The Indian Electricity Rules, 1956
The Indian Electricity Rules, 1956
Sections
CHAPTER I
CHAPTER I
Section 11. Short title and commencement
Section 12. Definitions
Section 23. Authorisation
Section 3
CHAPTER II
CHAPTER II
Section 55. Entry and inspection
Section 56. Appeals
Section 67. Amount of fees
Section 78. Incidence of fees recoverable in the cases of dispute
Section 89. Submission of records
Section 910. List of consumers
Section 10
CHAPTER III
CHAPTER III
Section 1211. Application for license
Section 1112. Copies of maps and draft license for public inspection
Section 1213. Contents of draft license
Section 1314. Form of draft license
Section 1415. Advertisement of application and contents thereof
Section 1516. Amendment of draft license
Section 1617. Local enquiries
Section 1718. Approval of draft license
Section 1819. Notification of grant of license
Section 1920. Date of commencement of license
Section 2021. Deposit of maps
Section 2122. Deposit of printed copies
Section 2223. Application for written consent of State Government in certain cases
Section 2324. Amendment of license
Section 2425. Sale of plans
Section 2526. Preparation and submission of accounts
Section 2627. Model conditions of supply
Section 2728. Forms of requisitions
Section 28
CHAPTER IV
CHAPTER IV
Section 3129. Construction, installation, protection, operation and maintenance of electric supply lines and apparatus
Section 2930. Service lines and apparatus on consumer's premises
Section 3031. Cut-out on consumer's premises
Section 3132. Identification of earthed and earthed neutral conductors and position of switches and cut-outs therein
Section 3233. Earthed terminal on consumer's premises
Section 3334. Accessibility of bare conductors
Section 3436. Handling of electric supply lines and apparatus
Section 3637. Supply to vehicles, cranes, etc
Section 3738. Cables for portable or transportable apparatus
Section 3839. Cables protected by bituminous materials
Section 3940. Street boxes
Section 4042. Accidental charge
Section 4243. Provisions applicable to protective equipment
Section 4344. Instructions for restoration of persons suffering from electric shock
Section 4445. Precautions to be adopted by consumers, [owners, occupiers,]
Section 4546. Periodical inspection and testing of [* * *]
Section 46
CHAPTER V
CHAPTER V
Section 4847. Testing of consumer's installation
Section 4748. Precautions against leakage before connection
Section 4849. Leakage on consumer's premises
Section 4951. Provisions applicable to medium, high or extra-high voltage installations
Section 5152. Appeal to Inspector in regard to defects
Section 5253. Cost of inspection and test of consumer's installation
Section 5354. Declared voltage of supply to consumer
Section 5455. Declared frequency of supply to consumer
Section 5556. Sealing of meters and cut-outs
Section 5657. Meters, maximum demand indicators and other apparatus on consumer's premises
Section 5759. Precautions against failure of supply: Notice of failures
Section 59
CHAPTER VI
CHAPTER VI
Section 6060. Test for resistance of insulation
Section 6061. Connection with earth
Section 6162. Systems at medium voltage
Section 62
CHAPTER VII
CHAPTER VII
Section 6463. Approval by Inspector
Section 6366. Metal sheathed electric supply lines-Precautions against excess leakage
Section 6667. Connection with earth
Section 6768. General conditions as to transformation and control of energy
Section 6869. Pole type sub-stations
Section 6970. Condensers
Section 7071. Additional provisions for supply to high voltage luminous tube sign installation
Section 7172. Additional provisions for supply to high voltage electrode boilers
Section 7273. Supply to X-ray and high frequency installation
Section 73
CHAPTER VIII
CHAPTER VIII
Section 7474. Material and strength
Section 7475. Joints
Section 7577. Clearance above ground of the lowest conductor
Section 7778. Clearance between conductors and trolley wires
Section 7879. Clearances from buildings of low and medium voltage lines and service lines
Section 7980. Clearances from buildings of high and extra-high voltage lines
Section 8081. Conductors at different voltages on same supports
Section 8183. Clearances: General
Section 8384. Routes: Proximity to aerodromes
Section 8485. Maximum interval between supports
Section 8586. Conditions to apply where telecommunication lines and power lines are carried on same supports
Section 8687. Lines crossing or approaching each other
Section 8788. Guarding
Section 8889. Service-lines from overhead lines
Section 8990. Earthing
Section 9091. Safety and protective devices
Section 9192. Protection against lightning
Section 9293. Unused overhead lines
Section 93
CHAPTER IX
CHAPTER IX
Section 9394. Additional rules for electric traction
Section 9495. Voltage of supply to vehicle
Section 9596. Insulation of lines
Section 9697. Insulation of returns
Section 9798. Proximity to metallic pipes, etc
Section 9899. Difference of potential on return
Section 99100. Leakage on conduit system
Section 100101. Leakage on system other than conduit system
Section 101102. Passengers not to have access to electric circuit
Section 102103. Current density in rails
Section 103104. Isolation of sections
Section 104105. Minimum size and strength of trolley-wire
Section 105106. Height of trolley-wire and length of span
Section 106107. Earthing of guard wires
Section 107108. Records
Section 108
CHAPTER X
CHAPTER X
Section 109109. Application of Chapter
Section 109111. Notices
Section 111112. Plans
Section 112113. Lighting, communications and fire precautions
Section 113114. Isolation and fixing of transformer, switchgear, etc
Section 114115. Method of earthing
Section 115117. Earthing metal, etc
Section 117120. Switchgear and terminals
Section 120121. Disconnection of supply
Section 121122. Cables
Section 122123. Flexible cables
Section 123124. Portable and transportable machines
Section 124125. Sundry precautions
Section 125127. Shot-firing
Section 127128. Signalling
Section 128129. Haulage
Section 129130. Earthing of neutral points
Section 130132. Exemption
Section 132
CHAPTER XI
CHAPTER XI
Section 128133. Relaxation by Government
Section 133134. Relaxation by Inspector
Section 134135. Supply and use of energy by non-licensees and others
Section 135136. Responsibility of agents and managers
Section 136137. Mode of entry
Section 137138. Penalty for breaking seal
Section 138139. Penalty for breach of rule 45
Section 45141. Penalty for breach of rules
Section 141142. Application of rules
Section 142143. Repeal
Section 1431. Year of working.
Section 12. Area of supply in square km.
Section 23. Approximate population in the area of supply.
Section 34. Installed capacity:
Section 41. Supervisory.
Section 12. Others.
Section 21. Supervisory
Section 12. Others.
Section 21. Preliminary & Promotional expenses
Section 12. Cost of Licence
Section 23. Other expenses e.g., expenses incidental to conversion from DC to AC change of frequency etc.
Section 31. Land & Rights
Section 12. Buildings and civil engineering works containing generating plant and equipment
Section 23. Hydraulic works forming part of a hydroelectric system including
Section 34. Water wheels, Generators and ancillary equipment including plant foundations
Section 45. Switchgear including cable connections
Section 56. Miscellaneous power plant equipment
Section 67. Other civil works (to be specified)
Section 71. Land & Rights
Section 12. Buildings and civil engineering works containing generating plant & equipment
Section 23. Boiler plant and equipment including plant foundations
Section 34. Engines, Turbines, generators and ancillary equipment including plant foundations
Section 45. Water cooling system comprising cooling towers and circulating water systems
Section 56. Switchgear including cable connections
Section 67. Miscellaneous power plant and equipment
Section 78. Other civil works (to be specified)
Section 81. Land and Rights
Section 12. Building and civil engineering works containing generating plant and equipment
Section 23. Engines, generators, and ancillary equipment including plant foundations
Section 34. Water cooling system comprising cooling towers and circulating water systems
Section 45. Switchgear including cable connections
Section 56. Miscellaneous power plant and equipment
Section 67. Other civil works (to be specified)
Section 71. Land and Rights
Section 12. Buildings and structures including civil engineering works containing transmission plant and equipment
Section 23. Sub-station transformers, transformer kiosks, sub-section equipment and other fixed apparatus including plant foundations:-
Section 34. Switchgear including cable connections
Section 45. Towers, poles, fixures, overhead conductors and devices:-
Section 57. Miscellaneous equipments (to be specified)
Section 71. Land & Rights
Section 12. Buildings and structures including civil engineering works containing distribution plant and equipment
Section 23. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations-
Section 34. Switchgear including cable connections
Section 45. Towers, Poles, Fixtures, Overhead conductors and devices:
Section 57. Service lines
Section 78. Metering equipment
Section 89. Miscellaneous equipments (to be specified):
Section 91. Land & Rights
Section 12. Buildings and structures including civil engineering works containing distribution plant and equipment
Section 23. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations
Section 34. Switchgear including cable connections
Section 45. Towers, Poles, Fixtures, Overhead conductors and devices:
Section 57. Service lines
Section 78. Metering equipment
Section 89. Miscellaneous equipments (to be specified)
Section 91. General Equipment:
Section 11. Land and Rights
Section 12. Buildings and structures
Section 23. Office furniture and equipment
Section 34. Transportation equipment
Section 45. Laboratory and meter testing equipment
Section 56. Workshop plant and equipment
Section 67. Tools and work equipment
Section 78. Communication equipment
Section 89. Miscellaneous equipment
Section 91. Domestic or residential
Section 12. Commercial
Section 23. Industrial
Section 34. Public Lighting
Section 45. Public Water works and Sewage pumping
Section 56. Irrigation
Section 67. Traction
Section 78. Supplies in bulk to distributing licences
Section 81. Rentals from
Section 12. Service connection fees
Section 23. Public Lighting Maintenance.
Section 31. Sale of Stores
Section 12. Repairs of lamps and other apparatus
Section 23. Commission for the collection of electricity duty
Section 34. Other miscellaneous items (to be specified)
Section 41. Water for power
Section 12. Lubricants and other consumable stores
Section 23. Station supplies and miscellaneous expenses
Section 34. Proportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff
Section 45. Wages and gratuities to labour
Section 56. Contribution to Provident Fund, staff pension & apprentice & other training schemes
Section 67. Bonus paid to the employees of the undertaking
Section 71. Salaries for Supervisory staff
Section 12. Buildings and civil engineering works containing generating plant and equipment
Section 23. Hydraulic works forming part of a hydro electric system, including-
Section 34. Water wheels, generators and ancillary equipment including plant foundations
Section 45. Switchgear including cable connections
Section 56. Miscellaneous power plant and equipment
Section 67. Other Civil works (to be specified)
Section 78. Contributions to Provident Fund, staff pension and apprentice and other training schemes
Section 89. Bonus paid to the employees of the undertaking
Section 91. Fuel (excluding sale proceeds of steam ashes, etc.)
Section 12. Lubricants and other consumable stores
Section 23. Water (if purchased separately)
Section 34. Station supplies and miscellaneous expenses
Section 45. Proportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff
Section 56. Wages and gratuities to labour
Section 67. Contribution to Provident Fund, staff pension & apprentice & other training schemes
Section 78. Bonus paid to the employees of the undertaking
Section 81. Salaries for Supervisory staff
Section 12. Building and civil engineering works containing generating plant and equipment
Section 23. Boiler plant and equipment including plant foundations
Section 34. Engines, turbines, generators and ancillary equipment including plant foundations
Section 45. Water cooling system comprising cooling towers and circulating water systems
Section 56. Switchgear including cable connections
Section 67. Miscellaneous power plant and equipment
Section 78. Other Civil works (to be specified)
Section 89. Contributions to Provident Fund, staff pension and apprentice and other training schemes
Section 910. Bonus paid to the employees of the undertaking
Section 101. Fuel
Section 12. Lubricants and other consumble stores
Section 23. Water (if purchased separately)
Section 34. Station supplies and miscellaneous expenses
Section 45. Proportion of salaries, allowances, gratuities etc. of Engineers, Superintendents, Officers, supervisory and other staff
Section 56. Wages and gratuities to labour
Section 67. Contributions to Provident Fund, Staff pension and apprentice and other training schemes
Section 78. Bonus paid to the employees of the undertaking
Section 81. Salaries for supervisory staff.
Section 12. Buildings and civil engineering works containing generating plant and equipment
Section 23. Engines, generators and ancillary equipment including plant foundations
Section 34. Water cooling system comprising cooling towers and circulating water system
Section 45. Switchgear including cable connections
Section 56. Miscellaneous power plant and equipment
Section 67. Other civil works (to be specified)
Section 78. Contributions to provident fund, staff pension and apprentice and other training schemes
Section 89. Bonus paid to the employees of the undertaking
Section 91. Proportion of salaries, allowances, gratuities, etc. of engineers, superintendents officers, supervisory and other staff
Section 12. Wages and gratuities to sub-station labour
Section 23. Wages and gratuities to labour on lines
Section 34. Buildings and structures including civil engineering works containing transmission plant and equipment
Section 45. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations
Section 56. Switchgear including cable connections
Section 67. Towers, poles, fixtures, overhead conductors and devices
Section 79. Contribution to Provident Fund or Staff Pension
Section 91. Proportion of salaries, allowances, gratuities, etc., of engineers, superintendents, officers, supervisory and other staff
Section 12. Wages and gratuities of sub-station labour
Section 23. Wages and gratuities to labour for mains
Section 34. Buildings and structures including civil engineering works containing distribution plant and equipment
Section 45. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations
Section 56. Switchgear including cable connections
Section 67. Towers, poles, fixtures, overhead conductors and devices
Section 79. Service Lines
Section 910. Metering Equipment
Section 1011. Contributions to Provident Fund or Staff Pension.
Section 111. Proportion of salaries, allowances, gratuities, etc. of engineers, superintendents, officers, supervisory and other staff
Section 12. Wage and Gratuities to labour
Section 23. Buildings and structures including civil engineering works containing transmission plant and equipment
Section 34. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations
Section 45. Switchgear including cable connections
Section 56. Towers, poles, fixtures, overhead conductors and devices
Section 68. Service lines
Section 89. Metering equipment
Section 91. Operation and maintenance
Section 12. Renewal of lamps
Section 21. Proportion of salaries, allowances, gratuities, etc. of engineers, secretary, accountants, other officers etc.
Section 12. Meter reading and inspection
Section 23. Billing, collecting and accounting
Section 34. Exhibition, demonstrations and advertisements
Section 45. Merchandising, servicing and contract work
Section 56. Miscellaneous expenses
Section 67. Contributions to Provident Fund or Staff Pension
Section 78. Depreciation on general assets and equipment, which are not allocated to other sub-heads (from Statement V)
Section 81. Proportion of salaries, allowances, gratuities, etc. of general officers, executive, etc.
Section 12. Salaries, wages, gratuities, etc. of general office staff
Section 23. Contribution to local authority administration for supervision (applicable to local authority licensee only)
Section 34. Travelling and other expenses of officers and staff
Section 45. Rents and Way leaves
Section 56. Rates and Taxes
Section 67. General Office expenses and showroom maintenance and supplies
Section 78. Repairs to office buildings, staff quarters, furniture and fixtures, office equipment etc., and maintenance
Section 89. Depreciation on office and general buildings, furniture, etc. not allocated to other sub-heads (from Statement V)
Section 910. Audit Services:
Section 1011. Legal services
Section 1112. Insurance expenses.
Section 1213. Contributions to Provident Fund, staff pension and apprentice and other training schemes
Section 1314. Bonus paid to the employees of the undertaking.
Section 141. Interest paid and accrued on:
Section 12. Bad debts written off
Section 23. Other items (to be specified) TOTAL OTHER CHARGES
Section 31. Director's fees and expenses and debenture Trustees' fees; if any
Section 12. Other Expenses
Section 21. SPECIALISED MECHANICAL COURSE FOR OPERATING & SUPERVISORY STAFF WHO WILL BE ENGAGED ON THE MECHANICAL SIDE OF THE POWER PLANT
Section 12. SPECIALISED ELECTRICAL COURSE FOR OPERATING AND SUPERVISORY STAFF WHO WILL BE ENGAGED IN THE ELECTRICAL SIDE OF THE POWER PLANT
Section 21. General description.
Section 12. Arrangement of boilers.
Section 23. Boiler auxiliaries.
Section 34. Boiler instrumentation.
Section 45. Fabrication and assembly of different parts of boiler and its accessories.
Section 56. High pressure welding in boilers.
Section 67. Arrangement of pulverised fuel boiler in a modern thermal power station.
Section 71. Fundamental principle of steam turbine.
Section 12. Theory and operation of steam turbine.
Section 23. Governing and protection of turbine.
Section 31. Purpose and function.
Section 12. Construction of surface Condenser and vacuum pumps.
Section 21. Coal handling.
Section 12. Steam and condensate.
Section 23. Ash and slag handling.
Section 34. Station services, domestic water, air-conditioning, ventilation, lifts.
Section 45. Air services, air compressors, switchgear.
Section 56. Bearing cooling and general service water systems.
Section 67. Circulating water systems.
Section 78. Feed water and reheating plant.
Section 89. Fuel oil system.
Section 910. Station batteries and battery charging equipment.
Section 1011. Station lighting, power supply and distribution Boards.
Section 111. SPECIALISED ELECTRICAL COUITSE FOR SKILLED PERSONS WHO WILL BE ENGAGED ON THE ELECTRICAL SIDE OF THE POWER PLANT
Section 12. SPECIALISED MECHANICAL COURSE FOR SKILLED PERSONS WHO WILL BE ENGAGED IN THE MECHANICAL SIDE OF THE POWER STATION
Section 2
the-indian-electricity-rules-1956.json
•
351 Sections
•
India (Central)
{
"id": 11991,
"slug": "the-indian-electricity-rules-1956",
"title": "The Indian Electricity Rules, 1956",
"short_title": "The Indian Electricity Rules, 1956",
"act_number": "Published vide S.R.O. 1455, dated 26.6.1956, publi",
"act_year": 1956,
"act_type": "CENTRAL",
"location": "India (Central)",
"law_status": "unknown",
"enactment_date": "1966-06-30",
"description": "The Indian Electricity Rules, 1956",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "CHAPTER I",
"chapter": "CHAPTER I",
"content": "Preliminary",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "1",
"title": "1. Short title and commencement",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 1
},
{
"number": "2",
"title": "2. Definitions",
"chapter": null,
"content": "(a) \"the Act\" means the Indian Electricity Act, 1910;\n(b) \"accessible\" means within physical reach without the use of any appliance or special effort;\n(c) \"ampere\" means a unit of electric current and is the unvarying electric current which when passed through a solution of nitrate of silver in water, in accordance with the specification set out in Annexure I, deposits silver at the rate of 0.001118 of a gramme per second; the aforesaid unit is equivalent to the current which, in passing through the suspended coil of wire forming part of the instrument marked \"Government of India Ampere Standard Verified\" when the suspended coil is in its sighted position, exerts a force which is exactly balanced by the force exerted by gravity in Calcutta on the counter-balancing iridio-platinum weight of the said instrument;\n(d) \"Annexure\" means an Annexure to these rules;\n(e) \"apparatus\" means electrical apparatus and includes all machines, fittings, accessories and appliances in which conductors are used;\n[(ee) \"authorised person\" means a person authorised under rule 3;]\n(f) \"bare\" means not covered with insulating materials;\n(g) \"cable\" means a length of insulated single conductor (solid or stranded or of two or more such conductors, each provided with its own insulation, which are laid up together. Such insulated conductor or conductors may or may not be provided with an overall mechanical protective covering;\n(gg) \"flexible cable\" means a cable consisting of one or more cores each formed of a group of wires, the diameter and the physical properties of the wires and the insulating material being such as to afford flexibility;\n(h) \"circuit\" means an arrangement of conductor or conductors for the purpose of conveying energy and forming a system or a branch of a system;\n(i) \"circuit breaker\" means a device, capable of making and breaking the circuit under all conditions, and unless otherwise specified, so designed as to break the current automatically under abnormal conditions;\n(j) \"concentric cable\" means a composite cable comprising an inner conductor which is insulated and one or more outer conductors which are insulated from one another and are disposed over the insulation of, and more or less around, the inner conductor;\n(k) \"conductor\" means any wire, cable, bar, tube, rail or plate used for conducting energy and so arranged as to be electrically connected to a system;\n(l) \"conduit\" means rigid or flexible metallic tubing or mechanically strong and fire-resisting non-metallic tubing into which a cable or cables may be drawn for the purpose of affording it or them mechanical protection;\n(m) \"covered with insulating material\" means adequately covered with insulating material of such quality and thickness as to prevent danger;\n(n) \"cut-out\" means any appliance for automatically interrupting the transmission of energy through any conductor when the current rises above a pre-determined amount, and shall also include fusible cut-out;\n(o) \"danger\" means danger to health or danger to life or any part of body from shock, burn, or other injury to persons, or property, or from fire or explosion, attendant upon the generation, transmission, transformation, conversion, distribution or use of energy;\n(p) \"dead\" means at or about earth potential and disconnected from any live system:\n(q) \"earthed\" or \"connected with earth\" means connected with the general mass of earth in such manner as to ensure at all times an immediate discharge of energy without danger;\n(r) \"earthing system\" means an electrical system in which all the conductors are earthed;\n[* * *]\n(t) \"enclosed sub-station\" means any premises or enclosure or part thereof, being large enough to admit the entrance of a person after the apparatus therein is in position, containing apparatus for transforming or converting energy to or from a voltage at or above medium voltage (other than transforming or converting solely for the operation of switchgear or instruments) with or without any other apparatus for switching, controlling or otherwise regulating the energy, and includes the apparatus therein;\n(u) \"enclosed switch-station\" means any premises or enclosure or part thereof, being large enough to admit the entrance of a person after the apparatus therein is in position, containing apparatus for switching, controlling or otherwise regulating energy at or above medium voltage but not for transforming or converting energy (other than for transforming or converting solely for the operation of switchgear or instruments), and includes the apparatus therein;\n[(uu) \"flameproof enclosure\" means an enclosure for electrical machinery or apparatus that will withstand, when the covers or other access doors are properly secured, an internal explosion of the inflammable gas or vapour which may enter or originate inside the enclosure, without suffering damage and without communicating the internal flammation (or explosion) to the external inflammable gas or vapour in which it is designed to be used, through any joints or other structural openings in the closure;]\n(v) \"guarded\" means covered, shielded, fenced or otherwise protected by means of suitable casings, barrier, rails or metal screens to remove the possibility of dangerous contact or approach by persons or objects to a point of danger;\n[(vv) \"hand-held portable apparatus\" means an apparatus which is so designed as to be capable of being held in the hands and moved while connected to supply of electricity;]\n(w) \"Inspector\" means an electrical Inspector appointed under section 36;\n(x) \"Inspector of Mines\" means an Inspector appointed under the Mines Act, 1952 (35 of 1952);\n(y) \"installation\" means any composite electrical unit used for the purpose of generating, transforming, transmitting, converting, distributing or utilising energy;\n(z) \"intrinsically safe\" as applied to apparatus or associated circuits shall denote that any sparking that may occur in normal working is incapable of causing explosion of inflammable gas or vapour;\n[(zz) Increased safety type \"e\" means a method of protection by which additional measures are applied so as to give increased security against the possibility of excessive temperatures and of occurrence of arcs and sparks in apparatus which does not produce arcs or sparks in normal service;]\n(aa) \"lightning arrestor\" means a device which has the property of diverting to earth any electrical surge of excessively high amplitude applied to its terminals and is capable of interrupting follow current if present and restoring itself thereafter to its original operating conditions;\n[(aaa) \"linked switch\" means a switch with all the poles mechanically linked so as to operate simultaneously;]\n(ab) \"live\" means electrically charged;\n(ac) \"metallic covering\" means mechanically strong metal covering surrounding one or more conductors;\n[(aca) \"meter\" means a set of integrating instruments used to measure the amount of electrical energy supplied or the quantity of electrical energy contained in the supply, in a given time, which include whole current meter and metering equipment such as current transformer, capacitor voltage transformer or potential or voltage transformer with necessary wiring and accessories;]\n[(ad) \"neutral conductor\" means that conductor of a multi-wire system, the voltage of which is normally intermediate between the voltages of the other conductors of the system and shall also include return-wire of the single phase system;]\n(ae) \"non-licensee\" means a person generating, supplying, transmitting or using energy to whom any of the provisions of Part III of the Act apply;\n(af) \"occupier\" means the owner or person in occupation of the premises where energy is used or proposed to be used;\n[(aff) \"officer appointed to assist the Inspector\" means an officer appointed under rule 4-A;]\n(ag) \"ohm\" means a unit of electric resistance and is the resistance offered to an unvarying electric current by a column of mercury at the temperature of melting ice 14.4521 grammes in mass of a uniform cross-sectional area and of a length of 106.3 centimetres. The aforesaid unit is represented by the resistance between the terminals of the instrument marked \"Government of India Ohm Standard Verified\" to the passage of an electric current when the coil of wire, forming part of the aforesaid instrument and connected to the aforesaid terminals is in all parts at a temperature of 300C;\n(ah) \"open sparking\" means sparking which owing to the lack of adequate provisions for preventing the ignition of inflammable gas external to the apparatus would ignite such inflammable gas;\n(ai) \"overhead line\" means any electric supply-line which is placed above ground and in the open [air] but excluding live rails of a traction system;\n(aj) \"owner\", \"agent\" and \"manager\" of a mine have the same meanings as are assigned to them in the Mines Act, 1952 (35 of 1952);\n[(ak) \"portable apparatus\" means an apparatus which is so designed as to be capable of being moved while in operation;]\n(al) \"portable hand lamp\" means a portable light-fitting provided with suitable handle, guard and flexible cord connected to a plug;\n(am) \"section\" means a section of the Act;\n(an) \"span\" means the horizontal distance between two adjacent supporting points of an overhead conductor;\n(ao) \"street box\" means a totally enclosed structure, either above or below ground containing apparatus for transforming, switching, controlling or otherwise regulating energy;\n(ap) \"supplier\" means a licensee, a non-licensee or any other supplier of energy, [including the Government] ;\n(aq) \"switch\" means a manually-operated device for opening and closing or for changing the connection of a circuit;\n[(aqa) \"switchboard\" means an assembly including the switchgear for the control of electrical circuits, electric connections and the supporting frame;]\n(ar) \"switchgear\" shall denote switches, circuit breakers, cut-outs and other apparatus used for the operation, regulation and control of circuits;\n(as) \"system\" means an electrical system in which all the conductors and apparatus are electrically connected to a common source of electric supply;\n(at) transportable apparatus\" means apparatus which is operated in a fixed position but which is so designed as to be capable of being moved readily from one place to another;\n(au) \"volt\" means a unit of electro-motive force and is the electric pressure which, when steadily applied to a conductor, the resistance of which is one ohm, will produce a current of one ampere;\n(av) \"voltage\" means the difference of electric potential measured in volts between any two conductors or between any part of either conductor and the earth as measured by a suitable voltmeter and is said to be-\n\"low\" where the voltage does not exceed 250 volts under normal conditions subject, however, to the percentage variation allowed by these rules;\n\"medium\" where the voltage does not exceed 650 volts under normal conditions subject, however, to the percentage variation allowed by these rules;\n\"high\" where the voltage does not exceed 33,000 volts under normal conditions subject, however, to the percentage variation allowed by these rules;\n\"extra high\" where the voltage exceeds 33,000 volts under normal conditions subject, however, to the percentage variation allowed by these rules.",
"footnote": "",
"is_definition": true,
"sort_order": 2
},
{
"number": "3",
"title": "3. Authorisation",
"chapter": null,
"content": "(b) The appropriate Government may, on the recommendations of the owner of such generating station, relax the conditions stipulated in clause (a) of this sub-rule for any engineer and such other person who has already sufficient experience in the operation and maintenance of a generating station.\n(c) The owner of a generating station, in consultation with Central Electricity Authority, may alter the duration and manner of training in respect of those persons who have been already engaged in the operation and maintenance of a generating station or a sub-station.]",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "CHAPTER II",
"chapter": "CHAPTER II",
"content": "Inspectors\n[4. Qualifications of Inspectors\n(a) he possesses a degree in electrical engineering or its equivalent from a recognised University or Institution; and\n(b) he has been regularly engaged for a period of at least eight years in the practice of electrical engineering, of which not less than two years have been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity, or in the administration of the Act and these rules, in a position of responsibility:\n[4-A. Appointment of officers to assist the Inspectors\n[4-B. Qualifications of officers appointed to assist the Inspectors\n(a)(i) he possesses a Degree in Electrical Engineering or its equivalent from a recognised University or Institution; and\n(ii) he has been regularly engaged for a period of at least three years in the practice of electrical engineering, of which not less than one year has been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity, or in the administration of the Act and these rules, in a position of responsibility:\n(b)(i) he possesses a diploma in electrical engineering or its equivalent from a recognised institution; and\n(ii) he has been regularly engaged for a period of at least six years in the practice of electrical engineering, of which not less than two years have been spent in an electrical or mechanical engineering workshop or in generation or transmission or distribution of electricity or in the administration of the Act and these rules, in a position of responsibility.",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "5",
