← Back to Directory

The Indian Electricity Rules, 1956

The Indian Electricity Rules, 1956

Raw JSON API

Sections

CHAPTER I

CHAPTER I

Section 1

1. Short title and commencement

Section 1

2. Definitions

Section 2

3. Authorisation

Section 3
CHAPTER II

CHAPTER II

Section 5

5. Entry and inspection

Section 5

6. Appeals

Section 6

7. Amount of fees

Section 7

8. Incidence of fees recoverable in the cases of dispute

Section 8

9. Submission of records

Section 9

10. List of consumers

Section 10
CHAPTER III

CHAPTER III

Section 12

11. Application for license

Section 11

12. Copies of maps and draft license for public inspection

Section 12

13. Contents of draft license

Section 13

14. Form of draft license

Section 14

15. Advertisement of application and contents thereof

Section 15

16. Amendment of draft license

Section 16

17. Local enquiries

Section 17

18. Approval of draft license

Section 18

19. Notification of grant of license

Section 19

20. Date of commencement of license

Section 20

21. Deposit of maps

Section 21

22. Deposit of printed copies

Section 22

23. Application for written consent of State Government in certain cases

Section 23

24. Amendment of license

Section 24

25. Sale of plans

Section 25

26. Preparation and submission of accounts

Section 26

27. Model conditions of supply

Section 27

28. Forms of requisitions

Section 28
CHAPTER IV

CHAPTER IV

Section 31

29. Construction, installation, protection, operation and maintenance of electric supply lines and apparatus

Section 29

30. Service lines and apparatus on consumer's premises

Section 30

31. Cut-out on consumer's premises

Section 31

32. Identification of earthed and earthed neutral conductors and position of switches and cut-outs therein

Section 32

33. Earthed terminal on consumer's premises

Section 33

34. Accessibility of bare conductors

Section 34

36. Handling of electric supply lines and apparatus

Section 36

37. Supply to vehicles, cranes, etc

Section 37

38. Cables for portable or transportable apparatus

Section 38

39. Cables protected by bituminous materials

Section 39

40. Street boxes

Section 40

42. Accidental charge

Section 42

43. Provisions applicable to protective equipment

Section 43

44. Instructions for restoration of persons suffering from electric shock

Section 44

45. Precautions to be adopted by consumers, [owners, occupiers,]

Section 45

46. Periodical inspection and testing of [* * *]

Section 46
CHAPTER V

CHAPTER V

Section 48

47. Testing of consumer's installation

Section 47

48. Precautions against leakage before connection

Section 48

49. Leakage on consumer's premises

Section 49

51. Provisions applicable to medium, high or extra-high voltage installations

Section 51

52. Appeal to Inspector in regard to defects

Section 52

53. Cost of inspection and test of consumer's installation

Section 53

54. Declared voltage of supply to consumer

Section 54

55. Declared frequency of supply to consumer

Section 55

56. Sealing of meters and cut-outs

Section 56

57. Meters, maximum demand indicators and other apparatus on consumer's premises

Section 57

59. Precautions against failure of supply: Notice of failures

Section 59
CHAPTER VI

CHAPTER VI

Section 60

60. Test for resistance of insulation

Section 60

61. Connection with earth

Section 61

62. Systems at medium voltage

Section 62
CHAPTER VII

CHAPTER VII

Section 64

63. Approval by Inspector

Section 63

66. Metal sheathed electric supply lines-Precautions against excess leakage

Section 66

67. Connection with earth

Section 67

68. General conditions as to transformation and control of energy

Section 68

69. Pole type sub-stations

Section 69

70. Condensers

Section 70

71. Additional provisions for supply to high voltage luminous tube sign installation

Section 71

72. Additional provisions for supply to high voltage electrode boilers

Section 72

73. Supply to X-ray and high frequency installation

Section 73
CHAPTER VIII

CHAPTER VIII

Section 74

74. Material and strength

Section 74

75. Joints

Section 75

77. Clearance above ground of the lowest conductor

Section 77

78. Clearance between conductors and trolley wires

Section 78

79. Clearances from buildings of low and medium voltage lines and service lines

Section 79

80. Clearances from buildings of high and extra-high voltage lines

Section 80

81. Conductors at different voltages on same supports

Section 81

83. Clearances: General

Section 83

84. Routes: Proximity to aerodromes

Section 84

85. Maximum interval between supports

Section 85

