not more than 1.83 m;\n(iv) Exemption to accessory use buildings. - The following accessory use buildings may be permitted in the open spaces:\nExemption to accessory use buildings.\n(a) In an existing building, sanitary block of 2.4 m in height subject to a maximum of 4m2 in the rear open space at a distance of 1.5 m from the rear boundary may be permitted, where facilities are not adequate.\n(b) Parking lock up garages not exceeding 2.4 m in height shall be permitted in the side or rear open spaces at a distance of 7.5 m from any road line or the front boundary of the plot;\n(c) Suction tank and pump room each up to 2.5 m2 in area.\n(d) Meter Room (Power supply) / Diesel Generator (DG) set room, Rain water harvesting Pit, Check post, Waste /Garbage collection room, Covered parking for car/motorcycle / cycles, Pump room / Underground tank / Over head tank, Cooling Towers for Heating, Ventilation and Air Conditioning (HVAC) Plant and Diesel Generator (DG) set, Sewer treatment plant and water treatment plant may be allowed in rear and side setback of the site subjected to that they cannot hinder the fire tender movement with minimum 6m setback from the building(s) and the maximum height of these structure shall not more than 2.75m.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "27",
            "title": "27. General Notes.",
            "chapter": null,
            "content": "(ii) For projects proposed within the Prohibited and Regulated areas as defined in the Ancient Monuments and Archaeological Sites and Remains Act, 2010, the development regulations of Height, Floor Area Ratio, Ground Coverage and any other controls stipulated in these rules for general buildings shall be superseded by site specific Heritage Bye-Laws prepared and notified by the Competent Authority or the National Monuments Authority under the said Act of 2010. No Objection Certificate shall have to be obtained as per the Rules framed under the said Act by submission of required documents as may be necessary vide rules, including \"Heritage Impact Assessment\" report, if so necessitated by the National Monuments Authority.\n(iii) The premises for which building regulations have not been formulated shall be examined by the Competent Authority on the basis of actual requirements and other relevant factors. Activities/uses for which these rules are silent shall be governed by National Building Code of India, 2016, as amended from time to time and where National Building Code of India, 2016 as amended from time to time are silent; Norms/ Guidelines of Model Building Bye-laws, 2016 as amended from time to time shall be followed.\n(iv) The provision of minimum setbacks for different sizes of plots for all categories of the plots if not specified in these rules shall be as per the provisions of the Zoning Plan of the said site.\n(v) Area requirements of each type of educational institutions wherever not specified shall be as per the norms/guidelines issued by the affiliating authority for such institutions.\n(vi) The Punjab Energy Conservation Building Code notified by the Government of Punjab, Department of New and Renewable Energy vide Notification No. 18/4/ 16-6;1/1856, dated the 24th June, 2016, as amended from time to time, wherever applicable shall be adhered to the buildings in additions to these rules.\n(vii) The setting up of the Petrol pumps, Brick Kiln, Rice Sheller, Stone Crusher, Cinema, Multiplex, Economical Weaker Section Houses, Affordable Housing, Communication Towers, Iconic building, Low Density Country Homes, Housing for All, Ancient Building and any other activity not specifically mentioned in these rules, shall be governed by the respective policy guidelines / notifications / Acts/ rules / norms of the Department of Housing and Urban Development, Punjab or any other concerned department, as the case may be.\n(viii) In addition to these rules, Guidelines/Notifications (amended from time to time) issued by the Punjab Pollution Control Board (Department of Science, Technology and Environment, Government. of Punjab) and the Department of Forests and Wildlife Preservation, Punjab shall be applicable, where ever required.\n(ix) No sub-division of the land/ site would be subsequently permitted.\n(x) Specific approvals shall be obtained from Airport Authority of India, Ministry of Environment, Forest and Climate Change, Fire Services Department, Pollution Control Board, designated authorities under the Factories Act, 1948/ the Punjab Cinemas (Regulation) Act, 1952, Archaeological Survey of India, Heritage Committee and any such other authority, as may be applicable. Approval of Fire Services Department shall be required for buildings of height 15 m or above and for such other buildings/special buildings referred to in Part 4 - Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time.\n(xi) No Objection Certificate from Airport Authority of India for the maximum height of building(s) shall be required of building(s) in the vicinity of aerodromes. No building or structure higher than the height specified in the subject No Objection Certificate, shall be constructed or erected.\nPART V\nGeneral Building Requirements",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "28",
            "title": "28. Occupant Load.",
            "chapter": null,
            "content": "[Table 32: Occupant Load\n[Table 32: Occupant Load\nS. No.\nS. No.\nType of occupancy\nType of occupancy\nOccupant load factor (sq.m per person)\nOccupant load factor (sq.m per person)\nI.\nResidential\nResidential\n12.50\nII.\nEducational\nEducational\n4.00\nIII.\nInstitutional\nInstitutional\nIndoor patient area\n15.00\nOutpatient area\n10.00\nIV.\nAssembly:\nAssembly:\nConcentrated use without fixed seating\n0.65\nLess concentrated use without fixed seating\n1.40\nFixed seating\nMultiplying the number of seats by 1.2.\nDining areas and restaurants with seating and\n\t\t\t\t\ttable\n1.80\nV.\nMercantile:\nMercantile:\nStreet floor and sales basement\n3.00\nUpper sales floor\n6.00\nStorage/warehouse,receiving and the like\n20.00\nVI.\nBusiness\nBusiness\n10.00\nVII.\nIndustrial\nIndustrial\nCalculated on the basis of Detailed Project\n\t\t\t\t\tReport (DPR) approved by labour Department plus 10% addition of\n\t\t\t\t\tit.\nVIII.\nStorage\nStorage\nIX.\nHazardous\nHazardous\nNotes. - (a) Gross area shall be the floor area as defined in clause (78) of subrule (1) of rule 2 of these rules. All factors expressed are in gross area unless marked net.\nNotes.\n(b) Occupant load in dormitory portions of homes for the aged, orphanages, insane asylums, etc, where sleeping accommodation is provided, shall not be calculated at less than 7.5 m2 gross floor area/ person.\n(c) For the purpose of public health facilities like W.C., urinal, washbasin, drinking water fountain, ablution tabs etc., occupant load shall be calculated on floor area ratio.]",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "29",
            "title": "29. Clearance zone for buildings near High Tension Electrical Line.",
            "chapter": null,
            "content": "Table 33: Clearance Zone for buildings near\n\t\t\t\tHigh Tension Electrical Line\nTable 33: Clearance Zone for buildings near\n\t\t\t\tHigh Tension Electrical Line\nType of supply line\nType of supply line\nType of supply line Horizontal clearance (in meters)\n\t\t\t\t(including both sides and from the centre line of the tower)\nType of supply line Horizontal clearance (in meters)\n\t\t\t\t(including both sides and from the centre line of the tower)\nHigh voltage lines up to 11 KV\n11.5\nHigh voltage lines above 11 KV and up to 33KV\n15.0\nHigh voltage lines above 33 KV and up to 66KV\n18.0\nHigh voltage lines above 66 KV and up to 132KV\n27.0\nHigh voltage lines above 132 KV and up to 220KV\n35.0\nHigh voltage lines above 220 KV and up to 440KV\n52.0",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "30",
            "title": "30. Part Building requirement.",
            "chapter": null,
            "content": "(1) Plinth. - (i) Main Building(s). - The plinth level for residential plots shall be kept as 900mm and for all other buildings shall be kept as 450 mm from the crown of the adjoining road in front or as specified by the Competent Authority from time to time:\n(1) Plinth.\n(ii) Interior Court Yard. - Every interior courtyard shall be raised at least 150 mm above the determining ground level and shall be satisfactorily drained.\nInterior Court Yard.\n(2) Space requirement of different component of a building. - Minimum size, width and height of different components of building(s), low/high rise as given below in Table 34 and Table 35, namely:-\n(2) Space requirement of different component of a building.\nTable 34:\n\t\t\t\t\tMinimum requirements of different component of a building\nTable 34:\n\t\t\t\t\tMinimum requirements of different component of a building\nS.No.\nS.No.\nComponents of building\nComponents of building\nMinimum requirement\nMinimum requirement\nArea(sq.m)\nArea(sq.m)\nWidth (m)\nWidth (m)\nClear Height (m)\nClear Height (m)\nI.\nHabitable room\nHabitable room\n9.5\n2.4\n2.75\nII.\nkitchen:\nkitchen:\nwhere separatedining\n\t\t\t\t\tarea is provided\nwhere there is\n\t\t\t\t\tseparate store is provide\nwhere dinning included\n5.0\n4.5\n7.5\n1.8\n1.8\n2.1\n2.75\nIII.\nBathroom\nBathroom\n1.8\n1.2\n2.1\nIV.\nwater closet(w.c)\nwater closet(w.c)\n1.2\n0.9\n2.1\nV.\ncombined bath and w.c\ncombined bath and w.c\n2.8\n1.2\n2.1\nVI.\nStore\nStore\n3.0\n1.2\n2.2\nVII.\nGarage\nGarage\n18\n3.00\n2.4\nVIII.\nSingle occupancy Hostel Room\nSingle occupancy Hostel Room\n7.5\n2.1\n2.75\nIX.\nSingle occupancy Servant Room\nSingle occupancy Servant Room\n7.5\n2.1\n2.75\nNote. - (a) Where two rooms are attached, one of these shall not be less than 9.5 sq.m and the other not less than 7.5 sq.m with a minimum width of 2.1 m.\nNote.\n(b) In the case of pitched roof, the average height of rooms shall not be less than 2.75 m. The minimum clear head room under a beam, folded plates or eaves shall be 2.4 m.\n(c) In the case of air-conditioned rooms, a height of not less than 2.4 m measured from the surface of the floor to the lowest point of air conditioning duct or the false ceiling shall be provided:\nTable 35: Minimum height requirement for\n\t\t\t\teducational and industrial buildings\nTable 35: Minimum height requirement for\n\t\t\t\teducational and industrial buildings\nS.No.\nS.No.\nType of building\nType of building\nMinimum Ceiling Height\nMinimum Ceiling Height\nI.\nEducational building\n3.6 m\nII.\nIndustrial Buildings\n3.6 m, except when air-conditioned where it is\n\t\t\t\t3m\nIII.\nReligious Building\n3.6 m\n(3) Lighting and ventilation of rooms. - (i) Rooms shall have, for the admission of light and air, one or more openings, such as windows and ventilators, opening directly to the external air or into an open Verandah.\n(3) Lighting and ventilation of rooms.\n(ii) Notwithstanding the area of openings obtained through above sub-rule (3) of rule 26(1), the minimum aggregate area [see Notes(a) to (c)]of such openings, excluding doors inclusive of frames, shall be not less than one-tenth of the floor area.\nNotes. - (a) If a window is partly fixed, the open able area shall be counted.\nNotes.\n(b) No portion of a room shall be assumed to be lighted, if it is more than 7.5 m away from the opening assumed for lighting that portion.\n(c) The area of openings above shall be increased by 25 percent in the case of a kitchen.\n(d) In bathroom or water closet have a window or ventilator, opening to a shaft or open space, of area not less than 0.3 m2 with side not less than 0.3 m.\n(e) No room containing water-closets shall be used for any purpose except as a lavatory and no such room shall open directly into any kitchen or cooking space by a door, window or other opening. Every room containing water-closet shall have a door completely closing the entrance to it.\n(f) Mechanical light and ventilation shall be permissible as per National Building Code of India, 2016, as amended from time to time.\n(4) Ledge or Tand. - (i) Height. - The minimum head-room of ledge or Tand/ loft shall be 2.2 m. The maximum height of loft shall be 1.5 m.\n(4) Ledge or Tand.\n(ii) Size. - A ledge or Tand/loft in a habitable room shall not cover more than 25 percent of the area of the floor on which it is constructed and shall not interfere with the ventilation of the room under any circumstances.\nSize.\n(5) Mezzanine Floor. - (i) Height. - It shall have a minimum height of 2.2 m. with no beams or protuberances below 1.8 m.\n(5) Mezzanine Floor.\n(ii) Size. - The minimum size of the mezzanine floor, if it is to be used as a living room, shall not be less than 9.5 m2. The aggregate area of such mezzanine floor in a building shall in no case exceed one-third the plinth area of the building.\nSize.\nNotes. - (a) A mezzanine floor may be permitted over a room or a compartment, provided;\nNotes.\n(b) It conform to the standard of living rooms as regards lighting and ventilation in case the size of mezzanine floor is 9.5 m2 or more;\n(c) It is so constructed as not to interfere under any circumstances with the ventilation of the space over and under it;\n(d) Such mezzanine floor is not subdivided into smaller compartments;\n(e) Such mezzanine floor or any part of it shall not be used as a kitchen; and\n(f) In no case shall a mezzanine floor be closed so as to make it liable to be converted into unventilated compartments.\n(6) Basement. - [(i) The multi-level basement in plots of an area above 2025 sq.m shall be allowed below the ground and beyond the building line at ground level subject to a clear minimum front margin of 4.5 m and side and rear margins of 3 m, subject to the provision of mechanical ventilation and all safety provisions and drainage. However, it is essential that the basement top slab below the external circulation at ground level should be designed for fire fighting vehicular loads as given in clause 4.6 of Part III of the National Building Code of India, 2016, as amended from time to time. The owner or the applicant, as the case may be, shall be bound to execute indemnity bond in the favour of competent authority as specified in annexure 21.\n(6) Basement.\n(ii) In case of plot size upto 2025 sq.m, single storey basement is allowed upto zoned area subject to the condition that the owner shall leave minimum 2.44 m (8'-0\") setback from the boundary wall of the plot:\n(iii) Basement shall not be allowed in the case of No construction Zone/Area or Master Plan Green area or any other restricted area/zone under the provision of any other Act/policy of the State or Central Government.\n(iv) Other conditions. - The following are the conditions for the basement, namely:-\nOther conditions.\n(a) First level basement area may be used for habitable purposes subject to the condition that mandatory parking norms are fulfilled and compliance of all requirements for fire safety in accordance with Part 4- Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time and necessary measures for required lighting, ventilation and water supply, drainage and sanitation is ensured;\n(b) The minimum height of basement shall be 2.40 meters measured from the finished level of the floor to the under surface of the beam, joist girders or any other horizontal structural member. However, if basement is used for habitable purpose than the minimum height and space requirement of that area shall be as per sub-rule (2) of rule 30 of these rules;\n(c) Adequate ventilation shall be provided for the basement. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans, air conditioning system and conform to fire safety and structural safety;\n[(d) The minimum height of the ceiling of first level basement shall be 0.9 meters and maximum 1.2 meters above the average surrounding ground level, except convenient shopping. However, if sunken court is provided for light and ventilation then the same shall not be mandatory.] ;\n(e) Adequate arrangement shall be made that surface drainage does not enter the basement;\n(f) There shall be provisions of sufficient doors in case the basement is used for habitable purposes and maximum travel distance from any point to the door shall not exceed 15 meters;\n(g) In case, where the basement is allowed beyond the building envelope as per sub-rule (6) of rule 30, then the level of the basement shall be at the ground floor level and the slabs should be designed to bear the load of fire tenders;\n(h) The walls and floors of the basement shall be watertight and be so designed that the effects of the surrounding soil and moisture, if any, are taken into account in design and adequate damp proofing treatment is given;\n(i) The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors. Where the staircase is continuous in the case of buildings served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floors. Open ramps shall be permitted if they are constructed within the building line subject to the provision of condition (e).