"title": "5. Entry and inspection",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "6",
"title": "6. Appeals",
"chapter": null,
"content": "(a) if the order is served by an officer appointed to assist an Inspector and authorised under sub-rule (2) of rule 4-A, to the Inspector;\n(b) if the order is served by an Inspector to the Central Government or the State Government, as the case may be.]",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "7",
"title": "7. Amount of fees",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "8",
"title": "8. Incidence of fees recoverable in the cases of dispute",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "9",
"title": "9. Submission of records",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "10",
"title": "10. List of consumers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "CHAPTER III",
"chapter": "CHAPTER III",
"content": "License",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "11",
"title": "11. Application for license",
"chapter": null,
"content": "(a) six copies, in print, of the draft license as proposed by the applicant, with the name and address of the applicant and of his agent (if any), printed on the outside of the draft;\n(b) three copies, each signed by the applicant, of maps of the proposed area of supply and of the streets or roads in which the supply of energy is to be compulsory, which shall be so marked or coloured as to define any portion of such area and streets or roads which are under the administrative control of any local authority and shall be on a scale-\n(i) of not less than 10 centimetres to a kilometre, or\n(ii) if no such maps are available, of not less than that of the largest scale ordinance maps available, or\n(iii) on such other scales as may be approved by State Government;\n(c) a list of any local authorities invested with the administration of any portion of the area of supply;\n(d) an approximate statement describing any lands which the applicant proposes to acquire for the purposes of the license under the provisions of the Land Acquisition Act, 1894 (1 of 1894);\n(e) an approximate statement of the capital proposed to be expended in connection with the undertaking and such other particulars as the State Government may require;\n(f) if the applicant is a Company which is registered under any of the enactments relating to Companies for the time being in force in India or is a Corporation by an Act of the Parliament, a copy of the Memorandum and Articles of Association; and\n(g) a treasury receipt for such fee not exceeding fifteen hundred rupees, as the State Government may require, paid into a Government treasury in the State concerned, unless such fee is remitted, wholly or in part, by general or special order of the State Government.",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "12",
"title": "12. Copies of maps and draft license for public inspection",
"chapter": null,
"content": "(a) copies of the maps referred to in clause (b) of sub-rule (1) of rule 11 for public inspection; and\n(b) a sufficient number of copies of the draft license to be furnished to all persons applying for them at a price not exceeding twenty-five [* * *]",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "13",
"title": "13. Contents of draft license",
"chapter": null,
"content": "(a) a short title descriptive of the proposed undertaking together with the address and description of the applicant, or in the case of a firm, the names of all the directors or partners of the firm;\n(b) a statement of the boundaries of the proposed area of supply;\n(c) if the generating station is situated or is to be situated outside the area of supply or if any intervening area not included in the area of supply is to be crossed, a list of the streets not included in the area of supply along or across which electric supply lines are to be laid down or placed;\n(d) the proposed limits within which and the conditions under which the supply of energy is to be compulsory or permissive, the nature and amount of the supply (if limited) and the like:\n(e) a list of the streets (if any) which are repairable neither by the Central or the State Governments nor by a local authority and of the railways and tramways (if any), the soil or pavement of which the applicant seeks powers to open or break up, and the names of the persons or designations of authorities by whom such streets are repairable or who are for the time being entitled to work such railways or tramways;\n(f) the proposed periods after which the right to purchase is to take effect;\n(g) a statement of any special terms of purchase or orders proposed to be made under section 10; and\n(h) any proposed modification of the Schedule to the Act to be made under clause (f) of sub-section (2) of section 3.",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "14",
"title": "14. Form of draft license",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "15",
"title": "15. Advertisement of application and contents thereof",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "16",
"title": "16. Amendment of draft license",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "17",
"title": "17. Local enquiries",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "18",
"title": "18. Approval of draft license",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "19",
"title": "19. Notification of grant of license",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "20",
"title": "20. Date of commencement of license",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "21",
"title": "21. Deposit of maps",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "22",
"title": "22. Deposit of printed copies",
"chapter": null,
"content": "(a) have adequate number of copies of the license printed:\n(b) have adequate number of maps prepared showing the area of supply and the compulsory areas specified in the license;\n(c) arrange to exhibit a copy of such license and maps for public inspection at all reasonable times at his head office, his local offices (if any), and at the office of every local authority within the area of supply.",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "23",
"title": "23. Application for written consent of State Government in certain cases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "24",
"title": "24. Amendment of license",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "25",
"title": "25. Sale of plans",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "26",
"title": "26. Preparation and submission of accounts",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "27",
"title": "27. Model conditions of supply",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "28",
"title": "28. Forms of requisitions",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "31",
"title": "CHAPTER IV",
"chapter": "CHAPTER IV",
"content": "[GENERAL SAFETY REQUIREMENTS]",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "29",
"title": "29. Construction, installation, protection, operation and maintenance of electric supply lines and apparatus",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "30",
"title": "30. Service lines and apparatus on consumer's premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "31",
"title": "31. Cut-out on consumer's premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "32",
"title": "32. Identification of earthed and earthed neutral conductors and position of switches and cut-outs therein",
"chapter": null,
"content": "(a) where the earthed or earthed neutral conductor is the property of the supplier, at or near the point of commencement of supply;\n(b) where a conductor forming part of a consumer's system is to be connected to the supplier's earthed or earthed neutral conductor, at the point where such connection is to be made;\n(c) in all other cases, at a point corresponding to the point of commencement of supply or at such other points as may be approved by an Inspector or any officer appointed to assist the Inspector and [authorised under sub-rule (2) of rule 4-A]\n(a) a link for testing purposes, or\n(b) a switch for use in controlling a generator or transformer.",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "33",
"title": "33. Earthed terminal on consumer's premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "34",
"title": "34. Accessibility of bare conductors",
"chapter": null,
"content": "(a) ensure that they are inaccessible;\n(b) provide readily accessible position switches for rendering them dead whenever necessary; and\n(c)\ttake such other safety measures as are considered necessary by the Inspector.\n35. [Danger]\n(a) every motor, generator, transformer and other electrical plant and equipment together with apparatus used for controlling or regulating the same;\n[(b) all supports of high and extra-high voltage overhead lines which can be easily climbed upon without the aid of ladder or special appliances.\n(c) luminous tube sign requiring high voltage supply, X-ray and similar high-frequency installations:",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "36",
"title": "36. Handling of electric supply lines and apparatus",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "37",
"title": "37. Supply to vehicles, cranes, etc",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "38",
"title": "38. Cables for portable or transportable apparatus",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "39",
"title": "39. Cables protected by bituminous materials",
"chapter": null,
"content": "(i) any pipe, conduit or the like into which such electric supply line may have been drawn or placed shall, unless other arrangements are approved by the Inspector in any particular case, be effectively sealed at its point of entry into any street box so as to prevent any flow of gas to or from the street box; and\n(ii) such electric supply line shall be periodically inspected and tested where accessible, and the result of each such inspection and test shall be duly recorded by the supplier or the owner.",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "40",
"title": "40. Street boxes",
"chapter": null,
"content": "(a) to ensure that any gas which may by accident have obtained access to the box shall escape before a person is allowed to enter; and\n(b) for the prevention of danger from sparking.\n41. [Distinction of different circuits]\n[41-A. Distinction of the installations having more than one feed",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "42",
"title": "42. Accidental charge",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "43",
"title": "43. Provisions applicable to protective equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "44",
"title": "44. Instructions for restoration of persons suffering from electric shock",
"chapter": null,
"content": "[44-A. Intimation of accident",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "45",
"title": "45. Precautions to be adopted by consumers, [owners, occupiers,]",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "46",
"title": "46. Periodical inspection and testing of [* * *]",
"chapter": null,
"content": "[(aa) The periodical inspection and testing of high voltage and extra-high voltage installations belonging to supplier, shall also be carried out at intervals not exceeding five years by the inspector or any officer appointed to assist the Inspector.]\n(b) Where the supplier is directed by the Central or the State Government, as the case may be, to inspect and test the installation he shall report on the condition of the installation to the consumer concerned in a form approved by the Inspector and shall submit a copy of such report to the Inspector [or to any officer appointed to assist the Inspector and authorised under sub-rule (2) of rule 4-A.]\n[(c) Subject to the approval of the Inspector, the forms of inspection report contained in Annexure IX-A may, with such variations as the circumstances of each case require, be used for the purposes of this sub-rule.]\n(b) In the event of the failure of any consumer to pay the fees on or before the date specified in the fee notice, supply to the installation of such consumer shall be liable to be disconnected under the direction of the Inspector. Such disconnection, however, shall not be made by the supplier without giving to the consumer seven clear days' notice in writing of his intention so to do.\n[(c) In the event of the failure of the owner of any installation to rectify the defects in his installation pointed out by the Inspector or by any officer appointed to assist him and authorised under sub-rule (2) of rule 4-A in the form set out in Annexure IX and within the time indicated therein, such installation shall be liable to be disconnected [under the directions of the Inspector] [ after serving the owner of such installation with a notice:",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "48",
"title": "CHAPTER V",
"chapter": "CHAPTER V",
"content": "General Conditions Relating To Supply And Use Of Energy",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "47",
"title": "47. Testing of consumer's installation",
"chapter": null,
"content": "[47-A. Installation and testing of generating units",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "48",
"title": "48. Precautions against leakage before connection",
"chapter": null,
"content": "[(i) All the electrical equipments shall have the \"IR\" values as stipulated in the relevant Indian Standards.\n(ii) At a pressure of 500 V DC applied between each line conductor and earth for a period of one minute, the insulation resistance of low voltage and medium voltage equipments shall be at least 1 MEGA-OHM or as specified in the relevant Indian Standard.\n(iii) At a pressure of 2.5 KV DC applied between each line conductor and earth for a period of one minute, the insulation resistance of high voltage equipments shall be at least 5 MEGA-OHM or as specified in the relevant Indian Standard.]",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "49",
"title": "49. Leakage on consumer's premises",
"chapter": null,
"content": "(a) the consumer does not give all reasonable facilities for inspection and testing of his installation, or\n[(b) when an insulation resistance at the consumer's installation is so low as to prevent safe use of energy,]\n[50. Supply and use of energy\n(a) The following controls of requisite capacity to carry and break the current [are placed]\n(i) a linked switch with fuse(s) or a circuit breaker by low and medium voltage consumers;\n(ii) a linked switch with fuse(s) or a circuit breaker by HV consumers having aggregate installed transformer/apparatus capacity up to 1000 KVA to be supplied at voltage upto 11 KV and 2500 KVA at higher voltages (above 11 KV and not exceeding 33 KV);\n(iii) a circuit breaker by HV consumers having an aggregate installed transformer/apparatus capacity above 1000 KVA and supplied at 11 KV and above 2500 KVA supplied at higher voltages (above 11 KV and not exceeding 33 KV);\n(iv) a circuit breaker by EHV consumer:\nProvided that where the point of commencement of supply and the consumer apparatus are near each other, one linked switch with fuse(s) or circuit breaker near the point of commencement of supply as required by this clause shall be considered sufficient for the purpose of this rule.\n(b) In case of every transformer the following shall be provided:-\n(i) On primary side for transformers a linked switch with fuse(s) or circuit breaker of adequate capacity:\nProvided that the linked switch on the primary side of the transformer may be of such capacity as to carry the full load current and to break only the magnetising current of the transformer:\n[Provided further that for all transformers:-\n(A) having a capacity of 5000 KVA and above and installed before the commencement of the Indian Electricity (Amendment-1) Rules, 2000; and\n(B) having a capacity of 1000 KVA and above and installed on or after the commencement of the Indian Electricity (Amendment-1) Rules, 2000 a circuit breaker shall be provided:]\n[Provided further that the provision of linked switch on the primary side of the transformer shall not apply to the unit auxiliary transformer of the generator.\n[(ii) In respect of all transformers installed on or after the commencement of the Indian Electricity (Amendment-1) Rules, 2000, on the secondary side of all transformers transforming HV to EHV, MV or LV a circuit breaker of adequate rating shall be installed:\nProvided that for suppliers' transformers of capacity upto 630 KVA, a linked switch with fuse or circuit breaker of adequate rating shall be installed on secondary side;]\n[(c) except in the case of composite control gear designed as a unit every distinct circuit is protected against excess energy by means of suitable cut-out or a circuit breaker of adequate breaking capacity suitably located and so constructed as to prevent danger from overheating, arcing or scattering of hot metal when it comes into operation and to permit for ready renewal of the fusible metal of the cut-out without danger;\n(d) the supply of energy to each motor or a group of motors or other apparatus meant for operating one particular machine is controlled by a suitable linked switch or a circuit breaker or an emergency tripping device with manual reset of requisite capacity placed in such a position as to be adjacent to the motor or a group of motors or other apparatus readily accessible to and easily operated by the person incharge and so connected in the circuit that by its means all supply of energy can be cut off from the motor or group of motors or apparatus from any regulating switch, resistance of other device associated therewith;\n(e) all insulating materials are chosen with special regard to the circumstances of its proposed use and their mechanical strength is sufficient for its purpose and so far as is practicable of such a character or so protected as to maintain adequately its insulating property under all working conditions in respect of temperature and moisture; and\n(f)\tadequate precautions shall be taken to ensure that no live parts are so exposed as to cause danger.\n[50-A. Additional provisions for supply and use of energy in multi-storeyed buildings (more than 15 metres in height)",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "51",
"title": "51. Provisions applicable to medium, high or extra-high voltage installations",
"chapter": null,
"content": "[(b) All metal works, enclosing, supporting or associated with the installation, other than that designed to serve as a conductor shall be connected with an earthing system as per standards laid down in the Indian Standards in this regard and also in accordance with rule 61 (4).]\n(c) Every [*] switchboard shall comply with the following provisions, namely:-\n(i) a clear space of not less than 1 metre in width shall be provided in front of the switchboard;\n(ii) if there are any attachments or bare connections at the back of the switchboard, the space (if any) behind the switchboard shall be either less than 20 centimetres or more than 75 centimetres in width, measured from the farthest outstanding part of any attachment or conductor;\n(iii) if the space behind the switchboard exceeds 75 centimetres in width, there shall be a passage-way from either end of the switchboard clear to a height of 1.8 metres.\n[(d) In case of installations provided in premises where inflammable materials including gases and/or chemicals are produced, handled or stored, the electrical installations, equipment and apparatus shall comply with the requirements of flame proof, dust tight, totally enclosed or any other suitable type of electrical fittings depending upon the hazardous zones as per the relevant Indian Standard Specifications.]",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "52",
"title": "52. Appeal to Inspector in regard to defects",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "53",
"title": "53. Cost of inspection and test of consumer's installation",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "54",
"title": "54. Declared voltage of supply to consumer",
"chapter": null,
"content": "[(i) in the case of low or medium voltage, by more than 6 per cent, or;\n(ii) in the case of high voltage, by more than 6 per cent on the higher side or by more than 9 per cent on the lower side, or;\n[(iii) in the case of extra-high voltage, by more than 10 per cent on the higher side or by more than 12.5 per cent on the lower side:]",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "55",
"title": "55. Declared frequency of supply to consumer",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "56",
"title": "56. Sealing of meters and cut-outs",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "57",
"title": "57. Meters, maximum demand indicators and other apparatus on consumer's premises",
"chapter": null,
"content": "[58. Point of commencement of supply",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "59",
"title": "59. Precautions against failure of supply: Notice of failures",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "60",
"title": "CHAPTER VI",
"chapter": "CHAPTER VI",
"content": "Electric Supply Lines, Systems And Apparatus For Low And Medium Voltages",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "60",
"title": "60. Test for resistance of insulation",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "61",
"title": "61. Connection with earth",
"chapter": null,
"content": "[(a) Neutral conductor of a 3-phase, 4-wire system and the middle conductor of a 2-phase, 3-wire system shall be earthed by not less than two separate and distinct connections with a minimum of two different earth electrodes or such large number as may be necessary to bring the earth resistance to a satisfactory value both at the generating station and at the sub-station. The earth electrodes so provided, may be inter-connected to reduce earth resistance. It may also be earthed at one or more points along the distribution system or service-line in addition to any connection with earth which may be at the consumers' premises.]\n(b) In the case of a system comprising electric supply lines having concentric cables, the external conductor of such cables shall be earthed by two separate and distinct connections with earth.\n(c) The connection with earth may include a link by means of which the connection may be temporarily interrupted for the purpose of testing or for locating a fault.\n(d)(i) In a direct current three-wire system the middle conductor shall be earthed at the generating station only, and the current from the middle conductor to earth shall be continuously recorded by means of a recording ammeter, and if any time the current exceeds one-thousandth part of the maximum supply-current immediate steps shall be taken to improve the insulation of the system.\n(ii) Where the middle conductor is earthed by means of a circuit-breaker with a resistance connected in parallel, the resistance shall not exceed 10 Ohms and on the opening of the circuit-breaker, immediate steps shall be taken to improve the insulation of the system, and the circuit-breaker shall be reclosed as soon as possible.\n(iii) The resistance shall be used only as a protection for the ammeter in case of earths on the system and until such earths are removed, immediate steps shall be taken to locate and remove the earth.\n(e) In the case of an alternating current system, there shall not be inserted in the connection with earth any impedance (other than that required solely for the operation of switch-gear or instruments), cut-out or circuit-breaker, and the result of any test made to ascertain whether the current (if any) passing through the connection with earth is normal, shall be duly recorded by the supplier.\n(f) No person shall make connection with earth by the aid of, nor shall he keep it in contact with, any water main not belonging to him except with the consent of the owner thereof and of the Inspector.\n(g) Alternating current systems which are connected with earth as aforesaid may be electrically interconnected:\n(a) consist of equipotential bonding conductors capable of carrying the prospective earth fault current and a group of pipe/rod/plate electrodes for dissipating the current to the general mass of earth without exceeding the allowable temperature limits as per relevant Indian Standards in order to maintain all non-current carrying metal works reasonably at earth potential and to avoid dangerous contact potentials being developed on such metal works;\n(b) limit earth resistance sufficiently low to permit adequate fault current for the operation of protective devices in time and to reduce neutral shifting;\n(c) be mechanically strong, withstand corrosion and retain electrical continuity during the life of the installation. All earthing systems shall be tested to ensure efficient earthing, before the electric supply lines or apparatus are energised.]\n[61-A. Earth leakage protective device",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "62",
"title": "62. Systems at medium voltage",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "64",
"title": "CHAPTER VII",
"chapter": "CHAPTER VII",
"content": "Electric Supply Lines, Systems And Apparatus For High And Extra-High Voltages",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "63",
"title": "63. Approval by Inspector",
"chapter": null,
"content": "[64. Use of energy at high and extra-high voltage\n(a) all conductors and apparatus situated on the premises of the consumer are so placed as to be inaccessible except to an authorised person and all operations in connection with the said conductors and apparatus are carried out by an authorised person;\n(b) the consumer has provided and agrees to maintain a separate building or a locked weather-proof and fire-proof enclosure of agreed design and location, to which the supplier at all times have access for the purpose of housing his apparatus and metering equipment, or where the provision for a separate building or enclosure is impracticable, the consumer has segregated the aforesaid apparatus of the supplier from any other part of his own apparatus:\n(c) all pole type sub-stations are constructed and maintained in accordance with rule 69.\n[(a)(i) Clearances as per Indian Standard Code shall be provided for electrical apparatus so that sufficient space is available for easy operation and maintenance without any hazard to the operating and maintenance personnel working near the equipment and for ensuring adequate ventilation:\n[(ii) The following minimum safety working clearances shall be maintained for the bare conductors or live parts of any apparatus in outdoor sub-stations, excluding overhead lines of HV and EHV installations.\nHighest system voltage (KV) Safety working clearance (Metres) 12 2.6 36 2.8 72.5 3.1 145 3.7 245 4.3 420 6.4 800 10.3\nHighest system voltage (KV)\nSafety working clearance (Metres)\n12\n2.6\n36\n2.8\n72.5\n3.1\n145\n3.7\n245\n4.3\n420\n6.4\n800\n10.3\nNotes\n(1) The above values are valid for altitude not exceeding 1000 metres (m). A correction factor of 1.25 per cent 100 m. is to be applied for increasing the clearance for altitudes more than 1000 m. and upto 3000 m.\n(2) The above safety working clearances are based on an insulation height of 2.44 m. which is the height of lowest point on the insulator (where it meets the earthed metal) from the ground.\n(3) \"Safety Working Clearance\" is the minimum clearance to be maintained in air between the live part of the equipment on one hand and earth or another piece of equipment or conductor on which it is necessary to carry out the work, on the other.\n(4) The \"Highest System Voltage\" is defined as the highest rms phase to phase voltage which occurs under normal operating conditions at any time and at any point of the system. It excludes voltage transients (such as those due to system switching) and temporary voltage variations due to abnormal system conditions (such as those due to fault conditions or the sudden disconnection of large loads).]\n[(b) The windings of motors or other apparatus within reach from any position in which a person may require to be, shall be suitably protected so as to prevent danger.\n(c) Where transformer or transformers are used, suitable provision shall be made, either by connecting with earth a point of the circuit at the lower voltage or otherwise, to guard against danger by reason of the said circuit becoming accidentally charged above its normal voltage by leakage from or contact with the circuit at the higher voltage.\n(d) A sub-station or a switch-station with apparatus having more than 2000 litres of oil shall not [* * *] [be located in the basement where proper oil draining arrangement cannot be provided.\n(e) Where a sub-station or a switch-station with apparatus having more than 2000 litres of oil is installed, whether indoor or out-doors, the following measures shall be taken, namely:-\n(i) The baffle walls [of 4 hour fire rating] [shall be provided between the apparatus in the following cases:-\n(A) single phase banks in the switch-yards of generating stations and sub-stations;\n(B) on the consumer premises;\n(C) where adequate clearance between the units is not available.\n(ii) Provisions shall be made for suitable oil soakpit and where use of more than 9000 litres of oil in any one oil tank, receptacle or chamber is involved, provision shall be made for the draining away or removal of any oil which may leak or escape from the tanks, receptacles or chambers containing the same, special precautions shall be taken to prevent the spread of any fire resulting from the ignition of the oil from any cause and adequate provision shall be made for extinguishing any fire which may occur. Spare oil shall not be stored in any such sub-station or switch-station.\n[(iii) All the transformers and switchgears shall be maintained in accordance with the maintenance schedule given in the relevant Code of Practices of BIS and the authorised person shall keep a record thereof as required under rule 3(6).\n(iv) Notwithstanding anything contained in rule 64(2)(d) and rule 64(2)(f)(ii), only dry type of transformers shall be used for installations inside the residential/commercial buildings.]\n[(f)(i) Without prejudice to the above measures, adequate fire protection arrangement shall be provided for quenching the fire in the apparatus;\n(ii) Where it is necessary to locate the sub-station/switch-station in the basement following measures shall be taken:-\n(a) The room shall necessarily be in the first basement at the periphery of the basement;\n(b) The entrances to the room shall be provided with fire resisting doors of 2-hour fire rating. A curb ( sill ) of a suitable height shall be provided at the entrance in order to prevent the flow of oil from a ruptured transformer into other parts of the basement. Direct access to the transformer room shall be provided from outside.\n[(c) The transformers shall be protected by an automatic high velocity water spray system or by carbon dioxide or BCF (bromochloro-difluromethane) or BTM (bromotrifluromethane) fixed installation system or nitrogen injection and drain method.]\n[(iii) Oil-filled transformers installed indoors shall not be on any floor above the ground or below the first basement.]\n(g) Cable trenches inside the sub-stations and switch-stations containing cables shall be filled with sand, pebbles or similar non-inflammable materials or completely covered with non-inflammable slabs.\n(h) Unless the conditions are such that all the conductors and apparatus may be made dead at the same time for the purpose of cleaning or for other work, the said conductors and apparatus shall be so arranged that these may be made dead in sections, and that work on any such section may be carried out by an authorised person without danger.\n(i) Only persons authorised under sub-rule (1) of rule 3, shall carry out the work on live lines and apparatus.]\n[64-A. Additional provisions for use of energy at high and extra-high voltage\n(a) Isolators and the controlling circuit breakers shall be inter-locked so that the isolators cannot be operated unless the corresponding breaker is in open position;\n(b) Isolators and the corresponding earthing switches shall be inter-locked so that no earthing switch can be closed unless and until the corresponding isolator is in open position;\n(c) Where two or more supplies are not intended to be operated in parallel, the respective circuit breakers or linked switches controlling the supplies shall be inter-locked to prevent possibility of any inadvertent paralleling or feedback;\n(d) When two or more transformers are operated in parallel, the system shall be so arranged as to trip the secondary breaker of a transformer in case the primary breaker of that transformer trips;\n(e) All gates or doors which give access to live parts of an installation shall be inter-locked in such a way that these cannot be opened unless the live parts are made dead. Proper discharging and earthing of these parts should be ensured before any person comes in close proximity of such parts;\n(f) Where two or more generators operate in parallel and neutral switching is adopted, inter-lock shall be provided to ensure that generator breaker cannot be closed unless one of the neutrals is connected to the earthing system.\n(a) Over current protection to disconnect the supply automatically if the rated current of the equipment, cable or supply line is exceeded for a time which the equipment, cable or supply line is not designed to withstand;\n(b) Earth-fault/earth leakage protection to disconnect the supply automatically if the earth fault current exceeds the limit of current for keeping the contact potential within reasonable values;\n[(c) Gas pressure type and winding and oil temperature protection to give alarm and tripping shall be provided on all transformers of ratings 1000 KVA and above;]\n[(d) Transformers of capacity 10 MVA and above shall be protected against incipient faults by differential protection; and\n(e) All generators with rating of 100 KVA and above shall be protected against earth fault/leakage. All generators of rating 1000 KVA and above shall be protected against faults within the generator winding using restricted earth fault protection or differential protection or by both;]\n[(f) High speed bus bar differential protection alongwith local breaker back up protection shall be commissioned and shall always be available at all 220 KV and above voltage sub-stations and switchyards and generating stations connected with the grid:\n[65. Testing, operation and maintenance",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "66",
