(i) Copy of all inspection reports of the Authority e.g. Fire Safety, Structural Safety, Green Building (if applicable) etc;
(ii) Detail of compoundable violations from the approved building plans, if any in the building, jointly signed by the owner, Architect and Engineer along with demand draft of the due payment for compounding charges of such violations at the rates specified by the competent authority shall be submitted;
(iii) Complete Completion drawings or as-built drawings - certified by the Architect and Engineer;
(iv) Photographs of front, side, rear setbacks, front and rear elevation of the building shall be submitted along with photographs of essential areas like cut outs and shafts from the roof top. An un-editable compact disc/ DVD/ any other electronic media containing all photographs shall also be submitted;
(v) Structural stability certificate duly signed by the Structural Engineer;
(vi) Certificate of fitness of the lift from concerned Department wherever required;
(vii) Certificate from the Punjab Energy Development Agency (PEDA) for installation of Rooftop Solar Photo Voltaic Power Plant in accordance to orders/ policies issued by the Renewable Energy Department from time to time;
(viii) Completion Certificate / Final Certificate/ No Objection Certificate from the rating agencies (GRIHA/LEED/IGBC) for green building or Bureau of Energy Efficiency (BEE), Certified Energy Auditor for Green Building or constructing building in accordance to the provision of PECBC, wherever applicable;
(ix) No Objection Certificate (NOC) of fire safety of building from concerned Fire Officer or an officer authorized for the purpose;
(x) Any other information/document that the Authority may deem fit.
(i) the applicant shall remove or demolish any temporary building which might have been erected and the debris from the site and adjoining roads or vacant site before the completion certificate is issued;
(ii) the partial completion certificate may be granted for partially constructed building with at least one habitable room, one water closet and one kitchen as per the sanctioned plan and duly functional in case of a residential house;
(iii) the partial completion certificate may be granted for partially constructed nonresidential buildings subject to the minimum completion of 25 percent construction of the availed total floor area along with all the required public utilities and public safety measures;
(iv) the partial completion certificate to SCO's (shop- cum- office) or shops may be granted subject to the condition that construction of ground floor is completed along with public safety measure;
(v) in case of large campus/complex, completion of individual block/building shall be issued by the competent authority in accordance with the construction work completed phase wise;
(vi) in case of high rise buildings, partial completion certificate shall be issued if the superstructure of the building has been constructed as per approved plans; and
(vii) the minimum permissible covered area as mentioned below shall have to be constructed to obtain partial completion certificate for industrial buildings:
Table 3: Minimum permissible covered area to
obtain partial completion certificate for industrial buildings
Table 3: Minimum permissible covered area to
obtain partial completion certificate for industrial buildings
Sr. No.
Sr. No.
Area of site
Area of site
Percentage of permissible covered area
Percentage of permissible covered area
I.
Upto 2 acre
25%
II.
Above 2 acre upto 5 acres
20%
III.
Above 5 acres and upto 10 acres
15%
Section 7 • Punjab Urban Planning and Development Building Rules, 2018
7. Completion certificate.
punjab-urban-planning-and-development-building-rules-2018-sec-7.json
•
Section 7
{
"act_title": "Punjab Urban Planning and Development Building Rules, 2018",
"act_slug": "punjab-urban-planning-and-development-building-rules-2018",
"section_label": "Section",
"section": {
"number": "7",
"title": "7. Completion certificate.",
"chapter": null,
"content": "(i) Copy of all inspection reports of the Authority e.g. Fire Safety, Structural Safety, Green Building (if applicable) etc;\n(ii) Detail of compoundable violations from the approved building plans, if any in the building, jointly signed by the owner, Architect and Engineer along with demand draft of the due payment for compounding charges of such violations at the rates specified by the competent authority shall be submitted;\n(iii) Complete Completion drawings or as-built drawings - certified by the Architect and Engineer;\n(iv) Photographs of front, side, rear setbacks, front and rear elevation of the building shall be submitted along with photographs of essential areas like cut outs and shafts from the roof top. An un-editable compact disc/ DVD/ any other electronic media containing all photographs shall also be submitted;\n(v) Structural stability certificate duly signed by the Structural Engineer;\n(vi) Certificate of fitness of the lift from concerned Department wherever required;\n(vii) Certificate from the Punjab Energy Development Agency (PEDA) for installation of Rooftop Solar Photo Voltaic Power Plant in accordance to orders/ policies issued by the Renewable Energy Department from time to time;\n(viii) Completion Certificate / Final Certificate/ No Objection Certificate from the rating agencies (GRIHA/LEED/IGBC) for green building or Bureau of Energy Efficiency (BEE), Certified Energy Auditor for Green Building or constructing building in accordance to the provision of PECBC, wherever applicable;\n(ix) No Objection Certificate (NOC) of fire safety of building from concerned Fire Officer or an officer authorized for the purpose;\n(x) Any other information/document that the Authority may deem fit.\n(i) the applicant shall remove or demolish any temporary building which might have been erected and the debris from the site and adjoining roads or vacant site before the completion certificate is issued;\n(ii) the partial completion certificate may be granted for partially constructed building with at least one habitable room, one water closet and one kitchen as per the sanctioned plan and duly functional in case of a residential house;\n(iii) the partial completion certificate may be granted for partially constructed nonresidential buildings subject to the minimum completion of 25 percent construction of the availed total floor area along with all the required public utilities and public safety measures;\n(iv) the partial completion certificate to SCO's (shop- cum- office) or shops may be granted subject to the condition that construction of ground floor is completed along with public safety measure;\n(v) in case of large campus/complex, completion of individual block/building shall be issued by the competent authority in accordance with the construction work completed phase wise;\n(vi) in case of high rise buildings, partial completion certificate shall be issued if the superstructure of the building has been constructed as per approved plans; and\n(vii) the minimum permissible covered area as mentioned below shall have to be constructed to obtain partial completion certificate for industrial buildings:\nTable 3: Minimum permissible covered area to\n\t\t\t\tobtain partial completion certificate for industrial buildings\nTable 3: Minimum permissible covered area to\n\t\t\t\tobtain partial completion certificate for industrial buildings\nSr. No.\nSr. No.\nArea of site\nArea of site\nPercentage of permissible covered area\nPercentage of permissible covered area\nI.\nUpto 2 acre\n25%\nII.\nAbove 2 acre upto 5 acres\n20%\nIII.\nAbove 5 acres and upto 10 acres\n15%",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
"prev_section": "6",
"next_section": "8"
}