\n(j) In the case of parking spaces provided in basement(s), at least two ramps of width and slope as per sub-rule (17) of rule 30 shall be provided, located preferably at opposite ends.\n(k) Access to basements through ramps shall be permitted subject to provision of condition (e). The requirements for the ramps shall be in accordance with sub rule (17) of Rule 31 and the National Building Code of India, 2016, as amended from time to time;\n(l) Parking in basement can be permitted through car lift, in case of residential building, except group housing, ramps are not mandatory. However, for other than residential building, ramps are mandatory for plot size above 3000 sq.m.\n(m) For all public buildings and uses including group housing, having basement going up to more than one level, access to all levels shall also be provided through lift. The exit requirements in basements shall comply with the provisions of Part 4- Fire and Life Safety of the National Building Code of India, 2016, as amended from time to time:\n(7) Chimneys. - The chimneys shall be built at least 0.9 m above flat roofs, provided the top of the chimneys is not below the top of the adjacent parapet wall. In the case of sloping roofs, the chimney top shall not be less than 0.6 m above the ridge of the roof in which the chimney penetrates.\n(7) Chimneys.\n(8) Parapet. - Parapet walls and handrails provided on the edges of roof terraces, balcony, Verandah, etc, shall not be less than 1.0 m and not more than 1.4 m in height from the finished floor level.\n(8) Parapet.\nNote. - The above shall not apply where roof terrace is not accessible by a staircase. However, on terrace floor in the portion where installations like Diesel Generator (DG) Set, Water Tank and other, screening parapet of a suitable height may be constructed to hide such equipment's etc and there is no need to have uniformly increased the height of the parapet.\n(9) Cabin. - The size of cabins shall not be less than 3.0 m2 with a minimum width of 1.0 m. The clear passages within the divided space of any floor shall not be less than 0.75 m and the distance from the farthest space in a cabin to any exit shall not be more than 18.5 m. In case, the sub-divided cabin does not derive direct lighting and ventilation from any open spaces/ mechanical means, the maximum height of the cabin shall be 2.2 m.\n(9) Cabin.\n(10) Boundary wall. - (i) In residential or industrial plotted development, independent floors front boundary wall shall have maximum height upto 0.9 m from the centre line of the adjoining road. However, above the boundary wall, the perforated wall such as stone jali/ iron grills/ vegetation maximum upto 0.9 m high may be constructed.\n(10) Boundary wall.\n(ii) Other than above buildings, the maximum height of the boundary wall along the road or open space or park shall be 0.9 m from the centre line of the adjoining road. However, above the boundary wall, the perforated wall such as stone jali/ iron grills/ vegetation of maximum upto 0.9 m high may be constructed.\n(iii) The maximum height of the solid boundary wall (i.e. side wall and back wall) shall be 1.83 m from ground level.\n(iv) In case of corner plot, radius of corner boundary wall shall be minimum 5'-0\" or 1/8th of the width of the adjoining road whichever is more and maximum upto 20'-0\".\n(v) In industrial buildings like workshops, factories, electric sub-stations, transformer stations and institutional buildings like sanatoria, hospitals, sports complex, stadium, and educational buildings like schools, colleges, including hostels, and other uses of public utility undertakings and strategically sensitive buildings, a height up to 2.4 m may be permitted on special request of the applicant. However, in case of security establishments, Jails, mental hospitals, etc. where additional height of the boundary wall is required by the applicant, the same may be allowed by the competent authority.\n[(vi) Boundary wall may be allowed to be constructed in No Construction Zone after leaving the road widening, if required, subject to the condition that the owner shall dismantle the boundary wall as and when required by any Government agency/ authority without any claim.] ;\n(11) Septic tanks. - Where a septic tank is used for sewage disposal, the location, design and construction of the septic tank shall conform to requirements of Part 9 -'Plumbing Services (including Solid Waste Management) and Section 2-Drainage and Sanitation' of the National Building Code of India, 2016.\n(11) Septic tanks.\n(12) Office-cum-letter box room. - In the case of multi-storeyed apartments, an officecum- letter box room of dimension of 3.6 m × 3 m shall be provided on the ground floor. In case the number of flats is more than 20, the maximum size of the officecum- letter box room shall be 20 m2.\n(12) Office-cum-letter box room.\n(13) Meter rooms. - For all buildings 15 m and above in height and in special occupancies, like educational, assembly, institutional, industrial, storage, hazardous and mixed occupancies with any of the aforesaid occupancies having area more than 500 m2 on each floor, provision shall be made for an independent and ventilated meter (service) room, as per requirements of electric (service) supply undertakings on the ground floor with direct access from outside for the purpose of termination of electric supply from the licensee's service and alternative supply cables. The door/ doors provided for the service room shall have fire resistance of not less than two hours.\n(13) Meter rooms.\n(14) Staircase or exit requirements. - The number of staircases in the building(s) shall be determined on the basis of the occupant load, travel distance, dead end restriction subject to minimum two staircases in respect of buildings identified under these rules:\n(14) Staircase or exit requirements.\nThe following Building(s) shall have minimum of two staircases:\n(i) Building(s) of 15m in height or above, and\n(ii) Special buildings, such as,\n(a) hotel, educational, institutional, business, mercantile, industrial, storage, hazardous and mixed occupancies, where any of these buildings have floor area more than 500 m2 on any one or more floors;\n(b) educational buildings having height 9 m and above;\n(c) institutional buildings having height 9 m and above;\n(d) all assembly buildings;\n(e) buildings having area more than 300 sq.m of incidental assembly occupancy on any floor; and\n(f) buildings with two basements or more, or with one basement of area more than 500 m2.\n(iii) All exit staircases shall discharge, at the level of exit discharge, to the exist discharge, either,\n(a) directly, or\n(b) through an exit passageway, or\n(c) through a large lobby.\n(15) Staircase requirement. - (i) Minimum clear width. - The following minimum width shall be provided for staircases for respective occupancies, namely:-\n(15) Staircase requirement.\n(a) Residential plotted/ independent floors :\nFor plot size upto 150 sq.m : 900 mm\nFor plot size above 150 sq.m : 1000 mm\n(b) Residential (lodging and rooming houses, dormitories) : 1250 mm\n(c) Apartment houses/group housing : 1350 mm\n(d) Hotel : 1500 mm\n(e) Assembly : 2000 mm\n(f) Educational : 1500 mm\n(g) Institutional: 2000 mm\n(Hospitals, sanatoria, custodial, institutions, penal and mental institutions)\n(h) All other occupancies : 1500 mm\n(ii) Minimum tread. - The minimum width of tread without nosing shall be 300 mm. However, for one or two family dwelling, it may be reduced to not less than 250 mm.\nMinimum tread.\n(iii) Maximum riser. - The maximum height of riser shall be 150 mm. However, for one or two family dwelling, it may be increased maximum upto190 mm. The number of risers shall be limited to 12 per flight.\nMaximum riser.\n(iv) Headroom height. - The minimum head-room in a passage under the landing of a staircase shall be 2.2 m. The minimum clear head-room in any staircase shall be 2.2 m.\n(16) Corridor requirement. - Minimum width provisions for passageway/corridors (clear width excluding handrail and balustrade)/ foyer, as the case may be, shall be determined such a way that it shall accommodate the entire population of the floor subject to minimum width depending upon the class of occupancy mentioned as under, namely:-\n(16) Corridor requirement.\n(i) Residential buildings (one or two family private dwelling): 1050 mm for single loaded (i.e. having door opening for single side of corridor) and 1500 mm for double loaded (i.e. having door opening for both side of corridor).\n(ii) Residential buildings, e.g., hostels, group housing etc.: 1350 mm for single loaded and 1800 mm for double loaded.\n(iii) Assembly buildings like auditoriums, theatres and cinemas: 2000 mm.\n(iv) All other buildings like commercial, institutional and hotels: 1500 mm for single loaded and 1800 mm for double loaded.\n(v) Hospital, Nursing Homes, etc.: 2400 mm for both single and double loaded.\n(vi) Where staircase discharges through corridors and passageways, the height of corridors and passageways shall be not less than 2400 mm.\n(vii) All means of exit including staircases, lift lobbies and corridors shall be naturally/ mechanically ventilated.\nNote. - The above mentioned width of the corridor is the minimum width, which shall increase with increase in the occupant load of the building and shall provide as per Part 4- Fire and Life Safety of the National Building Code of India, 2016.\nNote.\n(17) Ramps. - (i) Ramp requirement for pedestrians, differently-abled, elderly and children. - [(a) Ramp(s) shall be compulsory in educational building (upto high/ secondary school level), In-patient Medical facilities and shall go up to the highest floor. However, it shall not be mandatory for higher level educational institute building. Minimum width of the ramp shall be as per the provisions of the sub-rule (16) of rule 30 of these rules and its gradient shall not be less than 1:12. Other provisions of the ramp shall be as per National Building Code of India, 2016:\n(17) Ramps.\n(b) For physically challenged/ old persons, the provision of ramp upto the plinth level shall be as per the National Building Code of India, 2016.\n(ii) Ramp requirement for vehicular movement.-\n(a) Open Ramps with minimum width of 6m may also be provided in the setbacks which can be sloped considering unhindered movement of fire engine and in no case, the gradient shall be less than 1:10.\n(b) The ramp to basement and parking floors shall not be less than 7.2 m wide for two way traffic and 4 m wide for one way traffic, provided with gradient of 1:8 for cars and 1:15 for heavy vehicles. At curved portions of the ramp or for circular ramps, the slope should not be more than 1:12.\n(c) After a 40 m length of continuous ramp, a flat surface of minimum 6.0 m length shall be provided.\n(d) All and structural design/ safety aspects as per latest Bureau of Indian Standard Codes and the National Building Code of India, 2016 shall be complied along with consideration of weight of Fire Engine and its maneuverings.\n(18) Exit Requirements. - In respect of width and travel distance, all aspects of exit requirements for corridors, doors, staircases, ramps shall be as per Part 4- Fire and Life Safety of the National Building Code of India, 2016.\n(18) Exit Requirements.\n(19) Roofs. - (i) The roof of a building shall be so designed and constructed as to effectively drain water by means of sufficient rain water pipes of size as specified in the National Building Code of India, 2016, as amended from time to time wherever required, so arranged, jointed and fixed as to ensure that the rain water is carried away from the building without causing dampness in any part of the walls, roof or foundations of the building or an adjacent building.\n(19) Roofs.\n(ii) The rain water pipes shall be connected to a drain or a sewer which connects the rain-water pipe to the road gutter or in any other approved manner.\n(iii) The rain-water pipes shall be affixed to the outside of the external walls of the building or in recesses or chases cut or formed in such external walls or in such other manner as may be approved by the Authority.\n(iv) It is desirable to conserve rain water using suitable rain water harvesting techniques including by roof water collection. For this purpose, the provisions made in Part 9- Plumbing Services (including Solid Waste Management), Section 2 Drainage and Sanitation of the National Building Code of India, 2016 shall be followed.\n[(20) Sunken courtyard. - Sunken courtyard up to 3 m in depth from the ground level and minimum 2 m width and minimum 10 sq.m. area as light well within zoned area shall be permitted for light and ventilation for basement area provided that it does not interfere with the movement of fire tenders and adequate arrangements for drainage shall be provided.\n[(20) Sunken courtyard.\n(21) Fitments for drainage and sanitation. - (i) For Residences. - Dwelling with individual convenience shall have at least the following fitments, namely:-\n(21) Fitments for drainage and sanitation.\n(a) One bath room provided with a tap and a floor trap;\n(b) One water closet with flushing apparatus with an ablution tap / health faucet; and\n(c) One tap with a floor trap or a sink in kitchen.\n(ii) The requirements for fitments for drainage and sanitation in the case of buildings other than residences shall be in accordance with Table 36 to Table 49.\nTable 36: Office Building\nTable 36: Office Building\nS.No.\nS.No.\nFixtures\nFixtures\nPublic Toilets\nPublic Toilets\nStaff Toilets\nStaff Toilets\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\nExecutive Rooms and Conference Halls in\n\t\t\t\tOffice Buildings\nExecutive Rooms and Conference Halls in\n\t\t\t\tOffice Buildings\nI.\nToilet suite comprising one Water Closets (WC), one\n\t\t\t\twash basin (with optional shower stall if building is used round\n\t\t\t\tthe clock at user's option) Pantry optional as per user\n\t\t\t\trequirement\nUnit could be common for male/female or separate depending on the\n\t\t\t\tnumber of user of each facility\nFor individual officer rooms\nMain Office Toilets for Staff and Visitors\nMain Office Toilets for Staff and Visitors\nII.\nWater Closets (WC)\n1 per 25\n1 per 15\nIII.\nAblution tab with each water closet\n1 in each water closet\nIV.\nUrinals\nsee note\nsee note\nNil up to 6\n1 for 7 to 20\n2 for 21 to 45\n3 for 46 to 70\n4 for 71 to 100\nFrom 101 to 200,add @\n\t\t\t\t3%;\nfor over 200, add @ 2.5%\n-\nV.\nWash Basins\n25\n25\nVI.\nDrinking Water Fountain\n1 per 100 persons\nVII.\nCleaner's sink\n1 per floor\nNote. - Staff and public toilet utilities are generally common in office buildings. Where public toilets are to be provided separately, similar requirements as that of staff toilet may be provided.\nNote.\nTable 37:\n\t\t\t\tCinema, Multiplex Cinema, Concert and Convention Halls, Theatres\n\t\t\t\tand Stadia\nTable 37:\n\t\t\t\tCinema, Multiplex Cinema, Concert and Convention Halls, Theatres\n\t\t\t\tand Stadia\nS. No.\nS. No.\nFixtures\nFixtures\nPublic Toilets\nPublic Toilets\nStaff Toilets\nStaff Toilets\nMale\nFemale\nMale\nFemale\nI.\nWater Closets\n1 per 100 upto 400;\nOver 400 add at 1 per 250 or part thereof\n3 per 100 upto 200;\nOver 200 add at 2 per 100 or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n1 per 25 or part thereof\n-\n1 for 1 to 20\n2 for 21 to 45\n-\nIV.\nWash Basins\n1 per 200 or part thereof\n1 for upto 15\n2 for 16 to 35\n1 for upto 12\n2 for 13 to 25\nV.\nDrinking Water Fountain\n1 per 100\nVI.\nCleaner's sink\n1 per floor\nVII.\nShowers/bathing rooms\nAs per trade requirements\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as one-third.\nTable 38: Art\n\t\t\t\tGalleries, Libraries and Museums\nTable 38: Art\n\t\t\t\tGalleries, Libraries and Museums\nS. No.\nS. No.\nFixtures\nFixtures\nPublic Toilets\nPublic Toilets\nStaff Toilets\nStaff Toilets\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\nI.\nWater Closets\n1 per 100 upto 400;\nOver 400 add at 1 per 250 or part thereof\n3 per 100 upto 200;\nOver 200 add at 2 per 150 or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n1 per 25 or part thereof\n-\n1 for 1 to 20\n2 for 21 to 45\n-\nIV.\nWash Basins\n1 per 100 upto 400;\nOver 400 add at 1 per 250 or part thereof\n3 per 100 upto 200;\nOver 200 add at 2 per 150 or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nV.\nDrinking Water Fountain\n1 per 100\nVI.\nCleaner's sink\n1 per floor\nVII.\nShowers/bathing rooms\nAs per trade requirements\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as one-third.\nTable 39: Restaurants\nTable 39: Restaurants\nS. No.\nS. No.\nFixtures\nFixtures\nPublic Toilets\nPublic Toilets\nStaff Toilets\nStaff Toilets\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\nI.