"title": "66. Metal sheathed electric supply lines-Precautions against excess leakage",
"chapter": null,
"content": "(a) The conductors shall be enclosed in metal sheathing which shall be electrically continuous and connected with earth, and the conductivity of the metal sheathing shall be maintained and reasonable precautions taken where necessary to avoid corrosion of the sheathing:\n[(b) The resistance of the earth connection with metallic sheath shall be kept low enough to permit the controlling circuit breaker or cut-out to operate in the event of any failure of insulation between the metallic sheath and the conductor.]\n(c) Where an electric supply-line as aforesaid has concentric cables and the external conductor is insulated from an outer metal sheathing and connected with earth, the external conductor may be regarded as the metal sheathing for the purposes of this rule provided that the foregoing provisions as to conductivity are complied with.",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "67",
"title": "67. Connection with earth",
"chapter": null,
"content": "(a) limit the touch and step potential to tolerable values;\n(b) limit the ground potential rise to tolerable values so as to prevent danger due to transfer of potential through ground, earth wires, cable sheath, fences, pipe lines, etc.;\n(c) maintain the resistance of the earth connection to such a value as to make operation of the protective device effective.\n(a) the neutral point of every generator and transformer shall be earthed by connecting it to the earthing system as defined in rule 61(4) and hereinabove by not less than two separate and distinct connections:\n(b) in the event of an appreciable harmonic current flowing in the neutral connection so as to cause interference, with communication circuits, the generator or transformer neutral, shall be earthed through a suitable impedance;\n(c) in case of the delta-connected system the neutral point shall be obtained by the insertion of a grounding transformer and current limiting resistance or impedance; wherever considered necessary at the commencement of such a system.]\n[(b) Every earthing system belonging to either the supplier or the consumer shall be tested for its resistance to earth on a dry day during dry season not less than once a year. Records of such tests shall be maintained and shall be produced, if required, before the Inspector or any officer appointed to assist him and authorised under sub-rule (2) of rule 4-A.]",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "68",
"title": "68. General conditions as to transformation and control of energy",
"chapter": null,
"content": "[(a) Sub-stations and switch-stations shall preferably be erected above ground, but where necessarily constructed underground due provisions for ventilation and drainage shall be made and any space housing switchgear shall not be used for storage of any materials especially inflammable and combustible materials or refuse.]\n(b) Outdoor sub-stations except pole type sub-stations and outdoor switch-stations shall (unless the apparatus is completely enclosed in a metal covering connected with earth, the said apparatus also being connected with the system by armoured cables) be efficiently protected by fencing not less than [1.8 metres] in height or other means so as to prevent access to the electric supply lines and apparatus therein by an unauthorised person.\n(c) Underground street boxes (other than sub-stations) which contain transformers shall not contain switches or other apparatus, and switches, cut-outs or other apparatus required for controlling or other purposes shall be fixed in separate receptacles above ground wherever practicable.",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "69",
"title": "69. Pole type sub-stations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "70",
"title": "70. Condensers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "71",
"title": "71. Additional provisions for supply to high voltage luminous tube sign installation",
"chapter": null,
"content": "(a) All live parts of the installation (including all apparatus and live conductors in the secondary circuit, but excluding the tubes except in the neighbourhood of their terminals) shall be inaccessible to unauthorised persons and such parts shall be effectively screened.\n(b) Irrespective of the method of obtaining the voltage of the circuit which feeds the luminous discharge tube sign, no part of any conductor of such circuit shall be in metallic connection (except in respect of its connection with earth) with any conductor of the supply system or with the primary winding of the transformer.\n(c) All live parts of an exterior installation shall be so disposed as to protect them against the effects of the weather and such installation shall be so arranged and separated from the surroundings as to limit, as far as possible, the spreading of fire.\n(d) The secondary circuit shall be permanently earthed at the transformer and the core of every transformer shall be earthed.\n(e) Where the conductors of the primary circuit are not in metallic connection with the supply conductors, ( e.g. , where a motor-generator or a double-wound convertor is used), one phase of such primary circuit shall be permanently earthed at the motor generator or convertor, or at the transformer.\n[(ee) An earth leakage circuit breaker of sufficient rating shall be provided on the low voltage side to detect the leakage in such luminous tube sign installations.]\n(f) A final sub-circuit which forms the primary circuit of a fixed luminous discharge tube sign installation shall be reserved solely for such purpose.\n(g) A separate primary final sub-circuit shall be provided for each transformer or each group of transformers having an aggregate input not exceeding 1,000 volt amperes, of a fixed luminous-discharge-tube sign installation.\n(h) An interior installation shall be provided with suitable adjacent means for disconnecting all phases of the supply except the \"neutral\" in a three-phase four-wire circuit.\n(i) For installations on the exterior of a building a suitable emergency fire-proof linked switch to operate on all phases except the neutral in a three-phase four-wire circuit shall be provided and fixed in a conspicuous position at not more than 2.75 metres above the ground.\n(j) A special \"caution\" notice shall be affixed in a conspicuous place on the door of every high voltage enclosure to the effect that the low voltage supply must be cut off before the enclosure is opened.\n(k) Where static condensers are used, they shall be installed on the load side of the fuses and the primary (low voltage) side of the transformers.\n(l) Where static condensers are used on primary side, means shall be provided for automatically discharging the condensers when the supply is cut off:",
"footnote": "",
"is_definition": false,
"sort_order": 70
},
{
"number": "72",
"title": "72. Additional provisions for supply to high voltage electrode boilers",
"chapter": null,
"content": "(a) The metal work of the electrode boiler shall be efficiently connected to the metal sheathing and metallic armouring (if any) of the high voltage electric supply line whereby energy is supplied to the electrode boiler.\n(b) The supply of energy at high or extra-high voltage to the electrode boiler shall be controlled by a suitable circuit-breaker so set as to operate in the event of the phase currents becoming unbalanced to the extent of 10 per cent of the rated current consumption of the electrode boiler under normal conditions of operation:\n(c) An inverse time element device may be used in conjunction with the aforesaid circuit-breaker to prevent the operation thereof unnecessarily on the occurrence of unbalanced phase currents of momentary or short duration.\n(d) The supplier shall serve a notice in writing on the telegraph authority at least seven days prior to the date on which such supply of energy is to be afforded specifying the location of every point (including the earth connection of the electrode boiler) at which the system is connected with earth.",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "73",
"title": "73. Supply to X-ray and high frequency installation",
"chapter": null,
"content": "(a) Mechanical barriers shall be provided to prevent too close an approach to any high voltage parts of the X-ray apparatus, except the X-ray tube and its leads, unless such high voltage parts have been rendered shock-proof by being shielded by earthed metal or adequate insulating material.\n(b) Where extra-high voltage generators operating at 300 peak KV or more are used, such generators shall be installed in rooms separate from those containing the other equipment and any step-up transformer employed shall be so installed and protected as to prevent danger.\n(c) A suitable switch shall be provided to control the circuit supplying a generator, and shall be so arranged as to be open except while the door of the room housing the generator is locked from the outside.\n(d) X-ray tubes used in therapy shall be mounted in an earthed metal enclosure.\n(e) Every X-ray machine shall be provided with a milliammeter or other suitable measuring instrument, readily visible from the control position and connected, if practicable, in the earthed lead, but guarded if connected in the high voltage lead.\n[(ee) Notwithstanding the provisions of clause (e) an earth leakage circuit breaker of sufficient rating shall be provided on the low voltage side to detect the leakage in such X-ray installations.]\n(f) This sub-rule shall not apply to shock-proof portable units or shock-proof self-contained and stationary units.\n(b) The low voltage circuit of the step up transformer shall contain a manually operated control device having overload protection in addition to the over-current device for circuit protection, and these devices shall have no exposed live parts and for diagnostic work there shall be an additional switch in the said circuit, which shall be of one of the following types:-\n(i) a switch with a spring or other mechanism that will open automatically except while held close by the operator, or\n(ii) a time switch which will open automatically after a definite period of time for which it has been set.\n(c) If more than one piece of apparatus be operated from the same high or extra-high voltage source each shall be provided with a high or extra-high voltage switch to give independent control.\n(d) Low frequency current-carrying parts of a machine of the quenched-gap or open gap type shall be so insulated or guarded that they cannot be touched during operation, the high frequency circuit proper which delivers high-frequency current normally for the therapeutic purposes, being exempted.\n(e) All X-ray generators having capacitors shall have suitable means for discharging the capacitors manually.\n(f) Except in the case of self-contained units, all 200 peak KV or higher, X-ray generators shall have a sphere gap installed in the high voltage system adjusted so that it will break down on over-voltage surges.\n(b) Where short wave therapy machines are used, the treatment tables and examining chairs shall be wholly non-metallic.",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "74",
"title": "CHAPTER VIII",
"chapter": "CHAPTER VIII",
"content": "[OVERHEAD LINES, UNDERGROUND CABLES AND GENERATING STATIONS]",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "74",
"title": "74. Material and strength",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "75",
"title": "75. Joints",
"chapter": null,
"content": "[76. Maximum stresses, factors of safety\n(i) for metal supports 1.5; (ii) for mechanically processed concrete supports 2.0; (iii) for hand-moulded concrete supports 2.5; (iv) For wood supports 3.0.\nInitial unloaded tension 35 per cent Final unloaded tension 25 per cent\n(a) The maximum wind pressure shall be as specified in the relevant Indian Standards;\n(b) For cylindrical bodies, the effective area shall be taken as full projected area exposed to wind pressure; and\n(c) The maximum and minimum temperature shall be as specified in the relevant Indian Standard.",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "77",
"title": "77. Clearance above ground of the lowest conductor",
"chapter": null,
"content": "(a) for low and medium voltage lines 5.8 metres (b) for high voltage lines 6.1 metres\n(a) for low and medium voltage lines 5.5 metres (b) for high voltage lines 5.8 metres\n(a) for low, medium and high voltage lines upto and including 11,00 volts, if bare 4.6 metres (b) For low, medium and high voltage lines upto and including 11,000 volts, if insulated 4.0 metres (c) for low voltage lines above 11,000 volts 5.2 metres",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "78",
"title": "78. Clearance between conductors and trolley wires",
"chapter": null,
"content": "(a) Low and medium voltage lines 1.2 metres\n(b) High voltage lines up to and including 11,000 volts 1.8 metres (c) High voltage lines above 11,000 volts 2.5 metres (d) Extra-high voltage lines 3.0 metres",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "79",
"title": "79. Clearances from buildings of low and medium voltage lines and service lines",
"chapter": null,
"content": "(a) for any flat roof, open balcony, verandah roof and lean-to-roof-\n(i) when the line passes above the building a vertical clearance of 2.5 metres from the highest point, and\n(ii) when the line passes adjacent to the building a horizontal clearance of 1.2 metres from the nearest point, and\n(b) for pitched roof-\n(i) when the line passes above the building a vertical clearance of 2.5 metres immediately under the lines, and\n(ii) when the line passes adjacent to the building a horizontal clearance of 1.2 metres.",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "80",
"title": "80. Clearances from buildings of high and extra-high voltage lines",
"chapter": null,
"content": "(a) for high voltage lines upto and including 33,000 volts 3.7 metres (b) for extra-high voltage lines 3.7 metres plus 0.30 metres for every metres for every additional 33,0000 volts or part thereof.\n(a) for high voltage lines upto and including 11,000 volts 1.2 metres (b) for high voltage lines above 11,000 volts upto and including 33,000 volts 2.0 metres (c) for extra-high voltage lines 2.0 metres plus 0.3 metres plus 0.3 metre for every additional 33,000 volts for part thereof.",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
{
"number": "81",
"title": "81. Conductors at different voltages on same supports",
"chapter": null,
"content": "[82. Erection of or alteration to buildings, structures, flood banks and elevation of roads\n(b) If the person referred to in sub-rule (1) disputes the supplier's estimated cost of alteration of the overhead line or even the responsibility to pay such cost, the dispute may be referred to the Inspector by either of the parties whereupon the same shall be decided by the Inspector.\n(a) the cost of additional material used on the alteration giving due credit for the depreciated cost of the material which would be available from the existing line;\n(b) the wages of labour employed in effecting the alteration;\n(c) supervision charges to the extent of 15 per cent of the wages mentioned in clause (b); and\n(d) any charges incurred by the supplier in complying with the provisions of section 16 of the Act in respect of such alterations.\n[82-A. Transporting and storing of material near overhead lines",
"footnote": "",
"is_definition": false,
"sort_order": 80
},
{
"number": "83",
"title": "83. Clearances: General",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
{
"number": "84",
"title": "84. Routes: Proximity to aerodromes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 82
},
{
"number": "85",
"title": "85. Maximum interval between supports",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 83
},
{
"number": "86",
"title": "86. Conditions to apply where telecommunication lines and power lines are carried on same supports",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 84
},
{
"number": "87",
"title": "87. Lines crossing or approaching each other",
"chapter": null,
"content": "SI. No. Nominal System voltage 11-66 KV 110-132 KV 220 KV 400 KV 800 KV 1. Low & Medium 2.44 3.05 4.58 5.49 7.94 2. 11-66KV 2.44 3.05 4.58 5.49 7.94 3. 110-132KV 3.05 3.05 4.58 5.49 7.94 4. 220KV 4.58 4.58 4.58 5.49 7.94 5. 400KV 5.49 5.49 5.49 5.49 7.94 6. 800KV 7.94 7.94 7.94 7.94 7.94 ]",
"footnote": "",
"is_definition": false,
"sort_order": 85
},
{
"number": "88",
"title": "88. Guarding",
"chapter": null,
"content": "(a) where there is only one trolley-wire, two guard-wires shall be erected as in diagram A;\n(b) where there are two trolley-wires and the distance between them does not exceed 40 cms, two guard-wires shall be erected as in diagram B;\n(c) where there are two trolley-wires and the distance between them exceeds 40 cms but does not exceed 1.2 metres, three guard-wires shall be erected as in diagram C;\n(d) where there are two trolley-wires and the distance between them exceeds 1.2 metres, each trolley-wire shall be separately guarded as in diagram D;\n(e) the rise of the trolley boom shall be so limited that if the trolley leaves the trolley-wire, it shall not foul the guard-wires; and\n(f) where a telegraph-line is liable to fall or be blown down upon an arm, stay-wire or span-wire, and so slide down upon a trolley-wire, guard hooks shall be provided to prevent such sliding.",
"footnote": "",
"is_definition": false,
"sort_order": 86
},
{
"number": "89",
"title": "89. Service-lines from overhead lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 87
},
{
"number": "90",
"title": "90. Earthing",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 88
},
{
"number": "91",
"title": "91. Safety and protective devices",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 89
},
{
"number": "92",
"title": "92. Protection against lightning",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 90
},
{
"number": "93",
"title": "93. Unused overhead lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 91
},
{
"number": "93",
"title": "CHAPTER IX",
"chapter": "CHAPTER IX",
"content": "Electric Traction",
"footnote": "",
"is_definition": false,
"sort_order": 92
},
{
"number": "94",
"title": "94. Additional rules for electric traction",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 93
},
{
"number": "95",
"title": "95. Voltage of supply to vehicle",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 94
},
{
"number": "96",
"title": "96. Insulation of lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 95
},
{
"number": "97",
"title": "97. Insulation of returns",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 96
},
{
"number": "98",
"title": "98. Proximity to metallic pipes, etc",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 97
},
{
"number": "99",
"title": "99. Difference of potential on return",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 98
},
{
"number": "100",
"title": "100. Leakage on conduit system",
"chapter": null,
"content": "(a) where the rails are used to form any part of the return, they shall be electrically connected (at distances not exceeding 30 metres apart), with the conduit by means of copper strips having a cross-sectional area of at least 0.40 sq. cm. or by other means of equal conductivity. Where the return is wholly insulated and contained within the conduit, the latter shall be connected with earth at the generating station or sub-station through an instrument suitable for the indication of any contact or partial contact of either the line or the return with the conduit; and\n(b) the leakage-current shall be ascertained daily, before or after the hours of running, when the line is fully charged; and if at any time it is found to exceed 0.6 ampere per km. of single tramway track, the transmission and use of energy shall be suspended unless the leakage is stopped within twenty-four hours.",
"footnote": "",
"is_definition": false,
"sort_order": 99
},
{
"number": "101",
"title": "101. Leakage on system other than conduit system",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 100
},
{
"number": "102",
"title": "102. Passengers not to have access to electric circuit",
"chapter": null,
"content": "(a) the access of passengers to any portion of the electric circuit where there is danger from electric shock;\n(b) any metal, hand-rail or other metallic substance liable to be handled by passengers, becoming charged.",
"footnote": "",
"is_definition": false,
"sort_order": 101
},
{
"number": "103",
"title": "103. Current density in rails",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 102
},
{
"number": "104",
"title": "104. Isolation of sections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 103
},
{
"number": "105",
"title": "105. Minimum size and strength of trolley-wire",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 104
},
{
"number": "106",
"title": "106. Height of trolley-wire and length of span",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 105
},
{
"number": "107",
"title": "107. Earthing of guard wires",
"chapter": null,
"content": "[107-A. Proximity to magnetic observatories and laboratories",
"footnote": "",
"is_definition": false,
"sort_order": 106
},
{
"number": "108",
"title": "108. Records",
"chapter": null,
"content": "(a) daily records showing-\n(i) the maximum working current from the source of supply;\n(ii) the maximum working voltage at the source of supply;\n(iii) the difference of potential, as required by rule 99; and\n(iv) the leakage current (if any), as required by rule 100 and rule 101; and\n(b) occasional records showing-\n(i) every test made under sub-rules (2) and (3) of rule 98;\n(ii) every stoppage of leakage, together with the time occupied; and\n(iii) particulars of any abnormal occurrence affecting the electrical working of the system.",
"footnote": "",
"is_definition": false,
"sort_order": 107
},
{
"number": "109",
"title": "CHAPTER X",
"chapter": "CHAPTER X",
"content": "Additional Precautions To Be Adopted In Mines And Oil-Fields",
"footnote": "",
"is_definition": false,
"sort_order": 108
},
{
"number": "109",
"title": "109. Application of Chapter",
"chapter": null,
"content": "[110. Responsibility for observance\n(a) in the case of a coal mine, have the same meaning as assigned to it in the Coal Mines Regulations, 1957;\n(b) in the case of a metalliferous mine, have the same meaning as assigned to it in the Metalliferous Mines Regulations, 1961, and\n(c) in the case of an oil mine, mean the \"Installation Manager\" under the Oil Mines Regulations, 1984]",
"footnote": "",
"is_definition": false,
"sort_order": 109
},
{
"number": "111",
"title": "111. Notices",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 110
},
{
"number": "112",
"title": "112. Plans",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 111
},
{
"number": "113",
"title": "113. Lighting, communications and fire precautions",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 112
},
{
"number": "114",
"title": "114. Isolation and fixing of transformer, switchgear, etc",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 113
},
{
"number": "115",
"title": "115. Method of earthing",
"chapter": null,
"content": "[116. Protective equipment",
"footnote": "",
"is_definition": false,
"sort_order": 114
},
{
"number": "117",
"title": "117. Earthing metal, etc",
"chapter": null,
"content": "[118. Voltage limits\n(a) where hand-held portable apparatus is used, the voltage shall not exceed 125 volts;\n(b) where electric lighting is used:-\n(i) in underground mines, the lighting system shall have a mid or neutral point connected with earth and the voltage shall not exceed 125 volts between phases;\n(ii) on the surface of a mine or in an open cast mine, the voltage may be raised to 250 volts, if the neutral or the mid point of the system is connected with earth and the voltage between the phases does not exceed 250 volts;\n(c) where portable hand-lamps are used in underground working of mine, the voltage shall not exceed 30 volts;\n(d) where any circuit is used for the remote control or electric inter-locking of apparatus, the circuit voltage shall not exceed 30 volts:\n[119. Transformers",
"footnote": "",
"is_definition": false,
"sort_order": 115
},
{
"number": "120",
"title": "120. Switchgear and terminals",
"chapter": null,
"content": "(a) all parts shall be of mechanical strength sufficient to resist rough usage;\n(b) all conductors and contact areas shall be of adequate current-carrying capacity and all joints in conductors shall be properly soldered or otherwise efficiently made;\n(c) the lodgement of any matter likely to diminish the insulation or affect the working of any switchgear shall be prevented;\n(d) all live parts shall be so protected or enclosed as to prevent persons accidentally coming into contact with them and to prevent danger from arcs, short-circuits, fire, water, gas or oil;\n(e) where there may be risk of igniting gas, coal-dust, oil or other inflammable material, all parts shall be so protected as to prevent open sparking; and\n(f) every switch or circuit-breaker shall be so constructed as to be capable of opening the circuit, if controls and dealing with any short-circuit without danger.",
"footnote": "",
"is_definition": false,
"sort_order": 116
},
{
"number": "121",
"title": "121. Disconnection of supply",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 117
},
{
"number": "122",
"title": "122. Cables",
"chapter": null,
"content": "(a) All such cables (other than the outer conductor of a concentric cable) shall be covered with insulating material and shall be efficiently protected from mechanical damage and supported at sufficiently frequent intervals, and in such a manner as to prevent damage to such cables;\n(b)(i) Except as provided in clause (c), no cables other than concentric cables or two-core or multicore cables protected by a metallic covering or single core cables protected by a metallic covering and which contain all the conductors of a circuit shall be used-\n(1) where the voltage exceeds 125 volts, or\n(2) when an Inspector considers that there is risk of igniting gas or coal-dust or other inflammable material, and so directs;\n(ii) The sheath of metal-sheated cables and the metallic armouring of armoured cables shall be of a thickness not less than that recommended from time to time [in the appropriate standard of the [Bureau of Indian Standards] ;]\n(c) where a medium voltage direct current system is used, two single core cables may be used for any circuit provided that their metallic coverings are bounded together by earth conductors so placed that the distance between any two consecutive bonds is not greater than 30 metres measured along either cable;\n(d) the metallic covering of every cable shall be-\n(i) electrically and mechanically continuous throughout;\n(ii) earthed, if it is required by sub-rule (1) of rule 117 to be earthed by a connection to the earthing system of conductivity not less than of the same length of the said metallic covering;\n(iii) efficiently protected against corrosion where necessary;\n(iv) of a conductivity at all parts and at all joints at least equal to 50 per cent of the conductivity of the largest conductor enclosed by the said metallic covering; and\n(v) where there may be risk of igniting gas, coal-dust, or other inflammable material, so constructed as to prevent, as far as practicable, the occurrence of open sparking so as the result of any fault or leakage from live conductors;\n(e) cables and conductors where connected to motors, transformers, switch-gear and other apparatus, shall be installed so that:-\n(i) they are mechanically protected by securely attaching the metallic covering to the apparatus; and\n(ii) the insulating material at each cable end is efficiently sealed so as to prevent the diminution of its insulating properties;\n(f) where necessary to prevent abrasion or to secure gas-tightness properly constructed glands or bushes shall be provided;\n(g) unarmoured cables or conductors shall be conveyed either in metallic pipes or metal casings or suspended from efficient insulators by means of non-conducting materials which will not cut the covering and which will prevent contact with any timbering or metal work. If separate insulated conductors are used, they shall be installed at least 3.75 cm. (one and one half inches) apart and shall not be brought together except at lamps, switches and fittings.",
"footnote": "",
"is_definition": false,
"sort_order": 118
},
{
"number": "123",
"title": "123. Flexible cables",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 119
},
{
"number": "124",
"title": "124. Portable and transportable machines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 120
},
{
"number": "125",
"title": "125. Sundry precautions",
"chapter": null,
"content": "(a) at all places where electrical apparatus is in use, a notice forbidding an unauthorised person to operate or otherwise interfere with such apparatus;\n(b) at those places in the interior or at the surface of the mine where a telephone or other means of communication is provided, a notice giving full instructions to persons authorised to effect the disconnection, at the surface of the mine, of the supply of energy to the mine.\n[126. Precautions where gas exists\n(a) all cables shall be constructed, installed, protected, operated and maintained in such a manner as to prevent risk of open sparking;\n(b) at any place which lies in-bye of the last ventilation connection, all [signalling, telecommunication and remote control]\n(c) all apparatus including portable and transportable apparatus including lighting fittings used at any place which lies in-bye of the last ventilation connection shall be flame-proof:\n(a) all [signalling, telecommunication and remote control]\n[(b) all cables shall be constructed, installed, protected, operated and maintained in such a manner as to prevent risk of open sparking;\n(c) all apparatus, including portable and transportable apparatus used at any place within 90 metres of any working face or goaf in case of a second degree gassymine and within 270 metres of any working face or goaf in case of third degree gassymine or at any place which lies in-bye of the last ventilation connection or in any return airways shall be flame-proof;\n(d) all electric lamps shall be enclosed in flame-proof enclosures.\n(a) all [signalling, telecommunication and remote control]\n(b) all cables shall be so constructed, installed, operated and maintained as to prevent risk of open sparking;\n(c) all apparatus including portable and transportable apparatus shall be flame-proof;\n(d) all electric lamps shall be enclosed in flame-proof enclosures.\n(a) immediately, if open sparking occurs;\n(b) during the period required for examination or adjustment of the apparatus, which would necessitate the exposing of any part liable to open sparking;\n(c) the supply shall not be reconnected until the apparatus has been examined by the electrical supervisor or one of his duly appointed assistants until the defect, if any, has been remedied or the necessary adjustment made;\n(d) a flame safety lamp shall be provided and maintained in a state of continuous illumination near an apparatus (including portable or transportable apparatus) which remains energised and where the appearance of the flame of such safety lamps indicates the presence of inflammable gas, the supply to all apparatus in the vicinity shall be immediately disconnected and the incident reported forthwith to an official of the mine; [and such apparatus shall be interlocked with the controlling switch in such a manner as to disconnect power supply automatically in the event of percentage of inflammable gas exceeding one and one quarter in that particular district:]\n[(ii) Any such disconnection or reconnection of the supply shall be noted in the log-sheet which shall be maintained in the form set out in Annexure XII and shall be reported to the Inspector.\n(a) an area of not less than 90 metres around an oil-well where a blow-out has occurred or is likely to occur, as may be designated by the engineer-in-charge or the seniormost official present at the site;\n(b) an area within 90 metres of an oil-well which is being tested by open flow;\n(c) an area within 15 metres of-\n(i) a producing well-head or any point of open discharge of the crude therefrom or other point where emission of [hazardous atmosphere]\n(ii) any wildcat or exploration well-head being drilled in an area where abnormal pressure conditions are known to exist, or\n(iii) any exploration or interspaced well-head being drilled in an area where abnormal pressure conditions are known to exist; or\n(d) any area within 4.5 metres of-\n(i) any producing well-head where a closed system of production is employed such as to prevent the emission or accumulation in the area in normal circumstances of a [hazardous atmosphere]\n[(ii) exploration or interspaced well-head being drilled in an area where the pressure conditions are normal and where the system of drilling employed includes adequate measures for the prevention in normal circumstances of emission or accumulation within the area of a [hazardous atmosphere] ; or\n[(iii) an oil-well which is being tested other than by open flow.\n[(e) all appliances, equipments and machinery that are or may be used in zone 0, zones 1 and 2 hazardous areas shall be of such type, standard and make as approved by the Inspector by a general or special order in writing.\n(ii) \"Zone 1 hazardous area\" means \"an area in which hazardous atmo-sphere is likely to occur under normal operating conditions\".\n(iii) \"Zone 2 hazardous area\" means \"an area in which hazardous atmosphere is likely to occur under abnormal operating conditions\".]",