86. Conditions to apply where telecommunication lines and power lines are carried on same supports

Section 86

87. Lines crossing or approaching each other

Section 87

88. Guarding

Section 88

89. Service-lines from overhead lines

Section 89

90. Earthing

Section 90

91. Safety and protective devices

Section 91

92. Protection against lightning

Section 92

93. Unused overhead lines

Section 93
CHAPTER IX

CHAPTER IX

Section 93

94. Additional rules for electric traction

Section 94

95. Voltage of supply to vehicle

Section 95

96. Insulation of lines

Section 96

97. Insulation of returns

Section 97

98. Proximity to metallic pipes, etc

Section 98

99. Difference of potential on return

Section 99

100. Leakage on conduit system

Section 100

101. Leakage on system other than conduit system

Section 101

102. Passengers not to have access to electric circuit

Section 102

103. Current density in rails

Section 103

104. Isolation of sections

Section 104

105. Minimum size and strength of trolley-wire

Section 105

106. Height of trolley-wire and length of span

Section 106

107. Earthing of guard wires

Section 107

108. Records

Section 108
CHAPTER X

CHAPTER X

Section 109

109. Application of Chapter

Section 109

111. Notices

Section 111

112. Plans

Section 112

113. Lighting, communications and fire precautions

Section 113

114. Isolation and fixing of transformer, switchgear, etc

Section 114

115. Method of earthing

Section 115

117. Earthing metal, etc

Section 117

120. Switchgear and terminals

Section 120

121. Disconnection of supply

Section 121

122. Cables

Section 122

123. Flexible cables

Section 123

124. Portable and transportable machines

Section 124

125. Sundry precautions

Section 125

127. Shot-firing

Section 127

128. Signalling

Section 128

129. Haulage

Section 129

130. Earthing of neutral points

Section 130

132. Exemption

Section 132
CHAPTER XI

CHAPTER XI

Section 128

133. Relaxation by Government

Section 133

134. Relaxation by Inspector

Section 134

135. Supply and use of energy by non-licensees and others

Section 135

136. Responsibility of agents and managers

Section 136

137. Mode of entry

Section 137

138. Penalty for breaking seal

Section 138

139. Penalty for breach of rule 45

Section 45

141. Penalty for breach of rules

Section 141

142. Application of rules

Section 142

143. Repeal

Section 143

1. Year of working.

Section 1

2. Area of supply in square km.

Section 2

3. Approximate population in the area of supply.

Section 3

4. Installed capacity:

Section 4

1. Supervisory.

Section 1

2. Others.

Section 2

1. Supervisory

Section 1

2. Others.

Section 2

1. Preliminary & Promotional expenses

Section 1

2. Cost of Licence

Section 2

3. Other expenses e.g., expenses incidental to conversion from DC to AC change of frequency etc.

Section 3

1. Land & Rights

Section 1

2. Buildings and civil engineering works containing generating plant and equipment

Section 2

3. Hydraulic works forming part of a hydroelectric system including

Section 3

4. Water wheels, Generators and ancillary equipment including plant foundations

Section 4

5. Switchgear including cable connections

Section 5

6. Miscellaneous power plant equipment

Section 6

7. Other civil works (to be specified)

Section 7

1. Land & Rights

Section 1

2. Buildings and civil engineering works containing generating plant & equipment

Section 2

3. Boiler plant and equipment including plant foundations

Section 3

4. Engines, Turbines, generators and ancillary equipment including plant foundations

Section 4

5. Water cooling system comprising cooling towers and circulating water systems

Section 5

6. Switchgear including cable connections

Section 6

7. Miscellaneous power plant and equipment

Section 7

8. Other civil works (to be specified)

Section 8

1. Land and Rights

Section 1

2. Building and civil engineering works containing generating plant and equipment

Section 2

3. Engines, generators, and ancillary equipment including plant foundations

Section 3

4. Water cooling system comprising cooling towers and circulating water systems

Section 4

5. Switchgear including cable connections

Section 5

6. Miscellaneous power plant and equipment

Section 6

7. Other civil works (to be specified)

Section 7

1. Land and Rights

Section 1

2. Buildings and structures including civil engineering works containing transmission plant and equipment

Section 2

3. Sub-station transformers, transformer kiosks, sub-section equipment and other fixed apparatus including plant foundations:-