\nWater Closets\n1 per 50 seats up to\n\t\t\t\t200;\nOver 200 add at 1 per 100 or part thereof\n2 per 50 seats up to 200;\nOver\n\t\t\t\t200 add at 1 per 100 or part thereof\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6 for 78 to 100\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n1 per 50 persons or part thereof\n-\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 65\n4 for 66 to 100\n-\nIV.\nWash Basins\n1 per Water Closets (WC)\n1 per Water Closets (WC)\n1 per Water Closets (WC)\n1 per Water Closets (WC)\nV.\nCleaner's sink\n1 per restaurant\nVI.\nKitchen sink/dish washer\n1 per kitchen\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as one-third.\n(c) Provision for additional and special fittings where required shall be made.\nTable 40: Shopping Malls and Retail Buildings\nTable 40: Shopping Malls and Retail Buildings\nS.No.\nS.No.\nFixtures\nFixtures\nPublic Toilets for floating population\nPublic Toilets for floating population\nStaff Toilets in Shopping Building\nStaff Toilets in Shopping Building\nMale\nFemale\nMale\nFemale\nI.\nWater Closets\n1 per 50 (min. 2)\n1 per 50 (min. 2)\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6 for 78 to 100\nII.\nAblution tab\n1 in each water closet\nIII.\nUrinals\n1 per 50\n-\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 65\n4 for 66 to 100\n-\nIV.\nWash Basins\n1 per Water Closets (WC)\n1\n\t\t\t\tper Water Closets (WC)\n1\n\t\t\t\tper Water Closets (WC)\n1\n\t\t\t\tper Water Closets (WC)\nV.\nCleaner's sink\n1 per floor\nVI.\nBath/showers\n1 per 100 persons\nNotes. - (a) Toilet facilities for individual facilities in a shopping building should be taken same as that for office buildings.\nNotes.\n(b) Staff toilets in the shopping buildings provide facilities for persons working in shops and building, as well as for maintenance staff.\n(c) The number of persons against the fixture bath/showers represent the maintenance staff requiring such facility.\n(d) Public toilet facilities are provided for a large floating population for buyers and visitors.\n(e) Some Water Closets (WC) may be Indian style, if desired.\n(f) Male population may be assumed as two-third and female population as one-third.\n(g) Provision for additional and special fittings where required shall be made.\nTable 41:\n\t\t\t\tHotel\nTable 41:\n\t\t\t\tHotel\nS. No.\nS. No.\nFixtures\nFixtures\nPublic Room\nPublic Room\nNon Residential Staff\nNon Residential Staff\nMale\nFemale\nMale\nFemale\nI.\nToilet suite comprising one Water Closets (WC),\n\t\t\t\twash basin with shower or a bath tub\nIndividual guest rooms with attached toilets\n-\nGuest room with common facilities\nGuest room with common facilities\nII.\nWater Closets\n1 per 100 persons upto\n\t\t\t\t400;\nover 400 add at 1 per 250 or part thereof\n1 per 100 persons upto\n\t\t\t\t200;\nover 200 add at 1 per 100 or part thereof\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6 for 78 to 100\nIII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIV.\nUrinals\n1 per 50 person or part thereof\n-\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 65\n4 for 66 to 100\n-\nV.\nWash Basins\n1 per Water Closets (WC)\n1 per Water Closets\n\t\t\t\t(WC)\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n1 for up to 15\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n1 for up to 12\nVI.\nBath (showers)\n1 per 10 person or part thereof\nVII.\nCleaner's sink\n1 per 30 rooms, minimum 1 per floor\nVIII.\nKitchen sink\n1 per kitchen\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as onethird.\n(c) Provision for additional and special fittings where required shall be made.\nTable 42: Hospital with indoor patient ward\nTable 42: Hospital with indoor patient ward\nS. No.\nFixtures\nPublic Toilets\nStaff Toilets\nMale\nFemale\nMale\nFemale\nI.\nToilet suite comprising one Water Closets (WC),\n\t\t\t\tone wash basin and shower stall\nPrivate room with up to 4 patient\nFor individual doctor's/officer's rooms\nFor General wards, Hospital staff and visitors\nII.\nWater Closets\n1 per 5 Beds or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nIII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIV.\nUrinals\n1 per 15 beds\n-\n1 for 1 to 20\n2 for 21 to 45\n-\nV.\nWash Basins\n2 for every 30 beds\n\t\t\t\tor part thereof.\nAdd 1 per additional 30 beds or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nVI.\nDrinking Water Fountain\n1 per Ward\n1 per 100 person or part thereof\nVII.\nCleaner's sink\n1 per Ward\n-\nVIII.\nBed pan sink 1 per Ward\n1 per Ward\n-\nIX.\nKitchen sink 1 per Ward\n1 per Ward\n-\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as onethird.\n(c) Provision for additional and special fittings where required shall be made\n(d) Drinking water fountain are not recommended for hospitals for reasons of infection control. This is to be decided by the health authority recommendations.\nTable 43: Hospital with Outdoor Patient\n\t\t\t\tDepartment\nTable 43: Hospital with Outdoor Patient\n\t\t\t\tDepartment\nS. No.\nS. No.\nFixtures\nFixtures\nPatient Toilets\nPatient Toilets\nStaff Toilets\nStaff Toilets\nMale\nFemale\nMale\nFemale\nI.\nToilet suite comprising one Water Closets (WC) and\n\t\t\t\tone wash basin (with optional shower stall if building used for\n\t\t\t\t24 h)\nFor up to 4 patient\nFor individual doctor's/officer's rooms\nII.\nWater Closets\n1 per 100 persons or part thereof\n2\n\t\t\t\tper 100 persons or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nIII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIV.\nUrinals\n1 per 50 persons or part thereof\n-\n1 for 1 to 20\n2 for 21 to 45\n-\nV.\nWash Basins\n2 per 100 persons or part thereof\n1 for up to 15\n2 for 16 to 35\n1 for up to 12\n2 for 13 to 25\nVI.\nDrinking Water Fountain\nSee note (d)\n1 per 100 person or part thereof\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as onethird.\n(c) Provision for additional and special hospital fittings where required shall be made.\n(d) Drinking water fountain are not recommended for hospitals for reasons of infection control. This is to be decided by the health authority recommendations.\n(e) The Water Closets (WC) shall be provided keeping in view the location of main Out Patient Department (OPD) waiting hall and sub-waiting halls, floor wise, so as to serve the people effectively. The number of patients shall be calculated floor wise. The Out Patient Department (OPD) population shall include patient attendants @ at least 1 per patient.\nTable 44:\n\t\t\t\tHospital Administrative Buildings\nTable 44:\n\t\t\t\tHospital Administrative Buildings\nS. No.\nS. No.\nFixtures\nFixtures\nStaff Toilets\nStaff Toilets\nMale\nFemale\nI.\nToilet suite comprising one Water Closets (WC) and\n\t\t\t\tone wash basin (with optional shower stall if building used for\n\t\t\t\t24 h)\nFor individual doctor's /officer's rooms\nII.\nWater Closets\n1 per 25 persons or part thereof\n1 per 15 persons or part thereof\nIII.\nAblution tab\n1 in each water closet\n1 water tap with draining arrangements shall be provided for\n\t\t\t\tevery 50 persons or part thereof in the vicinity of water closets\n\t\t\t\tand urinals\nIV.\nUrinals\nNil up to 6\n1 for 6 to 15\n2 for 16 to 50\n-\nV.\nWash Basin\n1 per 25 persons or part thereof\nVI.\nDrinking Water Fountain\n1 per 100 persons or part thereof( see note c)\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as two-third and female population as one-third.\n(c) Drinking water fountains to be provided only where it is a separate block and patients will not use it.\nTable 45: Factories\nTable 45: Factories\nS No.\nS No.\nFixtures\nFixtures\nOffices/Visitors\nOffices/Visitors\nWorkers\nWorkers\nMale\nFemale\nMale\nFemale\nI.\nWater (workers and staff)\nClosets 1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\nFrom 101 to 200, add @ 3%;\nfor over 200, add @ 2.5%\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6 for 78 to 100\nFrom 101 to 200, add @ 5%;\nfor over 200, add @ 4%\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\nFrom 101 to 200, add @ 3%;\nfor over 200, add @ 2.5%\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6 for 78 to 100\nFrom 101 to 200, add @ 5%;\nfor over 200, add @ 4%\nII.\nAblution tab\n1 in each water closet\nIII.\nUrinals\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 70\n4 for 71 to 100\nFrom 101 to 200, add @ 3%;\nfor over 200, add @ 2.5%\n-\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 70\n4 for 71 to 100\nFrom 101 to 200, add @ 3%;\nfor over 200, add @ 2.5%\n-\nIV.\nWash Basins(wash basins in rows or troughs and taps\n\t\t\t\tspaced 750 mm c/c)\n1 per 25 or part thereof\nV.\nDrinking Water Fountain\n1 per 100 persons or part thereof with minimum\n\t\t\t\tone on each floor\nVI.\nCleaner's sink\n1 on each floor\nVII.\nShowers/bathing rooms\nAs per trade requirements\nVIII.\nEmergency shower and eye wash fountain\n-\n-\n1 per every shop floor per 500 persons\nNotes. - (a) For factories requiring workers to be engaged in dirty and dangerous operations or requiring them to being extremely clean and sanitized conditions, additional and separate (if required so) toilet facilities and if required by applicable Industrial and safety laws and the Factories Act shall be provided in consultation with the user.\nNotes.\n(b) Depending on the type of disability of a person and the hazard posed by the type of activities in the factory for a person with disabilities, if a person with disabilities is decided to be engaged for a particular activity, the requirements of accessibility shall be guided by the provisions given in 13 of Part 3 -'Development Control Rules and General Building Requirements of the National Building Code of India, 2016'.\nTable 46: Schools and Educational\n\t\t\t\tInstitutions\nTable 46: Schools and Educational\n\t\t\t\tInstitutions\nS No.\nS No.\nFixtures\nFixtures\nNursery School\nNursery School\nNon-Residential\nNon-Residential\nResidential\nResidential\nBoys\nGirls\nBoys\nGirls\nI.\nWater Closets\n1 per 15 pupils or part thereof\n1 per 40 pupils or part thereof\n1 per 25 pupils or part thereof\n1 per 8 pupils or part thereof\n1 per 6 pupils or part thereof\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n-\n1 per 20 pupils or part thereof\n-\n1 per 25 pupils or part thereof\n-\nIV.\nWash Basins\n1 per 15 pupils or part thereof\n1 per 60 pupils or part thereof\n1 per 40 pupils or part thereof\n1 per 8 pupils or part thereof\n1 per 6 pupils or part thereof\nV.\nDrinking Water Fountain\n1 per 50 pupils or part thereof\n1 per 50 pupils or part thereof\n1 per 50 pupils or part thereof\nVI.\nCleaner's sink\n1 per each floor\nVII.\nBath / Showers\n1 per 40 pupils or part thereof\n-\n1\n\t\t\t\tper 8 pupils or part thereof\n1\n\t\t\t\tper 6 pupils or part thereof\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) For teaching staff, the schedule of fixtures to be provided shall be the same as in case of office building.\nTable 47: Hostels\nTable 47: Hostels\nS No.\nS No.\nFixtures\nFixtures\nResident\nResident\nNon-Resident\nNon-Resident\nVisitor/Common Room\nVisitor/Common Room\nMales\nFemales\nMales\nFemales\nMales\nFemales\nI.\nWater Closets\n1 per 8 or part thereof\n1 per 6 or part thereof\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6 for 78 to 100\n1 per 100 upto 400;\nover 400 add at 1 per 250\n1 per 100 upto 200;\nover 200 add at 1 per 100\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n1 per 25 or part thereof\n-\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 70\n4 for 71 to 100\n-\n1 per 50 or part thereof\n-\nIV.\nWash Basins\n1 per 8 or part thereof\n1 per 6 or part thereof\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n5 for 58 to 77\n6 for 78 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n1 per water Closets(WC)\n1 per water Closets(WC)\nV.\nBath/showers\n1 per 8 or part thereof\n1 per 6 or part thereof\n-\n-\n-\n-\nVI.\nCleaner's sink\n1 per each floor\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired. Table 48: Fruit and Vegetable Markets S No. Fixtures Shop Owners Common toilets in market building Public toilet for floating population Males Females Males Females Males Females I. Water Closets 1\n\t\t\t\tper 8 or part thereof 1 for up to 15 2 for 16 to 35 3 for 36 to 65 4\n\t\t\t\tfor 66 to 100 1 for up to 12 2 for 13 to 25 3 for 26 to 40 4 for 41 to 57 5 for 58 to 77 6\n\t\t\t\tfor 78 to 100 1 per 50 (min 2) 1 per 50 (min 2) II. Ablution tab 1 in each water\n\t\t\t\tcloset 1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals III. Urinals - - 1 for 1 to 20 2 for 21 to 45 3 for 46 to 70 4 for 71 to 100 - 1 per 50 - IV. Wash Basins 1\n\t\t\t\tper 8 or part thereof 1 for up to 15 2 for 16 to 35 3 for 36 to 65 4 for 66 to 100 1 for up to 12 2 for 13 to 25 3 for 26 to 40 4 for 41 to 57 - - V. Bath/showers 1 per 8 or part thereof 1 per 6 or part thereof - - 1 per 50 persons 1 per 50 persons\nNotes.\nTable 48: Fruit and Vegetable Markets\nTable 48: Fruit and Vegetable Markets\nS No.\nS No.\nFixtures\nFixtures\nShop Owners\nShop Owners\nCommon toilets in market building\nCommon toilets in market building\nPublic toilet for floating population\nPublic toilet for floating population\nMales\nFemales\nMales\nFemales\nMales\nFemales\nI.\nWater Closets\n1\n\t\t\t\tper 8 or part thereof\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4\n\t\t\t\tfor 66 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n5 for 58 to 77\n6\n\t\t\t\tfor 78 to 100\n1 per 50 (min 2)\n1 per 50 (min 2)\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n-\n-\n1 for 1 to 20\n2 for 21 to 45\n3 for 46 to 70\n4 for 71 to 100\n-\n1 per 50\n-\nIV.\nWash Basins\n1\n\t\t\t\tper 8 or part thereof\n1 for up to 15\n2 for 16 to 35\n3 for 36 to 65\n4 for 66 to 100\n1 for up to 12\n2 for 13 to 25\n3 for 26 to 40\n4 for 41 to 57\n-\n-\nV.\nBath/showers\n1 per 8 or part thereof\n1 per 6 or part thereof\n-\n-\n1 per 50 persons\n1 per 50 persons\nNotes. - (a) Toilet facilities for individual buildings in a market should be taken same as that for office buildings.\nNotes.\n(b) Common toilets in the market buildings provide facilities for persons working in shops and their regular visitors.\n(c) Special toilet facilities for a large floating population of out of town buyers/ sellers, labour, drivers of vehicles for whom special toilet (public toilets).\nTable 49:Bus Stations, Airports and Railway\n\t\t\t\tStations\nTable 49:Bus Stations, Airports and Railway\n\t\t\t\tStations\nS No.\nS No.\nFixtures\nFixtures\nJunction Stations, Intermediate Stations and Bus\n\t\t\t\tStations\nJunction Stations, Intermediate Stations and Bus\n\t\t\t\tStations\nTerminal Railway and Bus Stations\nTerminal Railway and Bus Stations\nDomestic and International Airports\nDomestic and International Airports\nMales\nFemales\nMales\nFemales\nMales\nFemales\nI.\nWater Closets\n3\n\t\t\t\tfor up to 1000 add 1 per additional 1000 or part thereof\n4\n\t\t\t\tfor up to 1000 add 1 per additional 1000 or part thereof\n4\n\t\t\t\tfor up to 1000 add 1 per additional 1000 or part thereof\n5\n\t\t\t\tfor up to 1000 add 1 per additional 1000 or part thereof\nfor 200 : 5\nfor 400 : 9\n600 : 12\n800 : 16\nfor\n\t\t\t\t1000 : 18\nfor 200 : 8\nfor 400 : 15\nfor 600 : 20\nfor 800 : 26\nfor\n\t\t\t\t1000 : 29\nII.\nAblution tab\n1 in each water\n\t\t\t\tcloset\n1 water tap with draining arrangements shall be\n\t\t\t\tprovided for every 50 persons or part thereof in the vicinity of\n\t\t\t\twater closets and urinals\nIII.\nUrinals\n4 for up to 1000 add 1 per additional 1000\n-\n6 for up to 1000 add 1 per additional 1000\n-\n1 per 40 or part thereof\n4 for up to 1000 add 1 per additional 1000\nIV.\nWash Basins\n1 per wc\nV.\nBath/ showers\n2 per 1000 or part thereof\n3 per 1000 or part thereof\n4 per 1000 or part thereof\nVI.\nDrinking Water Fountain or taps (in common lobby\n\t\t\t\tfor male/female)\n2 per 1000 or part thereof\n3 per 1000 or part thereof\n4 per 1000 or part thereof\nVII.\nCleaner's sink\n1 per toilet compartment with 3 wcs\nNotes. - (a) Some Water Closets (WC) may be Indian style, if desired.\nNotes.\n(b) Male population may be assumed as three-fifth and female population as two-fifth.\n(c) Separate provision shall be made for staff and workers.\nPART VI\nFire Protection, Structural Design, Building Materials and Lighting and Ventilation",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "31",
            "title": "31. Fire protection.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "32",
            "title": "32. Structural design.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "33",
            "title": "33. Lighting and ventilation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "34",
            "title": "34. Electrical and allied installations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "35",