"footnote": "",
"is_definition": false,
"sort_order": 121
},
{
"number": "127",
"title": "127. Shot-firing",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 122
},
{
"number": "128",
"title": "128. Signalling",
"chapter": null,
"content": "(a) adequate precautions shall be taken to prevent signal and telephone wires coming into contact with other cables and apparatus;\n(b) the voltage used in any one circuit shall not exceed 30 volts; and\n(c) contact-makers shall be so constructed as to prevent the accidental closing of the circuit;\n[(d) bare conductors, where used shall be installed in suitable insulators.]",
"footnote": "",
"is_definition": false,
"sort_order": 123
},
{
"number": "129",
"title": "129. Haulage",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 124
},
{
"number": "130",
"title": "130. Earthing of neutral points",
"chapter": null,
"content": "[131. Supervision\n(ii) The electrical supervisor so appointed shall be the person holding a valid Electrical Supervisor's Certificate of Competency, covering mining installation issued under sub-rule (1) of rule 45.\n(iii) If the Inspector considers necessary for the compliance with the duties specified in this rule, he may direct the owner or agent of the mine to appoint one or more electricians who shall be persons holding license under sub-rule (1) of rule 45.\n(a) thorough examination of all apparatus (including the testing of earth conductors and metallic coverings for continuity) as often as may be necessary to prevent danger;\n(b) examination and testing of all new apparatus, and of all apparatus, re-erected in the mine before it is put into service in a new position.\n(ii) The results of all tests carried out in accordance with the provisions of sub-rule (3) shall be recorded in the log-sheets prepared in the form set out in Annexure XII.]",
"footnote": "",
"is_definition": false,
"sort_order": 125
},
{
"number": "132",
"title": "132. Exemption",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 126
},
{
"number": "128",
"title": "CHAPTER XI",
"chapter": "CHAPTER XI",
"content": "Miscellaneous",
"footnote": "",
"is_definition": false,
"sort_order": 127
},
{
"number": "133",
"title": "133. Relaxation by Government",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 128
},
{
"number": "134",
"title": "134. Relaxation by Inspector",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 129
},
{
"number": "135",
"title": "135. Supply and use of energy by non-licensees and others",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 130
},
{
"number": "136",
"title": "136. Responsibility of agents and managers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 131
},
{
"number": "137",
"title": "137. Mode of entry",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 132
},
{
"number": "138",
"title": "138. Penalty for breaking seal",
"chapter": null,
"content": "(a) the person breaking the seal shall be punishable with fine which may extend to two hundred rupees; and\n(b) the consumer when he has not himself broken the seal shall be punishable with fine which may extend to fifty rupees unless he proves that he used all reasonable means in his power to ensure that the seal should not be broken.\n[138-A. Penalty for breach of rule 44-A",
"footnote": "",
"is_definition": false,
"sort_order": 133
},
{
"number": "45",
"title": "139. Penalty for breach of rule 45",
"chapter": null,
"content": "(a) under the direct supervision of a person holding a certificate of competency issued by the State Government under that rule; and\n(b) in the absence of any applicable exemption under the proviso to sub-rule of that rule, by an electrical contractor licensed by the State Government in this behalf,\n[140. Penalty for breach of rule 82\n[140-A. Penalty for breach of rule 77, 79 or 80",
"footnote": "",
"is_definition": false,
"sort_order": 134
},
{
"number": "141",
"title": "141. Penalty for breach of rules",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 135
},
{
"number": "142",
"title": "142. Application of rules",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 136
},
{
"number": "143",
"title": "143. Repeal",
"chapter": null,
"content": "ANNEXURE I\n[See Clause (C) of Sub-rule (1) of rule 2]\nSpecification Relating To The Deposition Of Silver\nANNEXURE II\n[See Sub-rule (1) of rule 7]\nScale Of Fees For Comparison With The Government Of Indiastandards Referred To In Sub-Rule (1) Of Rule 2\nRs . For an instrument intended to be used as a sub-standard and submitted for special examination and testing 80 If required to be kept under observation for a period longer than one month, for each additional month or part of a month 40 For determining a resistance of standard form to highest accuracy obtainable at one temperature 20 For determining the E.M.F. of a standard cell to highest accuracy obtainable at one temperature 15\nRs .\nRs\n.\n80\n40\n20\n15\nNote 1\nANNEXURE III\n[See rule 14]\nModel Form Of Draft Licence Under The Indian Electricity Act, 1910\n[See Section 3]\nElectric Licence 20.............................\nDraft Licence\nShort Title\nInterpretation\n(1) \"The Act\" shall mean the Indian Electricity Act, 1910.\n(2) The expression \"the licensee\" shall mean and read the said, and their (or his) assigns; and\n(3) The expression \"deposited maps\" shall mean the plans of the area of supply hereinafter specified which has been deposited with Government in pursuance of the rules under the Act, which plans are signed for the purpose of identification by the Secretary to the Government of in the ......................... Department and by the applicants under the name and style of...............................\n(4) Other words and expressions have the same meanings as are assigned to them in the Act or the rules made there under.\n[SECURITY]\n[AREA OF SUPPLY]\nNorth - By\nEast - By\nSouth - By\nWest - By\nPower to lay mains outside area of Supply\nPower to lay mains outside area of Supply\nLimits within which the supply of energy is to be compulsory\nLimits within which the supply of energy is to be compulsory\nNature Of Supply\nBreaking up of streets, railways and tramways\nBreaking up of streets, railways and tramways\n(a) Streets.\n(b) Railways\n(c) Tramways\nAppointment Of Electrical Engineer\nPurchase Of Undertakings\nAdditions To Variations From, And Exceptions From The Schedule To The Act\n(2) In pursuance of clause (f) of sub-section (2) of section 3 of the Act it is hereby expressly declared that the clause/clauses of the schedule to the Act mentioned below shall be varied in the manner hereinafter indicated, namely :-\nNote\nSignature of Applicant or his agent (if any)\nAddress of Applicant.\nANNEXURE IV\n[See rule 26(3)]\nSummary Of Technical And Financial Particulars For The Year Ended 31st March 20..........",
"footnote": "",
"is_definition": false,
"sort_order": 137
},
{
"number": "1",
"title": "1. Year of working.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 138
},
{
"number": "2",
"title": "2. Area of supply in square km.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 139
},
{
"number": "3",
"title": "3. Approximate population in the area of supply.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 140
},
{
"number": "4",
"title": "4. Installed capacity:",
"chapter": null,
"content": "(a) Generating plant (excluding retired plant): (i) Hydraulic kW (ii) Steam kW (iii) Internal combustion kW TOTAL kW (b) Receiving Station: Transformers kVA 5. Normal maximum demand on the system kW 6. kWh generated: (i) Hydraulic kWh (ii) Steam kWh (iii) Internal combustion kWh TOTAL kWh\n(i) Hydraulic\nkW\n(ii) Steam\nkW\n(iii) Internal combustion\nkW\nTOTAL\nTOTAL\nkW\nTransformers\nkVA\nkW\n(i) Hydraulic\nkWh\n(ii) Steam\nkWh\n(iii) Internal combustion\nkWh\nTOTAL\nTOTAL\nkWh\n(a) (i) Coal and/or furnace oil consumed in tonnes\n(ii) Average calorific value per kg of coal and/or furnace oil consumed\n(iii) Average cost of coal and/or furnace oil per tonnes\n(b) (i) Oil consumed in tonnes\n(ii) Average calorific value per kg. of oil consumed\n(iii) Average cost of oil per tonne.\n(a) Quantity consumed Litres.\n(b) Average cost per litre\n(a) Domestic or Residential\n(b) Commercial\n(c) Industrial:\n(i) Low and medium voltage\n(ii) High and/or extra-high voltage\n......................................\nTOTAL\n(i) Domestic or Residential:\n(a) Lights* and Fans.\n(b) Heating and small power.\n(ii) Commercial:\n(a) Lights* and Fans.\n(b) Heating and small power.\n(iii) Industrial Power:\n(a) Low and medium voltage.\n(b) High voltage.\n(iv) Public Lighting.\n(v) Traction.\n(vi) Irrigation.\n(vii) Public Water-works and Sewage Pumping.\n(viii) Supplies in bulk to Distributing Licensees.\n(i) Technical-",
"footnote": "",
"is_definition": false,
"sort_order": 141
},
{
"number": "1",
"title": "1. Supervisory.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 142
},
{
"number": "2",
"title": "2. Others.",
"chapter": null,
"content": "(ii) Administrative-",
"footnote": "",
"is_definition": false,
"sort_order": 143
},
{
"number": "1",
"title": "1. Supervisory",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 144
},
{
"number": "2",
"title": "2. Others.",
"chapter": null,
"content": "(i) Length of transmission lines at different voltages-\n(a) Overhead...................................\n(b) Underground.............................\n(ii) Length of distribution lines]\n(a) On ordinary shares\n(b) on preference shares\n(a) Ordinary shares\n(b) Preference shares\n(i) Domestic or Residential:\n(a) Lights* and Fans\n(b) Heating and small power\n(ii) Commercial:\n(a) Lights* and Fans\n(b) Heating and small power\n(iii) Industrial Power:\n(a) Low and medium voltage\n(b) High voltage\n(iv) Public Lighting\n(v) Traction\n(vi) Irrigation\n(vii) Public Water-works and Sewage Pumping\n(viii) Supplies in bulk of Distributing Licensees\nANNEXURE V\nModel Form Of Accounts\n[See section 11 Of Indian Electricity Act, 1910 and rules 26(3)]\nElectric Licence, 20...............\nDate of Commencement of Licence\nDate of Commencement of Licence\nYear of Operation\nNO. I - STATEMENT OF SHARE AND LOAN CAPITAL FOR THE YEAR ENDED 31ST MARCH, 20.........\n( Applicable to Licensees other than Local Authority Licensees )\nDescription of Capital Balance at the beginning of the year Receipts during the year Redeemed during the year Balance at the end of the year Remarks 1 2 3 4 5 6 A. Share Capital: Authorised Capital Ordinary Shares of Rs each % Preference shares of Rs each Issued Capital Ordinary Shares of Rs each % Preference shares of Rs each Subscribed capital Ordinary Shares of Rs each % Preference shares of Rs each Called up capital: Ordinary Shares of Rs each % Preference shares of Rs each Less calls in arrears Paid-up Capital Ordinary Shares of Rs each % Preference shares of Rs each TOTAL PAID TO CAPITAL B. Capital Reserve Share Forfeiture a/c Share Premium a/c Other items (to be specified) TOTAL CAPITAL RESERVE C. Loan Capital-Loans from State Electricity Boards per cent debentures of Rs each Other Loans- (i) Secured (ii) Unsecured TOTAL LOANS CAPITAL D. Other Capital Contribution from consumer including local authorities for service-lines and public lighting after the commencement of the Electricity (Supply) Act, 1948. TOTAL OTHER CAPITAL TOTAL CAPITAL RAISED AND APPROPRIATED (A+B+C+D)\nDescription of Capital\nDescription of Capital\nBalance at the beginning of the year\nBalance at the beginning of the year\nReceipts during the year\nReceipts during the year\nRedeemed during the year\nRedeemed during the year\nBalance at the end of the year\nBalance at the end of the year\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nAuthorised Capital\neach\neach\nIssued Capital\neach\neach\nSubscribed capital\neach\neach\nCalled up capital:\neach\neach\nLess calls in arrears\nPaid-up Capital\neach\neach\nTOTAL PAID TO CAPITAL\nTOTAL PAID TO CAPITAL\nShare Forfeiture a/c\nShare Premium a/c\nOther items (to be specified)\nTOTAL CAPITAL RESERVE\nTOTAL CAPITAL RESERVE\nOther Loans-\n(i) Secured\n(ii) Unsecured\nTOTAL LOANS CAPITAL\nTOTAL LOANS CAPITAL\nContribution from consumer including local authorities for service-lines and public lighting after the commencement of the Electricity (Supply) Act, 1948.\nTOTAL OTHER CAPITAL\nTOTAL OTHER CAPITAL\nTOTAL CAPITAL RAISED AND APPROPRIATED\nTOTAL CAPITAL RAISED AND APPROPRIATED\n(A+B+C+D)\n(A+B+C+D)\nNote\nElectric Licence, 20............\nDate Of Commencement Of Licence\nYear of Operation\nNO. I (AL)- STATEMENT OF LOANS RAISED AND REDEEMED FOR THE YEAR ENDED 31ST MARCH, 20......\n( Applicable to Local Authority Licensees )\nDescription of loans raised from time to time Amount sanctioned Rate% Period of Payment Amount of Annual instalment Amount of loan redeemed up to the beginning of the year Amount of loan redeemed during the year Total loan redeemed upto the end of the year Balance of loan outstanding at the end of the year Remarks From To 1 2 3 4 5 6 7 8 9 10 11 Total loans raised for the electrification scheme___________________________________________________________________________________________________________________\nDescription of loans raised from time to time\nDescription of loans raised from time to time\nAmount sanctioned\nAmount sanctioned\nRate%\nRate%\nPeriod of Payment\nPeriod of Payment\nAmount of Annual instalment\nAmount of Annual instalment\nAmount of loan redeemed up to the beginning of the year\nAmount of loan redeemed up to the beginning of the year\nAmount of loan redeemed during the year\nAmount of loan redeemed during the year\nTotal loan redeemed upto the end of the year\nTotal loan redeemed upto the end of the year\nBalance of loan outstanding at the end of the year\nBalance of loan outstanding at the end of the year\nRemarks\nRemarks\nFrom\nFrom\nTo\nTo\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\nNO. I (A2)-STATEMENT OF LOAN AND OTHER CAPITAL FOR THE YEAR ENDED 31ST MARCH, 20.......\nParticulars Balance at the beginning of the year Received during the year Redeemed during the year Balance at the end of the year Remarks 1 2 3 4 5 6 A.\nCapital Raised Amount of loans outstanding [as per col. 10 of statement I-A(I)] Grants and advances made from the general funds of the local authority Grants-in-aid from Government TOTAL CAPITAL RAISED B.\nCapital Reserve Loan redemption account [as per col. 9 of statement IA(l)] Other items (to be specified) TOTAL CAPITAL RESERVE C.\nOther Capital Consumer's contributions for service lines after the commencement of the Electricity\n(Supply) Act, 1948. Special items (to be specified) TOTAL OTHER CAPITAL TOTAL CAPITAL RAISED AND APPROPRIATED (A+B+C)\nParticulars\nParticulars\nBalance at the beginning of the year\nBalance at the beginning of the year\nReceived during the year\nReceived during the year\nRedeemed during the year\nRedeemed during the year\nBalance at the end of the year\nBalance at the end of the year\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nAmount of loans outstanding [as per col. 10 of statement I-A(I)]\nGrants and advances made from the general funds of the local authority Grants-in-aid from Government\nTOTAL CAPITAL RAISED\nLoan redemption account [as per col. 9 of statement IA(l)] Other items (to be specified)\nTOTAL CAPITAL RESERVE\nConsumer's contributions for service lines after the commencement of the Electricity\n(Supply) Act, 1948.\nSpecial items (to be specified)\nTOTAL OTHER CAPITAL\nTOTAL CAPITAL RAISED AND APPROPRIATED\n(A+B+C)\nNO.II - STATEMENT OF CAPITAL EXPENDITURE FOR THE YEAR ENDED 31ST MARCH, 20........\nParticulars Balance at the beginning of the year Additions during the year Requirements during the year vide Col. 3, Statement II-A Balance at the end of the year Remarks 1 2 3 4 5 6 A.\nIntangible Assets: 1. Preliminary\n& Promotional expenses 2. Cost of Licence 3. Other expenses e.g., expenses incidental to conversion from DC to AC change of frequency etc. TOTAL INTANGIBLE ASSETS B.\nHydraulic Power Plant: 1. Land & Rights 2. Buildings and civil engineering works containing generating plant and equipment 3. Hydraulic works forming part of a hydroelectric system including (i) Dams, spillways, weirs, canals, reinforced concrete flumes and cyphons, (ii)\nreinforced concrete pipe lines and search tanks, steel pipe lines, sluice gates, steel surge tanks, hydraulic control valves and other hydraulic works 4. Water wheels, Generators and ancillary equipment including plant foundations 5. Switchgear including cable connections 6. Miscellaneous power plant equipment 7. Other civil works\n(to be specified) TOTAL HYDRAULIC POWER PLANT C.\nSteam Power Plant : 1. Land & Rights 2. Buildings and civil engineering works containing generating plant & equipment 3. Boiler plant and equipment including plant foundations 4. Engines, Turbines, generators and ancillary equipment including plant foundations 5. Water cooling system comprising cooling towers and circulating water systems 6. Switchgear including cable connections 7. Miscellaneous power plant and equipment 8. Other civil works (to be specified) TOTAL STEAM POWER PLANT D.\nInternal Combustion Power Plant: 1. Land and Rights 2. Building and civil engineering works containing generating plant and equipment 3. Engines, generators, and ancillary equipment including plant foundations 4. Water cooling system comprising cooling towers and circulating water systems 5. Switchgear including cable connections 6. Miscellaneous power plant and equipment 7. Other civil works (to be specified) TOTAL INTERNAL COMBUSTION POWER PLANT E.\nTransmission Plant (High or Extra-High Voltage): 1. Land and Rights 2. Buildings and structures including civil engineering works containing transmission plant and equipment 3. Sub-station transformers, transformer kiosks, sub-section equipment and other fixed apparatus including plant foundations:- (i) Transformers, including foundations having rating of\n`100 kilovolt amperes and over (ii) Others 4. Switchgear including cable connections 5. Towers, poles, fixures, overhead conductors and devices:- (i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports 6. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 7. Miscellaneous equipments (to be specified) TOTAL TRANSMISSION PLANT F.\nDistribution Plant-High Voltage: 1. Land & Rights 2. Buildings and structures including civil engineering works containing distribution plant and equipment 3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations- (i) Transformers including foundations having a rating of 100 kilovolt amperes and over (ii) Others 4. Switchgear including cable connections 5. Towers, Poles, Fixtures, Overhead conductors and devices: (i) Lines on steel or reinforced concrete supports operating at nominal voltages, higher than 13.2 Kilo Volts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports 6. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 7. Service lines 8. Metering equipment 9. Miscellaneous equipments (to be specified): TOTAL DISTRIBUTION PLANT (HV) G.\nDistribution Plant-Medium and low voltage: 1. Land & Rights 2. Buildings and structures including civil engineering works containing distribution plant and equipment 3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having a rating of 100 kilo volt amperes and over (ii) Others 4. Switchgear including cable connections 5. Towers, Poles, Fixtures, Overhead conductors and devices: (i) Lines on steel or reinforced concrete supports (ii) Lines on wood supports 6. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 7. Service lines 8. Metering equipment 9. Miscellaneous equipments (to be specified) TOTAL DISTRIBUTION (M&LV) H.\nPublic Lighting: Street and Signal lighting system 1. General Equipment: (Not allocated to other sub-heads) 1. Land and Rights 2. Buildings and structures 3. Office furniture and equipment 4. Transportation equipment 5. Laboratory and meter testing equipment 6. Workshop plant and equipment 7. Tools and work equipment 8. Communication equipment 9. Miscellaneous equipment TOTAL GENERAL EQUIPMENT TOTAL CAPITAL ASSETS IN USE\nParticulars\nParticulars\nBalance at the beginning of the year\nBalance at the beginning of the year\nAdditions during the year\nAdditions during the year\nRequirements during the year vide Col. 3, Statement II-A\nRequirements during the year vide Col. 3, Statement II-A\nBalance at the end of the year\nBalance at the end of the year\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6",
"footnote": "",
"is_definition": false,
"sort_order": 145
},
{
"number": "1",
"title": "1. Preliminary\n& Promotional expenses",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 146
},
{
"number": "2",
"title": "2. Cost of Licence",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 147
},
{
"number": "3",
"title": "3. Other expenses e.g., expenses incidental to conversion from DC to AC change of frequency etc.",
"chapter": null,
"content": "TOTAL INTANGIBLE ASSETS",
"footnote": "",
"is_definition": false,
"sort_order": 148
},
{
"number": "1",
"title": "1. Land & Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 149
},
{
"number": "2",
"title": "2. Buildings and civil engineering works containing generating plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 150
},
{
"number": "3",
"title": "3. Hydraulic works forming part of a hydroelectric system including",
"chapter": null,
"content": "(i) Dams, spillways, weirs, canals, reinforced concrete flumes and cyphons,\n(ii)\nreinforced concrete pipe lines and search tanks, steel pipe lines, sluice gates, steel surge tanks, hydraulic control valves and other hydraulic works",
"footnote": "",
"is_definition": false,
"sort_order": 151
},
{
"number": "4",
"title": "4. Water wheels, Generators and ancillary equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 152
},
{
"number": "5",
"title": "5. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 153
},
{
"number": "6",
"title": "6. Miscellaneous power plant equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 154
},
{
"number": "7",
"title": "7. Other civil works\n(to be specified)",
"chapter": null,
"content": "TOTAL HYDRAULIC POWER PLANT",
"footnote": "",
"is_definition": false,
"sort_order": 155
},
{
"number": "1",
"title": "1. Land & Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 156
},
{
"number": "2",
"title": "2. Buildings and civil engineering works containing generating plant & equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 157
},
{
"number": "3",
"title": "3. Boiler plant and equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 158
},
{
"number": "4",
"title": "4. Engines, Turbines, generators and ancillary equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 159
},
{
"number": "5",
"title": "5. Water cooling system comprising cooling towers and circulating water systems",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 160
},
{
"number": "6",
"title": "6. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 161
},
{
"number": "7",
"title": "7. Miscellaneous power plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 162
},
{
"number": "8",
"title": "8. Other civil works (to be specified)",
"chapter": null,
"content": "TOTAL STEAM POWER PLANT",
"footnote": "",
"is_definition": false,
"sort_order": 163
},
{
"number": "1",
"title": "1. Land and Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 164
},
{
"number": "2",
"title": "2. Building and civil engineering works containing generating plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 165
},
{
"number": "3",
"title": "3. Engines, generators, and ancillary equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 166
},
{
"number": "4",
"title": "4. Water cooling system comprising cooling towers and circulating water systems",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 167
},
{
"number": "5",
"title": "5. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 168
},
{
"number": "6",
"title": "6. Miscellaneous power plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 169
},
{
"number": "7",
"title": "7. Other civil works (to be specified)",
"chapter": null,
"content": "TOTAL INTERNAL COMBUSTION POWER PLANT",
"footnote": "",
"is_definition": false,
"sort_order": 170
},
{
"number": "1",
"title": "1. Land and Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 171
},
{
"number": "2",
"title": "2. Buildings and structures including civil engineering works containing transmission plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 172
},
{
"number": "3",
"title": "3. Sub-station transformers, transformer kiosks, sub-section equipment and other fixed apparatus including plant foundations:-",
"chapter": null,
"content": "(i) Transformers, including foundations having rating of\n`100 kilovolt amperes and over\n(ii) Others",
"footnote": "",
"is_definition": false,
"sort_order": 173
},
{
"number": "4",
"title": "4. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 174
},
{
"number": "5",
"title": "5. Towers, poles, fixures, overhead conductors and devices:-",
"chapter": null,
"content": "(i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts\n(ii) Other lines on steel or reinforced concrete supports\n(iii) Lines on wood supports\n6. (i) Underground cables and devices including joint boxes and disconnecting boxes\n(ii) Cable duct system",
"footnote": "",
"is_definition": false,
"sort_order": 175
},
{
"number": "7",
"title": "7. Miscellaneous equipments (to be specified)",
"chapter": null,
"content": "TOTAL TRANSMISSION PLANT",
"footnote": "",
"is_definition": false,
"sort_order": 176
},
{
"number": "1",
"title": "1. Land & Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 177
},
{
"number": "2",
"title": "2. Buildings and structures including civil engineering works containing distribution plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 178
},
{
"number": "3",
"title": "3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations-",
"chapter": null,
"content": "(i) Transformers including foundations having a rating of 100 kilovolt amperes and over\n(ii) Others",
"footnote": "",
"is_definition": false,
"sort_order": 179
},
{
"number": "4",
"title": "4. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 180
},
{
"number": "5",
"title": "5. Towers, Poles, Fixtures, Overhead conductors and devices:",
"chapter": null,
"content": "(i) Lines on steel or reinforced concrete supports operating at nominal voltages, higher than 13.2 Kilo Volts\n(ii) Other lines on steel or reinforced concrete supports\n(iii) Lines on wood supports\n6. (i) Underground cables and devices including joint boxes and disconnecting boxes\n(ii) Cable duct system",
"footnote": "",
"is_definition": false,
"sort_order": 181
},
{
"number": "7",
"title": "7. Service lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 182
},
{
"number": "8",
"title": "8. Metering equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 183
},
{
"number": "9",
"title": "9. Miscellaneous equipments (to be specified):",
"chapter": null,
"content": "TOTAL DISTRIBUTION PLANT (HV)",
"footnote": "",
"is_definition": false,
"sort_order": 184
},
{
"number": "1",
"title": "1. Land & Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 185
},
{
"number": "2",
"title": "2. Buildings and structures including civil engineering works containing distribution plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 186
},
{
"number": "3",
"title": "3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations",
"chapter": null,
"content": "(i) Transformers including foundations having a rating of 100 kilo volt amperes and over\n(ii) Others",
"footnote": "",
"is_definition": false,
"sort_order": 187
},
{
"number": "4",
"title": "4. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 188
},
{
"number": "5",
"title": "5. Towers, Poles, Fixtures, Overhead conductors and devices:",
"chapter": null,
"content": "(i) Lines on steel or reinforced concrete supports\n(ii) Lines on wood supports\n6. (i) Underground cables and devices including joint boxes and disconnecting boxes\n(ii) Cable duct system",
"footnote": "",
"is_definition": false,
"sort_order": 189
},
{
"number": "7",
"title": "7. Service lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 190
},
{
"number": "8",
"title": "8. Metering equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 191
},
{
"number": "9",
"title": "9. Miscellaneous equipments (to be specified)",
"chapter": null,
"content": "TOTAL DISTRIBUTION (M&LV)\nStreet and Signal lighting system",
"footnote": "",
"is_definition": false,
"sort_order": 192
},
{
"number": "1",
"title": "1. General Equipment:",
"chapter": null,
"content": "(Not allocated to other sub-heads)",
"footnote": "",
"is_definition": false,
"sort_order": 193
},
{
"number": "1",
"title": "1. Land and Rights",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 194
},
{
"number": "2",
"title": "2. Buildings and structures",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 195
},
{
"number": "3",
"title": "3. Office furniture and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 196
},
{
"number": "4",
"title": "4. Transportation equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 197
},
{
"number": "5",
"title": "5. Laboratory and meter testing equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 198
},
{
"number": "6",
"title": "6. Workshop plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 199
},
{
"number": "7",
"title": "7. Tools and work equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 200
},
{
"number": "8",
"title": "8. Communication equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 201
},
{
"number": "9",
"title": "9. Miscellaneous equipment",
"chapter": null,
"content": "TOTAL GENERAL EQUIPMENT\nTOTAL CAPITAL ASSETS IN USE\nNote\nNO. II-A - STATEMENT SHOWING THE WRITTEN DOWN COST OF FIXED ASSETS RETIRED ON ACCOUNT OF OBSOLESCENCE INADEQUACY, SUPERFLUITY, ETC.\nParticulars of the assets Written down cost of assets at the beginning of he year Written down cost of assets retired during the year vide Col. 4 Statement II less Col. 8, Statement V Written down cost of assets sold during the year Amount realised during the year Excess of sale proceeds over written down cost transferred to contingencies Reserve Account vide Col. 4 of Statement VI [Amounts]written off during the year vide [col. 6] statement VI Balance of written down cost at the end of the year 1 2 3 4 5 6 7 8\nParticulars of the assets\nParticulars of the assets\nWritten down cost of assets at the beginning of he year\nWritten down cost of assets at the beginning of he year\nWritten down cost of assets retired during the year vide Col. 4 Statement II less Col. 8, Statement V\nWritten down cost of assets retired during the year vide Col. 4 Statement II less Col. 8, Statement V\nWritten down cost of assets sold during the year\nWritten down cost of assets sold during the year\nAmount realised during the year\nAmount realised during the year\nExcess of sale proceeds over written down cost transferred to contingencies Reserve Account vide Col. 4 of Statement VI\nExcess of sale proceeds over written down cost transferred to contingencies Reserve Account vide Col. 4 of Statement VI\n[Amounts]written off during the year vide [col. 6] statement VI\n[Amounts]written off during the year vide [col. 6] statement VI\nBalance of written down cost at the end of the year\nBalance of written down cost at the end of the year\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\nNO. III STATEMENT OF OPERATING REVENUES FOR THE YEAR ENDED 31ST MARCH, 20....................\nParticulars of revenue Corresponding amount for the previous year of account Amount for the year of account Remarks 1 2 3 4 A.\nNet Revenue by sale of electricity for cash & credit: 1. Domestic or residential (a) Lights and Fans (b) Heating and small power 2. Commercial (a) Lights and Fans (b) Heating and small power 3. Industrial (a) Low and Medium voltage (b) High voltage 4. Public Lighting 5. Public Water works and Sewage pumping 6. Irrigation 7. Traction 8. Supplies in bulk to distributing licences TOTAL REVENUES BY SALE OF ELECTRICITY B.\nMiscellaneous Revenue from Consumers: 1. Rentals from (a) Meters (b) Electric motors, fittings, appliances & other apparatus hired to consumers 2. Service connection fees 3. Public Lighting Maintenance. TOTAL MISCELLANEOUS REVENUE FROM CONSUMERS C.\nOther Revenues: 1. Sale of Stores 2. Repairs of lamps and other apparatus 3. Commission for the collection of electricity duty 4. Other miscellaneous items (to be specified) TOTAL OTHER REVENUES TOTAL OPERATING REVENUES\nParticulars of revenue\nParticulars of revenue\nCorresponding amount for the previous year of account\nCorresponding amount for the previous year of account\nAmount for the year of account\nAmount for the year of account\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4",
