47. Risk Based Classification of building proposals.

(ii) storage and handling of hazardous and highly flammable liquids, liquefiable gases like LPG, rocket propellants, etc;
(iii) storage and handling of hazardous and highly flammable or explosive materials (other than liquids); and
(iv) manufacture of artificial flowers, synthetic leather, ammunition, explosives and fireworks.
Note. - A list of hazardous substances giving quantities, for which or exceeding which owners handling such substances are required to be covered under the Public Liability Insurance Act, 1991, has been notified under the Rules on Emergency Planning, Preparedness and Response for Chemical Accidents by the Government of India, Ministry of Environment and Forests, Notification No. G.S.R. 347(E), dated the 01st August 1996.
Note.
(1) Classification of risk based storage building.
Table 55 - Classification of risk based
storage building
Table 55 - Classification of risk based
storage building
Category
Category
Storage Material Specifications
Storage Material Specifications
Stacking
Stacking
Designated officer for site Inspection
Designated officer for site Inspection
Height (in m)
Height (in m)
Medium
Medium
High
High
Category-I(Low Risk)
Category-I(Low Risk)
Articles such as Carpets,
Non-synthetic/synthetic yarn and fabrics. Mechanical and
electrical goods (dominantly metal parts), Glassware and
crockery, fiberboards, groceries, metal goods, Papers other than
those listed under categories Moderate and High, Powdered and
canned foods, Plastic/glass bottles containing nonflammable
liquids, etc.
4
6.5
Assistant Town Planner/Assistant Engineer/
Senior Divisional Engineer
Category-II(Medium Risk)
Category-II(Medium Risk)
Articles such as Batteries, Baled
cotton/synthetic fibers, Books, Baled cork, Baled waste paper,
Cartons containing alcohols ( in cans/bottles), Cartons of canned
lacquers which dry by solvent evaporation, Chipboard, Cardboard
rolls (horizontally Stored), Cereals/Grains/Foodstuff/ Flour/
Sugar in sacks, Cellulose/Cellulose pulp, Electrical goods other
than those stated in Category low, Flammable liquids in
non-combustible containers, Leather goods, Palletized liquor
stocks, Plastics (non-foamed, other than cellulose nitrate),
Rolled pulp and paper and asphalted paper (Horizontal storage),
Veneer sheets, Wooden patterns, Metal/wooden furniture with
plastic seats, etc.
3
5.5
District Town Planner/Executive Engineer
Category-III(High Risk)
Category-III(High Risk)
Articles such as Bitumen/Wax coated paper,
Candles, Carbon black, Card board rolls (vertically stored),
Charcoal, Coal, cellulose nitrate, Foamed plastic and foam rubber
products, Flammable liquids in combustible containers, Linoleum
products, Matches, Plastics other than those stated in Category
Moderate, Rolled pulp and paper and asphalted paper (vertical
storage), Rubber goods including tyres and tubes, Sawn timber,
Ventilated wood stacks, Waxed and asphalt coated papers and
containers in cartons, Wood wool, wooden pallets and flats
(idle), Ail materials having wrappings or preformed containers of
foamed plastics, etc.
2
4.5
Senior Town Planner/Senior Engineer.
Category-IV (Extreme High Risk)
Category-IV (Extreme High Risk)
Off cuts and random pieces of foamed plastic or
rubber rolls of sheets of foamed plastic or foamed rubber, Foam
mattress, Expanded polystyrene packaging, Foam upholstery, etc.
1.25
3.5
Senior Town Planner/Senior Engineer.
Notes. - (a) The deflector of the sprinkler fitted in the ceiling shall be at more than 1.5 m from the goods stored below. However, in case of jute storage, no jute stock shall reach within 2 m of the deflectors of the sprinkler heads.
Notes.
(b) In case of storage in racks or shelves, if the height of storage is more than what is specified, intermediate sprinklers shall be provided for each shelf/rack in addition to the ceiling sprinklers and overall design density and Assumed Maximum Area of Operation shall be maintained as per Table 5 of IS: 15105.
(c) The aisle width between the storage stacks shall not be less than 2.5 m and the maximum area of each storage stack shall not be more than 150m2. If these parameters are exceeded, the design density applicable shall be loaded by 2.5 L/min/m2.
(d) In case of mixed storage (both moderate and high hazard storage) in buildings, the parameters will be governed by the most hazardous occupancy.
(e) Goods stored not higher than what is stated above table for the appropriate category or not higher than the eaves height of the roofs or within 1 m of a flat ceiling whichever is the lowest shall be regarded as moderate hazard storage. If the above conditions are not met, the risk shall be regarded as high hazard storage.
(f) Any new use which increases the number of occupants to a figure comparable with other classes of occupancy shall change the classification of the building to that of the new use (for example, Warehouse used for office purposes).