            "title": "35. Building Materials.",
            "chapter": null,
            "content": "PART VII\nProvisions for Differently-Abled, Elderly and Children",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "36",
            "title": "36. Applicable provisions.",
            "chapter": null,
            "content": "PART VIII\nGreen Buildings and Sustainability Provisions",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "37",
            "title": "37. Provisions and applicability.",
            "chapter": null,
            "content": "Table 50:\n\t\t\t\tProvisions for various plot sizes (Residential uses)\nTable 50:\n\t\t\t\tProvisions for various plot sizes (Residential uses)\nGreen Building Provisions\nResidential plotted\nGroup housing\nPlot Area in Sq.mt.\nUpto 250\nAbove 250 upto 500\nAbove 500 upto 1,000\nAbove 1,000 upto 3,000\nAbove 3,000\nAs Par Government policy\nWater Conservation and Management\nWater Conservation and Management\nRain Water Harvesting (By Recharge)\nLow Water Consumption Plumbing Fixtures\nEnergy Efficiency and Solar Energy\n\t\t\t\tUtilization\nEnergy Efficiency and Solar Energy\n\t\t\t\tUtilization\nProvisions of notification no. 18/4/16 HG 1/1856\n\t\t\t\tdated: 24-6-2016 of Department of New & Renewable Energy\n\t\t\t\tshall be applicable or as amended from time to time\nTable 51: Provisions for various plot sizes\n\t\t\t\t(Non-Residential uses)\nTable 51: Provisions for various plot sizes\n\t\t\t\t(Non-Residential uses)\nGreen Building Provisions\nGreen Building Provisions\nPlot Area in Sq.mt.\nUpto\n\t\t\t\t250\nAbove\n\t\t\t\t250 upto 500\nAbove\n\t\t\t\t500 upto 1,000\nAbove\n\t\t\t\t1,000 upto 3,000\nAbove\n\t\t\t\t3,000\nWater Conservation and Management\nWater Conservation and Management\nRain Water Harvesting and (by Recharge)\nManagement Low Water Consumption Plumbing Fixtures\nEnergy Efficiency & Solar Energy Utilization\nEnergy Efficiency & Solar Energy Utilization\nProvisions of notification no. 18/4/16 HG 1/ \n\t\t\t\t1856 dated: 24-6-2016 of Department of New & Renewable Energy\n\t\t\t\tshall be applicable or as amended from time to time.\nNote. - The shaded boxes indicate that the provision is applicable for a plot.\nNote.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "38",
            "title": "38. Energy efficiency.",
            "chapter": null,
            "content": "(ii) The applicant/owner shall submit a certificate from an architect/ Civil Engineer confirming that the building plans conform to the Punjab Energy Conservation Building Code and is duly verified by Punjab Energy Development Agency (PEDA) along with the application approval of building plan.\n(iii) The completion and occupation certificate of buildings shall be issued by the competent authority only after the applicant/ owner shall submit a certificate from an architect / Civil Engineer (who has supervised the construction of building) that building has been constructed in accordance with the provision of the Punjab Energy Conservation Building Code and is duly verified by Punjab Energy Development Agency.\n(iv) An incentive of additional 5 percent Floor Area Ratio free of charges and 100 % exemption of building scrutiny fee shall be permissible on submission of Green building Certificate from the following agencies with rating duly verified by rating agencies, namely :-\n(a) Buildings granted 4 or 5 star rating by Green Rating for Integrated Habitat (GRIHA) or;\n(b) Buildings granted Gold/ Platinum rating by Leadership in Energy and Environmental Design (LEED) or;\n(c) Buildings granted Gold/Platinum rating by Indian Green Building Council (IGBC).",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "39",
            "title": "39. Provisions for tree plantation in new building sites.",
            "chapter": null,
            "content": "(i) One tree for every 225 sq.m covered area of building(s) shall be planted. While calculating the number of trees, if there is a fraction less than 0.5, it shall be rounded down to the nearest whole digit and if there is a fraction equal to or greater than 0.5, it shall be rounded up to the nearest whole digit.\n(ii) The occupancy certificate shall only be granted if the owner has planted the requisite number of trees as per the sanctioned plans.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "40",
            "title": "40. Roof Top Solar Photovoltaic Installation.",
            "chapter": null,
            "content": "Table 52\n\t\t\t\tNorms for Roof Top Solar Photovoltaic Installation\nTable 52\n\t\t\t\tNorms for Roof Top Solar Photovoltaic Installation\nS.No.\nS.No.\nCategory of buildings/area\nCategory of buildings/area\nGeneration requirement\nGeneration requirement\nI.\nResidential building\nAll residential buildings (new construction/ reconstruction)\n400 yd2(334 m2) to 499 yd2 (417 m2) - 1KWp SPV\n500 yd2(418 m2) to 999 yd2 (835 m2) - 2KWp SPV\n1000 yd2 (836 m2) to 1999 yd2 (1671 m2) - 3KWp SPV\n2000 yd2 (1672 m2) and above - 5KWp SPV\nII.\nAll private educational institutes schools,\n\t\t\t\tcolleges, hostels, technical / vocational educational institute,\n\t\t\t\tuniversities etc. having connected load of 30 KWp and above\nMinimum 5 kilo watt peak (KWp) or 5% of connected load,\n\t\t\t\twhichever is higher.\nIII.\nAll government building and offices and government\n\t\t\t\tcolleges, government educational institutions, universities,\n\t\t\t\thaving connected load of 30 KWp and above\nMinimum 2 Kilo Watt peak (KWp) or 5% of whichever is higher.\nIV.\nAll private hospitals\n\t\t\t\tand nursing homes industrial establishments, commercial malls,\n\t\t\t\thotels, motels, banquet halls, and tourism complexes having\n\t\t\t\tconnected load of :-\n(a)50 KWp to 1000 KWp\n(b) Above 1000 KWp\nMinimum 10 Kilo Watt peak or 5% of connected load, which is\n\t\t\t\thigher\nMinimum 50 Kilo Watt peak or 3% of connected load, which is\n\t\t\t\thigher\nV.\nAll group housing\n\t\t\t\tcomplexes, developed on plot size of :-\n(a) 0.5 Acre to 1.0 acre\n(b) More than 1.0 acre\n\t\t\t\tto 2.0 acre\n(c) More than 2.0 acre\n\t\t\t\tto 5.0 acre\n(d) More than 5.0 acre\nMinimum 10 Kilo Watt peak (KWp)\nMinimum 20 Kilo Watt peak (KWp)\nMinimum 30 Kilo Watt peak (KWp)\nMinimum 40 Kilo Watt peak (KWp)\nNote. - (a) The height of module structure carrying solar panel shall not be covered towards total height of building\nNote.\n(b) Completion certificate for building shall be issued after getting clearance from Punjab Energy Development Agency (PEDA) regarding solar power plant installation.\n(c) For all other matters regarding solar power plant installation which are not covered in these rules, the Punjab Energy Development Agency (PEDA) norms/ guidelines of renewable energy sources, Punjab shall be applicable.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "41",
            "title": "41. Rainwater harvesting.",
            "chapter": null,
            "content": "(a) Roof catchment;\n(b) Gutters;\n(c) Down pipes;\n(d) Rain water/ Storm water drains;\n(e) Filter Chamber;\n(f) Storage Tanks/ Pits/ Sumps; and\n(g) Ground Water recharge structures like pit, trench, tube well or combination of above structure.\n(1) Rainwater harvesting techniques. - There are two main techniques of rain water harvestings, namely:-\n(1) Rainwater harvesting techniques.\n(a) Storage of rainwater under surface; and\n(b) Recharge to ground water.\n(2) Harvesting provisions in various building categories. - The provision for rain water harvesting is as under:\n(2) Harvesting provisions in various building categories.\nTable 53\n\t\t\t\tProvisions for Rainwater harvesting by building types\nTable 53\n\t\t\t\tProvisions for Rainwater harvesting by building types\nCategory/Use\nCategory/Use\nArea of Plot\nArea of Plot\nProvisions to be made\nProvisions to be made\nOther conditions\nOther conditions\nResidential Plotted Houses\nResidential Plotted Houses\nNew Proposals\nAbove 250 sq. mt.\nConstruction of Rain Water Harvesting Structure.\nShall have emphasis on both storage and reuse.\nGroup Housing\nGroup Housing\nNew Proposals\nAll plot sizes\nConstruction of Rain\n\t\t\t\tWater Harvesting Structure.\nConcrete paving to be avoided and permeable\n\t\t\t\tmaterials are to be used for all open parking spaces.\nShould indicate the system of Strom Water\n\t\t\t\tDrainage, Rain Water Harvesting Structure and Recharging Well\nGovt. &Semi Govt. Public Buildings &\n\t\t\t\tPrivate Institutions\nGovt. &Semi Govt. Public Buildings &\n\t\t\t\tPrivate Institutions\nAll Proposals\nAbove 250 sq.mt.\nShall have Rain Harvesting Structure and storage\n\t\t\t\tShall have Recharge pits\nWater Shall have emphasis on both storage and\n\t\t\t\treuse.\nCommercial / Mixed use Buildings\nCommercial / Mixed use Buildings\nAll Proposals\nAbove 100 Sq.mt.\nConstruction of Rain\n\t\t\t\tWater Harvesting Structure.\nSoft landscape provision\n\t\t\t\tand open spaces with Percolation pits.\nCommon treatment plant to be made part of the\n\t\t\t\tintegrated development. funded by sale of commercial space.\nShould indicate the system of Stor Water\n\t\t\t\tDrainage, Rain Water Harvesting Structure and Recharging Well.\n\t\t\t\tShall have emphasis on both storage and reuse.\nIndustrial\nIndustrial\nAll proposals\nAbove 100Sq.mt.\nConstruction of Rain\n\t\t\t\tWater Harvesting Structure.\nSoft landscape\n\t\t\t\tprovisions and open spaces with Percolation pits.\nCommon treatment plant to be made part of the\n\t\t\t\tintegrated development funded by sale of commercial space.\nShould indicate the\n\t\t\t\tsystem of Strom Water Drainage, Rain Water Harvesting Structure\n\t\t\t\tand Recharging Well.\nProvision should be made not to inject\n\t\t\t\tcontaminated water into recharge structures in industrial areas\n\t\t\t\tand care to be taken to keep such structure away from sewer\n\t\t\t\tlines,septic tanks, soak pits, landfill and other sources of\n\t\t\t\tcontamination.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "42",
            "title": "42. Sustainable waste management .",
            "chapter": null,
            "content": "(a) the collection is made from house to house and some segregation is done at household level;\n(b) separate wet and dry bins must be provided at the ground level;\nand\n(c) the recycling is done at decentralized.\nPART IX\nConservation of Heritage Sites Including Heritage Buildings, Heritage Precincts and Natural FEATURE AREAS",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "43",
            "title": "43. Applicable provisions.",
            "chapter": null,
            "content": "PART X\nEnvironmental Clearances for Building Plan Approval",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "44",
            "title": "44. Integration of environmental conditions for building plan approval.",
            "chapter": null,
            "content": "PART XI\nPublic Health: Water Supply, Sewerage and Drainage",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "45",
            "title": "45. Water Supply.",
            "chapter": null,
            "content": "(2) Material for water connection.\n(3) Sanction of water connection.\n(4) Release of water connection.\n(ii) No building or premises shall be supplied with water by the competent authority through more than one communication pipe and in the case of multi storeyed flats, separate water connection for each flat will be allowed and its water meter shall be installed at the ground floor.\n(iii) All works to be carried out by the applicant in connection with the supply or use of water shall be required to be executed by the registered plumber and shall conform to the standard and specifications laid down for such items in the Punjab Public Works Department specification Book 1986 Edition and if no standards or specifications are laid down for any item, it shall be as per standard and specifications of the Indian Standard Institute and if no standard and specifications are laid down by the Indian Standard Institute, then that item shall be as per the Bureau of Indian Standards.\n(iv) The applicant shall make provision of dual button type flushing cistern in each water closet.\n(v) Tertiary treated water from nearby Sewerage Treatment Plant shall be supplied to every public, commercial, residential buildings through separate connection, which shall be utilized for non potable purposes such as gardening, washing of floors or courtyards, flushing of WC's (Water Closet) through separate network system to be provided in the building. This provision shall be applicable to newly developed areas after coming into operation of this provision.\n(5) Notice and certificate of completion of work.\n(ii) If no decision is communicated or taken on the application for a certificate mentioned under sub-rule (5) of rule 45 within a period of 20 days of the receipt of the application to the applicant, the certificate shall be deemed to have been granted.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "46",
            "title": "46. Sewerage and Drainage.",
            "chapter": null,
            "content": "(i) After the grant of the certificate referred to in sub-rule (5) of rule 45 or in the event of the certificate having been deemed to have been granted, every person intending to connect a drain or sewer to a public water sewer shall apply in Form 'L' to the competent authority at least seven days before the date on which connection is required.\n(ii) The application under sub-rule (i) shall be accompanied by the certificate referred to in sub-rule (5) of rule 45 along with a fee, which the Chief Administrator may specify from time to time.\n(iii) On receipt of the application and subject to the requirements of sub-rule (5) of rule 45, the Competent Authority shall accept or reject the application after giving the opportunity of being heard.\n(iv) In the event of the required connection having been sanctioned, it shall be got connected through a registered plumber.\n(1) Connection with public sewer.\n(2) Material for drain and construction.\n(3) Drain connection for trade effluent.\n(4) Waste water pipes.\n(i) not discharge as to cause dampness in the walls or the foundation of a building; and\n(ii) if it discharges into a drain, be disconnected from the drain by a trapped gully with a suitable grating above the level of the water in the trap.\n(5) Manholes.\n(ii) Where the diameter of a drain is increased the crown of the pipes shall be fixed at the same level and the necessary slopes given in the invert of the manhole chamber, and in exceptional cases, where the required fall is not available, connection may be made upto half the difference in the diameter that is the connecting branch sewer shall be connected with the main sewer in such a manner that full supply level of both the sewers is maintained running half the diameter of both the sewers of drain and the minimum internal size of chamber (between brick faces) shall be as follows,-\nTable 54 Provisions for minimum internal size\n\t\t\t\tof Chamber\nTable 54 Provisions for minimum internal size\n\t\t\t\tof Chamber\nI.\nFor depth of 0.80 meter\n0.75 x 0.75 meters\nII.\nFor depth of more than 0.80 meters but not\n\t\t\t\texceeding 2.1 meters\n1.2 x 0.90 metres\nIII.\nFor depths of more than 2.1 meters\nRectangular chamber with minimum internal\n\t\t\t\tdimension of 1.20 x 0.90 meter\n(6) Septic tank.\n(ii) Every septic tank shall be constructed into two separate compartments so that one compartment when required may be put out of use for cleaning purposes.\n(iii) The capacity of every compartment of the septic tank shall be two and a half times the total water allowance for the total number of residents of the building.\n(iv) Every inlet pipe into a septic tank shall be effectively trapped.\n(v) The design of septic tank shall be in accordance with the B.I.S. (Bureau of Indian Standards) Code No. IS 2470, Part-I-1968 and IS 2470 (Part-II-1971) Code of practice for design and construction of septic tank.\n(7) Absorption pits.\n(ii) No absorption pit shall have any outlet into, or means of communication with, any sewer, storm water, drain or surface drain.\n(iii) The wall of every absorption pit shall be at least 0.50 metre above ground level so as to exclude effectively the entry of storm water into the absorption pit.\n(iv) The absorption pit shall be constructed in duplicate so that one pit can be put out of use for cleaning purpose and the capacity of the absorption pit shall be as approved by the competent authority.\n(v) The other details of the absorption pit should conform to the B.I.S. (Bureau of Indian Standards) Code No. IS 2470(Part I) 1968 Code of Practice for design and construction of septic tanks.\n(vi) The absorption pits shall be provided with adequate means of access for removing the filtering media and cleaning the same.\nNote. - For requirements regarding water supply, drainage and sanitation, solid waste management, gas supply shall be made as per Part 9, Plumbing Services of the National Building Code of India, 2016.\nNote.\nPART XII\nRisk Based Classification of Building Plan Approval Proposals",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "47",