"footnote": "",
"is_definition": false,
"sort_order": 202
},
{
"number": "1",
"title": "1. Domestic or residential",
"chapter": null,
"content": "(a) Lights and Fans\n(b) Heating and small power",
"footnote": "",
"is_definition": false,
"sort_order": 203
},
{
"number": "2",
"title": "2. Commercial",
"chapter": null,
"content": "(a) Lights and Fans\n(b) Heating and small power",
"footnote": "",
"is_definition": false,
"sort_order": 204
},
{
"number": "3",
"title": "3. Industrial",
"chapter": null,
"content": "(a) Low and Medium voltage\n(b) High voltage",
"footnote": "",
"is_definition": false,
"sort_order": 205
},
{
"number": "4",
"title": "4. Public Lighting",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 206
},
{
"number": "5",
"title": "5. Public Water works and Sewage pumping",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 207
},
{
"number": "6",
"title": "6. Irrigation",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 208
},
{
"number": "7",
"title": "7. Traction",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 209
},
{
"number": "8",
"title": "8. Supplies in bulk to distributing licences",
"chapter": null,
"content": "TOTAL REVENUES BY SALE OF ELECTRICITY",
"footnote": "",
"is_definition": false,
"sort_order": 210
},
{
"number": "1",
"title": "1. Rentals from",
"chapter": null,
"content": "(a) Meters\n(b) Electric motors, fittings, appliances & other apparatus hired to consumers",
"footnote": "",
"is_definition": false,
"sort_order": 211
},
{
"number": "2",
"title": "2. Service connection fees",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 212
},
{
"number": "3",
"title": "3. Public Lighting Maintenance.",
"chapter": null,
"content": "TOTAL MISCELLANEOUS REVENUE FROM CONSUMERS",
"footnote": "",
"is_definition": false,
"sort_order": 213
},
{
"number": "1",
"title": "1. Sale of Stores",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 214
},
{
"number": "2",
"title": "2. Repairs of lamps and other apparatus",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 215
},
{
"number": "3",
"title": "3. Commission for the collection of electricity duty",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 216
},
{
"number": "4",
"title": "4. Other miscellaneous items (to be specified)",
"chapter": null,
"content": "TOTAL OTHER REVENUES\nTOTAL OPERATING REVENUES\nTotal Operating expenses as per Statement IV\nNet surplus or deficit carried to the Net Revenue and Appropriations account-Statement X\nNO. IV - STATEMENT OF OPERATING EXPENSES FOR THE YEAR ENDED 31ST MARCH, 20.........\nParticulars of expenses Corresponding amount for the previous year of account Amount for the year of account Remarks 1 2 3 4 A.\nHYDRAULIC POWER GENERATION (a) Operation 1. Water for power 2. Lubricants and other consumable stores 3. Station supplies and miscellaneous expenses 4.\nProportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff 5. Wages and gratuities to labour 6. Contribution to Provident Fund, staff pension & apprentice & other training schemes 7. Bonus paid to the employees of the undertaking TOTAL OPERATION (b) Maintenance 1. Salaries for Supervisory staff 2. Buildings and civil engineering works containing generating plant and equipment 3. Hydraulic works forming part of a hydro electric system, including- (i) Dams, spillways, weirs, canals reinforced concrete flumes and syphons (ii)\nReinforced concrete pipelines and surge tanks, steel pipelines, sluice gates, steel surge tanks, hydraulic control valves and other hydraulic works 4. Water wheels, generators and ancillary equipment including plant foundations 5. Switchgear including cable connections 6. Miscellaneous power plant and equipment 7.\nOther Civil works (to be specified) 8. Contributions to Provident Fund, staff pension and apprentice and other training schemes 9. Bonus paid to the employees of the undertaking TOTAL MAINTENANCE (c) Depreciation Depreciation to Hydraulic Power Generating Plant and Equipment (From Statement V) TOTAL HYDRAULIC POWER GENERATION EXPENSES B.\nSTEAM POWER GENERATION (a) Operation 1. Fuel (excluding sale proceeds of steam ashes, etc.) 2. Lubricants and other consumable stores 3. Water (if purchased separately) 4. Station supplies and miscellaneous expenses 5.\nProportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff 6. Wages and gratuities to labour 7. Contribution to Provident Fund, staff pension & apprentice & other training schemes 8. Bonus paid to the employees of the undertaking TOTAL OPERATION (b) Maintenance 1. Salaries for Supervisory staff 2. Building and civil engineering works containing generating plant and equipment 3. Boiler plant and equipment including plant foundations 4. Engines, turbines, generators and ancillary equipment including plant foundations 5. Water cooling system comprising cooling towers and circulating water systems 6. Switchgear including cable connections 7. Miscellaneous power plant and equipment 8. Other Civil works (to be specified) 9. Contributions to Provident Fund, staff pension and apprentice and other training schemes 10. Bonus paid to the employees of the undertaking TOTAL MAINTENANCE (c) Depreciation Depreciation on Steam Power Generating Plant and equipment (from Statement V) TOTAL STEAM POWER GENERATION EXPENSES C.\nINTERNAL COMBUSTION POWER GENERATION: (a) Operation 1. Fuel 2. Lubricants and other consumble stores 3. Water (if purchased separately) 4. Station supplies and miscellaneous expenses 5.\nProportion of salaries, allowances, gratuities etc. of Engineers, Superintendents, Officers, supervisory and other staff 6. Wages and gratuities to labour 7. Contributions to Provident Fund, Staff pension and apprentice and other training schemes 8. Bonus paid to the employees of the undertaking TOTAL OPERATION (b) Maintenance 1. Salaries for supervisory staff. 2. Buildings and civil engineering works containing generating plant and equipment 3. Engines, generators and ancillary equipment including plant foundations 4. Water cooling system comprising cooling towers and circulating water system 5. Switchgear including cable connections 6. Miscellaneous power plant and equipment 7. Other civil works (to be specified) 8. Contributions to provident fund, staff pension and apprentice and other training schemes 9. Bonus paid to the employees of the undertaking TOTAL MAINTENANCE (c) Depreciation: Depreciation on Internal Combustion Power Generating Plant and Equipment (from Statement V) TOTAL INTERNAL COMBUSTION POWER GENERATION EXPENSES D.\nPOWER PURCHASED: TOTAL PRODUCTION EXPENSES (A+B+C+D) E.\nTRANSMISSION (HIGH OR EXTRA-HIGH VOLTAGE): (a) Operation and Maintenance: 1.\nProportion of salaries, allowances, gratuities, etc. of engineers, superintendents officers, supervisory and other staff 2. Wages and gratuities to sub-station labour 3. Wages and gratuities to labour on lines 4.\nBuildings and structures including civil engineering works containing transmission plant and equipment 5.\nSub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having rating of 100 kilovolt amperes and over (ii) Others 6. Switchgear including cable connections 7. Towers, poles, fixtures, overhead conductors and devices (i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports. 8. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 9. Contribution to Provident Fund or Staff Pension (b)\nDepreciation on Transmission Plant and equipment (from Statement V). TOTAL TRANSMISSION EXPENSES F.\nDISTRIBUTION (HIGH VOLTAGE): (a) Operation and Maintenance: 1.\nProportion of salaries, allowances, gratuities, etc., of engineers, superintendents, officers, supervisory and other staff 2. Wages and gratuities of sub-station labour 3. Wages and gratuities to labour for mains 4. Buildings and structures including civil engineering works containing distribution plant and equipment 5.\nSub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having a rating of 100 Kilovolt amperes and over (ii) Others 6. Switchgear including cable connections 7. Towers, poles, fixtures, overhead conductors and devices (i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports 8. (i) Underground cables and devices including joint boxes and disconnection boxes (ii) Cable duct system 9. Service Lines 10. Metering Equipment 11. Contributions to Provident Fund or Staff Pension. (b) Depreciation on Distribution Plant and equipment (from Statement V) TOTAL DISTRIBUTION (H.V) EXPENSES G.\nDISTRIBUTION MEDIUM AND LOW VOLTAGE: (a) Operation and Maintenance: 1.\nProportion of salaries, allowances, gratuities, etc. of engineers, superintendents, officers, supervisory and other staff 2. Wage and Gratuities to labour 3. Buildings and structures including civil engineering works containing transmission plant and equipment 4.\nSub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having rating of 100 kilovolt amperes and over (ii) Others 5. Switchgear including cable connections 6. Towers, poles, fixtures, overhead conductors and devices (i) Lines on steel or reinforced concrete supports (ii) Lines and wood supports 7. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 8. Service lines 9. Metering equipment 10.Contributions to Provident Fund or staff person (b) Depreciation on Distribution Plant and equipment (from Statement V) TOTAL DISTRIBUTION (M.&L.V.) EXPENSES H.\nPUBLIC LIGHTING: (a) Operation and maintenance 1. Operation and maintenance 2. Renewal of lamps (b) Depreciation P.L. System and Equipment (from Statement V) TOTAL PUBLIC LIGHTING EXPENSES I.\nCONSUMERS' SERVICING, METER READING, BILLING, COLLECTING, ACCOUNTING, SALES PROMOTING, ETC. 1.\nProportion of salaries, allowances, gratuities, etc. of engineers, secretary, accountants, other officers etc. 2. Meter reading and inspection 3. Billing, collecting and accounting 4. Exhibition, demonstrations and advertisements 5. Merchandising, servicing and contract work 6. Miscellaneous expenses 7. Contributions to Provident Fund or Staff Pension 8.\nDepreciation on general assets and equipment, which are not allocated to other sub-heads (from Statement V) TOTAL CONSUMERS' SERVICING, METER READING, ETC. EXPENSES K. GENERAL ESTABLISHMENT CHARGES: 1. Proportion of salaries, allowances, gratuities, etc. of general officers, executive, etc. 2. Salaries, wages, gratuities, etc. of general office staff 3.\nContribution to local authority administration for supervision (applicable to local authority licensee only) 4. Travelling and other expenses of officers and staff 5. Rents and Way leaves 6. Rates and Taxes 7. General Office expenses and showroom maintenance and supplies 8.\nRepairs to office buildings, staff quarters, furniture and fixtures, office equipment etc., and maintenance 9.\nDepreciation on office and general buildings, furniture, etc. not allocated to other sub-heads (from Statement V) 10. Audit Services: (a) Auditor of company (b) Auditor appointed under the provisions of the Act 11. Legal services 12. Insurance expenses. 13. Contributions to Provident Fund, staff pension and apprentice and other training schemes 14. Bonus paid to the employees of the undertaking. TOTAL GENERAL ESTABLISHMENT CHARGES L.\nOTHER CHARGES: 1. Interest paid and accrued on: (a) Loans advanced by the State Electricity Board (b) Depreciation fund (c) Consumer's Security deposit 2. Bad debts written off 3. Other items (to be specified) TOTAL OTHER CHARGES M.\nMANAGEMENT EXPENSES 1. Director's fees and expenses and debenture Trustees' fees; if any 2. Other Expenses TOTAL MANAGEMENT EXPENSES TOTAL OPERATING EXPENSES TRANSFERRED TO STATEMENT-III\nParticulars of expenses\nParticulars of expenses\nCorresponding amount for the previous year of account\nCorresponding amount for the previous year of account\nAmount for the year of account\nAmount for the year of account\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n(a) Operation",
"footnote": "",
"is_definition": false,
"sort_order": 217
},
{
"number": "1",
"title": "1. Water for power",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 218
},
{
"number": "2",
"title": "2. Lubricants and other consumable stores",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 219
},
{
"number": "3",
"title": "3. Station supplies and miscellaneous expenses",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 220
},
{
"number": "4",
"title": "4.\nProportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 221
},
{
"number": "5",
"title": "5. Wages and gratuities to labour",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 222
},
{
"number": "6",
"title": "6. Contribution to Provident Fund, staff pension & apprentice & other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 223
},
{
"number": "7",
"title": "7. Bonus paid to the employees of the undertaking",
"chapter": null,
"content": "TOTAL OPERATION\n(b) Maintenance",
"footnote": "",
"is_definition": false,
"sort_order": 224
},
{
"number": "1",
"title": "1. Salaries for Supervisory staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 225
},
{
"number": "2",
"title": "2. Buildings and civil engineering works containing generating plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 226
},
{
"number": "3",
"title": "3. Hydraulic works forming part of a hydro electric system, including-",
"chapter": null,
"content": "(i) Dams, spillways, weirs, canals reinforced concrete flumes and syphons\n(ii)\nReinforced concrete pipelines and surge tanks, steel pipelines, sluice gates, steel surge tanks, hydraulic control valves and other hydraulic works",
"footnote": "",
"is_definition": false,
"sort_order": 227
},
{
"number": "4",
"title": "4. Water wheels, generators and ancillary equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 228
},
{
"number": "5",
"title": "5. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 229
},
{
"number": "6",
"title": "6. Miscellaneous power plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 230
},
{
"number": "7",
"title": "7.\nOther Civil works (to be specified)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 231
},
{
"number": "8",
"title": "8. Contributions to Provident Fund, staff pension and apprentice and other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 232
},
{
"number": "9",
"title": "9. Bonus paid to the employees of the undertaking",
"chapter": null,
"content": "TOTAL MAINTENANCE\n(c) Depreciation\nDepreciation to Hydraulic Power Generating Plant and Equipment (From Statement V)\nTOTAL HYDRAULIC POWER GENERATION EXPENSES\n(a) Operation",
"footnote": "",
"is_definition": false,
"sort_order": 233
},
{
"number": "1",
"title": "1. Fuel (excluding sale proceeds of steam ashes, etc.)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 234
},
{
"number": "2",
"title": "2. Lubricants and other consumable stores",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 235
},
{
"number": "3",
"title": "3. Water (if purchased separately)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 236
},
{
"number": "4",
"title": "4. Station supplies and miscellaneous expenses",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 237
},
{
"number": "5",
"title": "5.\nProportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 238
},
{
"number": "6",
"title": "6. Wages and gratuities to labour",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 239
},
{
"number": "7",
"title": "7. Contribution to Provident Fund, staff pension & apprentice & other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 240
},
{
"number": "8",
"title": "8. Bonus paid to the employees of the undertaking",
"chapter": null,
"content": "TOTAL OPERATION\n(b) Maintenance",
"footnote": "",
"is_definition": false,
"sort_order": 241
},
{
"number": "1",
"title": "1. Salaries for Supervisory staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 242
},
{
"number": "2",
"title": "2. Building and civil engineering works containing generating plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 243
},
{
"number": "3",
"title": "3. Boiler plant and equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 244
},
{
"number": "4",
"title": "4. Engines, turbines, generators and ancillary equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 245
},
{
"number": "5",
"title": "5. Water cooling system comprising cooling towers and circulating water systems",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 246
},
{
"number": "6",
"title": "6. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 247
},
{
"number": "7",
"title": "7. Miscellaneous power plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 248
},
{
"number": "8",
"title": "8. Other Civil works (to be specified)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 249
},
{
"number": "9",
"title": "9. Contributions to Provident Fund, staff pension and apprentice and other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 250
},
{
"number": "10",
"title": "10. Bonus paid to the employees of the undertaking",
"chapter": null,
"content": "TOTAL MAINTENANCE\n(c) Depreciation\nDepreciation on Steam Power Generating Plant and equipment (from Statement V)\nTOTAL STEAM POWER GENERATION EXPENSES\n(a) Operation",
"footnote": "",
"is_definition": false,
"sort_order": 251
},
{
"number": "1",
"title": "1. Fuel",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 252
},
{
"number": "2",
"title": "2. Lubricants and other consumble stores",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 253
},
{
"number": "3",
"title": "3. Water (if purchased separately)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 254
},
{
"number": "4",
"title": "4. Station supplies and miscellaneous expenses",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 255
},
{
"number": "5",
"title": "5.\nProportion of salaries, allowances, gratuities etc. of Engineers, Superintendents, Officers, supervisory and other staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 256
},
{
"number": "6",
"title": "6. Wages and gratuities to labour",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 257
},
{
"number": "7",
"title": "7. Contributions to Provident Fund, Staff pension and apprentice and other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 258
},
{
"number": "8",
"title": "8. Bonus paid to the employees of the undertaking",
"chapter": null,
"content": "TOTAL OPERATION\n(b) Maintenance",
"footnote": "",
"is_definition": false,
"sort_order": 259
},
{
"number": "1",
"title": "1. Salaries for supervisory staff.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 260
},
{
"number": "2",
"title": "2. Buildings and civil engineering works containing generating plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 261
},
{
"number": "3",
"title": "3. Engines, generators and ancillary equipment including plant foundations",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 262
},
{
"number": "4",
"title": "4. Water cooling system comprising cooling towers and circulating water system",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 263
},
{
"number": "5",
"title": "5. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 264
},
{
"number": "6",
"title": "6. Miscellaneous power plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 265
},
{
"number": "7",
"title": "7. Other civil works (to be specified)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 266
},
{
"number": "8",
"title": "8. Contributions to provident fund, staff pension and apprentice and other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 267
},
{
"number": "9",
"title": "9. Bonus paid to the employees of the undertaking",
"chapter": null,
"content": "TOTAL MAINTENANCE\n(c) Depreciation:\nDepreciation on Internal Combustion Power Generating Plant and Equipment (from Statement V)\nTOTAL INTERNAL COMBUSTION POWER GENERATION EXPENSES\nTOTAL PRODUCTION EXPENSES (A+B+C+D)\n(a) Operation and Maintenance:",
"footnote": "",
"is_definition": false,
"sort_order": 268
},
{
"number": "1",
"title": "1.\nProportion of salaries, allowances, gratuities, etc. of engineers, superintendents officers, supervisory and other staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 269
},
{
"number": "2",
"title": "2. Wages and gratuities to sub-station labour",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 270
},
{
"number": "3",
"title": "3. Wages and gratuities to labour on lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 271
},
{
"number": "4",
"title": "4.\nBuildings and structures including civil engineering works containing transmission plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 272
},
{
"number": "5",
"title": "5.\nSub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations",
"chapter": null,
"content": "(i) Transformers including foundations having rating of 100 kilovolt amperes and over\n(ii) Others",
"footnote": "",
"is_definition": false,
"sort_order": 273
},
{
"number": "6",
"title": "6. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 274
},
{
"number": "7",
"title": "7. Towers, poles, fixtures, overhead conductors and devices",
"chapter": null,
"content": "(i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts\n(ii) Other lines on steel or reinforced concrete supports\n(iii) Lines on wood supports.\n8. (i) Underground cables and devices including joint boxes and disconnecting boxes\n(ii) Cable duct system",
"footnote": "",
"is_definition": false,
"sort_order": 275
},
{
"number": "9",
"title": "9. Contribution to Provident Fund or Staff Pension",
"chapter": null,
"content": "TOTAL TRANSMISSION EXPENSES\n(a) Operation and Maintenance:",
"footnote": "",
"is_definition": false,
"sort_order": 276
},
{
"number": "1",
"title": "1.\nProportion of salaries, allowances, gratuities, etc., of engineers, superintendents, officers, supervisory and other staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 277
},
{
"number": "2",
"title": "2. Wages and gratuities of sub-station labour",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 278
},
{
"number": "3",
"title": "3. Wages and gratuities to labour for mains",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 279
},
{
"number": "4",
"title": "4. Buildings and structures including civil engineering works containing distribution plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 280
},
{
"number": "5",
"title": "5.\nSub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations",
"chapter": null,
"content": "(i) Transformers including foundations having a rating of 100 Kilovolt amperes and over\n(ii) Others",
"footnote": "",
"is_definition": false,
"sort_order": 281
},
{
"number": "6",
"title": "6. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 282
},
{
"number": "7",
"title": "7. Towers, poles, fixtures, overhead conductors and devices",
"chapter": null,
"content": "(i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts\n(ii) Other lines on steel or reinforced concrete supports\n(iii) Lines on wood supports\n8. (i) Underground cables and devices including joint boxes and disconnection boxes\n(ii) Cable duct system",
"footnote": "",
"is_definition": false,
"sort_order": 283
},
{
"number": "9",
"title": "9. Service Lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 284
},
{
"number": "10",
"title": "10. Metering Equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 285
},
{
"number": "11",
"title": "11. Contributions to Provident Fund or Staff Pension.",
"chapter": null,
"content": "(b) Depreciation on Distribution Plant and equipment (from Statement V)\nTOTAL DISTRIBUTION (H.V) EXPENSES\n(a) Operation and Maintenance:",
"footnote": "",
"is_definition": false,
"sort_order": 286
},
{
"number": "1",
"title": "1.\nProportion of salaries, allowances, gratuities, etc. of engineers, superintendents, officers, supervisory and other staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 287
},
{
"number": "2",
"title": "2. Wage and Gratuities to labour",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 288
},
{
"number": "3",
"title": "3. Buildings and structures including civil engineering works containing transmission plant and equipment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 289
},
{
"number": "4",
"title": "4.\nSub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations",
"chapter": null,
"content": "(i) Transformers including foundations having rating of 100 kilovolt amperes and over\n(ii) Others",
"footnote": "",
"is_definition": false,
"sort_order": 290
},
{
"number": "5",
"title": "5. Switchgear including cable connections",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 291
},
{
"number": "6",
"title": "6. Towers, poles, fixtures, overhead conductors and devices",
"chapter": null,
"content": "(i) Lines on steel or reinforced concrete supports\n(ii) Lines and wood supports\n7. (i) Underground cables and devices including joint boxes and disconnecting boxes\n(ii) Cable duct system",
"footnote": "",
"is_definition": false,
"sort_order": 292
},
{
"number": "8",
"title": "8. Service lines",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 293
},
{
"number": "9",
"title": "9. Metering equipment",
"chapter": null,
"content": "10.Contributions to Provident Fund or staff person\n(b) Depreciation on Distribution Plant and equipment (from Statement V)\nTOTAL DISTRIBUTION (M.&L.V.) EXPENSES\n(a) Operation and maintenance",
"footnote": "",
"is_definition": false,
"sort_order": 294
},
{
"number": "1",
"title": "1. Operation and maintenance",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 295
},
{
"number": "2",
"title": "2. Renewal of lamps",
"chapter": null,
"content": "(b) Depreciation P.L. System and Equipment (from Statement V)\nTOTAL PUBLIC LIGHTING EXPENSES",
"footnote": "",
"is_definition": false,
"sort_order": 296
},
{
"number": "1",
"title": "1.\nProportion of salaries, allowances, gratuities, etc. of engineers, secretary, accountants, other officers etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 297
},
{
"number": "2",
"title": "2. Meter reading and inspection",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 298
},
{
"number": "3",
"title": "3. Billing, collecting and accounting",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 299
},
{
"number": "4",
"title": "4. Exhibition, demonstrations and advertisements",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 300
},
{
"number": "5",
"title": "5. Merchandising, servicing and contract work",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 301
},
{
"number": "6",
"title": "6. Miscellaneous expenses",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 302
},
{
"number": "7",
"title": "7. Contributions to Provident Fund or Staff Pension",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 303
},
{
"number": "8",
"title": "8.\nDepreciation on general assets and equipment, which are not allocated to other sub-heads (from Statement V)",
"chapter": null,
"content": "TOTAL CONSUMERS' SERVICING, METER READING, ETC. EXPENSES K. GENERAL ESTABLISHMENT CHARGES:",
"footnote": "",
"is_definition": false,
"sort_order": 304
},
{
"number": "1",
"title": "1. Proportion of salaries, allowances, gratuities, etc. of general officers, executive, etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 305
},
{
"number": "2",
"title": "2. Salaries, wages, gratuities, etc. of general office staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 306
},
{
"number": "3",
"title": "3.\nContribution to local authority administration for supervision (applicable to local authority licensee only)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 307
},
{
"number": "4",
"title": "4. Travelling and other expenses of officers and staff",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 308
},
{
"number": "5",
"title": "5. Rents and Way leaves",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 309
},
{
"number": "6",
"title": "6. Rates and Taxes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 310
},
{
"number": "7",
"title": "7. General Office expenses and showroom maintenance and supplies",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 311
},
{
"number": "8",
"title": "8.\nRepairs to office buildings, staff quarters, furniture and fixtures, office equipment etc., and maintenance",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 312
},
{
"number": "9",
"title": "9.\nDepreciation on office and general buildings, furniture, etc. not allocated to other sub-heads (from Statement V)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 313
},
{
"number": "10",
"title": "10. Audit Services:",
"chapter": null,
"content": "(a) Auditor of company\n(b) Auditor appointed under the provisions of the Act",
"footnote": "",
"is_definition": false,
"sort_order": 314
},
{
"number": "11",
"title": "11. Legal services",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 315
},
{
"number": "12",
"title": "12. Insurance expenses.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 316
},
{
"number": "13",
"title": "13. Contributions to Provident Fund, staff pension and apprentice and other training schemes",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 317
},
{
"number": "14",
"title": "14. Bonus paid to the employees of the undertaking.",
"chapter": null,
"content": "TOTAL GENERAL ESTABLISHMENT CHARGES",
"footnote": "",
"is_definition": false,
"sort_order": 318
},
{
"number": "1",
"title": "1. Interest paid and accrued on:",
"chapter": null,
"content": "(a) Loans advanced by the State Electricity Board\n(b) Depreciation fund\n(c) Consumer's Security deposit",
"footnote": "",
"is_definition": false,
"sort_order": 319
},
{
"number": "2",
"title": "2. Bad debts written off",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 320
},
{
"number": "3",
"title": "3. Other items (to be specified) TOTAL OTHER CHARGES",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 321
},
{
"number": "1",
"title": "1. Director's fees and expenses and debenture Trustees' fees; if any",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 322
},
{
"number": "2",
"title": "2. Other Expenses",
"chapter": null,