(g) Warehouse buildings shall not include any article which is highly combustible or explosive materials or products which are liable to bum with extreme rapidity and or which may produce poisonous fumes or explosions for storage, handling and which involve highly corrosive, toxic or noxious alkalis, acids or other liquids or chemicals producing flame, fumes and explosive, poisonous, irritant or corrosive gases; and for the storage, handling of any material producing ex-plosive mixtures of dust which result in the division of matter in to fine particles subject to spontaneous ignition as such buildings fall in Hazardous Building Category.
(2) Classification of risk based industrial building.
Table 56 Classification of risk based
industrial building
Table 56 Classification of risk based
industrial building
Category
Category
Nature of risk
Nature of risk
Designated officer for site Inspection
Designated officer for site Inspection
Low risk
Low risk
This subdivision shall include any building in
Town which the contents are of such comparative low
combustibility and the industrial processes or operations
conducted therein are of such a nature that there is hardly any
possibility for any self-propagating fire to occur and the only
consequent danger to life and property may arise from panic,
fumes or smoke, or fire from some external source.
Assistant Planner/Assistant Engineer/Senior Divisional Engineer
Medium risk
Medium risk
This subdivision shall include any building in
which the contents or industrial processes or operations
conducted therein are liable to give rise to a fire which will
burn with moderate rapidity or result in other hazardous
situation and may give off a considerable volume of smoke, but
from which neither toxic fumes nor explosions are to be feared in
the event of fire.
District Town Planner/Executive Engineer.
High risk
High risk
This subdivision shall include any building in
which the contents or industrial processes or operations
conducted therein are liable to give rise to a fire which will
burn with extreme rapidity or result in other hazardous situation
or from which poisonous fumes or explosions are to be feared in
the event of a fire.
Senior Town Planner/ Senior Engineer.
(a) For determination of fire loads and fire load density for arriving at the classification of occupancy hazard, guidance on calorific values of some common materials is given at Annexure A of part IV of the National Building Code of India, 2016.
(b) A broad classification of industrial occupancies into low, moderate and high hazard classes is given at Annexure B of part IV of the National Building Code of India, 2016.
(3) Classification of risk based on nature of occupancy in building.
Table 57
Classification of risk based on nature of occupancy in building
Table 57
Classification of risk based on nature of occupancy in building
Category
Category
Nature of occupancy
Nature of occupancy
Designated officer for site Inspection
Designated officer for site Inspection
Low risk
Low risk
• Residential
(excluding rental housing) and commercial like shops, booths,
sco's building and office below 15m height,
• Creche and Pre Nursery/ Nursery School
Assistant Town Planner/Assistant Engineer/ Senior Divisional
Engineer
Medium risk
Medium risk
• Residential and
commercial like shops, booths, sco's building and office 15m and
above but below 30m
• Educational
building, Nursing Homes, Clinics, laboratory, below 15m
• Orphanage Home ,
Old Age Home, Children's Centre / Care Centre / School /
Institute for Mentally challenged or Physically Handicapped
Person below 15m
• Hotel/ Motels,
Guest House, Lodging & Boarding / Service Apartments below
15m
• Restaurant/ Dabha
seating capacity below 50 persons
• recreational,
sports complex (low rise)
• rental housing below 15m
District Town Planner/Executive Engineer.
High risk
High risk
• Assembly building
like Religious, cinemas, multiplex, miniplex, concert hall,
exhibition hall, convention centre, marriage palace, stadium,
community centre, club, Religious Building, Auditorium, Museum,
Gymnasium etc.
• Residential and
commercial like shops, booths, sco's building and office 30m and
above
• Educational
building, Nursing Homes, Clinics, laboratory, 15m and above
• Orphanage Home ,
Old Age Home, Children's Centre / Care Centre / School /
Institute for Mentally challenged or Physically Handicapped
Person 15m and above
• Commercials such
as Shopping Mall / Shopping Complex
• Restaurant/ Dabha
seating capacity 50 persons and above
• Hospital
• Wholesale Trade/
Ware House/ Integrated Freight complex (Standalone)
• rental housing 15m and above
Senior Town Planner/ Senior Engineer.
Note. - Inspection of the risk based buildings site at the time of approval of building plan shall be carried out as mentioned in Table 58 and Table 59 below.
Note.
Table 58: where the date of
issuance of change of land use is within three months from the
date of application for approval of building plans
Table 58: where the date of
issuance of change of land use is within three months from the
date of application for approval of building plans
S. No.
S. No.
Nature of risk
Nature of risk
Inspection of site
Inspection of site
Remarks
Remarks
I.
Low risk
Not applicable
Since the
site has already been inspected at the time of approval of Change
of Land Use and the application for approval of building plans
has been submitted with in the period of three months. Hence
re-inspection of the site may not be required after such a short
period of time.
II.
Medium risk
III.
High risk
Table 59: where the date of issuance of change of land use
exceed a period of three months
Table 59: where the date of issuance of change of land use
exceed a period of three months
S. No.
S. No.
Nature of risk
Nature of risk
% of random inspection
% of random inspection
Remarks
Remarks
I.
Low risk
25
-
II.
Medium risk
50
III.
High risk
100
PART XIII
Registration of Plumbers