Table 26: Community Centre, Public Concert
Hall or Auditorium, Museum, Gymnasium or Public Exhibition
Table 26: Community Centre, Public Concert
Hall or Auditorium, Museum, Gymnasium or Public Exhibition
S. No.
S. No.
Parameter
Parameter
Permissible Limits
Permissible Limits
I.
Minimum Site area
Minimum Site area
2000 sq.m
II.
Minimum Approach Road
Minimum Approach Road
Within Master Plan -18m (60'-0")
Outside Master Plan-12m (40'-0")
III.
Maximum Ground Coverage
Maximum Ground Coverage
40%
IV.
Maximum Floor Area Ratio
Maximum Floor Area Ratio
1:1
V.
Maximum Height of Building
Maximum Height of Building
No Restriction subject to clearance from Airport
Authority and fulfilment of norms such as setbacks around
building, ground coverage, F.A.R., structural safety and fire
safety norms.
VI.
Parking
Parking
3 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .
VII.
Setbacks around buildings
Setbacks around buildings
Refer sub-rule (1) of rule 26 of these building
rules.
Notes. - (a) In case of Community Centre, it shall only have banquet hall, kitchen, library, office and reading room, except these if any other activity is proposed then it shall be considered as club.
Notes.
(b) Upto 1.0 percent of the total covered area of Community Centre, Public Concert Hall or Auditorium, Museum, Gymnasium or Public Exhibition shall be allowable for commercial activity.
Table 27: Religious Building
Table 27: Religious Building
S. No.
S. No.
Parameter
Parameter
Permissible Limits
Permissible Limits
I.
Minimum Approach Road and Site area
Minimum Approach Road and Site area
Plot size minimum 1000 sq. mts upto 2000 sq.m
12m (40'-0")
Plot size above 2000 sq.m
18m (60'-0")
II.
Maximum Ground Coverage
Maximum Ground Coverage
40% of site area
III.
Maximum Floor Area Ratio
Maximum Floor Area Ratio
1:1.0
IV.
Maximum Height of Building
Maximum Height of Building
No Restriction subject to clearance from Airport
Authority and fulfilment of norms such as setbacks around
building, ground coverage, F.A.R., structural safety and fire
safety norms.
V.
Parking
Parking
2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .
VI.
Setbacks around buildings
Setbacks around buildings
Refer sub-rule (1) of rule 26 of these
building rules.
sub-rule (1) of rule 26
Table 28: Public Offices
Table 28: Public Offices
S. No.
S. No.
Parameter
Parameter
Permissible Limits
Permissible Limits
I.
Minimum Site area
Minimum Site area
1000 sq.m
II.
Minimum Approach Road
Minimum Approach Road
18m
III.
Maximum Ground Coverage
Maximum Ground Coverage
40% of plot area
IV.
Maximum Floor Area Ratio
Maximum Floor Area Ratio
Minimum approach road
18m 1:2
Minimum approach road 30m 1:2.5
Minimum approach road 45m Unlimited*
V.
Maximum Height of Building
Maximum Height of Building
No Restriction subject to clearance from Airport
Authority and fulfilment of norms such as setbacks around
building, ground coverage, F.A.R., structural safety and fire
safety norms.
VI.
Parking
Parking
2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .
VII.
Setbacks around buildings
Setbacks around buildings
Refer sub-rule (1) of rule 26 of these
building rules.
sub-rule (1) of rule 26
Notes. - (a) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around the building, parking norms, light and ventilation, height, fire and structural safety.
Notes.
(b) F.A.R above 1:1.75, will be chargeable on pro-rata basis expect State/ Central Government offices. However, the site allotted or sold by the development
(c) Upto 15 percent of the total covered area in Public buildings shall be permissible for the housing of staff or workers.
Section 24 • Punjab Urban Planning and Development Building Rules, 2018
24. Public Buildings.
punjab-urban-planning-and-development-building-rules-2018-sec-24.json
•
Section 24
{
"act_title": "Punjab Urban Planning and Development Building Rules, 2018",
"act_slug": "punjab-urban-planning-and-development-building-rules-2018",
"section_label": "Section",
"section": {
"number": "24",
"title": "24. Public Buildings.",
"chapter": null,
"content": "Table 26: Community Centre, Public Concert\n\t\t\t\tHall or Auditorium, Museum, Gymnasium or Public Exhibition\nTable 26: Community Centre, Public Concert\n\t\t\t\tHall or Auditorium, Museum, Gymnasium or Public Exhibition\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n2000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\nWithin Master Plan -18m (60'-0\")\nOutside Master Plan-12m (40'-0\")\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40%\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nParking\nParking\n3 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these building\n\t\t\t\trules.\nNotes. - (a) In case of Community Centre, it shall only have banquet hall, kitchen, library, office and reading room, except these if any other activity is proposed then it shall be considered as club.\nNotes.\n(b) Upto 1.0 percent of the total covered area of Community Centre, Public Concert Hall or Auditorium, Museum, Gymnasium or Public Exhibition shall be allowable for commercial activity.\nTable 27: Religious Building\nTable 27: Religious Building\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Approach Road and Site area\nMinimum Approach Road and Site area\nPlot size minimum 1000 sq. mts upto 2000 sq.m\n12m (40'-0\")\nPlot size above 2000 sq.m\n18m (60'-0\")\nII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of site area\nIII.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\n1:1.0\nIV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\t Authority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nV.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVI.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nTable 28: Public Offices\nTable 28: Public Offices\nS. No.\nS. No.\nParameter\nParameter\nPermissible Limits\nPermissible Limits\nI.\nMinimum Site area\nMinimum Site area\n1000 sq.m\nII.\nMinimum Approach Road\nMinimum Approach Road\n18m\nIII.\nMaximum Ground Coverage\nMaximum Ground Coverage\n40% of plot area\nIV.\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMinimum approach road\n\t\t\t\t18m 1:2\nMinimum approach road 30m 1:2.5\nMinimum approach road 45m Unlimited*\nV.\nMaximum Height of Building\nMaximum Height of Building\nNo Restriction subject to clearance from Airport\n\t\t\t\tAuthority and fulfilment of norms such as setbacks around\n\t\t\t\tbuilding, ground coverage, F.A.R., structural safety and fire\n\t\t\t\tsafety norms.\nVI.\nParking\nParking\n2 [Equivalent Car Space per 100 square meters of the total Floor Area Ratio] .\nVII.\nSetbacks around buildings\nSetbacks around buildings\nRefer sub-rule (1) of rule 26 of these\n\t\t\t\tbuilding rules.\nsub-rule (1) of rule 26\nNotes. - (a) *Unlimited F.A.R shall be subject to fulfilment of building controls such as ground coverage, setback around the building, parking norms, light and ventilation, height, fire and structural safety.\nNotes.\n(b) F.A.R above 1:1.75, will be chargeable on pro-rata basis expect State/ Central Government offices. However, the site allotted or sold by the development\n(c) Upto 15 percent of the total covered area in Public buildings shall be permissible for the housing of staff or workers.",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
"prev_section": "23",
"next_section": "25"
}