"content": "TOTAL MANAGEMENT EXPENSES\nTOTAL OPERATING EXPENSES TRANSFERRED TO STATEMENT-III\nNote\nNO. V - STATEMENT FOR PROVISION FOR DEPRECIATION FOR THE YEAR ENDED 31ST MARCH, 20...................\nDescription of assets in Groups as per statement II Balance of accrued depreciation brought forward from last account Balance of arrears of depreciation brought forward from last account Additions during the year With drawals during the year, vide Col.3, Statement II-A Balance of accrued depreciation carried over to next account Balance of arrears of depreciation carried over to next account Remarks Interest @ 4% per annum on the balance at the beginning of the year under para.\nVI(I) of the Sixth Schedule to the Electricity (Supply) Act, 1948 Depreciation provided for the year Arrears of depreciation written off during the year Total 1 2 3 4 5 6 7 8 9 10 11 A. Hydraulic Power Plant: B. Steam Power-Plant: C. Internal Combustion Plant: D. Transmission Plants High or Extra-High Voltage: E. Distribution Plant-High Voltage: F. Distriibution Plant Medium and Low Voltage: G. Public Lighting: H. General Equipment: Total\nDescription of assets in Groups as per statement II\nDescription of assets in Groups as per statement II\nBalance of accrued depreciation brought forward from last account\nBalance of accrued depreciation brought forward from last account\nBalance of arrears of depreciation brought forward from last account\nBalance of arrears of depreciation brought forward from last account\nAdditions during the year\nAdditions during the year\nWith drawals during the year, vide Col.3, Statement II-A\nWith drawals during the year, vide Col.3, Statement II-A\nBalance of accrued depreciation carried over to next account\nBalance of accrued depreciation carried over to next account\nBalance of arrears of depreciation carried over to next account\nBalance of arrears of depreciation carried over to next account\nRemarks\nRemarks\nInterest @ 4% per annum on the balance at the beginning of the year under para.\nVI(I) of the Sixth Schedule to the Electricity (Supply) Act, 1948\nInterest @ 4% per annum on the balance at the beginning of the year under para.\nVI(I) of the Sixth Schedule to the Electricity (Supply) Act, 1948\nDepreciation provided for the year\nDepreciation provided for the year\nArrears of depreciation written off during the year\nArrears of depreciation written off during the year\nTotal\nTotal\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\nTotal\nTotal\nNote-1.\nNO. VI - STATEMENT OF CONTINGENCIES RESERVE FOR THE YEAR ENDED 31ST MARCH, 20............\nParticulars Balance at the beginning of the year Additions during the year Withdrawls during the year Balance at he end of the year Remarks Appropriations during the year Additions under paragraph IX of the sixth schedule to the Electricity (Supply) Act, 1948, vide Col. 6 of statement II-A Total Amount written off under sub-para (2) of para VII of the Sixth Schedule to the Electricity (Supply) Act, 1948 vide Col. 7 of Statement II-A Expenses and/or compensation under para V, sixth schedule of the E(S) Act, 1948 Total 1 2 3 4 5 6 7 8 9 10\nParticulars\nParticulars\nBalance at the beginning of the year\nBalance at the beginning of the year\nAdditions during the year\nAdditions during the year\nWithdrawls during the year\nWithdrawls\nduring the year\nBalance at he end of the year\nBalance at he end of the year\nRemarks\nRemarks\nAppropriations during the year\nAppropriations during the year\nAdditions under paragraph IX of the sixth schedule to the Electricity (Supply) Act, 1948, vide Col. 6 of statement II-A\nAdditions under paragraph IX of the sixth schedule to the Electricity (Supply) Act, 1948, vide Col. 6 of statement II-A\nTotal\nTotal\nAmount written off under sub-para (2) of para VII of the Sixth Schedule to the Electricity (Supply) Act, 1948 vide Col. 7 of Statement II-A\nAmount written off under sub-para (2) of para VII of the Sixth Schedule to the Electricity (Supply) Act, 1948 vide Col. 7 of Statement II-A\nExpenses and/or compensation under para V, sixth schedule of the E(S) Act, 1948\nExpenses and/or compensation under para V, sixth schedule of the E(S) Act, 1948\nTotal\nTotal\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\nNote\nNO. VII - STATEMENT OF DEVELOPMENT RESERVE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 20.........\nBalance of the beginning of the year Development rebate for the year permissible under the Indian Income-tax Act, 1961 (As per the details attached) Development reserve permissible for the year under the para. V-A(1) of the Sixth Schedule to the Electricity (Supply) Act, 1948 being the amount of relief on Income-tax and Super Tax on the amount of development rebate Actual appropriation made under the proviso to para. V-A(1) of the Sixth Schedule to the Electricity (Supply) Act, 1948 Unabsorbed development reserve to be appropriated in future years under paragraph VI-A(2) of the Sixth Schedule to the Electricity (Supply) Act, 1948 Remarks Balance at the beginning of the year Current year's balance Col. (3-4) Total Instalment appropriated during the year Balance awaited adjustment Col. [(7-8)] Balance at the end of the year Col. (1+4+8) 1 2 3 4 5 6 7 8 9 10 11\nBalance of the beginning of the year\nBalance of the beginning of the year\nDevelopment rebate for the year permissible under the Indian Income-tax Act, 1961 (As per the details attached)\nDevelopment rebate for the year permissible under the Indian Income-tax Act, 1961 (As per the details attached)\nDevelopment reserve permissible for the year under the para. V-A(1) of the Sixth Schedule to the Electricity (Supply) Act, 1948 being the amount of relief on Income-tax and Super Tax on the amount of development rebate\nDevelopment reserve permissible for the year under the para. V-A(1) of the Sixth Schedule to the Electricity (Supply) Act, 1948 being the amount of relief on Income-tax and Super Tax on the amount of development rebate\nActual appropriation made under the proviso to para. V-A(1) of the Sixth Schedule to the Electricity (Supply) Act, 1948\nActual appropriation made under the proviso to para. V-A(1) of the Sixth Schedule to the Electricity (Supply) Act, 1948\nUnabsorbed development reserve to be appropriated in future years under paragraph VI-A(2) of the Sixth Schedule to the Electricity (Supply) Act, 1948\nUnabsorbed development reserve to be appropriated in future years under paragraph VI-A(2) of the Sixth Schedule to the Electricity (Supply) Act, 1948\nRemarks\nRemarks\nBalance at the beginning of the year\nBalance at the beginning of the year\nCurrent year's balance Col. (3-4)\nCurrent year's balance Col. (3-4)\nTotal\nTotal\nInstalment appropriated during the year\nInstalment\nappropriated during the year\nBalance awaited adjustment Col. [(7-8)]\nBalance awaited adjustment Col. [(7-8)]\nBalance at the end of the year Col. (1+4+8)\nBalance at the end of the year Col. (1+4+8)\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\n8\n8\n9\n9\n10\n10\n11\n11\nNO. VIII - STATEMENT OF TARIFFS AND DIVIDENDS CONTROL RESERVE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 20.......\nParticulars Balance at the beginning of the year Appropriated during the year Withdrawn during the year\n(purpose to be indicated in the remarks column) Balance at the end of the year Remarks 1 2 3 4 5 6\nParticulars\nParticulars\nBalance at the beginning of the year\nBalance at the beginning of the year\nAppropriated during the year\nAppropriated during the year\nWithdrawn during the year\n(purpose to be indicated in the remarks column)\nWithdrawn during the year\n(purpose to be indicated in the remarks column)\nBalance at the end of the year\nBalance at the end of the year\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nNO. IX STATEMENT CONSUMER'S REBATE RESERVE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 20......\nParticulars Balance at the beginning of the year Distributed to consumers during the year under paragraph II(I) of the Sixth Schedule to the Electricity\n(Supply) Act, 1948 Appropriated during the year Balance at the end of the year Remarks 1 2 3 4 5 6\nParticulars\nParticulars\nBalance at the beginning of the year\nBalance at the beginning of the year\nDistributed to consumers during the year under paragraph II(I) of the Sixth Schedule to the Electricity\n(Supply) Act, 1948\nDistributed to consumers during the year under paragraph II(I) of the Sixth Schedule to the Electricity\n(Supply) Act, 1948\nAppropriated during the year\nAppropriated during the year\nBalance at the end of the year\nBalance at the end of the year\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nNO. X - STATEMENT OF SPECIAL APPROPRIATIONS PERMITTED BY STATE GOVERNMENT FOR THE YEAR ENDED 31ST MARCH, 20......\nParticulars giving reference to the sanction of the State Government permitting the appropriation Balance at the beginning of the year Additions by way of appropriation during the year Transfer by way of re-appropriation during the year (details to be given in the remarks column) Balance at the end of the year Remarks 1 2 3 4 5 6\nParticulars giving reference to the sanction of the State Government permitting the appropriation\nParticulars giving reference to the sanction of the State Government permitting the appropriation\nBalance at the beginning of the year\nBalance at the beginning of the year\nAdditions by way of appropriation during the year\nAdditions by way of appropriation during the year\nTransfer by way of re-appropriation during the year (details to be given in the remarks column)\nTransfer by way of re-appropriation during the year (details to be given in the remarks column)\nBalance at the end of the year\nBalance at the end of the year\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nNO. XI - STATEMENT OF NET REVENUE AND APPROPRIATIONS ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 20....\nCorresponding figures of the previous year Particulars Amount Corresponding figures of previous year Particulars Amount 1 2 3 4 5 6 1. To Balance of loss brought forward from last account. 1. By Balance of profit brought forward from last account. 2. To net operating deficit, as per Statement III. 2. By net operating surplus as per Statement-III. 3. To appropriations (applicable to local Authority Licensee only):- 3. By interest on securities investments. (a) Interest on loan capital. (b) Instalment of redemption of loan capital, as per (Col. 8\nof St. I-A(1). (c) General Rates. 4. (a) Provision for taxes on Income and profit for the year____________ Rs______________ 4. By other receipts (non-operating) e.g.\nrents-Less outgoing not otherwise provided for transfer fee etc., (to be specified.) (b) Additional short provision in respect of year 20_________________ Rs._______________ 5. To instalments of write-down in respect of intangible assets. 5. Adjustment in respect of excess provision of income-tax. 6. To instalment of contribution towards arrears of Depreciation as per Statement V-Column 6. 6. By Balance of loss carried over. 7. To contribution towards Contingencies Reserve as per Statement VI-Column 3. 8. To appropriation towards development Reserve as per Statement VII-Column 4 or 8 or 4+8. 9. To appropriation to Tariffs and Dividends Controls Reserve, as per Statement VIII-Column 3. 10. To appropriation to Consumers'\nRebate Reserve, as per Statement IX column 4. 11. To other special appropriation permitted by the State Government, as per Statement X- Column 3. 12. To appropriation towards interest paid and accrued and dividends paid and payable:- (a) Interest on debentures. (b)\nInterest on loans borrowed from an Organisation or Institution approved by the State Government. (c) Interest on other secured loans. (d) Interest on unsecured loans, advances, deposits, bank over-drafts, etc (e) Dividends on preference share capital. (f) Dividends on ordinary share capital. To balance of profit carried over.\nCorresponding figures of the previous year\nCorresponding figures of the previous year\nParticulars\nParticulars\nAmount\nAmount\nCorresponding figures of previous year\nCorresponding figures of previous year\nParticulars\nParticulars\nAmount\nAmount\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n(a) Interest on loan capital.\n(b) Instalment of redemption of loan capital, as per (Col. 8\nof St. I-A(1).\n(c) General Rates.\n(a) Interest on debentures.\n(b)\nInterest on loans borrowed from an Organisation or Institution approved by the State Government.\n(c) Interest on other secured loans.\n(d) Interest on unsecured loans, advances, deposits, bank over-drafts, etc\n(e) Dividends on preference share capital.\n(f) Dividends on ordinary share capital. To balance of profit carried over.\nNO. XII - GENERAL BALANCE SHEET AS ON 31ST MARCH, 20.......................\nCorresponding figures of the previous year Particulars Amount Corresponding figures of the previous year Particulars Amount 1 2 3 4 5 6 1. Capital raised and appropriated vide Statement-I or I-A. 1. Capital amount expended on works in use-Statement-II. Reserve and Surplus. Less-Accumulated provisions for depreciation-Statement V Net Block. 2. Non-statutory Reserve. 2. Balance of written down cost of obsolete, inadequate etc. assets-Statement IIA. Current Assets. 3. Contingencies Reserve Fund, as per Statement No. VI. 3. Capital Works in progress. 4. Development Reserve as per Statement VII. 4. Stores and materials in hand- (a) Fuel-Coal and/or etc. at cost. (b) General stores at or below cost. 5. Tariffs & Dividends Control Reserve, as per Statement VIII. 5. Debtors for amounts paid in advance on account of contracts. 6. Consumers' Rebate Reserve as per Statement IX. 6. Sundry debtors for electricity supplied. 7. Special appropriations (as permitted by the State Government) reserve as per Statement X. 7. Other debtors (as per the Schedule attached). 8. Balance of Net Revenue and Appropriations Account as per Statement XI. 8. Accounts receivable (to be specified). Current Liabilities and Provisions. 9. Balances due on construction of Plant, Machinery, etc. 9. Investments in statutory securities of cost. (a) Contingencies Reserve Fund Investment. (Market value on closing date). (b) Depreciation Reserve Fund Investment. (Market value on closing date). (c) Other investments. (Market value on closing date). 10. Creditors of open accounts (as per schedule attached). 10. Special investments. (a)\nIn respect of taxation. (b) Others (to be specified). 11. Consumers' Security deposits: 11. Balance at Bank: (i) In Cash Rs................................... (a)\nDeposit account. (ii) In Securities Rs............................ (b) Current account and at call. 12. Accounts payable (to be specified). 12. Cash in hand Debits Balances. 13. Temporary accommodations, Bank overdrafts and other finances. 13. Net Revenue and Appropriations Account balance at debit thereof Statement XI. 14. Other current and accrued liabilities (to be specified). 14. Deferred payments.\nCorresponding figures of the previous year\nCorresponding figures of the previous year\nParticulars\nParticulars\nAmount\nAmount\nCorresponding figures of the previous year\nCorresponding figures of the previous year\nParticulars\nParticulars\nAmount\nAmount\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\nReserve and Surplus.\nLess-Accumulated provisions for depreciation-Statement V\nNet Block.\nCurrent Assets.\n(a) Fuel-Coal and/or etc. at cost.\n(b) General stores at or below cost.\nCurrent Liabilities and Provisions.\n(a) Contingencies Reserve Fund Investment. (Market value on closing date).\n(b) Depreciation Reserve Fund Investment. (Market value on closing date).\n(c) Other investments. (Market value on closing date).\n(a)\nIn respect of taxation.\n(b) Others (to be specified).\n(i) In Cash Rs...................................\n(a)\nDeposit account.\n(ii) In Securities Rs............................\n(b) Current account and at call.\nNote\nANNUXURE VI\n(See Rule 27)\nModel Form Of Draff Conditions Of Supply\nPART - I\nPART - I\n(a) \"The Act\" means the Indian Electricity Act, 1910 as in force from time to time.\n(b) \"Licensee\" means................\n(c) \"Consumer\" means any person who is supplied with energy by the incensee or whose premises are for the time being connected for the purpose of supply of energy with the works of the licensee.\n(d) \"Date of presentation\" means the second day after the date of any bill rendered by the licensee.\nApplication and agreement for supply\n(b) If the supply is required for motors the applicant shall state the purpose for which the motors are required.\nNotice before connection\nNotice for fixing the position of service, meter, etc.\nQuotations, etc., for laying-Service lines\nNote\n(b) If a consumer desires to have the position of the existing service line altered the licensee shall carry out the work and charge the consumer the cost of the additional material used and the labour employed plus 15 percent of the later as supervision charges\n(c) Service lines for temporary illumination shall be laid by the licensee where possible and the cost incurred in laying and removing such service lines as determined in the manner laid down in clause (b) above shall be paid by the consumer.\n(d) Where any difference or dispute arises as to the cost of fixing of the position of service lines, the matter shall be referred to the Electrical Inspector for and shall be decided by him.\n(e) A consumer requiring high voltage supply must provide and maintain at his expense a locked and weather proof enclosure of agreed design, for the purposes of housing the licensees metering equipment. Such an enclosure may be used by the consumer for his own similar metering equipment but for no other purposes.\nService Lines\nConsumer not to interfere with the supply mains or apparatus\nWriting on consumer's premises\nApparatus on consumer's premises\n(b) In the case of high voltage consumers, suitable protective devices approved by the licensee shall be used so as to afford full protection to the licensee's apparatus placed on the consumer's premises.\nProcedure for testing installation by licensee and fee\n(b) No connection shall be made until the consumer's installation has been inspected and tested by the licensee and found satisfactory No charge shall be made for the first test made by the licensee but subsequent tests due to faults disclosed at the initial test shall be charged for in accordance with part III of these conditions. Periodical tests of the installation will also be undertaken by the licensee at rates that may be ascertained from his local office.\n(c) Before taking the insulation test of the installation the wiring must be completed in all respects. All fittings, whether incandescent lamps, fans, motors, heating, cooking or other apparatus, must be connected to the conductors and all fuses must be in place and all switches switched in the `on' position before the tests are carried out. Temporary wires or fittings or dead ends should not be included in the installation and no part of the work should be left incomplete.\n(d) A pressure of 500 volts will be applied between installation and \"earth\" and the insulation resistance to earth after one minute's electrification shall be such as will not cause a leakage from the installation exceeding one five thousand part of the maximum current demanded.\n(e) The test between the poles should give at least half the result of that to \"earth\". (o Manufacturer's test certificates in respect of all high voltage apparatus shall be produced if required by the licensee.\nExtensions and alterations\nFailure of supply\n(b) The licensee shall not be liable for any claims for loss, damage or compensation whatsoever arising out of failure of supply when such failure is due either directly or indirectly to war, mutiny, civil commotion, riot, strike, lock-out, fire, tempest lightning, earthquake or other force, accident or cause beyond his control.\nAccess to premises and apparatus\nSecurity Deposit\nMethod of charging for current\n(b) Unless specified otherwise all rates refer to one point supply.\nPayment of bills\n(a) Bills should be paid at the licensees local office within 15 days from the date of their presentation.\n(b) Any complaints with regard to the accuracy of the bills shall be made in writing to the licensee and the amounts of such bills shall be paid under protest within the said period of 15 days. The amounts of bills paid under protest will be regarded as advance to the credit of the consumer's account until such time as the bills in dispute have been fully settled.\n(c) If the consumer fails to pay any bills presented to him within the said period of 15 days, the licensee shall be at liberty to take action under sub-section (1) of section 24 of the Act and to cut-off the supply after giving such consumer not less than 7 clear days' notice in writing without prejudice to his right to recover the amount of the bill by suit. Where, however, any difference or dispute has been referred under the Act to the Electrical Inspector for... before notice aforesaid has been given by the licensee, the licensee shall not be at liberty to cut-off the supply for failure to pay the bill except where the licensee has made a request in writing to the consumer that the amount in dispute should be deposited with the said Electrical Inspector and the consumer has failed to comply with such request.\nNotice of removal\n(b) Consumers leaving the station for a period exceeding two months and closing their houses while away, or those houses remain closed and unoccupied owing to non-tenancy for the same period are requested to inform the licensee before-hand so that the meters installed at the premises may be read, installations disconnected and the licensee's property removed if agreed to between the licensee and the consumer or otherwise to notify the licensee where the key can be obtained to enable the licensee's engineer to remove, the fuses whenever it is desired to test the distribution mains in the consumer's district. In such cases consumers will not be charged the monthly minimum provided that: -\n(i) The rental of meter or meters of the licensee shall be paid so long as they remain on the consumer's premises if the meters are removed, the charges as provided for in Part III will be payable for removing and re-fixing the meters;\n(ii) The consumer agrees to the extension of the term of the agreement by the period by which the monthly minimum charge has been waived if the period, of his contract had not expired;\n(iii) A reconnection fee as provided in part III is paid before reconnection. Should the consumer require reconnection before the expiry of two months, both the reconnection fee and the monthly minimum charge will have, to be paid by the consumer. The life of the contract will not be extended in such cases.\n(c) When a consumer, leaves his installation connected to the licensee's mains, but locks up the meter or otherwise makes it inaccessible for reading by the employees of the licensee, for the first month of such inaccessibility the consumer will be charged the monthly minimum. If in the next month the meter is accessible for reading, the consumer will be charged the actual consumption less the above minimum, but subject to the monthly minimum. If on the other hand the meter remains inaccessible in the second month also the consumer will be served with 24 hours' notice (section 20 of the Act) to open his premises for the reading of the meter by any employee of the licensee at a fixed time and date; the meter is now made available for reading, the consumer will be charged the actual consumption less the minimum charged or paid for the first month of inaccessibility subject to monthly minimum. If the meter remains inaccessible even after 24 hours' notice, the premises will be disconnected. For that month also the monthly minimum charge will be charged to the consumer. If the meter is made accessible subsequent to the disconnection for purposes of reading the meter and settling accounts or for reconnection of the service, as the case may be the consumer will be charged the actual consumption less the two minima or paid for the two months of inaccessibility subject to the proportionate minimum for the period of inaccessibility of the meter upto the time of disconnection. If the consumer applies for reconnection, fees under clause B.I of part III of these conditions will be collected before reconnection\nAccuracy of meters\nDiscontinuance of Supply\n(b) The licensee shall not be bound to give or continue the supply if the Electrical Inspector for................ or other competent person appointed by the................ Government is satisfied that the electric supply-lines, fittings, works or any other apparatus within the said premises are not in good order and condition and are likely to effect injuriously the use of energy by the licensee or by other persons.\n(c) Any consumer who after having been duly notified, refuses to permit or fails to give an authorised representative of the licensee, reasonable facilities to enter any premises to which energy is, or has been supplied for the purpose of testing or inspecting the installation of the consumer, shall be liable to have the electricity supply discontinued after the expiry of 24 hours' notice in writing in accordance with section 20 of the Act.\n(i) Low voltage Direct current two wire or Alternating current single phase 50 cycles;\n(ii) Medium voltage- Direct current three wire or Alternating current three phase 50 cycles;\n(iii) High voltage- Alternating current three phase 50 cycles.]\n(a) Two wire single phase, 230 volts-\n(i) General supply not exceeding 10 amperes.\n(ii) Motive power installations upto I BHP in aggregate.\n(b) Four-wire, three phase, 230 volts between phase wires and neutral general supply exceeding 10 amperes.\n(c) Three-wire, three phase, 400 volts between phases- Motive general supply exceeding 10 amperes.\n(i) General supply not exceeding 10 amperes.\n(ii) Motive power installations upto I BHP in aggregate.\n(b) Three-wire 460 volts between outers- Motive power installations of over 1 BHP.\nGeneral Wiring Conditions\n(b) Switches and Fuses - The consumer shall provide linked quick break main switches and a single pole fuse on each conductor except the neutral conductor which shall be fixed as near as possible to the licensee' meter board.\nSwitches and Fuses\n(c) Balance of installation - If the connected load of any installation exceeds 10 amperes at 230 volts, the installation shall be wired on the group system separate neutral wires being brought back in each case to the licensee's point of supply An approved type of double pole linked switch shall control each main circuit. The lamps, fans or any other apparatus of which the installation consists shall be so grouped that under normal working conditions the current will be balanced and no current will be following in the neutral wire.\nBalance of installation\n(d) Medium voltage supply - With medium voltage supply, i.e., above 250 volts and upto 650 volts, the licensee's meter and service cut-outs shall be enclosed in a strong teakwood box suitably ventilated and provided with a hasp staple and lock. All wires between which a difference of potential of over 250 volts exists shall be made inaccessible to unauthorised persons or enclosed in an earthed metallic casing or conduit. A \"Caution\" Board printed in Hindi and the local language of the district shall be fixed thereto.\nMedium voltage supply\n(e) Overhead Mains - In order to save the expense of a long underground service on private property, a consumer may, with the licensee's approval erect a pillar on that portion of his property which is nearest to the licensee's supply mains into which the service shall be laid and from which the consumer shall run overhead mains to his premises. These overhead mains shall constitute a portion of his installation and shall be laid in compliance with the Indian Electricity Rules in force from time to time. An efficient chocking coil and lightning arrestor maybe fixed at the commencement of the overhead line at the consumer's cost should be desire the same, as an additional protection for his installation.\nOverhead Mains\n(f) Earthing - Gas pipes shall on no account be used for earthing purposes.\nEarthing\n(g) Domestic heating and cooking - A special circuit for heating and cooking shall be run from the licensee's point of supply Wall plugs used on these circuits shall be of the three pin type, the third pin being an earth connection. Two pin plugs or lighting sockets shall not be allowed. All appliances used in the bathroom for heating or washing purposes or in any damp location must be effectively earthed.\nDomestic heating and cooking\n(h) Plugs - All plugs shall be switched on the live wire and not on the neutral.\nPlugs\n(i) Wiring - Single leads shall not be allowed to be run separately in iron conduit.\nWiring\n(j) A.C. Motor installation - Motors shall be provide with control gear so as to prevent satisfactorily the maximum current demand from the consumer's installation exceeding the limits given in the following schedule at any time under all possible conditions. Failure to comply with these regulations will render the consumer liable to disconnection from the supply on account of interference with the supply to other consumers :-\nA.C. Motor installation\nNature of supply Size of installation Limit of maximum current demanded Single phase Upto and including 1 BHP Six times full load current. Three Phase Above 1 BHP and upto and including 10 BHP Three times full load current. Above 10 BHP and upto and including 15 BHP Twice full load current. Above 15 BHP One and a half time full load current.\nNature of supply\nNature of supply\nSize of installation\nSize of installation\nLimit of maximum current demanded\nLimit of maximum current demanded\nSingle phase\nUpto and including 1 BHP\nSix times full load current.\nThree Phase\nAbove 1 BHP and upto and including 10 BHP\nThree times full load current.\nAbove 10 BHP and upto and including 15 BHP\nTwice full load current.\nAbove 15 BHP\nOne and a half time full load current.\n(k) Power Factor of Apparatus - The apparatus shall have a power factor of not less than 85 per cent at normal working load.\nPower Factor of Apparatus\nSaving rights\nPART - II\nPART - II\nSchedule Of Rules\n(To be filled in by the licensee)\nPART - III\nPART - III\nSchedule Of Service & Miscellaneous Charges\nA. Charges for service line\nB. Miscellaneous Charges\nItem No. Name of charges Amount of charges 1 2 3\nItem No.\nItem No.\nName of charges\nName of charges\nAmount of charges\nAmount of charges\n1\n1\n2\n2\n3\n3\n(a) For installations upto 11 KW-\n(i) At cut outs,\n(ii) At overhead mains,\n(iii) At underground mains.\n(b) For installations over 10 KW 25 per cent added to the charges under item A above.\n(c) If the same consumer is reconnected within 12 months of the date of last reconnection, 50 per cent will be added to the charges under items (a) and (b) above.\n(a) Hire of meter, where it is the property of licensee, per meter per-mensem-\n(i) A.C. Single phase meter\n(ii) A.C. Polyphase meter\n(iii) Demand for special type meter.\n(b) Removing of meter at consumer's request.\n(c) Re-fixing of meter at consumer's request.\n(d) Changing meter for one of higher capacity only at the request of the consumer.\n(a) Installations-\n(i) The first test and inspection will be carried out free of charge but should any further test or inspection be necessitated by faults in the installation or by non-compliance with the conditions of supply per extra test or inspection.\n(ii) Periodical testing at consumer's request, per test.\n(b) Meters-\n(i) A.C. Single phase meter\n(ii) A.C. polyphase meter\n(iii) Demand or special type meter.\n(i) Licensees's fuse.\n(ii) Consumer's fuse.\nNote\nNote\n(ii) The dispute between the consumer and the licensee regarding accuracy of meter or any other indicator maybe referred by either party to the Electrical Inspector for settlement.\nAPPENDIX \"A\"\nAPPLICATION AND AGREEMENT FOR ELECTRICAL SUPPLY FOR DOMESTIC/INDUSTRIAL PURPOSE\nConnection No.\nSignature of applicant\nPresent address\nSignature & address of witness.\nAccepted on behalf of.................... Electric Supply Co. Ltd.\nSignature\nElectrical Engineer/Secretary/Manager\nANNEXURE VII\n(See rule 28)\nForm Of Requisition Under Clause V (4) Of The Schedule To The Act\nANNEXURE VIII\n(See rule 28)\nForm Of Requisition For Supply Of Energy Under Clause Vi (5) Of The Schedule To The Act\nStreet Town Village or Taluka\nStreet\nTown\nVillage or Taluka\nA.\nDomestic or Residential: No. of points Wattage Total Wattage.\nA.\nDomestic or Residential: No. of points\nWattage\nTotal Wattage.\n(a) Lights and Fans.\n(b) Heating and Small Power.\n(a) Lights and Fans.\n(b) Heating and Small Power.\nMotor and/or apparatus No.\nof points H.P.\n& K.W. Total H.P. & K.W. Purpose\nMotor and/or apparatus\nNo.\nof points\nH.P.\n& K.W.\nTotal H.P. & K.W.\nPurpose\n(a) Low Voltage\n(b) Medium Voltage\n(c) High Voltage\n(1) Anew service.\n(2) A sub-service from one existing service.\nApplicant's signature\nPresent address:\nDated....................................\nNotes.\n(a) Within fourteen' days after the service on him by the licensee of a notice in writing in this behalf, tenders to the licensee a written contract in the form, approved by the State Government duly executed and with sufficient security binding himself to take the supply of energy for not less than two years to such amount as will assure to the licensee at the current rates charged by him, an annual revenue not exceeding 15 percentum of the cost of the service line required to comply with the requisition; and\n(b) If required by the licensee so to do, pays to the licensee the cost of so much of any service line as may be laid down or placed for the purposes of the supply upon the property in respect of which the requisition is made, and of so much of any service line as it may be necessary for the 6 said purposes to lay down or place beyond 30 metres from the licensee's distributing mains, although not on that property.\nDeclaration\nNote\nANNEXURE IX\nForm Of Order Under Sub-Rule (4) Of Rules 5, or Sub-Rule (2) Of Rule 46]\nSupplier, consumer, owner, or occupier 1. Whereas the installation was inspected on ........................and whereas it appears to me that you have not complied with rules of the Indian Electricity Rules, 1956, in the following respect* namely............... you are hereby called upon to comply with the said rule (s) on or before...............day of 20....... and to report compliance in writing to me.]\nowner, or occupier\nSignature\nElectrical Inspector,\nOfficer appointed under sub-rule (4) of rule 5\nANNEXURE IX-A\n(See Rule 46)\nModel Forms Of Inspection Report\nFORM I\nFORM I\nInspection Report\n(Under Rule 46 of the Indian Electricity Rules, 1956)\nLow Voltage Installation of Consumer\n(i) Volts........................................\n(ii) No. of Phases....................................\n(iii) AC/DC....................................\n(1) Light Points................................................................................................\n(2) Fan Points................................................................................................\n(3) Plug Points................................................\n(1)................................................\n(2)................................................\n(1)................................................................................................\n(2)................................................................................................\nRule of the Indian Electricity Rules, 1956 Requirement Report 1 2 3\nRule of the Indian Electricity Rules, 1956\nRule of the Indian Electricity Rules, 1956\nRequirement\nRequirement\nReport\nReport\n1\n1\n2\n2\n3\n3\n(ii) Condition of flexible cords, sockets, switches, plug-pins, cut-outs and lamp holders and such other fittings.\n(iii) General condition of wiring.\n(iv) State if any unauthorised temporary installation exists.\n(v) State if sockets are controlled by individual switches.\n(vi) Any other defect or condition which may be a source of danger.\n(ii) State if indication of a permanent nature is provided as per this rule so as to distinguish neutral conductor from the live conductor.\n(iii) Whether a direct line is provided on the neutral in the case of single phase double pole iron clad switches instead of fuse?\n(ii) Have three pin plugs been provided for plug points?\n(iii) Report on the efficiency of the earthing arrangement.\n(ii) State if the wiring is divided in suitable number of circuits and each such circuit is protected by suitable cut-out.\n(iii) State if supply to each motor or apparatus is controlled by suitable linked switch.\n(iv) Has it been ensured that no live part is so accessible as to cause danger?\n(ii) Is the earth wire free from any mechanical damage?\n(iii) In the case of conduit/lead covered wiring, has the conduit or lead cover been efficiently earthed?\n(iv) If the consumer has him own earth-electrode, state if it is properly executed and has been tested with satisfactory results.\n(ii) Is there any other overhead line near the premises of the consumer which does not comply with rule 79 or 80?\n(iii) Is guarding provided for overhead lines, if it is inside the factory, for road crossings and busy localities?\n(iv) Any other remarks.\nInspecting Officer's Signature............................\nName.........................................\nDesignation........................................