            "title": "47. Risk Based Classification of building proposals.",
            "chapter": null,
            "content": "(ii) storage and handling of hazardous and highly flammable liquids, liquefiable gases like LPG, rocket propellants, etc;\n(iii) storage and handling of hazardous and highly flammable or explosive materials (other than liquids); and\n(iv) manufacture of artificial flowers, synthetic leather, ammunition, explosives and fireworks.\nNote. - A list of hazardous substances giving quantities, for which or exceeding which owners handling such substances are required to be covered under the Public Liability Insurance Act, 1991, has been notified under the Rules on Emergency Planning, Preparedness and Response for Chemical Accidents by the Government of India, Ministry of Environment and Forests, Notification No. G.S.R. 347(E), dated the 01st August 1996.\nNote.\n(1) Classification of risk based storage building.\nTable 55 - Classification of risk based\n\t\t\t\tstorage building\nTable 55 - Classification of risk based\n\t\t\t\tstorage building\nCategory\nCategory\nStorage Material Specifications\nStorage Material Specifications\nStacking\nStacking\nDesignated officer for site Inspection\nDesignated officer for site Inspection\nHeight (in m)\nHeight (in m)\nMedium\nMedium\nHigh\nHigh\nCategory-I(Low Risk)\nCategory-I(Low Risk)\nArticles such as Carpets,\n\t\t\t\tNon-synthetic/synthetic yarn and fabrics. Mechanical and\n\t\t\t\telectrical goods (dominantly metal parts), Glassware and\n\t\t\t\tcrockery, fiberboards, groceries, metal goods, Papers other than\n\t\t\t\tthose listed under categories Moderate and High, Powdered and\n\t\t\t\tcanned foods, Plastic/glass bottles containing nonflammable\n\t\t\t\tliquids, etc.\n4\n6.5\nAssistant Town Planner/Assistant Engineer/\n\t\t\t\tSenior Divisional Engineer\nCategory-II(Medium Risk)\nCategory-II(Medium Risk)\nArticles such as Batteries, Baled\n\t\t\t\tcotton/synthetic fibers, Books, Baled cork, Baled waste paper,\n\t\t\t\tCartons containing alcohols ( in cans/bottles), Cartons of canned\n\t\t\t\tlacquers which dry by solvent evaporation, Chipboard, Cardboard\n\t\t\t\trolls (horizontally Stored), Cereals/Grains/Foodstuff/ Flour/\n\t\t\t\tSugar in sacks, Cellulose/Cellulose pulp, Electrical goods other\n\t\t\t\tthan those stated in Category low, Flammable liquids in\n\t\t\t\tnon-combustible containers, Leather goods, Palletized liquor\n\t\t\t\tstocks, Plastics (non-foamed, other than cellulose nitrate),\n\t\t\t\tRolled pulp and paper and asphalted paper (Horizontal storage),\n\t\t\t\tVeneer sheets, Wooden patterns, Metal/wooden furniture with\n\t\t\t\tplastic seats, etc.\n3\n5.5\nDistrict Town Planner/Executive Engineer\nCategory-III(High Risk)\nCategory-III(High Risk)\nArticles such as Bitumen/Wax coated paper,\n\t\t\t\tCandles, Carbon black, Card board rolls (vertically stored),\n\t\t\t\tCharcoal, Coal, cellulose nitrate, Foamed plastic and foam rubber\n\t\t\t\tproducts, Flammable liquids in combustible containers, Linoleum\n\t\t\t\tproducts, Matches, Plastics other than those stated in Category\n\t\t\t\tModerate, Rolled pulp and paper and asphalted paper (vertical\n\t\t\t\tstorage), Rubber goods including tyres and tubes, Sawn timber,\n\t\t\t\tVentilated wood stacks, Waxed and asphalt coated papers and\n\t\t\t\tcontainers in cartons, Wood wool, wooden pallets and flats\n\t\t\t\t(idle), Ail materials having wrappings or preformed containers of\n\t\t\t\tfoamed plastics, etc.\n2\n4.5\nSenior Town Planner/Senior Engineer.\nCategory-IV (Extreme High Risk)\nCategory-IV (Extreme High Risk)\nOff cuts and random pieces of foamed plastic or\n\t\t\t\trubber rolls of sheets of foamed plastic or foamed rubber, Foam\n\t\t\t\tmattress, Expanded polystyrene packaging, Foam upholstery, etc.\n1.25\n3.5\nSenior Town Planner/Senior Engineer.\nNotes. - (a) The deflector of the sprinkler fitted in the ceiling shall be at more than 1.5 m from the goods stored below. However, in case of jute storage, no jute stock shall reach within 2 m of the deflectors of the sprinkler heads.\nNotes.\n(b) In case of storage in racks or shelves, if the height of storage is more than what is specified, intermediate sprinklers shall be provided for each shelf/rack in addition to the ceiling sprinklers and overall design density and Assumed Maximum Area of Operation shall be maintained as per Table 5 of IS: 15105.\n(c) The aisle width between the storage stacks shall not be less than 2.5 m and the maximum area of each storage stack shall not be more than 150m2. If these parameters are exceeded, the design density applicable shall be loaded by 2.5 L/min/m2.\n(d) In case of mixed storage (both moderate and high hazard storage) in buildings, the parameters will be governed by the most hazardous occupancy.\n(e) Goods stored not higher than what is stated above table for the appropriate category or not higher than the eaves height of the roofs or within 1 m of a flat ceiling whichever is the lowest shall be regarded as moderate hazard storage. If the above conditions are not met, the risk shall be regarded as high hazard storage.\n(f) Any new use which increases the number of occupants to a figure comparable with other classes of occupancy shall change the classification of the building to that of the new use (for example, Warehouse used for office purposes).\n(g) Warehouse buildings shall not include any article which is highly combustible or explosive materials or products which are liable to bum with extreme rapidity and or which may produce poisonous fumes or explosions for storage, handling and which involve highly corrosive, toxic or noxious alkalis, acids or other liquids or chemicals producing flame, fumes and explosive, poisonous, irritant or corrosive gases; and for the storage, handling of any material producing ex-plosive mixtures of dust which result in the division of matter in to fine particles subject to spontaneous ignition as such buildings fall in Hazardous Building Category.\n(2) Classification of risk based industrial building.\nTable 56 Classification of risk based\n\t\t\t\tindustrial building\nTable 56 Classification of risk based\n\t\t\t\tindustrial building\nCategory\nCategory\nNature of risk\nNature of risk\nDesignated officer for site Inspection\nDesignated officer for site Inspection\nLow risk\nLow risk\nThis subdivision shall include any building in\n\t\t\t\tTown which the contents are of such comparative low\n\t\t\t\tcombustibility and the industrial processes or operations\n\t\t\t\tconducted therein are of such a nature that there is hardly any\n\t\t\t\tpossibility for any self-propagating fire to occur and the only\n\t\t\t\tconsequent danger to life and property may arise from panic,\n\t\t\t\tfumes or smoke, or fire from some external source.\nAssistant Planner/Assistant Engineer/Senior Divisional Engineer\nMedium risk\nMedium risk\nThis subdivision shall include any building in\n\t\t\t\twhich the contents or industrial processes or operations\n\t\t\t\tconducted therein are liable to give rise to a fire which will\n\t\t\t\tburn with moderate rapidity or result in other hazardous\n\t\t\t\tsituation and may give off a considerable volume of smoke, but\n\t\t\t\tfrom which neither toxic fumes nor explosions are to be feared in\n\t\t\t\tthe event of fire.\nDistrict Town Planner/Executive Engineer.\nHigh risk\nHigh risk\nThis subdivision shall include any building in\n\t\t\t\twhich the contents or industrial processes or operations\n\t\t\t\tconducted therein are liable to give rise to a fire which will\n\t\t\t\tburn with extreme rapidity or result in other hazardous situation\n\t\t\t\tor from which poisonous fumes or explosions are to be feared in\n\t\t\t\tthe event of a fire.\nSenior Town Planner/ Senior Engineer.\n(a) For determination of fire loads and fire load density for arriving at the classification of occupancy hazard, guidance on calorific values of some common materials is given at Annexure A of part IV of the National Building Code of India, 2016.\n(b) A broad classification of industrial occupancies into low, moderate and high hazard classes is given at Annexure B of part IV of the National Building Code of India, 2016.\n(3) Classification of risk based on nature of occupancy in building.\nTable 57\n\t\t\t\tClassification of risk based on nature of occupancy in building\nTable 57\n\t\t\t\tClassification of risk based on nature of occupancy in building\nCategory\nCategory\nNature of occupancy\nNature of occupancy\nDesignated officer for site Inspection\nDesignated officer for site Inspection\nLow risk\nLow risk\n• Residential\n\t\t\t\t(excluding rental housing) and commercial like shops, booths,\n\t\t\t\tsco's building and office below 15m height,\n• Creche and Pre Nursery/ Nursery School\nAssistant Town Planner/Assistant Engineer/ Senior Divisional\n\t\t\t\tEngineer\nMedium risk\nMedium risk\n• Residential and\n\t\t\t\tcommercial like shops, booths, sco's building and office 15m and\n\t\t\t\tabove but below 30m\n• Educational\n\t\t\t\tbuilding, Nursing Homes, Clinics, laboratory, below 15m\n• Orphanage Home ,\n\t\t\t\tOld Age Home, Children's Centre / Care Centre / School /\n\t\t\t\tInstitute for Mentally challenged or Physically Handicapped\n\t\t\t\tPerson below 15m\n• Hotel/ Motels,\n\t\t\t\tGuest House, Lodging & Boarding / Service Apartments below\n\t\t\t\t15m\n• Restaurant/ Dabha\n\t\t\t\tseating capacity below 50 persons\n• recreational,\n\t\t\t\tsports complex (low rise)\n• rental housing below 15m\nDistrict Town Planner/Executive Engineer.\nHigh risk\nHigh risk\n• Assembly building\n\t\t\t\tlike Religious, cinemas, multiplex, miniplex, concert hall,\n\t\t\t\texhibition hall, convention centre, marriage palace, stadium,\n\t\t\t\tcommunity centre, club, Religious Building, Auditorium, Museum,\n\t\t\t\tGymnasium etc.\n• Residential and\n\t\t\t\tcommercial like shops, booths, sco's building and office 30m and\n\t\t\t\tabove\n• Educational\n\t\t\t\tbuilding, Nursing Homes, Clinics, laboratory, 15m and above\n• Orphanage Home ,\n\t\t\t\tOld Age Home, Children's Centre / Care Centre / School /\n\t\t\t\tInstitute for Mentally challenged or Physically Handicapped\n\t\t\t\tPerson 15m and above\n• Commercials such\n\t\t\t\tas Shopping Mall / Shopping Complex\n• Restaurant/ Dabha\n\t\t\t\tseating capacity 50 persons and above\n• Hospital\n• Wholesale Trade/\n\t\t\t\tWare House/ Integrated Freight complex (Standalone)\n• rental housing 15m and above\nSenior Town Planner/ Senior Engineer.\nNote. - Inspection of the risk based buildings site at the time of approval of building plan shall be carried out as mentioned in Table 58 and Table 59 below.\nNote.\nTable 58: where the date of\n\t\t\t\tissuance of change of land use is within three months from the\n\t\t\t\tdate of application for approval of building plans\nTable 58: where the date of\n\t\t\t\tissuance of change of land use is within three months from the\n\t\t\t\tdate of application for approval of building plans\nS. No.\nS. No.\nNature of risk\nNature of risk\nInspection of site\nInspection of site\nRemarks\nRemarks\nI.\nLow risk\nNot applicable\nSince the\n\t\t\t\tsite has already been inspected at the time of approval of Change\n\t\t\t\tof Land Use and the application for approval of building plans\n\t\t\t\thas been submitted with in the period of three months. Hence\n\t\t\t\tre-inspection of the site may not be required after such a short\n\t\t\t\tperiod of time.\nII.\nMedium risk\nIII.\nHigh risk\nTable 59: where the date of issuance of change of land use\n\t\t\t\texceed a period of three months\nTable 59: where the date of issuance of change of land use\n\t\t\t\texceed a period of three months\nS. No.\nS. No.\nNature of risk\nNature of risk\n% of random inspection\n% of random inspection\nRemarks\nRemarks\nI.\nLow risk\n25\n-\nII.\nMedium risk\n50\nIII.\nHigh risk\n100\nPART XIII\nRegistration of Plumbers",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "48",
            "title": "48. Registration of Plumbers.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "49",
            "title": "49. Grant of registration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "50",
            "title": "50. Renewal of registration.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "51",
            "title": "51. Cancellation of registration certificate.",
            "chapter": null,
            "content": "PART XIV\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "52",
            "title": "52. Relaxation.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "53",
            "title": "53. Matters not covered under these rules.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "54",
            "title": "54. Repeal and saving.",
            "chapter": null,
            "content": "Annexure 1\nAnnexure 1\nForm A\nForm A\n[See rule 0]\nForm of Application\nForm of Application\n......................................................\n.......................................................\nCompetent Authority\n.........................................................\n..........................................................\nI/We attach following documents in triplicate\nI/We attach following documents in triplicate",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "1",
            "title": "1. Site plan showing the position of site proposed to be built upon as required by these rules;",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "2",
            "title": "2. Plans, elevations and sections as required by these with rules;",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "3",
            "title": "3. Water supply, Drainage plans, scheme for fire safety and fire safety system and equipment, electrical scheme for air conditioning and air cooling, as required by these rules;",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "4",
            "title": "4. Specifications of material of the proposed building;",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "5",
            "title": "5. Copy of allotment letter/ Change of land use;",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "6",
            "title": "6. Other document, as required.",
            "chapter": null,
            "content": "I/we solemnly declare as under ;\nI/we solemnly declare as under ;\n1. that I/we shall construct the building as per approved building plan;\n2. that I/we shall take plinth level from the Executive Engineer of competent authority;\n3. that I/we shall provide the solar heater system and PV panels for electricity generation;\n4. that I/we shall provide rain water harvesting system within the site;\n5. that the work related to public health shall be under the supervision of the registered plumber with the competent authority;\n6. that I/we shall responsible for the construction as per the structural design and specification prepared and certified by civil engineer / structural engineer.\n7. that I/we shall provide public health facilities, sewerage, solid waste and electrical facilities as per norms.\n8. that I/we shall occupy the building after taking the completion certificate and occupation certificate from competent authority.\n9. that if there is any change in planning and design of building, then the construction for this shall be done only after the prior approval of revised building plan from the competent authority .\n10. that I/we shall abide to follow the term and conditions lay in Change of Land Use letter.\n11. that I/we will not obstruct any official from entering the premises for inspection purpose;",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "12",
            "title": "12. Certificate of conformity to regulation and structural safety for the relevant buildings (depending upon type and height);",
            "chapter": null,
            "content": "13. that structural design given by the Structural Engineer, and got supervised by following Architect or Engineer or both as the case may be.\n14. that all plans and drawings shall be submitted with an un-editable Compact Disc/DVD or any other electronic medium permissible by competent authority from time to time along with hard copies of plans.\n15. that structural design given by the Structural Engineer, and got supervised by following Architect or Engineer or both as the case may be.\n16. that I/we shall abide to take required NOC's from any department, if any.\n17. that I/we shall abide to pay the scrutiny fees/or any other charges.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "18",