Section 3

4. Switchgear including cable connections

Section 4

5. Towers, poles, fixures, overhead conductors and devices:-

Section 5

7. Miscellaneous equipments (to be specified)

Section 7

1. Land & Rights

Section 1

2. Buildings and structures including civil engineering works containing distribution plant and equipment

Section 2

3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations-

Section 3

4. Switchgear including cable connections

Section 4

5. Towers, Poles, Fixtures, Overhead conductors and devices:

Section 5

7. Service lines

Section 7

8. Metering equipment

Section 8

9. Miscellaneous equipments (to be specified):

Section 9

1. Land & Rights

Section 1

2. Buildings and structures including civil engineering works containing distribution plant and equipment

Section 2

3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations

Section 3

4. Switchgear including cable connections

Section 4

5. Towers, Poles, Fixtures, Overhead conductors and devices:

Section 5

7. Service lines

Section 7

8. Metering equipment

Section 8

9. Miscellaneous equipments (to be specified)

Section 9

1. General Equipment:

Section 1

1. Land and Rights

Section 1

2. Buildings and structures

Section 2

3. Office furniture and equipment

Section 3

4. Transportation equipment

Section 4

5. Laboratory and meter testing equipment

Section 5

6. Workshop plant and equipment

Section 6

7. Tools and work equipment

Section 7

8. Communication equipment

Section 8

9. Miscellaneous equipment

Section 9

1. Domestic or residential

Section 1

2. Commercial

Section 2

3. Industrial

Section 3

4. Public Lighting

Section 4

5. Public Water works and Sewage pumping

Section 5

6. Irrigation

Section 6

7. Traction

Section 7

8. Supplies in bulk to distributing licences

Section 8

1. Rentals from

Section 1

2. Service connection fees

Section 2

3. Public Lighting Maintenance.

Section 3

1. Sale of Stores

Section 1

2. Repairs of lamps and other apparatus

Section 2

3. Commission for the collection of electricity duty

Section 3

4. Other miscellaneous items (to be specified)

Section 4

1. Water for power

Section 1

2. Lubricants and other consumable stores

Section 2

3. Station supplies and miscellaneous expenses

Section 3

4. Proportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff

Section 4

5. Wages and gratuities to labour

Section 5

6. Contribution to Provident Fund, staff pension & apprentice & other training schemes

Section 6

7. Bonus paid to the employees of the undertaking

Section 7

1. Salaries for Supervisory staff

Section 1

2. Buildings and civil engineering works containing generating plant and equipment

Section 2

3. Hydraulic works forming part of a hydro electric system, including-

Section 3

4. Water wheels, generators and ancillary equipment including plant foundations

Section 4

5. Switchgear including cable connections

Section 5

6. Miscellaneous power plant and equipment

Section 6

7. Other Civil works (to be specified)

Section 7

8. Contributions to Provident Fund, staff pension and apprentice and other training schemes

Section 8

9. Bonus paid to the employees of the undertaking

Section 9

1. Fuel (excluding sale proceeds of steam ashes, etc.)

Section 1

2. Lubricants and other consumable stores

Section 2

3. Water (if purchased separately)

Section 3

4. Station supplies and miscellaneous expenses

Section 4

5. Proportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff

Section 5

6. Wages and gratuities to labour

Section 6

7. Contribution to Provident Fund, staff pension & apprentice & other training schemes

Section 7

8. Bonus paid to the employees of the undertaking

Section 8

1. Salaries for Supervisory staff

Section 1

2. Building and civil engineering works containing generating plant and equipment

Section 2

3. Boiler plant and equipment including plant foundations

Section 3

4. Engines, turbines, generators and ancillary equipment including plant foundations

Section 4

5. Water cooling system comprising cooling towers and circulating water systems

Section 5

6. Switchgear including cable connections

Section 6

7. Miscellaneous power plant and equipment

Section 7

8. Other Civil works (to be specified)

Section 8

9. Contributions to Provident Fund, staff pension and apprentice and other training schemes

Section 9

10. Bonus paid to the employees of the undertaking

Section 10

1. Fuel

Section 1

2. Lubricants and other consumble stores

Section 2

3. Water (if purchased separately)

Section 3

4. Station supplies and miscellaneous expenses

Section 4

5. Proportion of salaries, allowances, gratuities etc. of Engineers, Superintendents, Officers, supervisory and other staff

Section 5

6. Wages and gratuities to labour

Section 6

7. Contributions to Provident Fund, Staff pension and apprentice and other training schemes

Section 7

8. Bonus paid to the employees of the undertaking

Section 8

1. Salaries for supervisory staff.

Section 1

2. Buildings and civil engineering works containing generating plant and equipment

Section 2

3. Engines, generators and ancillary equipment including plant foundations

Section 3

4. Water cooling system comprising cooling towers and circulating water system

Section 4

5. Switchgear including cable connections

Section 5

6. Miscellaneous power plant and equipment

Section 6

7. Other civil works (to be specified)

Section 7

8. Contributions to provident fund, staff pension and apprentice and other training schemes

Section 8

9. Bonus paid to the employees of the undertaking

Section 9

1. Proportion of salaries, allowances, gratuities, etc. of engineers, superintendents officers, supervisory and other staff

Section 1

2. Wages and gratuities to sub-station labour

Section 2

3. Wages and gratuities to labour on lines

Section 3

4. Buildings and structures including civil engineering works containing transmission plant and equipment

Section 4

5. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations

Section 5

6. Switchgear including cable connections

Section 6

7. Towers, poles, fixtures, overhead conductors and devices

Section 7

9. Contribution to Provident Fund or Staff Pension

Section 9

1. Proportion of salaries, allowances, gratuities, etc., of engineers, superintendents, officers, supervisory and other staff