\nFile No...........................................\nSignature..............................\nName...............................................\nFORM II\nFORM II\nInspection Report\n(Under rule 46 of the Indian Electricity Rules, 1956)\n(Medium voltage installations of a consumer)\n(i) Volts....................................................\n(ii) No. of phases....................................................\n(iii) AC/DC....................................................\nMake No. H.P Amps. Voltage (1) _________________________________________________________________________________________________________________________________ (2) _________________________________________________________________________________________________________________________________ (3) _________________________________________________________________________________________________________________________________ (4) _________________________________________________________________________________________________________________________________ (5) _________________________________________________________________________________________________________________________________ II. Other equipment (complete details to be furnished):_______________________________________________________________________________________ (1) _________________________________________________________________________________________________________________________________ (2) _________________________________________________________________________________________________________________________________ (3) _________________________________________________________________________________________________________________________________ Total connected load h.p./KVA _______________________________________________________________________________________________________ III. Generators (in the case of consumer himself generating energy): (1) _________________________________________________________________________________________________________________________________ (2) _________________________________________________________________________________________________________________________________ (3) _________________________________________________________________________________________________________________________________ 7. General condition of the installation:\nMake\nMake\nNo.\nNo.\nH.P\nH.P\nAmps.\nAmps.\nVoltage\nVoltage\nTotal connected load h.p./KVA _______________________________________________________________________________________________________\nRule of the Indian Electricity Rules, 1956 Requirements Reports 1 2 3\nRule of the Indian Electricity Rules, 1956\nRule of the Indian Electricity Rules, 1956\nRequirements\nRequirements\nReports\nReports\n1\n1\n2\n2\n3\n3\n(ii) State if any unauthorised temporary installation exist.\n(iii) Are the electric supply lines and apparatus so installed, protected, worked and maintained as to prevent danger?\n(iv) Any other general remarks.\n(ii) State if indication of a permanent nature is provided as per this rule so as to distinguish neutral conductor from live conductor.\n(iii) Whether a direct link is provided on the neutral in the case of single phase double pole iron-clad switches instead of fuse?\n(ii) Is the Consumer's separate earth efficient?\n(iii) Report on the efficiency of the earthing arrangement.\n(ii) Whether readily accessible switches have been provided for rendering them dead?\n(iii) Whether any other safety measures are considered necessary?\n(ii) Are the authorised persons able to apply instructions for resuscitation of persons suffering from electric shock?\n(ii) Whether every distinct circuit is protected against excess energy by means of a suitable circuit breaker or cut-out?\n(iii) State if a suitable linked switch or circuit breaker is provided near each motor or apparatus for controlling supply to the motor or apparatus.\n(iv) State if adequate precautions are taken to ensure that no live parts are so exposed as to cause danger.\n(ii)(a) State whether clear space of 90 cm is provided in front of the main switch board.\n(b) State whether the space behind the switch board exceeds 75 cm in width or is less than 23 cm.\n(c) In case the clear space behind the switch-board exceeds 75 cm. state whether a passage way from either end of the switch-board to a height of 1.80 metres is provided.\n(ii) Have the frame of every generator, stationary motor and so far as practicable portable motor and the metallic parts (not intended as conductors) of all transformers and any other apparatus used for regulating or controlling energy and all medium voltage energy consuming apparatus been earthed by two separate and distinct connections with earth? (iii) Have the metal casings or metallic coverings containing or protecting any electric supply line or apparatus been properly earthed and so joined and connected across all junction boxes as to make good mechanical and electrical connection ? (iv) State if the consumer's earth electrode is properly executed and has been tested with satisfactory results. (v) Is the earth wire free from any mechanical damage? 73 to 93. Overhead Lines:\n(iii) Have the metal casings or metallic coverings containing or protecting any electric supply line or apparatus been properly earthed and so joined and connected across all junction boxes as to make good mechanical and electrical connection ?\n(iv) State if the consumer's earth electrode is properly executed and has been tested with satisfactory results.\n(v) Is the earth wire free from any mechanical damage?\n(ii) Is there any other overhead line near the premises of the consumer which does not comply with rule 79 or 80?\n(iii) Is guarding provided for overhead lines if it is inside the factory, for road crossings and busy localities?\n(iv) Any other remarks.\nInspecting Officer's Signature.........................\nName:..................................................\nDesignation:...........................................\nFile No................................................\nFORM III\nFORM III\nInspection Report\n(Under rule 46 of the Indian Electricity Rules, 1956)\nHigh and Extra-high Voltage Installation of a Consumer\n(i) Volts.................................\n(ii) No. of phases.......................\n(iii) AC/DC.......................\nMake No. H.P Amps. Voltage (1)\n_________________________________________________________________________________________________________________________________ (2)\n_________________________________________________________________________________________________________________________________ (3)\n_________________________________________________________________________________________________________________________________ II. Transformers :\nMake\nMake\nNo.\nNo.\nH.P\nH.P\nAmps.\nAmps.\nVoltage\nVoltage\nMake No. KVA Power Factor Voltage H.V. L.V. (1)\n_________________________________________________________________________________________________________________________________ (2)\n_________________________________________________________________________________________________________________________________ (3)\n_________________________________________________________________________________________________________________________________ III. Other equipment (complete details to be furnished): (1)\n_________________________________________________________________________________________________________________________________ (2)\n_________________________________________________________________________________________________________________________________ (3)\n_________________________________________________________________________________________________________________________________ Total capacity in h.p./KVA)\n_____________________________________________________________________________________________________________ IV Generators (in the case of consumer himself generating energy): (1)\n_________________________________________________________________________________________________________________________________ (2)\n_________________________________________________________________________________________________________________________________ 7. General condition of the installations: Rule of the Indian Electricity Rules, 1956 Requirements Report 1 2 3\nMake\nMake\nNo.\nNo.\nKVA\nKVA\nPower\nPower\nFactor\nFactor\nVoltage\nVoltage\nH.V. L.V.\nH.V. L.V.\nRule of the Indian Electricity Rules, 1956\nRule of the Indian Electricity Rules, 1956\nRequirements\nRequirements\nReport\nReport\n1\n1\n2\n2\n3\n3\n(ii) Whether the authorised persons are competent for the work assigned to them?\n(ii) State if any unauthorised temporary installation exists.\n(iii) Whether the H.V motors and controlling equipment are being over hauled periodically and record kept of the same in a register?\n(iv) Whether the transformer oil samples are being tested periodically and results recorded in a register?\n(v) Whether suitable lightning arrestors have been provided near the transformers for protection against lightning?\n(vi) Whether earth resistance is being measured periodically and results recorded in a register?\n(vii) Any other defect or condition which may be source of danger.\n(viii) Any other general remarks.\n(ii) Is the consumer's separate earth efficient? (State the earth resistance, if measured).\n(iii) Report on the efficiency of the earthing arrangement.\n(ii) Whether readily accessible switches have been provided for rendering them dead?\n(iii) Whether any other safety measures are considered necessary?\n(ii) State if First Aid Boxes or Cupboards conspicuously marked and properly equipped are provided and maintained.\n(iii)Is some staff trained in First Aid Treatment?\n(ii) Are the authorised persons able to apply instructions for resuscitation of persons suffering from electric shock?\n(ii) Is there a suitable linked switch or a circuit breaker to carry and break the full load current on the secondary side of a transformer?\n(iii) Whether every distinct circuit is protected against excess energy by means of a suitable circuit breaker or cut-outs?\n(iv) State if a suitable linked switch or circuit breaker is provided near the High Voltage motor or other apparatus for controlling supply to the motor or apparatus.\n(v) State if adequate precautions are taken to ensure that no live parts are so exposed as to cause danger.\n(ii) (a) State whether clear space of 90 cm is provided in front of the main switch-board.\n(b) State whether the space behind the switch-board exceeds 75 cm. in width or is less than 23 cm.\n(c) In case the clear space behind the switch-board exceeds 75 cm state whether a passage way from either end of the switch board to a height of 1.80 meters is provided.\n(ii) State if all windings of motors or other apparatus are suitably protected.\n(iii) State the method adopted to guard lower voltage circuits in transformers becoming accidentally charged above its/their normal voltage.\n(iv) State in case of transformers or switches or static condensers involving the use of more than 2,275 litres of oil in one chamber, if suitable oil soak pits are provided.\n(v) Where 9,000 litres or more of oil is used in any one oil tank, has provision been made for draining away or removal of oil which may leak or escape from such tank(s)?\n(vi) State if trenches inside sub-station containing cables are filled with noninflammable material or completely covered with noninflammable slabs.\n(vii) Are conductors and apparatus so arranged that they may be made dead in sections for carrying out work thereon?\n(ii) Is the earth-wire free from any mechanical damage?\n(iii) Have two separate and distinct connections with earth, each having its own electrode, been provided for the earth neutral point?\n(iv) Have the metal casings or' metallic coverings containing or protecting any electric supply line or apparatus been properly earthed and so joined and connected across all junctions boxes as to make good mechanical and electrical connections throughout their whole length?\n(ii) Has hand-rail been provided and connected with earth (if metallic and if sub-station has not been erected on wooden supports)?\n(ii) On the basis of maximum deflection due to wind pressure, are horizontal clearances between the nearest conductor and any part of such building as per this rule? 81. Where conductors forming parts of system at different voltages are erected on the same supports, has adequate provision been made to guard against danger to linemen and others from the lower voltage system being charged above its normal working voltage by leakage from or contact with the higher voltage system?\n(ii) What is the type and size of guard wire?\n(ii) Has each stay-wire (except in case where an insulator has been placed in it at a height not less than 3 metres from the ground) been similarly earthed?\n(ii) Whether anti climbing devices have been provided for each of the high voltage and extra high voltage supports?\n(ii) Has earthing lead from the lightning arrestors been connected to a separate earth electrode?\nInspecting Officer's Signature........................\nName.............................................................\nDesignation.......................................................\nFile No.............................................................\nANNUXURE X\nForm Of Annual Return For Mines\n(See rule 111)\nPART A\nPART A\nState\nDistrict\nPART B\nPART B\nLighting\nPower\nPOWER (a)\nOn Surface Type H.P/K.W. of Motor/apparatus and voltage Type of control Gear Location Purpose for which used (b)\nIn Mine Type H.P/K.W. of Motor/apparatus and voltage Type of control Gear Location Purpose for which used Ventilation Percentage of inflammable gas or vapour LIGHTING Type of light fitting Wattage Location Percentage of Inflammable gas or vapour\nPOWER\nPOWER\n(a)\nOn Surface\n(a)\nOn Surface\nType H.P/K.W. of Motor/apparatus and voltage\nType of control Gear\nLocation\nPurpose for which used\n(b)\nIn Mine\n(b)\nIn Mine\nType H.P/K.W. of Motor/apparatus and voltage\nType of control Gear\nLocation\nPurpose for which used\nVentilation\nPercentage of inflammable gas or vapour\nLIGHTING\nLIGHTING\nType of light fitting\nWattage\nLocation\nPercentage of Inflammable gas or vapour\nANNEXURE XI\n( See rule 111 )\nForm Of Annual Return For Oil-Fields\nPART A\nPART A\nYear ending.....................20......\nState\nDistrict\nPART B\nPART B\nLighting\nPower\n(a) On wells\n(a) On wells\nNo. of other identifying mark of well Drilling or pumping Type and H.P. of motor No. of lamps & type Other electrical appliances\nNo. of other identifying mark of well\nNo. of other identifying mark of well\nDrilling or pumping\nDrilling or pumping\nType and H.P. of motor\nType and H.P. of motor\nNo. of lamps & type\nNo. of lamps & type\nOther electrical appliances\nOther electrical appliances\n(b) Not on wells\n(b) Not on wells\nType and H.P. of motors Purpose for which used Identifying mark on map\nType and H.P. of motors\nPurpose for which used\nIdentifying mark on map\nAppliances Type and size in K.W. Purpose for which used Identifying mark on map\nAppliances\nAppliances\nType and size in K.W.\nType and size in K.W.\nPurpose for which used\nPurpose for which used\nIdentifying mark on map\nIdentifying mark on map\nANNEXURE XII\n[See sub-rule (5) of rule 131]\nLog Sheet For Mines And Oil-Fields\n(a) Condition of the insulation of the system.\n(b) Specified defects of insulation (particulars of each failure of apparatus should be given).\n(c) Accidents or dangerous occurrence (including any cases of electric shock and any cases of open sparking in apparatus in use in places where rule 126 applies).\n[(d) Disconnection and reconnection of the supply as required by rule 126 5(i) and (ii).]\n(e) Examination of earth fault detectors or recorders as provided by rule 116(3). Examinations of apparatus as provided by rule 131: -\n(i) Routine examinations as required by clause (a) of sub-rule (3) of rule 131.\n(ii) Special examination* as required by clause (b) of sub-rule (3) of rule 131.\nSigned\nExamined by\nNote\n[ANNEXURE XIII]\n(See rule 44-A)\nForm For Reporting Electrical Accidents\n(a) Human:\nSl . No. Name Father's Name Sex of victim Full postal address Approximate age Fatal/non-fatal 1 2 3 4 5 6 7\nSl . No.\nSl\n. No.\nName\nName\nFather's Name\nFather's Name\nSex of victim\nSex of victim\nFull postal address\nFull postal address\nApproximate age\nApproximate age\nFatal/non-fatal\nFatal/non-fatal\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n7\n7\nSl . No. Description of animal(s) Number(s) Name(s) of owner(s) Address(es) of owner(s) Fatal/non-fatal 1 2 3 4 5 6\nSl . No.\nSl\n. No.\nDescription of animal(s)\nDescription of animal(s)\nNumber(s)\nNumber(s)\nName(s) of owner(s)\nName(s) of owner(s)\nAddress(es) of owner(s)\nAddress(es) of owner(s)\nFatal/non-fatal\nFatal/non-fatal\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n6\n6\n(a) Designation of such person(s).\n(b) Brief description of the job undertaken, if any\n(c) Whether such person/persons was/were allowed to work on the job.\n(a) Did the victim(s) possess any electric workman's permit(s), supervisor's certificate of competency issued under rule 45? If yes give number and date of issue and the name of issuing authority.\n(b) Name and designation of the person who assigned the duties of the victim(s).\n(b) In case of fatal accident, was the post mortem performed?\nSignature ..................................\nName ........................................\nDesignation..................................\nAddress of the person reporting...................\n[ANNEXURE XIV]\n[See rule 3(2A)]\nGuidelines For Providing Training As Required Under Rule 3(2a)\n(1) (a) The training may be arranged in his own institute or any other institute established for this purpose.\n(b) Any institute where such training is arranged shall have been recognised by the Central Electricity Authority.\n(2) There shall be separate training courses for the persons to be engaged in operation and maintenance of thermal power stations and hydro power stations together with associated sub-stations. In respect of thermal stations, separate course may be arranged for the operating and supervisory staff and other skilled persons who are to assist them.\n(3) Refresher courses shall be arranged periodically for the persons who have already undergone training under para (2) above and those who have already sufficient experience in the operation and maintenance of a generating station and are engaged in its operation and maintenance under clause (b) of sub-rule 2(A) of rule 3 to familiarise with modern practices of operation and maintenance.\n(1) Thermal Power Stations - The duration of the training courses for the operating supervisory staff (both electrical and mechanical) shall not be less than 12 months. This shall include 186 hours of lectures as specified in Appendix-I to this Annexure followed by specialised lectures as specified in Appendix-II to this Annexure for the mechanical and electrical fields. The lectures may be arranged during the half day and the other half day shall be spent on observation by the trainees in the power stations to get familiarised with different sections of the power station- After the lecture course is completed the trainees should be taken on visits to a few modern power stations and factories manufacturing turbines, generators, switchgear, instrumentation and auxiliary equipments. The remaining period will be spent on in-plant training where the candidates will be given an opportunity to operate or maintain the machinery by themselves under close supervision of the regular operating staff as well as the training supervisors. Arrangements shall be made for familiarising the trainees with the operation of power stations, through simulator facilities.\nThermal Power Stations\n(2) The duration of the training course for the skilled person to assist the operators and supervisory staff in a thermal power stations shall not be less than nine months. This shall include 82 hours of lectures as specified in Appendix-Ill to this Annexure followed by specialised lectures as specified in Appendix IV. The lectures may be arranged during the half day and the other half day being spent on observation by the trainees in the power stations so that they get familiarized with different sections of the power station. After the later course is completed; the trainee shall be taken on visits to study a few modern power stations and factories manufacturing turbines, Generators, switch gear, instrumentation and auxiliary equipments. The remaining period will be spent on in-plant training under close supervision.\n(3) The duration of the training course for the operation and supervisory staff to work in hydro power stations shall not be less than nine months. This shall include 124 hours of lectures as specified in Appendix-V to this Annexure. The procedure for familiarization visits and in-plant training shall be similar to that which has been specified in respect of thermal power stations.\n(4) Those who are expected to be engaged in the operation and maintenance of the sub-station associated with the generating station shall be given a training of duration of not less than six months as specified in Appendix-VI to this Annexure. This shall be followed by visits and in-plant training.\n(5) The duration and contents of the refresher course shall be determined jointly by the owner of the generating station and the training institute.\nQualifications\nCreation of the Institute.\nANNEXURE XV\n[See rue 65(8)]\nForm For Failure Report In Respect Of Transformers/reactors Of 20 Mva And Above\n(Signature and name of\nInstallation Manager/Executive\nEngineer of the Installation)]\nANNEXURE XVI\n[See rule 80]\nAPPENDIX I\nSYLLABUS FOR THE OPERATING AND SUPERVISORY STAFF ENGAGED IN THE OPERATION AND MAINTENANCE OF THE THERMAL POWER STATIONS\n(General course for Electrical and Mechanical)\nItem No. Particulars Number of Hours 1 2 3 I Concept of modern Thermal Station: Central Station and utility systems, base load and peaking stations, concept of unit system, typical thermal cycles, parameters, heat rates, fuel rates, steam rates, typical heat balance of boiler, turbine and generator 4 II Choice of location of large thermal station Site availability, water requirements, fuel, load, centres, transport facilities, air pollution, topography, choice of size of generating units 3 III Plant lay out in large central station including machine arrangements, equipment layout and auxiliary arrangements 3 IV Constructional details of large pulverised fuel boilers and auxiliaries 16 (i) Water and steam drums, heaters and tubes. (ii)\nTypes of furnace and firing arrangements, burner details. (iii)\nEconomisers, primary, secondary, super heaters, re-heaters and attemperators. (iv)\nForced drought, Induced draught, Primary Air exhauster and gas recirculation fans, compressors. (v)\nTypes of coal mills (balls/recess, balltube, bowl roller) stoker, coal feeders. (vi)\nAir preheaters, Lunstorm, tubes, steam. (vii)\nDust extraction plant-electrostatic, mechanical. (viii)\nSoot blowers: steam/compressed air operated. (ix)\nStation compressed air system-reciprocating and rotary compressors. (x)\nOil handling and firing equipment. (xi)\nBoiler mountings, gauge glasses, safety valves, stop valves, startup devices, stampling, chemical dosing, continuous blow down. (xii)\nRefractories and laggings as used in modern power stations. V Turbine and auxiliaries, constructional details- 9 (i) Principle of operation, heat conversion cycles, types of turbines. (ii)\nCasing, steam chests, `Wheel blading, nozzles, diaphragms, glands, flanges and bolt heating, bearings. (iii)\nCondenser and vacuum extraction plant, ejectors. (iv)\nLubrication system, pumps, coolers, filters, shaft turbines and lifting gear (v)\nFeed water booster and extraction and cooling water pump. (vi)\nLow pressure and high pressure feed water heaters, de aerators and evaporators. (vii)\nHigh and low power by pass systems. (viii)\nOil purifications unit. VI Alternators and excitation systems- 6 (i) Constructional details of alternators, methods of cooling (Hydrogen/air cooling). (ii)\nMain and pilot exciters, voltage regulators, types and characteristics, amplidyne and magnetic amplifier. (iii)\nMethods of grounding. VII Coal handling plant: Tipples, hoppers, vibratory feeders and conveyors, crushers, magnetic separators and pulleys 6 VIII Ash and slag handling plant: Electrostatic precipitators, methods of conveying pneumatic, vaccumatic, hydraulic; bucket elevators conveyors, screw extractors 2 IX Water sources, treatment: Raw water pumping station, domestic, circulating and boiler make up water treatment, river salinity, local water conditions, their variations in different seasons and effects on power station operation 7 X (i) Fuels: Solid, liquid and gaseous fuels-analysis (ii)\nCoal-types and suitability for different kinds of boilers alterations in firing methods due to change of coal composition XI Basic flow diagrams in power station practice- 8 (i) Coal and fuel oil cycle (ii)\nAir and gas cycle (iii)\nFly ash and slag handling arrangements (iv)\nCondensate and feed heating cycle (from condenser hot well upto economiser) (v)\nSteam and water cycle (from economiser to turbine inlet). (vi)\nCirculating water cycle (vii)\nHydrogen filling in generator and hydrogen gland sealing of generator. (viii)\nBearing cooling system. XII Direct and closed cooling circuits, cooling towers, types and characteristics 2 XIII D.C. & A.C.\npower supply for auxiliaries arrangements of units and station boards, station lighting and automatic changeover 4 XIV Transformers: main transformers, interconnecting transformer, station/unit transformers, voltage grounding transformers, types of connections paralleling, tap changer gear 5 XV Out-door switch yard single line diagrams, bus bars, circuit breakers, isolators, current transformers, potential transformers, lightning arrestors, grounding 5 XVI Indoor and outdoor switchgear: types bulk oil, minimum oil, air blast, air break-constructional details 3 XVII Instrumentation and measurements: constructional details of measuring instruments for pressure, flow temperature, level, draught, vibration eccentricity, conductivity, pH value, differential expansion, oxygen analyser, current, power, reactive power, frequency, energy, winding temperature. 16 Auto-controllers, hydrogen purity meter. Axial shift indicator and recorder, flue gas analysers, Megger-its use for primary detection of faults XVIII Operation, control and supervision- 15 (i) General boiler start-up procedure. (ii)\nOperation of boilers under different loading conditions, soot blowing. (iii)\nBanking and preservation of boilers. (iv)\nDemonstration wherever possible through simulators of various operating conditions. (v) Handling of boiler under emergency conditions such as tripping of turbo-alternator set, high/low drum levels, flame failure, failure of supply to auxiliaries. (vi)\nGeneral start-up procedure for high pressure multicy under reheat type turbines froth cold, warm and hot conditions. (vii) Handling of turbine, generator and auxiliary plant under emergency conditions, such as vaccum failure, low feed water, condenser levels, excitation failure, circulating water failure, feed water heater high levels, excessive vibration, water or oil ingress in generator, failure of lubricating, sealing oil circuits. (viii)\nAlternator-synchronising, loading, parallel operations, MW & MVAR sharing. XIX Controls and Protection-sequential operation and interlocks :- (i) Boiler and auxiliaries 2 (ii)\nTurbines and auxiliaries. 2 (iii)\nCombustion control-pressure, fuel, air and feed heating cycle 2 (iv)\nAnalysis of feed and boiler water, fuel gas at station laboratory 4 (v)\nFeed water and feed heating cycle controls 2 (vi)\nTurbine governing, speed setting, speed drop setting and control circuits 3 (vii) Generator protection, under-voltage, over-voltage, differential, reverse power, under excitation, negative phase sequence, earth fault with types of the relays used 4 (viii)\nImportance of sequential inter-locks 2 (ix)\nTransformer protection-differential, overload, earth faults, high 4 (x)\nTypes of motors and variable speed-drive and speed controls 4 (xi)\nVarious types of pumps and their starting and control. 3 (xii)\nSteam temperature control 3 (xiii)\nFurnace purging 3 XX Fire fighting and multifier type protection 3 XXI General safety precautions, treatment of electrical or acid alkali burn, permit to work, first aid 2 XXII Indian Boiler Rules, Factory Act, Indian Electricity Act, 1910, Electricity (Supply) Act,\n1948, Indian Electricity Rules, 1956 and other statutory regulation concerning Power Stations (General outline) 4 XXIII General plant maintenance procedure, PERT/CPM Methods, Power Station records and calculation of efficiency 10 XXIV Various type of valves, traps, their constructional details and application 2 XXV Cranes, hoists, characteristics and control 3 XXVI Personnel management, duties and responsibilities, Labour Laws and Labour Welfare 6 XXVII Broad principles of material management and inventory control 4 TOTAL 186\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of Hours\nNumber of Hours\n1\n1\n2\n2\n3\n3\nI\nConcept of modern Thermal Station: Central Station and utility systems, base load and peaking stations, concept of unit system, typical thermal cycles, parameters, heat rates, fuel rates, steam rates, typical heat balance of boiler, turbine and generator\n4\nII\nChoice of location of large thermal station Site availability, water requirements, fuel, load, centres, transport facilities, air pollution, topography, choice of size of generating units\n3\nIII\nPlant lay out in large central station including machine arrangements, equipment layout and auxiliary arrangements\n3\nIV\nConstructional details of large pulverised fuel boilers and auxiliaries\n16\n(i) Water and steam drums, heaters and tubes.\n(ii)\nTypes of furnace and firing arrangements, burner details.\n(iii)\nEconomisers, primary, secondary, super heaters, re-heaters and attemperators.\n(iv)\nForced drought, Induced draught, Primary Air exhauster and gas recirculation fans, compressors.\n(v)\nTypes of coal mills (balls/recess, balltube, bowl roller) stoker, coal feeders.\n(vi)\nAir preheaters, Lunstorm, tubes, steam.\n(vii)\nDust extraction plant-electrostatic, mechanical.\n(viii)\nSoot blowers: steam/compressed air operated.\n(ix)\nStation compressed air system-reciprocating and rotary compressors.\n(x)\nOil handling and firing equipment.\n(xi)\nBoiler mountings, gauge glasses, safety valves, stop valves, startup devices, stampling, chemical dosing, continuous blow down.\n(xii)\nRefractories and laggings as used in modern power stations.\nV\nTurbine and auxiliaries, constructional details-\n9\n(i) Principle of operation, heat conversion cycles, types of turbines.\n(ii)\nCasing, steam chests, `Wheel blading, nozzles, diaphragms, glands, flanges and bolt heating, bearings.\n(iii)\nCondenser and vacuum extraction plant, ejectors.\n(iv)\nLubrication system, pumps, coolers, filters, shaft turbines and lifting gear\n(v)\nFeed water booster and extraction and cooling water pump.\n(vi)\nLow pressure and high pressure feed water heaters, de aerators and evaporators.\n(vii)\nHigh and low power by pass systems.\n(viii)\nOil purifications unit.\nVI\nAlternators and excitation systems-\n6\n(i) Constructional details of alternators, methods of cooling (Hydrogen/air cooling).\n(ii)\nMain and pilot exciters, voltage regulators, types and characteristics, amplidyne and magnetic amplifier.\n(iii)\nMethods of grounding.\nVII\nCoal handling plant: Tipples, hoppers, vibratory feeders and conveyors, crushers, magnetic separators and pulleys\n6\nVIII\nAsh and slag handling plant: Electrostatic precipitators, methods of conveying pneumatic, vaccumatic, hydraulic; bucket elevators conveyors, screw extractors\n2\nIX\nWater sources, treatment: Raw water pumping station, domestic, circulating and boiler make up water treatment, river salinity, local water conditions, their variations in different seasons and effects on power station operation\n7\nX\n(i) Fuels: Solid, liquid and gaseous fuels-analysis\n(ii)\nCoal-types and suitability for different kinds of boilers alterations in firing methods due to change of coal composition\nXI\nBasic flow diagrams in power station practice-\n8\n(i) Coal and fuel oil cycle\n(ii)\nAir and gas cycle\n(iii)\nFly ash and slag handling arrangements\n(iv)\nCondensate and feed heating cycle (from condenser hot well upto economiser)\n(v)\nSteam and water cycle (from economiser to turbine inlet).\n(vi)\nCirculating water cycle\n(vii)\nHydrogen filling in generator and hydrogen gland sealing of generator.\n(viii)\nBearing cooling system.\nXII\nDirect and closed cooling circuits, cooling towers, types and characteristics\n2\nXIII\nD.C. & A.C.\npower supply for auxiliaries arrangements of units and station boards, station lighting and automatic changeover\n4\nXIV\nTransformers: main transformers, interconnecting transformer, station/unit transformers, voltage grounding transformers, types of connections paralleling, tap changer gear\n5\nXV\nOut-door switch yard single line diagrams, bus bars, circuit breakers, isolators, current transformers, potential transformers, lightning arrestors, grounding\n5\nXVI\nIndoor and outdoor switchgear: types bulk oil, minimum oil, air blast, air break-constructional details\n3\nXVII\nInstrumentation and measurements: constructional details of measuring instruments for pressure, flow temperature, level, draught, vibration eccentricity, conductivity, pH value, differential expansion, oxygen analyser, current, power, reactive power, frequency, energy, winding temperature.\n16\nAuto-controllers, hydrogen purity meter. Axial shift indicator and recorder, flue gas analysers, Megger-its use for primary detection of faults\nXVIII\nOperation, control and supervision-\n15\n(i) General boiler start-up procedure.\n(ii)\nOperation of boilers under different loading conditions, soot blowing.\n(iii)\nBanking and preservation of boilers.\n(iv)\nDemonstration wherever possible through simulators of various operating conditions.\n(v) Handling of boiler under emergency conditions such as tripping of turbo-alternator set, high/low drum levels, flame failure, failure of supply to auxiliaries.\n(vi)\nGeneral start-up procedure for high pressure multicy under reheat type turbines froth cold, warm and hot conditions.\n(vii) Handling of turbine, generator and auxiliary plant under emergency conditions, such as vaccum failure, low feed water, condenser levels, excitation failure, circulating water failure, feed water heater high levels, excessive vibration, water or oil ingress in generator, failure of lubricating, sealing oil circuits.\n(viii)\nAlternator-synchronising, loading, parallel operations, MW & MVAR sharing.\nXIX\nControls and Protection-sequential operation and interlocks :-\n(i) Boiler and auxiliaries\n2\n(ii)\nTurbines and auxiliaries.\n2\n(iii)\nCombustion control-pressure, fuel, air and feed heating cycle\n2\n(iv)\nAnalysis of feed and boiler water, fuel gas at station laboratory\n4\n(v)\nFeed water and feed heating cycle controls\n2\n(vi)\nTurbine governing, speed setting, speed drop setting and control circuits\n3\n(vii) Generator protection, under-voltage, over-voltage, differential, reverse power, under excitation, negative phase sequence, earth fault with types of the relays used\n4\n(viii)\nImportance of sequential inter-locks\n2\n(ix)\nTransformer protection-differential, overload, earth faults, high\n4\n(x)\nTypes of motors and variable speed-drive and speed controls\n4\n(xi)\nVarious types of pumps and their starting and control.\n3\n(xii)\nSteam temperature control\n3\n(xiii)\nFurnace purging\n3\nXX\nFire fighting and multifier type protection\n3\nXXI\nGeneral safety precautions, treatment of electrical or acid alkali burn, permit to work, first aid\n2\nXXII\nIndian Boiler Rules, Factory Act, Indian Electricity Act, 1910, Electricity (Supply) Act,\n1948, Indian Electricity Rules, 1956 and other statutory regulation concerning Power Stations (General outline)\n4\nXXIII\nGeneral plant maintenance procedure, PERT/CPM Methods, Power Station records and calculation of efficiency\n10\nXXIV\nVarious type of valves, traps, their constructional details and application\n2\nXXV\nCranes, hoists, characteristics and control\n3\nXXVI\nPersonnel management, duties and responsibilities, Labour Laws and Labour Welfare\n6\nXXVII\nBroad principles of material management and inventory control\n4\nTOTAL\nTOTAL\n186\n186\nAPPENDIX II",