            "title": "18. Certificate of conformity of design as per Punjab Energy Conservation Building Code,2016, if applicable, as per its notification.",
            "chapter": null,
            "content": "A. Architect:\nA. Architect:\ni. Name of Architect:\nii. Council of Architecture Registration No. ____, valid upto____________.\niii. Complete Address:\niv. E-Mail:\nv. Mobile no.:\nB. Engineer:\nB. Engineer:\ni. Name of Engineer:\nii. Qualifications:\niii. Registration No.:\niv. Complete Address:\nv. E-Mail:\nvi. Mobile no.:\nEnclosures Signature of applicant\ni. Complete Address:\nii. E-Mail:\niii. Mobile no.:\n*strike out whichever is not applicable\nAnnexure 2\nForm B\nForm B\n[See rule 5 0(v)]\nStructure Safety Certificate\nStructure Safety Certificate\nForm 'A'\nDetails of the building for which the certificate is issued\nBuilding Plan:\ni. Name of Architect:\nii. Council of Architecture Registration No. ____, valid up to __________.\niii. Complete Address\niv. E-mail\nv. Mobile no.\nStructural Design:\ni. Name of Engineer:\nii. Qualifications:\niii. Complete Address\niv. E-mail\nv. Mobile no.\nCertificate\nIt is hereby certified that the plans submitted in Form A for the building detailed above, are in accordance with the Punjab Urban Planning and Development Building Rules, 2018 and the approved zoning plan of the plot. The structure has been designed in accordance with the provisions of the National Building Code of India, 2016 as amended from time to time and the relevant Indian Standard Code including Bureau of Indian Standard Codes for structures resistant to earthquakes and other natural hazards. The local soil conditions, its load bearing capacity and the underground water table etc. have been kept in view while designing the same.\nDated________________\nSignature of Owner\nMobile no.____________\nE-mail_______________\nSignature of Architect\nSignature of Engineer/Structural Engineer\nAnnexure 3\nAnnexure 3\nForm C\nForm C\nSpecifications\nSpecifications\n[See rule 5 0(iv)]\nItems Specifications:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "1",
            "title": "1. Foundations",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "2",
            "title": "2. Walls",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "3",
            "title": "3. Damp-proof course",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "4",
            "title": "4. Floors",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        },
        {
            "number": "5",
            "title": "5. Roofs",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 62
        },
        {
            "number": "6",
            "title": "6. Windows and Doors and other wood-work",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 63
        },
        {
            "number": "7",
            "title": "7. Steel work",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 64
        },
        {
            "number": "8",
            "title": "8. Internal finish",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 65
        },
        {
            "number": "9",
            "title": "9. External finish",
            "chapter": null,
            "content": "Signature of applicant\nSignature of Architect/Engineer\ni. Complete Address\nii. E-Mail\niii. Mobile no.\nAnnexure 4\nAnnexure 4\nForm D\nForm D\n[See rule 9 (iii)]\nIntimation for Sanction/rejection of the Building Plan\nIntimation for Sanction/rejection of the Building Plan\nThe Competent Authority,\n(i) Sanction for the aforesaid construction under rule 9 of the Punjab Urban Planning and Development Building Rules, 2018;\n(ii) Rejected for reasons given hereunder:-\n(iii) Sanction subject to the following amendments:-\n(iv) Returned for removal of the following defects:-\nSignature Competent Authority\nAnnexure 5\nAnnexure 5\nForm E\nForm E\n[See rules 10 and 45(5)(5)]\nForm for Notice of Commencement of Work\nForm for Notice of Commencement of Work\n____________________________,\n_____________________________,\nSignature of Applicant/Owner\nName of the Applicant_____________\nPermanent Address_______________\nTemporary Address _______________\nTelephone No. ___________________\nMobile No. ______________________\nE-mail address ___________________\nAnnexure 6\nAnnexure 6\nForm F\nForm F\n[See rule (7)]\nNotice of Completion and Part Completion\nNotice of Completion and Part Completion\nThe Competent Authority\nDescription of Building\nSignature of the Applicant\nAnnexure 7\nAnnexure 7\nForm G\nForm G\n[See rule(7)]\nCompletion Certificate by Architect and Engineer\nCompletion Certificate by Architect and Engineer\nNote. - In case of buildings more than 15 metres height (including stilt), the supervision of building shall be undertaken by both i.e. the Architect and the Engineer.\nNote.\nAnnexure 8\nAnnexure 8\nForm H\nForm H\n[See rules 8 (2), 7(3) and 45(5)]\nCompletion Certificate from Competent Authority\nCompletion Certificate from Competent Authority\nThe Competent Authority,\n(1) Grant permission for the completion and/or use of the said building; Or\n(2) Refuse permission for the completion and/or use of the said building for reasons given below:-\nDescription of building\nArea _______________________________\nSite no.__________House no._______________\nKhasra no.___________,Village______________\nCompetent Authority\nCompetent Authority\nAnnexure 9\nAnnexure 9\nForm I\nForm I\n[See rule 8 (1)]\nNotice of Permission to Occupy\nNotice of Permission to Occupy\nCompetent Authority\nDescription of Building\nArea ________________________________\nSite no._____________House no.________________\nKhasra no.______________, Village_______________\nSignature of the Applicant\nAnnexure 10\nAnnexure 10\nForm J\nForm J\n[See rules 9 (2) and 45(5)]\nPermission for Occupancy or Use of the Building\nPermission for Occupancy or Use of the Building\n(1) Grant permission for the occupation and/or use of the said building; Or\n(2) Refuse permission for the occupation and/or use of the said building for reasons given below:-\nDescription of building\nCompetent Authority\nAnnexure 11\nAnnexure 11\nForm K\nForm K\n[See rule 45(1)]\nApplication For Water Connection\nApplication For Water Connection\nThe Competent Authority\nThe particulars are given below:-",
            "footnote": "",
            "is_definition": false,
            "sort_order": 66
        },
        {
            "number": "1",
            "title": "1. Name of Area ........... Road......... Building/Plot/ House No. ................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 67
        },
        {
            "number": "2",
            "title": "2. Name of owner ................... Son of .................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 68
        },
        {
            "number": "3",
            "title": "3. Name of applicant ......................... Son of .........................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 69
        },
        {
            "number": "4",
            "title": "4. Size of ferrule .................. Number of taps required.....................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 70
        },
        {
            "number": "5",
            "title": "5. Name of registered Plumber through whom the work executed...................",
            "chapter": null,
            "content": "Instructions :-\nThe application should be entertained either from the owner or such person who has been authorized to do so by the owner who would be held responsible for the payment of water charges etc.\nAnnexure 12\nAnnexure 12\nForm L\nForm L\n[See rule 46]\nApplication For Sewerage Connection\nApplication For Sewerage Connection\nThe Competent Authority\nThe particulars are given below:-",
            "footnote": "",
            "is_definition": false,
            "sort_order": 71
        },
        {
            "number": "1",
            "title": "1. Name of Area ........... Road......... Building/ House No. ................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 72
        },
        {
            "number": "2",
            "title": "2. Name of owner ................... Son of .................................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 73
        },
        {
            "number": "3",
            "title": "3. Name of applicant ......................... Son of .........................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 74
        },
        {
            "number": "4",
            "title": "4. Number of seat..................... Size of line ............................",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 75
        },
        {
            "number": "5",
            "title": "5. Name of registered Plumber through whom the work executed ................",
            "chapter": null,
            "content": "Instructions:-\nThe application should be entertained either from the owner or such person who has been authorized to do so by the owner who would be held responsible for the payment of water charges etc.\n[Annexure 13]\n[Annexure 13]\nQualification and Competence of Technical Personnel for Preparations of Schemes for Building Permit and Supervision\nQualification and Competence of Technical Personnel for Preparations of Schemes for Building Permit and Supervision\nGeneral\nGeneral\nBuilding/Development work for which permission is sought, shall be planned, designed and supervised by registered professionals. The registered professionals for carrying out the various activities shall be:\nArchitect, Engineer, Structural engineer, Town planner, Landscape architect, Urban designer, Supervisor. Requirements of registration/license for these professionals by the Authority or by the body governing such profession and constituted under a statute, as applicable to practice within the local bodys jurisdiction, are given in items 1 to 7 of the following table:\n(items 8-10 Plumber, Electrician and Fire Consultant may not need registration)\nSerial No.\nSerial No.\nProfessional\nProfessional\nQualification\nQualification\nCompetence/Function\nCompetence/Function\nRole/Responsibilities\nRole/Responsibilities\n1\nArchitect\nArchitect\nRegistered with valid membership of the Council of\n\t\t\t\t\tArchitecture, India as prescribed under Architect’s Act\n\t\t\t\t\t1972.\nThe registered architect shall be competent to\n\t\t\t\t\tcarry out the work related to the building/development permit as\n\t\t\t\t\tgiven below:\na. The architect should need to help the client to\n\t\t\t\t\tbring together a team to give specific services such as that of\n\t\t\t\t\ta structural engineer, quantity surveyor, builder,\n\t\t\t\t\tmechanical/electrical engineers, etc.\na. Prepare and sign all plans, sub-division/\n\t\t\t\t\tlayout plans and information connected with building permit\n\t\t\t\t\texcept engineering services of high rise/ special buildings.\nb. During the construction stage, the architect\n\t\t\t\t\tshould be visiting site periodically for inspections to ensure\n\t\t\t\t\tthat in general, the work being carried out on site is\n\t\t\t\t\tincompliance with architectural design and specifications. Some\n\t\t\t\t\tprojects may require the services of resident architect (s) on\n\t\t\t\t\tbuilding project site.\nb. Issuing certificate of supervision and\n\t\t\t\t\tcompletion of all buildings pertaining to architectural aspects.\nc. Preparation of subdivision/layout plans and\n\t\t\t\t\trelated information connected with development permit.\nd. Issuing certificate of supervision for\n\t\t\t\t\tdevelopment permit.\n2\nEngineer\nEngineer\nGraduate in Civil Engineering from recognized\n\t\t\t\t\tIndian or foreign university. Registered with valid membership\n\t\t\t\t\t(Civil) of the Institution of Engineers, India.\nThe registered engineer shall be competent to\n\t\t\t\t\tcarry out the work related to the building/development permit as\n\t\t\t\t\tgiven below:\na. Engineers are very important members of the\n\t\t\t\t\tdesign team whose responsibilities are to assist in the overall\n\t\t\t\t\tdesign of the project within the scope of their specialist\n\t\t\t\t\tfields.\na. Prepare and sign all building plans (all types\n\t\t\t\t\tof buildings), structural drawings and service plans and\n\t\t\t\t\tinformation connected with building permit;\nb. Engineers such as geotechnical, structural,\nb. Preparation of structural drawings, details and\n\t\t\t\t\tcalculations of buildings on plot up to 500 sq.m and up to 5\n\t\t\t\t\tstoreys or 15 m in height, all service plans.\nc. electrical, mechanical, and will so on, will\n\t\t\t\t\tcarry out various analyses and calculations before arriving at\n\t\t\t\t\tthe optimal design solution for a specific building.\nc. Issuing certificate of supervision and\n\t\t\t\t\tcompletion of all buildings pertaining including structure and\n\t\t\t\t\tbuilding services.\nd. During project execution stage, engineers\n\t\t\t\t\tshould visit the site periodically for inspections to ensure\n\t\t\t\t\tthat in general, the work being carried out is in compliance\n\t\t\t\t\twith their engineering drawings, schedules and specifications.\nThey must also be available to modify or re-design\n\t\t\t\t\ttheir individual aspects as may become necessary.\n3\nStructural Engineer\nStructural Engineer\nGraduate in Civil Engineer engineering from\n\t\t\t\t\trecognized Indian or foreign university, or Corporate Member\n\t\t\t\t\t(Civil) of Institution of Engineers (India), minimum 3 years\n\t\t\t\t\texperience in structural engineering practice with designin and\n\t\t\t\t\tfield work.\na. The registered structural engineer shall be\n\t\t\t\t\tcompetent to prepare the structural design, calculations and\n\t\t\t\t\tdetails for all buildings and undertake their supervision.\nb. In case of buildings having special structural\n\t\t\t\t\tfeatures, as decided by the Authority, they shall be designed\n\t\t\t\t\tonly by Structural engineers.\nNOTE : The 3 years’ experience shall\n\t\t\t\t\tbe relaxed to 2 years in the case of postgraduate degree of\n\t\t\t\t\trecognized Indian or foreign university in the branch of\n\t\t\t\t\tstructural engineering. In case of doctorate in structural\n\t\t\t\t\tengineering, the experience required would be one year.\nNOTE\n4\nTown Planner\nTown Planner\nGraduate or Postgraduate degree in Town and\n\t\t\t\t\tcountry planning with valid Associate Membership of the\n\t\t\t\t\tInstitute of Town Planners, India.\nThe registered town planner shall be competent to\n\t\t\t\t\tcarry out the work related to the development permit as given\n\t\t\t\t\tbelow:\na. Town planner is responsible for the orderliness\n\t\t\t\t\tin the developmental layout to show the various land use.\na. Preparation of plans for land\n\t\t\t\t\tsub-division/layout and related information connected with\n\t\t\t\t\tdevelopment permit for all areas.\nb. During the execution stage, Town Planners will\n\t\t\t\t\talso ensure that the orderliness in the layout is not distorted\n\t\t\t\t\tand that the approval given is also adhered to strictly.\nb. Issuing of certificate of supervision for\n\t\t\t\t\tdevelopment of land of all areas.\nc. Town planners also carry out Site Analysis\n\t\t\t\t\tReport for building projects.\nNOTE : However, for land layouts for\n\t\t\t\t\tdevelopment permit above 5 hectare in area, landscape architect\n\t\t\t\t\tshall also be associated, and for land development\n\t\t\t\t\tinfrastructural services for roads, water supplies, sewerage/\n\t\t\t\t\tdrainage, electrification, etc, the registered engineers for\n\t\t\t\t\tutility services shall be associated.\nNOTE\n5\nLandscape Architect\nLandscape Architect\nBachelor or Master’s degree in landscape\n\t\t\t\t\tarchitecture or equivalent from recognized Indian or foreign\n\t\t\t\t\tuniversity.\nThe registered landscape architect shall be\n\t\t\t\t\tcompetent to carry out the work related to landscape design for\n\t\t\t\t\tbuilding/development permit for land areas 5 hectares and above.\n\t\t\t\t\tIn case of metro-cities, this limit of land area shall be 2\n\t\t\t\t\thectares and above.\nNOTE For smaller areas below the limits indicated\n\t\t\t\t\tabove, association of landscape architect may also be considered\n\t\t\t\t\tfrom the point of view of desired landscape development.\n6\nUrban Designer\nUrban Designer\nMaster’s degree in Urban Design or\n\t\t\t\t\tequivalent from recognized Indian or foreign university.\nThe registered urban designer shall be competent\n\t\t\t\t\tto carry out the work related to urban design for city areas\n\t\t\t\t\tmore than 5 hectares and campus area more than 2 hectares.\n\t\t\t\t\tHe/She shall also be competent to carry out the work of urban\n\t\t\t\t\trenewal for all blighted/congested areas.\nNOTE For smaller areas below the limits\n\t\t\t\t\tindicated above, association of urban designei may be considered\n\t\t\t\t\tfrom the point of view of desired urban design.