Section 1

2. Wages and gratuities of sub-station labour

Section 2

3. Wages and gratuities to labour for mains

Section 3

4. Buildings and structures including civil engineering works containing distribution plant and equipment

Section 4

5. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations

Section 5

6. Switchgear including cable connections

Section 6

7. Towers, poles, fixtures, overhead conductors and devices

Section 7

9. Service Lines

Section 9

10. Metering Equipment

Section 10

11. Contributions to Provident Fund or Staff Pension.

Section 11

1. Proportion of salaries, allowances, gratuities, etc. of engineers, superintendents, officers, supervisory and other staff

Section 1

2. Wage and Gratuities to labour

Section 2

3. Buildings and structures including civil engineering works containing transmission plant and equipment

Section 3

4. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations

Section 4

5. Switchgear including cable connections

Section 5

6. Towers, poles, fixtures, overhead conductors and devices

Section 6

8. Service lines

Section 8

9. Metering equipment

Section 9

1. Operation and maintenance

Section 1

2. Renewal of lamps

Section 2

1. Proportion of salaries, allowances, gratuities, etc. of engineers, secretary, accountants, other officers etc.

Section 1

2. Meter reading and inspection

Section 2

3. Billing, collecting and accounting

Section 3

4. Exhibition, demonstrations and advertisements

Section 4

5. Merchandising, servicing and contract work

Section 5

6. Miscellaneous expenses

Section 6

7. Contributions to Provident Fund or Staff Pension

Section 7

8. Depreciation on general assets and equipment, which are not allocated to other sub-heads (from Statement V)

Section 8

1. Proportion of salaries, allowances, gratuities, etc. of general officers, executive, etc.

Section 1

2. Salaries, wages, gratuities, etc. of general office staff

Section 2

3. Contribution to local authority administration for supervision (applicable to local authority licensee only)

Section 3

4. Travelling and other expenses of officers and staff

Section 4

5. Rents and Way leaves

Section 5

6. Rates and Taxes

Section 6

7. General Office expenses and showroom maintenance and supplies

Section 7

8. Repairs to office buildings, staff quarters, furniture and fixtures, office equipment etc., and maintenance

Section 8

9. Depreciation on office and general buildings, furniture, etc. not allocated to other sub-heads (from Statement V)

Section 9

10. Audit Services:

Section 10

11. Legal services

Section 11

12. Insurance expenses.

Section 12

13. Contributions to Provident Fund, staff pension and apprentice and other training schemes

Section 13

14. Bonus paid to the employees of the undertaking.

Section 14

1. Interest paid and accrued on:

Section 1

2. Bad debts written off

Section 2

3. Other items (to be specified) TOTAL OTHER CHARGES

Section 3

1. Director's fees and expenses and debenture Trustees' fees; if any

Section 1

2. Other Expenses

Section 2

1. SPECIALISED MECHANICAL COURSE FOR OPERATING & SUPERVISORY STAFF WHO WILL BE ENGAGED ON THE MECHANICAL SIDE OF THE POWER PLANT

Section 1

2. SPECIALISED ELECTRICAL COURSE FOR OPERATING AND SUPERVISORY STAFF WHO WILL BE ENGAGED IN THE ELECTRICAL SIDE OF THE POWER PLANT

Section 2

1. General description.

Section 1

2. Arrangement of boilers.

Section 2

3. Boiler auxiliaries.

Section 3

4. Boiler instrumentation.

Section 4

5. Fabrication and assembly of different parts of boiler and its accessories.

Section 5

6. High pressure welding in boilers.

Section 6

7. Arrangement of pulverised fuel boiler in a modern thermal power station.

Section 7

1. Fundamental principle of steam turbine.

Section 1

2. Theory and operation of steam turbine.

Section 2

3. Governing and protection of turbine.

Section 3

1. Purpose and function.

Section 1

2. Construction of surface Condenser and vacuum pumps.

Section 2

1. Coal handling.

Section 1

2. Steam and condensate.

Section 2

3. Ash and slag handling.

Section 3

4. Station services, domestic water, air-conditioning, ventilation, lifts.

Section 4

5. Air services, air compressors, switchgear.

Section 5

6. Bearing cooling and general service water systems.

Section 6

7. Circulating water systems.

Section 7

8. Feed water and reheating plant.

Section 8

9. Fuel oil system.

Section 9

10. Station batteries and battery charging equipment.

Section 10

11. Station lighting, power supply and distribution Boards.

Section 11

1. SPECIALISED ELECTRICAL COUITSE FOR SKILLED PERSONS WHO WILL BE ENGAGED ON THE ELECTRICAL SIDE OF THE POWER PLANT

Section 1

2. SPECIALISED MECHANICAL COURSE FOR SKILLED PERSONS WHO WILL BE ENGAGED IN THE MECHANICAL SIDE OF THE POWER STATION

Section 2