46. Sewerage and Drainage.

(i) After the grant of the certificate referred to in sub-rule (5) of rule 45 or in the event of the certificate having been deemed to have been granted, every person intending to connect a drain or sewer to a public water sewer shall apply in Form 'L' to the competent authority at least seven days before the date on which connection is required.
(ii) The application under sub-rule (i) shall be accompanied by the certificate referred to in sub-rule (5) of rule 45 along with a fee, which the Chief Administrator may specify from time to time.
(iii) On receipt of the application and subject to the requirements of sub-rule (5) of rule 45, the Competent Authority shall accept or reject the application after giving the opportunity of being heard.
(iv) In the event of the required connection having been sanctioned, it shall be got connected through a registered plumber.
(1) Connection with public sewer.
(2) Material for drain and construction.
(3) Drain connection for trade effluent.
(4) Waste water pipes.
(i) not discharge as to cause dampness in the walls or the foundation of a building; and
(ii) if it discharges into a drain, be disconnected from the drain by a trapped gully with a suitable grating above the level of the water in the trap.
(5) Manholes.
(ii) Where the diameter of a drain is increased the crown of the pipes shall be fixed at the same level and the necessary slopes given in the invert of the manhole chamber, and in exceptional cases, where the required fall is not available, connection may be made upto half the difference in the diameter that is the connecting branch sewer shall be connected with the main sewer in such a manner that full supply level of both the sewers is maintained running half the diameter of both the sewers of drain and the minimum internal size of chamber (between brick faces) shall be as follows,-
Table 54 Provisions for minimum internal size
of Chamber
Table 54 Provisions for minimum internal size
of Chamber
I.
For depth of 0.80 meter
0.75 x 0.75 meters
II.
For depth of more than 0.80 meters but not
exceeding 2.1 meters
1.2 x 0.90 metres
III.
For depths of more than 2.1 meters
Rectangular chamber with minimum internal
dimension of 1.20 x 0.90 meter
(6) Septic tank.
(ii) Every septic tank shall be constructed into two separate compartments so that one compartment when required may be put out of use for cleaning purposes.
(iii) The capacity of every compartment of the septic tank shall be two and a half times the total water allowance for the total number of residents of the building.
(iv) Every inlet pipe into a septic tank shall be effectively trapped.
(v) The design of septic tank shall be in accordance with the B.I.S. (Bureau of Indian Standards) Code No. IS 2470, Part-I-1968 and IS 2470 (Part-II-1971) Code of practice for design and construction of septic tank.
(7) Absorption pits.
(ii) No absorption pit shall have any outlet into, or means of communication with, any sewer, storm water, drain or surface drain.
(iii) The wall of every absorption pit shall be at least 0.50 metre above ground level so as to exclude effectively the entry of storm water into the absorption pit.
(iv) The absorption pit shall be constructed in duplicate so that one pit can be put out of use for cleaning purpose and the capacity of the absorption pit shall be as approved by the competent authority.
(v) The other details of the absorption pit should conform to the B.I.S. (Bureau of Indian Standards) Code No. IS 2470(Part I) 1968 Code of Practice for design and construction of septic tanks.
(vi) The absorption pits shall be provided with adequate means of access for removing the filtering media and cleaning the same.
Note. - For requirements regarding water supply, drainage and sanitation, solid waste management, gas supply shall be made as per Part 9, Plumbing Services of the National Building Code of India, 2016.
Note.
PART XII
Risk Based Classification of Building Plan Approval Proposals