\nNOTE\n7\nSupervisor\nSupervisor\nDiploma in Civil engineering/ Architectural\n\t\t\t\t\tAssistantship from recognized institute with 2yrs working\n\t\t\t\t\texperience or Civil Craftsmanship from I.T.I with 5yrs\n\t\t\t\t\texperience under a qualified Architect/Civil Engineer for\n\t\t\t\t\tbuilding construction and supervision.\nThe registered\n\t\t\t\t\tsupervisor shall be competent to carry out the work related to\n\t\t\t\t\tthe building permit as given below:\nAll plans and related\n\t\t\t\t\tinformation connected with building permit for residential\n\t\t\t\t\tbuildings on plot up to 100 m2 and up to two storeys or 7.5 m in\n\t\t\t\t\theight; and\nIssuing certificate of supervision for buildings\n\t\t\t\t\tas per (a).\nThe role of the supervisor on site is to inspect\n\t\t\t\t\tquality of materials and the workmanship to ensure that they all\n\t\t\t\t\tcomply with drawings and specifications.\n8\nPlumber\nPlumber\nlicensed by the concerned Authority through\n\t\t\t\t\texamination of candidates-Certificate of training from ITI, with\n\t\t\t\t\tmin. 2yrs experience of execution of sanitary and plumbing works\n\t\t\t\t\tunder any govt. Dept./ Local body or a qualified Architect/\n\t\t\t\t\tEngineer. Knowledge of working drawings and dimensioned\n\t\t\t\t\tsketches.\nA plumber shall be competent to do the following\n\t\t\t\t\tjobs: Execution / supervision of sanitary works up to 500 sqmt\n\t\t\t\t\tplot size and 4 storeyed buildings.\n9\nElectrician\nElectrician\nAs prescribed by the concerned electricity\n\t\t\t\t\tcompany.\n10\nFire Consultant\nFire Consultant\nAs prescribed by Chief Fire Officer, Town/City\n\t\t\t\t\tFire Service .\nAnnexure 14\nAnnexure 14\nEnvironmental Conditions for Buildings and Constructions\nEnvironmental Conditions for Buildings and Constructions\n(Category '1': 5,000 to less than 20,000\n\t\t\t\tSquare meters)\n(Category '1': 5,000 to less than 20,000\n\t\t\t\tSquare meters)\nMedium\nMedium\nS. No.\nS. No.\nEnvironmental conditions\nEnvironmental conditions\nTopography and natural drainage\n1\n• The natural drain system should be\n\t\t\t\tmaintained for ensuring unrestricted flow of water. No\n\t\t\t\tconstruction shall be allowed to obstruct the natural drainage\n\t\t\t\tthrough the site. No construction is allowed on wetland and water\n\t\t\t\tbodies. Check dams, bio- swales, landscape, and other sustainable\n\t\t\t\turban drainage systems (SUDS) are allowed for maintaining the\n\t\t\t\tdrainage pattern and to harvest rain water.\nWater Conservation,\n\t\t\t\tRain Water Harvesting and Ground Water Recharge\n2\n• Use of water\n\t\t\t\tefficient appliances should be promoted with low flow fixtures\n\t\t\t\tor sensors.\n• A rain water\n\t\t\t\tharvesting plan needs to be designed where the recharge bores\n\t\t\t\t(minimum one recharge bore per 5,000 square meters of built up\n\t\t\t\tarea) is recommended. Other provisions of rain water harvesting\n\t\t\t\tas per rule no. 41 of these rules shall be followed.\n• Storage and\n\t\t\t\treuse of rainwater harvested should be promoted.\n• In areas where\n\t\t\t\tground water recharge is not feasible, the rain water should be\n\t\t\t\tharvested and stored for reuse.\n• The ground\n\t\t\t\twater shall not be withdrawn without approval from the Competent\n\t\t\t\tAuthority and as per notification issued vide Memo No.\n\t\t\t\tPUDA/CA/2013/ 1713-16 dated 27.02.2013; the underground water for\n\t\t\t\tconstruction of development works in the notified areas shall not\n\t\t\t\tbe used.\n• All recharge should be limited to shallow\n\t\t\t\taquifer.\n2 (a)\nAt least 20% of the open spaces as required by\n\t\t\t\tthe local building bye-laws shall be pervious. Use of Grass\n\t\t\t\tpavers, paver blocks with at least 50% opening, landscape etc.\n\t\t\t\twould be considered as pervious surface.\nWaste Management\n• Solid waste:\n\t\t\t\tSeparate wet and dry bins must be provided in each unit and at\n\t\t\t\tthe ground level for facilitating segregation of waste.\n• Sewage: Onsite\n\t\t\t\tsewage treatment of capacity of treating 100% waste water to be\n\t\t\t\tinstalled. Treated waste water shall be reused on site for\n\t\t\t\tlandscape, flushing, cooling tower, and other end-uses. Excess\n\t\t\t\ttreated water shall be discharged as per CPCB norms. Natural\n\t\t\t\ttreatment systems shall be promoted.\n• Sludge from\n\t\t\t\tthe onsite sewage treatment, including septic tanks, shall be\n\t\t\t\tcollected, conveyed and disposed as per the Ministry of Urban\n\t\t\t\tDevelopment, Central Public Health and Environmental Engineering\n\t\t\t\tOrganization (CPHEEO) Manual on Sewerage and Sewage Treatment\n\t\t\t\tSystems, 2013.\n• The provisions of The Solid Waste\n\t\t\t\t(Management) Rules 2016 and The E-waste (Management) Rules 2016,\n\t\t\t\tand The Plastics Waste (Management) Rules 2016 shall be followed.\nEnergy\n• The provisions\n\t\t\t\tof Punjab Energy Conservation Building Code shall be applicable\n\t\t\t\tto the buildings/areas in accordance with the notification issued\n\t\t\t\tvide notification no. 18/4/16 HG 1/1856 dated: 24-6-2016 or as\n\t\t\t\tamended from time to time.\n• Rooftop Solar\n\t\t\t\tPhotovoltaic installation shall be as per the provisions laid\n\t\t\t\tdown in rule no. 37 & 38 of these rules.\nrule no. 37 & 38\n• Solar water heating shall be provided to\n\t\t\t\tmeet 20% of the hot water demand of the commercial and\n\t\t\t\tinstitutional building or as per the requirement of these rules,\n\t\t\t\twhichever is higher. Residential buildings are also recommended\n\t\t\t\tto meet its hot water demand from solar water heaters, as far as\n\t\t\t\tpossible.\nAir Quality and Noise\n• Provisions of\n\t\t\t\t\"Action Plan for Monitoring of Construction/ Demolition\n\t\t\t\tActivity of Buildings within the State of Punjab\" dated\n\t\t\t\t01.03.2017 shall be applicable.\n• All demolition\n\t\t\t\tand construction waste shall be managed as per the provisions of\n\t\t\t\tthe Construction and Demolition Waste Rules 2016.\n• For indoor air quality the ventilation\n\t\t\t\tprovisions as per National Building Code of India of India, 2016.\nThe location of the Diesel Generator (DG) set\n\t\t\t\tand exhaust pipe height shall be as per the provisions of the\n\t\t\t\tCPCB norms.\nGreen Cover\n• Every plot\n\t\t\t\thaving area more than 60 sq.mt. but upto 100 sq.mt. shall plant\n\t\t\t\tat least one tree in the setbacks of plot. However, for bigger\n\t\t\t\tplots, one tree for every additional 100 sq.mt. of plot area\n\t\t\t\tshall be mandatory.\n• The existing\n\t\t\t\ttrees will be counted for this purpose. Preference should be\n\t\t\t\tgiven to planting native species.\n• Compensatory\n\t\t\t\tPlantation for felled/transplanted trees in the ratio 1:3 within\n\t\t\t\tthe premises under consideration.\n• Choice of species for plantation in site\n\t\t\t\tshall be as per Section 8 of the Urban Green Guidelines, 2014.\n(Category'2': 20,000 to less than 50,000\n\t\t\t\tSquare meters)\n(Category'2': 20,000 to less than 50,000\n\t\t\t\tSquare meters)\nMedium\nMedium\nS. No.\nS. No.\nEnvironmental conditions\nEnvironmental conditions\nTopography and natural drainage\n1\n• The natural\n\t\t\t\tdrain system should be maintained for ensuring unrestricted flow\n\t\t\t\tof water. No construction shall be allowed to obstruct the\n\t\t\t\tnatural drainage through the site. No construction is allowed on\n\t\t\t\twetland and water bodies. Check dams, bio- swales, landscape, and\n\t\t\t\tother sustainable urban drainage systems (SUDS) are allowed for\n\t\t\t\tmaintaining the drainage pattern and to harvest rain water.\n• Buildings shall be designed to follow the\n\t\t\t\tnatural topography as much as possible. Minimum cutting and\n\t\t\t\tfilling should be done.\nWater Conservation,\n\t\t\t\tRain Water Harvesting and Ground Water Recharge\n2\n• A complete\n\t\t\t\tplan for rain water harvesting, water efficiency and conservation\n\t\t\t\tshould be prepared.\n• Use of water\n\t\t\t\tefficient appliances should be promoted with low flow fixtures\n\t\t\t\tor sensors.\n• A rain water\n\t\t\t\tharvesting plan needs to be designed where the recharge bores of\n\t\t\t\tminimum one recharge bore per 5,000 square meters of built up\n\t\t\t\tarea and storage capacity of minimum one day of total fresh water\n\t\t\t\trequirement shall be provided. Other provisions of rain water\n\t\t\t\tharvesting as per rule no. 42 of these rules shall be followed.\n• In areas where\n\t\t\t\tground water recharge is not feasible, the rain water should be\n\t\t\t\tharvested and stored for reuse.\n• The ground\n\t\t\t\twater shall not be withdrawn without approval from the Competent\n\t\t\t\tAuthority and as per notification issued vide Memo No.\n\t\t\t\tPUDA/CA/2013/ 1713-16 dated 27.02.2013; the underground water for\n\t\t\t\tconstruction of development works in the notified areas shall not\n\t\t\t\tbe used.\n• All recharge should be limited to shallow\n\t\t\t\taquifer.\n2 (a)\nAt least 20% of the open spaces as required by\n\t\t\t\tthe local building bye-laws shall be pervious. Use of Grass\n\t\t\t\tpavers, paver blocks with at least 50% opening, landscape etc.\n\t\t\t\twould be considered as pervious surface.\nWaste Management\n3\n• Solid waste:\n\t\t\t\tSeparate wet and dry bins must be provided in each unit and at\n\t\t\t\tthe ground level for facilitating segregation of waste.\n• Sewage: Onsite\n\t\t\t\tsewage treatment of capacity of treating 100% waste water to be\n\t\t\t\tinstalled. Treated waste water shall be reused on site for\n\t\t\t\tlandscape, flushing, cooling tower, and other end-uses. Excess\n\t\t\t\ttreated water shall be discharged as per CPCB norms. Natural\n\t\t\t\ttreatment systems shall be promoted.\n• Sludge from\n\t\t\t\tthe onsite sewage treatment, including septic tanks, shall be\n\t\t\t\tcollected, conveyed and disposed as per the Ministry of Urban\n\t\t\t\tDevelopment, Central Public Health and Environmental Engineering\n\t\t\t\tOrganization (CPHEEO) Manual on Sewerage and Sewage Treatment\n\t\t\t\tSystems, 2013.\n• The provisions of the Solid Waste\n\t\t\t\t(Management) Rules 2016 and The E-waste (Management) Rules 2016,\n\t\t\t\tand The Plastics Waste (Management) Rules 2016 shall be followed.\n3 (a)\nAll non-biodegradable waste shall be handed over\n\t\t\t\tto authorized recyclers for which a written tie up must be done\n\t\t\t\twith the authorized recyclers.\n3 (b)\nOrganic waste compost/ Vermiculture pit with a\n\t\t\t\tminimum capacity of 0.3 kg/person/day must be installed.\nEnergy\n4\n• The provisions\n\t\t\t\tof Punjab Energy Conservation Building Code shall be applicable\n\t\t\t\tto the buildings/areas in accordance with the notification issued\n\t\t\t\tvide notification no. 18/4/16 HG 1/1856 dated: 24-6-2016 or as\n\t\t\t\tamended from time to time.\n• Rooftop Solar\n\t\t\t\tPhotovoltaic installation shall be as per the provisions laid\n\t\t\t\tdown in rule no. 40 of these rules.\n• Solar water heating shall be provided to\n\t\t\t\tmeet 20% of the hot water demand of the commercial and\n\t\t\t\tinstitutional building or as per the requirement of these rules,\n\t\t\t\twhichever is higher. Residential buildings are also recommended\n\t\t\t\tto meet its hot water demand from solar water heaters, as far as\n\t\t\t\tpossible.\n4 (a)\n• Use of\n\t\t\t\tenvironment friendly materials in bricks, blocks and other\n\t\t\t\tconstruction materials, shall be required for at least 20% of the\n\t\t\t\tconstruction material quantity. These include flyash bricks,\n\t\t\t\thollow bricks, AACs, Fly Ash Lime Gypsum blocks, compressed earth\n\t\t\t\tblocks, and other environment friendly materials.\n• Fly ash should be used as building\n\t\t\t\tmaterial in the construction as per the provisions of the Fly Ash\n\t\t\t\tNotification of September, 1999 as amended from time to time.\nAir Quality and Noise\n5\n• Provisions of\n\t\t\t\t\"Action Plan for Monitoring of Construction /Demolition\n\t\t\t\tActivity of Buildings within the State of Punjab\" dated\n\t\t\t\t01.03.2017 shall be applicable.\n• All demolition\n\t\t\t\tand construction waste shall be managed as per the provisions of\n\t\t\t\tthe Construction and Demolition Waste Rules 2016.\n• For indoor air quality the ventilation\n\t\t\t\tprovisions as per National Building Code of India, 2016 as\n\t\t\t\tamended from time to time.\n5 (a)\nThe location of the Diesel Generator (DG) set\n\t\t\t\tand exhaust pipe height shall be as per the provisions of the\n\t\t\t\tCPCB norms.\nGreen Cover\n6\n• Every plot\n\t\t\t\thaving area more than 60 sq.mt. but upto 100 sq.mt. shall plant\n\t\t\t\tat least one tree in the setbacks of plot. However, for bigger\n\t\t\t\tplots, one tree for every additional 100 sq.mt. of plot area\n\t\t\t\tshall be mandatory.\n• The existing\n\t\t\t\ttrees will be counted for this purpose. Preference should be\n\t\t\t\tgiven to planting native species.\n• Compensatory\n\t\t\t\tPlantation for felled/transplanted trees in the ratio 1:3 within\n\t\t\t\tthe premises under consideration.\n• Choice of species for plantation in site\n\t\t\t\tshall be as per Section 8 of the Urban Green Guidelines, 2014.\nTop Soil preservation\n7\n• Topsoil\n\t\t\t\tshould be stripped to a depth of 20 cm from and reuse the areas\n\t\t\t\tproposed for buildings, roads, paved areas, and external\n\t\t\t\tservices.\n• It should be stockpiled appropriately in\n\t\t\t\tdesignated areas and reapplied during plantation of the proposed\n\t\t\t\tvegetation on site.\nTransport\n8\n• A\n\t\t\t\tcomprehensive mobility plan, as per MoUD best practices\n\t\t\t\tguidelines (URDPFI), shall be prepared to include motorized,\n\t\t\t\tnon-motorized, public, and private networks.\n• Road should be\n\t\t\t\tdesigned with due consideration for environment, and safety of\n\t\t\t\tusers. The road system can be designed with these basic criteria.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 76
        },
        {
            "number": "1",
            "title": "1. Hierarchy of roads\n\t\t\t\twith proper segregation of vehicular and pedestrian traffic.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 77
        },
        {
            "number": "2",
            "title": "2. Traffic calming\n\t\t\t\tmeasures.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 78
        },
        {
            "number": "3",
            "title": "3. Proper design of\n\t\t\t\tentry and exit points.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 79
        },
        {
            "number": "4",
            "title": "4. Parking norms as per local regulation.",
            "chapter": null,
            "content": "(Category '3': 50000 to 150000 sq.mt.)\n(Category '3': 50000 to 150000 sq.mt.)\nMedium\nMedium\nS. No.\nS. No.\nEnvironmental conditions\nEnvironmental conditions\nTopography and natural drainage\n1\n• The natural\n\t\t\t\tdrain system should be maintained for ensuring unrestricted flow\n\t\t\t\tof water.\n• No\n\t\t\t\tconstruction shall be allowed to obstruct the natural drainage\n\t\t\t\tthrough the site. No construction is allowed on wetland and water\n\t\t\t\tbodies. Check dams, bio-swales, landscape, and other sustainable\n\t\t\t\turban drainage systems (SUDS) are allowed for maintaining the\n\t\t\t\tdrainage pattern and to harvest rain water.\n• Buildings\n\t\t\t\tshall be designed to follow the natural topography as much as\n\t\t\t\tpossible.\n• Minimum cutting and filling should be\n\t\t\t\tdone.\nWater Conservation, Rain Water Harvesting and\n\t\t\t\tGround Water Recharge\n2\n• A complete\n\t\t\t\tplan for rain water harvesting, water efficiency and\n\t\t\t\tconservation should be prepared.\n• Use of water\n\t\t\t\tefficient appliances should be promoted. Low flow fixtures or\n\t\t\t\tsensors are used to promote water conservation.\n• A rain water\n\t\t\t\tharvesting plan needs to be designed where the recharge bores of\n\t\t\t\tminimum one recharge bore per 5,000 square meters of built up\n\t\t\t\tarea and storage capacity of minimum one day of total fresh water\n\t\t\t\trequirement shall be provided. Other provisions of rain water\n\t\t\t\tharvesting as per rule no. 42 of these rules shall be followed.\n• In areas where\n\t\t\t\tground water recharge is not feasible, the rain water should be\n\t\t\t\tharvested and stored for reuse.\n• The ground\n\t\t\t\twater shall not be withdrawn without approval from the Competent\n\t\t\t\tAuthority and as per notification issued vide Memo No.\n\t\t\t\tPUDA/CA/2013/ 1713-16 dated 27.02.2013, the underground water for\n\t\t\t\tconstruction of development works in the notified areas shall not\n\t\t\t\tbe used.\n• All recharge should be limited to shallow\n\t\t\t\taquifer.\n2 (a)\nAt least 20% of the open spaces as required by\n\t\t\t\tthe local building bye-laws shall be pervious. Use of Grass\n\t\t\t\tpavers, paver blocks with at least 50% opening, landscape etc.\n\t\t\t\twould be considered as pervious surface.\n2 (b)\nSeparation of grey and black water should be\n\t\t\t\tdone by the use of dual plumbing system. In case of single stack\n\t\t\t\tsystem separate recirculation lines for flushing by giving dual\n\t\t\t\tplumbing system be done.\nSolid Waste Management\n3\n• Solid waste:\n\t\t\t\tSeparate wet and dry bins must be provided in each unit and at\n\t\t\t\tthe ground level for facilitating segregation of waste.\n• The provisions of The Solid Waste\n\t\t\t\t(Management) Rules 2016 and The E-waste (Management) Rules 2016,\n\t\t\t\tand The Plastics Waste (Management) Rules 2016 shall be followed.\n3 (a)\nAll non-biodegradable waste shall be handed over\n\t\t\t\tto authorized recyclers for which a written tie up must be done\n\t\t\t\twith the authorized recyclers.\n3 (b)\nOrganic waste composter/Vermiculture pit with a\n\t\t\t\tminimum capacity of 0.3 kg/person/day must be installed.\nSewage Treatment Plant\n4\n• Onsite sewage\n\t\t\t\ttreatment of capacity of treating 100% waste water to be\n\t\t\t\tinstalled. Treated waste water shall be reused on site for\n\t\t\t\tlandscape, flushing, cooling tower, and other end-uses. Excess\n\t\t\t\ttreated water shall be discharged as per CPCB norms.\n• Natural\n\t\t\t\ttreatment systems shall be promoted.\n• Sludge from the onsite sewage treatment,\n\t\t\t\tincluding septic tanks, shall be collected, conveyed and disposed\n\t\t\t\tas per the Ministry of Urban Development, Central Public Health\n\t\t\t\tand Environmental Engineering Organization (CPHEEO) Manual on\n\t\t\t\tSewerage and Sewage Treatment Systems, 2013.\nEnergy\n5\n• The\n\t\t\t\tprovisions of Punjab Energy Conservation Building Code shall be\n\t\t\t\tapplicable to the buildings/areas in accordance with the\n\t\t\t\tnotification issued vide notification no. 18/4/16 HG 1/1856\n\t\t\t\tdated: 24-6-2016 or as amended from time to time.\n• Rooftop Solar\n\t\t\t\tPhotovoltaic installation shall be as per the provisions laid\n\t\t\t\tdown in rule no. 41 of these rules.\n• Solar water heating shall be provided to\n\t\t\t\tmeet 20% of the hot water demand of the commercial and\n\t\t\t\tinstitutional building or as per the requirement of these rules,\n\t\t\t\twhichever is higher. Residential buildings are also recommended\n\t\t\t\tto meet its hot water demand from solar water heaters, as far as\n\t\t\t\tpossible.\n5 (a)\n• Use of\n\t\t\t\tenvironment friendly materials in bricks, blocks and other\n\t\t\t\tconstruction materials, shall be required for at least 20% of the\n\t\t\t\tconstruction material quantity. These include flyash bricks,\n\t\t\t\thollow bricks, AACs, Fly Ash Lime Gypsum blocks, compressed earth\n\t\t\t\tblocks, and other environment friendly materials.\n• Fly ash should be used as building\n\t\t\t\tmaterial in the construction as per the provisions of the Fly Ash\n\t\t\t\tNotification of September, 1999 as amended from time to time.\nAir Quality and Noise\n6\n• Provisions of\n\t\t\t\t\"Action Plan for Monitoring of Construction /Demolition\n\t\t\t\tActivity of Buildings within the State of Punjab\" dated\n\t\t\t\t01.03.2017 shall be applicable.\n• All demolition\n\t\t\t\tand construction waste shall be managed as per the provisions of\n\t\t\t\tthe Construction and Demolition Waste Rules 2016.\n• For indoor air quality the ventilation\n\t\t\t\tprovisions as per National Building Code of India, 2016 as\n\t\t\t\tamended from time to time.\n6 (a)\nThe location of the Diesel Generator (DG) set\n\t\t\t\tand exhaust pipe height shall be as per the provisions of the\n\t\t\t\tCPCB norms.\nGreen Cover\n7\n• Every plot\n\t\t\t\thaving area more than 60 sq.mt. but upto 100 sq.mt. shall plant\n\t\t\t\tat least one tree in the setbacks of plot. However, for bigger\n\t\t\t\tplots, one tree for every additional 100 sq.mt. of plot area\n\t\t\t\tshall be mandatory.\n• The existing\n\t\t\t\ttrees will be counted for this purpose. Preference should be\n\t\t\t\tgiven to planting native species.\n• Compensatory\n\t\t\t\tPlantation for felled/transplanted trees in the ratio 1:3 within\n\t\t\t\tthe premises under consideration.\n• Choice of species for plantation in site\n\t\t\t\tshall be as per Section 8 of the Urban Green Guidelines, 2014.\nTop Soil preservation and reuse\n8\n• Topsoil\n\t\t\t\tshould be stripped to a depth of 20 cm from the areas proposed\n\t\t\t\tfor buildings, roads, paved areas, and external services.\n• It should be stockpiled appropriately in\n\t\t\t\tdesignated areas and reapplied during plantation of the proposed\n\t\t\t\tvegetation on site.\nTransport\n9\n• A\n\t\t\t\tcomprehensive mobility plan, as per MoUD best practices\n\t\t\t\tguidelines (URDPFI), shall be prepared to include motorized,\n\t\t\t\tnon-motorized, public, and private networks.\n• Road should be\n\t\t\t\tdesigned with due consideration for environment, and safety of\n\t\t\t\tusers. The road system can be designed with these basic criteria.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 80
        },
        {
            "number": "1",
            "title": "1. Hierarchy of roads\n\t\t\t\twith proper segregation of vehicular and pedestrian traffic.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 81
        },
        {
            "number": "2",
            "title": "2. Traffic calming\n\t\t\t\tmeasures.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 82
        },
        {
            "number": "3",
            "title": "3. Proper design of\n\t\t\t\tentry and exit points.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 83
        },
        {
            "number": "4",
            "title": "4. Parking norms as per local regulation.",
            "chapter": null,
            "content": "Environment Management Plan\n10\nAn environmental management plan (EMP) shall be \n\t\t\t\tprepared and implemented to ensure compliance with the\n\t\t\t\tenvironmental conditions specified in item number 1 to 9 above. A\n\t\t\t\tdedicated Environment Monitoring Cell with defined functions and\n\t\t\t\tresponsibility shall be put in place to implement the EMP. The\n\t\t\t\tenvironmental cell shall ensure that the environment\n\t\t\t\tinfrastructure like Sewage Treatment Plant, Landscaping, Rain\n\t\t\t\tWater Harvesting, Energy efficiency and conservation, water\n\t\t\t\tefficiency and conservation, solid waste management, renewable\n\t\t\t\tenergy etc. are kept operational and meet the required standards.\n\t\t\t\tThe environmental cell shall also keep the record of environment\n\t\t\t\tmonitoring and those related to the environment infrastructure.\nAnnexure 15\nAnnexure 15\nSr No.\nSr No.\nConditions to be checked\nConditions to be checked\nCategory of the Project\nCategory of the Project\n1\nThe project proponent shall get it certified\n\t\t\t\tfrom the approved consultant of the PPCB/Qualified Building\n\t\t\t\tEnvironment Auditor regarding installation of sewage treatment\n\t\t\t\tplant (STP) and adequacy of disposal system and shall ensure that\n\t\t\t\tthe treated sewage shall conform to the norms and standards\n\t\t\t\tprescribed by Punjab Pollution Control Board or any other\n\t\t\t\tstatutory authority for such discharges.\nCategory 1, 2 & 3\n2\nThe project proponent shall adopt only the\n\t\t\t\tauthorized mode of disposal and shall not use any illegal mode\n\t\t\t\tof disposal for treated waste water.\nCategory 1, 2 & 3\n3\nThe project proponent shall form Environment\n\t\t\t\tMonitoring Committee for supervising and monitoring the\n\t\t\t\tenvironment related conditions of the building permission.\nCategory 3\n4\nThe project proponent shall make provisions for\n\t\t\t\tthe housing of construction labour within the site with all\n\t\t\t\tnecessary infrastructure and facilities such as fuel for cooking,\n\t\t\t\tmobile toilets, mobile STP, Safe drinking water and medical\n\t\t\t\thealth care etc. The housing may be in the form to temporary\n\t\t\t\tstructure and it shall be removed after the completion of the\n\t\t\t\tproject.\nCategory 1, 2 & 3\n5\nThe project proponent shall comply with the\n\t\t\t\tConstruction and Demolition Rules, 2016.\nCategory 1, 2 & 3\n6\nThe project proponent shall provide dual\n\t\t\t\tplumbing line for use of the treated waste water for flushing\n\t\t\t\tpurpose and shall provide other measures like providing fixtures\n\t\t\t\tfor showers, toilet flushing and drinking of low flow either by\n\t\t\t\tuse of aerators or pressure reducing devices or sensor based\n\t\t\t\tcontrol, for conservation of groundwater.\nCategory 2 & 3\n7\nThe project proponent shall use only treated\n\t\t\t\twastewater for construction purpose and to reduce the water\n\t\t\t\tdemand during construction, the project proponent shall make use\n\t\t\t\tof premixed concrete, curing agents and other best practices\n\t\t\t\treferred\nCategory 1, 2 & 3\n8\nThe project proponent shall hire vehicles of\n\t\t\t\tgood condition for bringing construction material to the site of\n\t\t\t\tthe project and ensure that all these vehicles shall conform to\n\t\t\t\tapplicable air, noise and emission standards and shall only be\n\t\t\t\toperated during non-peak hours.\nCategory 1, 2 & 3\n9\nThe project proponent shall ensure that ambient\n\t\t\t\tnoise levels shall conform to prescribed standards both during\n\t\t\t\tday and night times. The ambient air and noise quality should be\n\t\t\t\tclosely monitored during construction and operation phase.\nCategory 1, 2 & 3\n10\nThe project proponent shall make provision of\n\t\t\t\tthe budget for carrying out long lasting and public utility\n\t\t\t\tactivities under the corporate social responsibility with the\n\t\t\t\tadvice of District Administration.\nCategory 2 & 3\nAnnexure 16\nAnnexure 16\n(1) Environmental Cell at the level of Development Authority.\n(2) Constitution of the cell.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 84
        },
        {
            "number": "1",
            "title": "1. Waste management (solid and liquid)",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 85
        },
        {
            "number": "2",
            "title": "2. Water conservation and management",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 86
        },
        {
            "number": "3",
            "title": "3. Resource efficiency including Building materials",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 87
        },
        {
            "number": "4",
            "title": "4. Energy Efficiency and renewable energy",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 88
        },
        {
            "number": "5",
            "title": "5. Environmental planning including air quality management.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 89
        },
        {
            "number": "6",
            "title": "6. Transport planning and management.",
            "chapter": null,
            "content": "(3) Financial Support.\n(4) Functions of the Cell.\nAnnexure 17\nAnnexure 17\n(1) Accreditation of Environmental Auditors (Qualified Building Auditors).\n(2) Qualifications of the Auditor.\n(3) Training.\n(4) Experience.\n(5) Infrastructure and equipment.\n(6) Renewal.\nAnnexure 18\nAnnexure 18\nForm M\nForm M\n[See rule 49]\nForm of Application for Registration as Plumber\nForm of Application for Registration as Plumber\nThe Authorized Officer,\nPunjab Urban Planning and Development Authority.\nYours faithfully,\nPlace:\nName__________________\nDated:\nFull Address_____________\nAnnexure 19\nAnnexure 19\nForm N\nForm N\n[See rule 50]\nForm of Registration Certificate of Plumbers\nForm of Registration Certificate of Plumbers\nRegistration No.\nDated:\n(i) The certificate shall remain valid for a period of five years from the date of its issue;\n(ii) It shall be renewable on submission of fresh application along with the prescribed fee provided the application is submitted one month before the expiry date of previous registration;\n(iii) The certification will be operative in the areas in which the Punjab Urban Planning and Development Building Rules, 2018 are in operation;\n(iv) It will not be used for the purpose other than the purposes specified under the Punjab Urban Planning and Development Building Rules, 2018.\n(v) The Authorized Officer has the right to withdraw or cancel the certificate at any time during the tenure of registration of it is found, that,\n(a) The Plumber has given any wrong information in his application for registration;\n(b) The Plumber has violated any terms and conditions of registration or any provision of the Punjab Regional and Town Planning and Development Act, 1995 or any rule made thereunder.\nPlace:\nAuthorized Officer\nDated:\nStrike down which is\n\t\t\t\t\tnot applicable.\nSerial No.\nSerial No.\nDate of renewal\nDate of renewal\nDate upto which\n\t\t\t\t\trenewed\nDate upto which\n\t\t\t\t\trenewed\nSignature of\n\t\t\t\t\tAuthorized Officer\nSignature of\n\t\t\t\t\tAuthorized Officer\nAnnexure 20\nAnnexure 20\nSchedule\n[See rule 49]\nQualification for registration of Plumber\nQualification for registration of Plumber",
            "footnote": "",
            "is_definition": false,
            "sort_order": 90
        },
        {
            "number": "1",
            "title": "1. A person having one year certificate in plumbing from any Industrial Training Institute recognized by the State Government; or",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 91
        },
        {
            "number": "2",
            "title": "2. A person registered as plumber with any local authority or statutory body of the Government of Punjab; or",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 92
        },
        {
            "number": "3",
            "title": "3. Ten years practical experience in sanitary installation with a firm of repute or under a registered plumber.",
            "chapter": null,
            "content": "Annexure 21\nAnnexure 21\n[See rule 31(6)]\nIndemnity Bond for Basement and Construction of Building\nIndemnity Bond for Basement and Construction of Building\n1. that in consideration of the sanction of the plans by................................. for construction of the basement the executant undertakes that he/she shall at all times keep.....................harmless and free from any liability, loss or damages/ flowing from any injury or damage caused to the adjoining built-up properties or to any person as a consequence of the construction of at the time of digging of its foundations or during the course of its construction or at any time thereafter.\n2. the owner agreed and undertakes that in the event of any claim being made by any person or persons against the competent authority either in respect of the sanction granted by the competent authority to the owner for the construction of basement or in respect of the construction or manner of construction of the basement by the owner or the consequences flowing from the said sanction the executant shall be responsible and liable and not the competent authority.\n3. that the executant agrees and undertake to indemnify the competent authority fully in respect of any amount which the competent authority may be required to pay to any person either by way of compensation or damages or on any other account as a result of any claim or suit or any other proceedings concerning the sanctioning of the construction of the basement of the making thereof and also in respect of the costs and expenses which the competent authority may incur on defending any action.\n4. that without prejudice to the above undertaking the executant hereby binds itself to pay to the competent authority to the full extent any amount which the competent authority may be required to pay to any person in connection with, relating to or concerning the sanctioning of the basement or the making thereof.\n5. that owner further agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully observes/performs the undertaking herein before contained.\nIndemnifier\nIndemnifier\n(Signatures)..............................\nName....................................\nFull Address..............................\n(Signatures)..............................\nName.......................................\nFull Address.....................................\nAdditional Chief Secretary to Government of Punjab, Department of Housing and Urban Development",
            "footnote": "",
            "is_definition": false,
            "sort_order": 93
        }
    ],
    "metadata": {
        "Act ID": "Last Updated 19th March, 2020 [pu956]",
        "Act Number": "Published vide Notification No. G.S.R. 43/P.A.11/1995/Ss.43 and 180/2018, dated 12.6.2018",
        "Enactment Date": "",
        "Act Year": "2018",
        "Short Title": "Punjab Urban Planning and Development Building Rules, 2018",
        "Type": "STATE",
        "Location": "Punjab"
    },
    "updated_at": "2026-09-29 21:55:21"
}