"footnote": "",
"is_definition": false,
"sort_order": 323
},
{
"number": "1",
"title": "1. SPECIALISED MECHANICAL COURSE FOR OPERATING & SUPERVISORY STAFF WHO WILL BE ENGAGED ON THE MECHANICAL SIDE OF THE POWER PLANT",
"chapter": null,
"content": "Item No. Particulars Number of Hours 1 2 3 I Corrosion of boiler and auxiliaries, condenser and feed water heating plant: Scale formation in boiler in relation to water conditions 7 II Acid cleaning and preservation of boilers. Mechanical removal of scale and deposits from boilers where acid cleaning is not advisable. High pressure water jet equipment 14 III Annual boiler and auxiliaries overhaul hydraulic test, floating of safety valves, preventive and breakdown maintenance of boiler auxiliaries 10 IV Efficient operation of boilers-interpretation of gas analysis for proper combustion controls and methods of reducing of other losses. 8 V Constructional details of hydraulic and other types of couplings torque converters, servo-motor 5 VI Constructional details of various types of pumps, their drives and automatic starting, air-conditioning. Constructional details of various types of drought fans, their drives and automatic starting. Types of wear on fans and pumps and their effects, detection of unbalance in fans and pumps, instruments for measuring vibrations, methods of primary balancing-balancing instruments and their use 9 VII Coal handling plant\n: (i) Sequential operation, (ii) conveyor and conveyor drives, (iii) tensioning arrangements, (iv) maintenance of guide rollers, (v) sway switches/slip switches, (vi) Beatle chargers for wagon marshalling, (vii) wagon tipplers and coal crushers, weighing of coal, different types of weighing bridges and weight meters, storage problems and prevention of spontaneous combustion. Sampling of coal/British Standards Specification/Indian Standards Specification, procedure and proximate analysis. 8 VIII Water treatment-hardness, pH value clarifiers, treatment, phosphate and hydrazine dosing, base exchangers. 6 IX Annual overhaul and inspection of turbine and auxiliary plant, condenser tube cleaning, maintenance of pumps, lubrication system, recycling of lubricating oil and selection of lubricant, condenser tube materials wear and tear and effect of local water conditions, types of failure, detection, preventive maintenance and re tubing of condensers 10 X Maintenance practice valve grinding methods, high pressure joints, heat insulation methods, pipe-work, alignments, beating, scraping & matching practice, radiography and stress relieving methods 6 XI Indian Boiler Regulations and other statutory regulations 4 XII Workshop, fabrication of spares, repairs and maintenance of mechanical equipments such as vehicles, tractors, dozers, shunters, cranes and hoists, welding-modern techniques and their applications in maintenance of boilers, turbine & associated plant 10 XIII Compositions, properties and behaviours of engineering materials used in power stations 8 105 Common course for mechanical and electrical 186 Supplementary course for mechanical 105 Total Hours 291\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of Hours\nNumber of Hours\n1\n1\n2\n2\n3\n3\nI\nCorrosion of boiler and auxiliaries, condenser and feed water heating plant: Scale formation in boiler in relation to water conditions\n7\nII\nAcid cleaning and preservation of boilers. Mechanical removal of scale and deposits from boilers where acid cleaning is not advisable. High pressure water jet equipment\n14\nIII\nAnnual boiler and auxiliaries overhaul hydraulic test, floating of safety valves, preventive and breakdown maintenance of boiler auxiliaries\n10\nIV\nEfficient operation of boilers-interpretation of gas analysis for proper combustion controls and methods of reducing of other losses.\n8\nV\nConstructional details of hydraulic and other types of couplings torque converters, servo-motor\n5\nVI\nConstructional details of various types of pumps, their drives and automatic starting, air-conditioning. Constructional details of various types of drought fans, their drives and automatic starting. Types of wear on fans and pumps and their effects, detection of unbalance in fans and pumps, instruments for measuring vibrations, methods of primary balancing-balancing instruments and their use\n9\nVII\nCoal handling plant\n: (i) Sequential operation, (ii) conveyor and conveyor drives, (iii) tensioning arrangements, (iv) maintenance of guide rollers, (v) sway switches/slip switches, (vi) Beatle chargers for wagon marshalling, (vii) wagon tipplers and coal crushers, weighing of coal, different types of weighing bridges and weight meters, storage problems and prevention of spontaneous combustion. Sampling of coal/British Standards Specification/Indian Standards Specification, procedure and proximate analysis.\n8\nVIII\nWater treatment-hardness, pH value clarifiers, treatment, phosphate and hydrazine dosing, base exchangers.\n6\nIX\nAnnual overhaul and inspection of turbine and auxiliary plant, condenser tube cleaning, maintenance of pumps, lubrication system, recycling of lubricating oil and selection of lubricant, condenser tube materials wear and tear and effect of local water conditions, types of failure, detection, preventive maintenance and re tubing of condensers\n10\nX\nMaintenance practice valve grinding methods, high pressure joints, heat insulation methods, pipe-work, alignments, beating, scraping & matching practice, radiography and stress relieving methods\n6\nXI\nIndian Boiler Regulations and other statutory regulations\n4\nXII\nWorkshop, fabrication of spares, repairs and maintenance of mechanical equipments such as vehicles, tractors, dozers, shunters, cranes and hoists, welding-modern techniques and their applications in maintenance of boilers, turbine & associated plant\n10\nXIII\nCompositions, properties and behaviours of engineering materials used in power stations\n8\n105\nCommon course for mechanical and electrical\n186\nSupplementary course for mechanical\n105\nTotal Hours\nTotal Hours\n291\n291",
"footnote": "",
"is_definition": false,
"sort_order": 324
},
{
"number": "2",
"title": "2. SPECIALISED ELECTRICAL COURSE FOR OPERATING AND SUPERVISORY STAFF WHO WILL BE ENGAGED IN THE ELECTRICAL SIDE OF THE POWER PLANT",
"chapter": null,
"content": "Item No. Particulars Number of Hours I Generators protection-earth fault, rotor and stator, negative phase sequence, loss of excitation, differential protection, back up protection, reverse power-protection, under voltage protection, constructional details of the relays used, method of setting and their testing, overload protection and over heating of rotors. 15 II Transformers protection, Buchholz relay, over current, differential and earth fault protection, types of relays used, their construction, testing and settings 6 III Transformers, commissioning-dielectric strength of oil, insulation resistance, tap changers, filtration of oil, pre commissioning testing . Tano resistively of oil and preventive maintenance of transformers 6 IV Circuit breakers, commissioning and maintenance, isolators, disconnectors, bus bar arrangements, charging, synchronising with the grid, disconnecting for repairs, maintenance of switchgear contractors 8 V Maintenance of equipments in the outdoor switchyard, current transformers, potential transformer and lightning arrestors, operation and maintenance bus differential protection 6 VI Cables, control, high voltage and extra-high voltage types, layouts, testing and maintenance 8 VII Principle of electronic controls and transistorised circuits 5 VII Pneumatic and di-electric transmitters and receivers, servomotors 6 IX Interlocking sequential control circuits, details of components used 7 X Calibration and testing of various types of instruments, indicating, measuring instruments, recorders and analyser 8 XI Statutory Electricity Acts and rules, permit procedure 4 XII Starting and control equipments of various types of motors Station Battery-care & maintenance, trickle charging and extended charging, operation and maintenance of rectifiers and battery charges 8 XIII Economic load despatch, power system control and operation, MVAR-control, voltage regulation and frequency control, carrier current equipments, telephones, telemetering 5 XIV Station emergency lighting arrangements 1 93 Common Course for electrical and mechanical 186 Supplementary course for electrical 93 Total Hours 279\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of Hours\nNumber of Hours\nI\nGenerators protection-earth fault, rotor and stator, negative phase sequence, loss of excitation, differential protection, back up protection, reverse power-protection, under voltage protection, constructional details of the relays used, method of setting and their testing, overload protection and over heating of rotors.\n15\nII\nTransformers protection, Buchholz relay, over current, differential and earth fault protection, types of relays used, their construction, testing and settings\n6\nIII\nTransformers, commissioning-dielectric strength of oil, insulation resistance, tap changers, filtration of oil, pre commissioning testing . Tano resistively of oil and preventive maintenance of transformers\n6\nIV\nCircuit breakers, commissioning and maintenance, isolators, disconnectors, bus bar arrangements, charging, synchronising with the grid, disconnecting for repairs, maintenance of switchgear contractors\n8\nV\nMaintenance of equipments in the outdoor switchyard, current transformers, potential transformer and lightning arrestors, operation and maintenance bus differential protection\n6\nVI\nCables, control, high voltage and extra-high voltage types, layouts, testing and maintenance\n8\nVII\nPrinciple of electronic controls and transistorised circuits\n5\nVII\nPneumatic and di-electric transmitters and receivers, servomotors\n6\nIX\nInterlocking sequential control circuits, details of components used\n7\nX\nCalibration and testing of various types of instruments, indicating, measuring instruments, recorders and analyser\n8\nXI\nStatutory Electricity Acts and rules, permit procedure\n4\nXII\nStarting and control equipments of various types of motors Station Battery-care & maintenance, trickle charging and extended charging, operation and maintenance of rectifiers and battery charges\n8\nXIII\nEconomic load despatch, power system control and operation, MVAR-control, voltage regulation and frequency control, carrier current equipments, telephones, telemetering\n5\nXIV\nStation emergency lighting arrangements\n1\n93\n93\nCommon Course for electrical and mechanical\n186\nSupplementary course for electrical\n93\nTotal Hours\nTotal Hours\n279\n279\nAPPENDIX III\nSYLLABUS FOR SKILLED PERSONS FOR ASSISTING THE OPERATION AND MAINTENANCE OF THERMAL POWER STATIONS\n(General course for Electrical and Mechanical)\nItem No. Particulars Number of Hours 1 2 3 I General description of thermal power stations and outline of power station operation 5 II Fundamental units and their conversion (mechanical, electrical, thermodynamics 2 III Fuels and combustion types of fuels-their properties and testing 1 IV Boilers and boiler house plant and auxiliaries 10 1. General description. 2. Arrangement of boilers. 3. Boiler auxiliaries. 4. Boiler instrumentation. 5. Fabrication and assembly of different parts of boiler and its accessories. 6. High pressure welding in boilers. 7. Arrangement of pulverised fuel boiler in a modern thermal power station. V. Water conditioning, pretreatment and demineralisation 4 VI Ash handling-electrostatic precipitation and mechanical dust collector-Function and description of two types 2 VII Turbine and turbine house auxiliaries 5 1. Fundamental principle of steam turbine. 2. Theory and operation of steam turbine. 3. Governing and protection of turbine. VIII Handling of turbines and boilers under emergency conditions 4 IX Condenser and vaccum extraction plant 3 1. Purpose and function. 2. Construction of surface Condenser and vacuum pumps. X Regenerative feed water heating-constructional details of low pressure and high pressure feed water heaters, deaerators and evaporators 2 XI Cooling water systems and cooling towers 1 XII Flow diagrams of basic cycles: 12 1. Coal handling. 2. Steam and condensate. 3. Ash and slag handling. 4. Station services, domestic water, air-conditioning, ventilation, lifts. 5. Air services, air compressors, switchgear. 6. Bearing cooling and general service water systems. 7. Circulating water systems. 8. Feed water and reheating plant. 9. Fuel oil system. 10. Station batteries and battery charging equipment. 11. Station lighting, power supply and distribution Boards. XIII Station instrumentation and controls 8 XIV Fire fighting installations in a thermal power station 2 XV Electric shocks, acid burn, alkali, wounds, chlorine gas poisoning and their treatment 3 XVI Duties and responsibilities of operators and plant attendants, carrying out instructions, reporting to supervisors, recording readings, unusual'\noccurrences, expected behaviour, discipline, sincerity, cleanliness and love for machines 3 XVII Personnel safety equipment, cleanliness, caution and care in power station working 3 XVIII How electricity is generated, transmitted and distributed i.e., generator to consumer service board 2 XIX Fundamental units, conversion and measurement of electrical quantities 1 XX Principle and working of alternating current and direct current generators and their parallel operation 2 XXI Principle and working of transformers and their parallel operation 2 XXII Principle and working of alternating current and direct current motors, their speed characteristics, controls 2 XXIII Storage battery-principle, construct-on and charging 1 XXIV Alternator cooling, different systems of cooling, advantages of hydrogen cooling over others, hydrogen plant 2 82\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of Hours\nNumber of Hours\n1\n1\n2\n2\n3\n3\nI\nGeneral description of thermal power stations and outline of power station operation\n5\nII\nFundamental units and their conversion (mechanical, electrical, thermodynamics\n2\nIII\nFuels and combustion types of fuels-their properties and testing\n1\nIV\nBoilers and boiler house plant and auxiliaries\n10",
"footnote": "",
"is_definition": false,
"sort_order": 325
},
{
"number": "1",
"title": "1. General description.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 326
},
{
"number": "2",
"title": "2. Arrangement of boilers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 327
},
{
"number": "3",
"title": "3. Boiler auxiliaries.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 328
},
{
"number": "4",
"title": "4. Boiler instrumentation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 329
},
{
"number": "5",
"title": "5. Fabrication and assembly of different parts of boiler and its accessories.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 330
},
{
"number": "6",
"title": "6. High pressure welding in boilers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 331
},
{
"number": "7",
"title": "7. Arrangement of pulverised fuel boiler in a modern thermal power station.",
"chapter": null,
"content": "V.\nWater conditioning, pretreatment and demineralisation\n4\nVI\nAsh handling-electrostatic precipitation and mechanical dust collector-Function and description of two types\n2\nVII\nTurbine and turbine house auxiliaries\n5",
"footnote": "",
"is_definition": false,
"sort_order": 332
},
{
"number": "1",
"title": "1. Fundamental principle of steam turbine.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 333
},
{
"number": "2",
"title": "2. Theory and operation of steam turbine.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 334
},
{
"number": "3",
"title": "3. Governing and protection of turbine.",
"chapter": null,
"content": "VIII\nHandling of turbines and boilers under emergency conditions\n4\nIX\nCondenser and vaccum extraction plant\n3",
"footnote": "",
"is_definition": false,
"sort_order": 335
},
{
"number": "1",
"title": "1. Purpose and function.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 336
},
{
"number": "2",
"title": "2. Construction of surface Condenser and vacuum pumps.",
"chapter": null,
"content": "X\nRegenerative feed water heating-constructional details of low pressure and high pressure feed water heaters, deaerators and evaporators\n2\nXI\nCooling water systems and cooling towers\n1\nXII\nFlow diagrams of basic cycles:\n12",
"footnote": "",
"is_definition": false,
"sort_order": 337
},
{
"number": "1",
"title": "1. Coal handling.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 338
},
{
"number": "2",
"title": "2. Steam and condensate.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 339
},
{
"number": "3",
"title": "3. Ash and slag handling.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 340
},
{
"number": "4",
"title": "4. Station services, domestic water, air-conditioning, ventilation, lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 341
},
{
"number": "5",
"title": "5. Air services, air compressors, switchgear.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 342
},
{
"number": "6",
"title": "6. Bearing cooling and general service water systems.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 343
},
{
"number": "7",
"title": "7. Circulating water systems.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 344
},
{
"number": "8",
"title": "8. Feed water and reheating plant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 345
},
{
"number": "9",
"title": "9. Fuel oil system.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 346
},
{
"number": "10",
"title": "10. Station batteries and battery charging equipment.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 347
},
{
"number": "11",
"title": "11. Station lighting, power supply and distribution Boards.",
"chapter": null,
"content": "XIII\nStation instrumentation and controls\n8\nXIV\nFire fighting installations in a thermal power station\n2\nXV\nElectric shocks, acid burn, alkali, wounds, chlorine gas poisoning and their treatment\n3\nXVI\nDuties and responsibilities of operators and plant attendants, carrying out instructions, reporting to supervisors, recording readings, unusual'\noccurrences, expected behaviour, discipline, sincerity, cleanliness and love for machines\n3\nXVII\nPersonnel safety equipment, cleanliness, caution and care in power station working\n3\nXVIII\nHow electricity is generated, transmitted and distributed i.e., generator to consumer service board\n2\nXIX\nFundamental units, conversion and measurement of electrical quantities\n1\nXX\nPrinciple and working of alternating current and direct current generators and their parallel operation\n2\nXXI\nPrinciple and working of transformers and their parallel operation\n2\nXXII\nPrinciple and working of alternating current and direct current motors, their speed characteristics, controls\n2\nXXIII\nStorage battery-principle, construct-on and charging\n1\nXXIV\nAlternator cooling, different systems of cooling, advantages of hydrogen cooling over others, hydrogen plant\n2\n82\n82\nAPPENDIX IV",
"footnote": "",
"is_definition": false,
"sort_order": 348
},
{
"number": "1",
"title": "1. SPECIALISED ELECTRICAL COUITSE FOR SKILLED PERSONS WHO WILL BE ENGAGED ON THE ELECTRICAL SIDE OF THE POWER PLANT",
"chapter": null,
"content": "Item No. Particulars Number of hours 1 2 3 I. Alarm systems-Visual and audible 2 II . Isolators, circuit breakers and contractors 3 III . Earthing and neutral grounding necessity of methods for safety rules while handling electrical equipments 4 IV Motor winding and repairs 4 V Maintenance of internal telephones and primary air systems 3 VI. Meggering and testing of wiring and cable faults. 3 VII. Maintenance of electrical motors 6 VIII. Maintenance of electrical switchgear 8 IX. Fuses-rewirable type-cartridges type high rupturing capacity fuse, constructional features of fuse and fuse sockets, knife type high rupturing capacity fuses-use of pullers for insertion and removal, colour code for fuse rating. 8 X. Motor starters and their applications direction line, star-delta, rotor resistance 5 XI. Meggers , avometers, voltmeters, ammeters, wattmeters, energy meters general information about their use 6 XII. Maintenance of transformers & Tap changer 6 XIII. Jointing of low & medium voltage cables 4 XIV. Connections, earthing, principles of operation of all small distribution transformers 2 XV Current & potential transformers, purpose, connection and use 2 XVI. Various types of drive 2 XVII. Elementary knowledge of Engineering material & their properties 2 XVIII. Lubrication & cooling system 4 74 Common course for electrical and mechanical 82 Supplementary course for electrical 74 Total Hours 156\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of hours\nNumber of hours\n1\n1\n2\n2\n3\n3\nI.\n2\nII .\n3\nIII .\n4\nIV\n4\nV\n3\nVI.\n3\nVII.\n6\nVIII.\n8\nIX.\n8\nX.\n5\nXI.\n6\nXII.\n6\nXIII.\n4\nXIV.\n2\nXV\n2\nXVI.\n2\nXVII.\n2\nXVIII.\n4\n74\n82\n74\n156\n156",
"footnote": "",
"is_definition": false,
"sort_order": 349
},
{
"number": "2",
"title": "2. SPECIALISED MECHANICAL COURSE FOR SKILLED PERSONS WHO WILL BE ENGAGED IN THE MECHANICAL SIDE OF THE POWER STATION",
"chapter": null,
"content": "Item No. Particulars Number of hours 1 2 3 I. Type of bearing and their uses 2 II. Types of valves-safety valve, suction valve, delivery valve, non return valve, bypass valve, drain valve, air release valve, control valve, float operated valve, solenoid operated and pneumatically operated valves and their applications 5 III. Pressure gauges-Bourden type gauge, manometer, vacuum gauge, barometer, principles of operation, absolute pressure, gauge and vaccum pressure and their inter relationship 5 IV Temperature indicators, mercury thermometers, resistance thermometers, thermocouples, pyrometers, gas thermometers, temperature alarm 5 V. Level gauges-different types-Level Alarm 4 VI. Flow meters-steam and water-general principles 3 VII. Couplings-different types, rigid, flexible, magnetic and fluid couplings 3 VIII. Clutches-different types and uses 2 IX. Maintenance of pneumatic measuring instruments, servometers, power cylinders and other thermostats, monostats 2 X. Maintenance of instruments, recorders, clocks 4 XI. Vibration-general knowledge of their causes, effects, remedies, misalignment, worn out bearings, vibration, fed to foundations, cracking, eccentricity and differential expansion, their causes, remedies 5 40 Common course for electrical & mechanical 82 Specialized course for mechanical 44 Total Hours 122\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of hours\nNumber of hours\n1\n1\n2\n2\n3\n3\nI.\nType of bearing and their uses\n2\nII.\nTypes of valves-safety valve, suction valve, delivery valve, non return valve, bypass valve, drain valve, air release valve, control valve, float operated valve, solenoid operated and pneumatically operated valves and their applications\n5\nIII.\nPressure gauges-Bourden type gauge, manometer, vacuum gauge, barometer, principles of operation, absolute pressure, gauge and vaccum pressure and their inter relationship\n5\nIV\nTemperature indicators, mercury thermometers, resistance thermometers, thermocouples, pyrometers, gas thermometers, temperature alarm\n5\nV.\nLevel gauges-different types-Level Alarm\n4\nVI.\nFlow meters-steam and water-general principles\n3\nVII.\nCouplings-different types, rigid, flexible, magnetic and fluid couplings\n3\nVIII.\nClutches-different types and uses\n2\nIX.\nMaintenance of pneumatic measuring instruments, servometers, power cylinders and other thermostats, monostats\n2\nX.\nMaintenance of instruments, recorders, clocks\n4\nXI.\nVibration-general knowledge of their causes, effects, remedies, misalignment, worn out bearings, vibration, fed to foundations, cracking, eccentricity and differential expansion, their causes, remedies\n5\n40\n40\nCommon course for electrical & mechanical\n82\nSpecialized course for mechanical\n44\nTotal Hours\nTotal Hours\n122\n122\nAPPENDIX V\nSYLLABUS FOR OPERATION AND MAINTENANCE STAFF WHO WILL BE ENGAGED IN THE OPERATION AND MAINTENANCE OF HYDRO-ELECTRIC GENERATING STATION\nItem No. Particulars Number of Hours 1 2 3 I. Concept of a modem hydro station: Type of stations, its role in the power systems, base load, peak load operation, plant layout, capacity; underground power station, hydraulic and electrical design, features, interconnection with other stations 3 II. Hydraulic system; reservoirs-type of reservoirs, storage capacity, operation of reservoirs, intake tower, surge tank, tunnels, fore bays and penstocks, protection against water hammer and negative pressure in penstocks, provision for draining penstocks 3 III. Types of valves-Butterfly valve, spherical valve, needle valve, their operation and control 3 IV Water turbines-types of turbines; their characteristics, ratings, specifications, constructional details 2 V. Governing system; control circuit for governing, types of governors, pendulum, hydraulic, electronic 3 VI. Generator: type and rating, cooling and ventilation system, bearing cooling arrangements, lubrication system, construction and characteristics of generators, split-phase double layer winding, synchronising, loading, grounding of generators neutral 3 VII. Excitation system, types of excitors, voltage, control, automatic voltage control, amplidyne control, magnetic amplifier 5 VIII. Generator protection: earth fault (rotor and stator), negative phase sequence, differential protection, backup protection, reverse power protection, under voltage protection, constructional details of the relays used, method of settling and their testing 10 IX. Hydraulic and electrical protective devices, load frequency control 3 X. Starting, shutting down and operation procedure. 3 XI. Power transformer connections, parallel operation, three single phase unit versus three phase unit, regulation, voltage control, tap changing, weights and size, grounding 5 XII. Transformer protection: Buchholz relay, over current, differential and earth fault protection, types of relays used, their construction, testing and settings 5 XIII. Transformers-commissioning: Dielectric strength of oil, insulation, resistance tap changer, filtration of oil, pre-commissioning testing 3 XIV. Cooling system for transformers 2 XV. Circuits breakers, isolators, disconnectors, bus bar arrangements, charging and synchronising with the grid, disconnecting for repairs, maintenance of switchgear contractors 4 XVI. Maintenance of equipments in the outdoor switchyard current transformers, potential transformers and lightning arrestors, erection, operation and maintenance 4 XVII. Cables-high voltage, oil filled cable, types of cables used, rating of cables, layout, testing 4 XVIII. Principle of electronic controls and transistorised circuits 3 XIX. Pneumatic and electric transmitters and receivers, servomotors 3 XX. Control Board-layout, indicating and recording instruments for monitoring and supervision, remote control of various equipments, signalling and interlocking, automatic reclosure of breakers on outgoing lines and enunciation system 3 XXI. Interlocking sequential control circuits, details of components used 4 XXII. Calibration and testing of various types of instruments, indicating, recording and analysers 4 XXIII . Study of communication/system 1 XXIV . House turbine set-its functions and use 1 XXV. Station transformers, alternating current, auxiliary supply, essential auxiliaries, auxiliaries in emergency, study of single line diagrams 3 XXVI . Station Direct Current system-storage battery, rectifiers, motor generator set etc. their control and operation, standby source of station power, automatic change over to standby source of supply 3 XXVII. Records-(hourly, daily, monthly, annually) of operations 2 XXVIII. Flow diagram and single line diagram for hydraulic and electrical system in the station 5 XXIX. Air conditioning and ventilation plant, compressors 2 XXX. Operation under emergency conditions 2 XXXI. General plant maintenance procedures 3 XXXII. Cranes, hoists-characteristics and controls 2 XXXIII. Statutory Electricity Acts and Rules, permit procedure 2 XXXIV. Fire fighting 6 XXXV. General safety precautions, first-aid 6 XXXVI. Personnel management, duties and responsibilities, labour laws & labour welfare 4 Total hours 124\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of Hours\nNumber of Hours\n1\n1\n2\n2\n3\n3\nI.\nConcept of a modem hydro station: Type of stations, its role in the power systems, base load, peak load operation, plant layout, capacity; underground power station, hydraulic and electrical design, features, interconnection with other stations\n3\nII.\nHydraulic system; reservoirs-type of reservoirs, storage capacity, operation of reservoirs, intake tower, surge tank, tunnels, fore bays and penstocks, protection against water hammer and negative pressure in penstocks, provision for draining penstocks\n3\nIII.\nTypes of valves-Butterfly valve, spherical valve, needle valve, their operation and control\n3\nIV\nWater turbines-types of turbines; their characteristics, ratings, specifications, constructional details\n2\nV.\nGoverning system; control circuit for governing, types of governors, pendulum, hydraulic, electronic\n3\nVI.\nGenerator: type and rating, cooling and ventilation system, bearing cooling arrangements, lubrication system, construction and characteristics of generators, split-phase double layer winding, synchronising, loading, grounding of generators neutral\n3\nVII.\nExcitation system, types of excitors, voltage, control, automatic voltage control, amplidyne control, magnetic amplifier\n5\nVIII.\nGenerator protection: earth fault (rotor and stator), negative phase sequence, differential protection, backup protection, reverse power protection, under voltage protection, constructional details of the relays used, method of settling and their testing\n10\nIX.\nHydraulic and electrical protective devices, load frequency control\n3\nX.\nStarting, shutting down and operation procedure.\n3\nXI.\nPower transformer connections, parallel operation, three single phase unit versus three phase unit, regulation, voltage control, tap changing, weights and size, grounding\n5\nXII.\nTransformer protection: Buchholz relay, over current, differential and earth fault protection, types of relays used, their construction, testing and settings\n5\nXIII.\nTransformers-commissioning: Dielectric strength of oil, insulation, resistance tap changer, filtration of oil, pre-commissioning testing\n3\nXIV.\nCooling system for transformers\n2\nXV.\nCircuits breakers, isolators, disconnectors, bus bar arrangements, charging and synchronising with the grid, disconnecting for repairs, maintenance of switchgear contractors\n4\nXVI.\nMaintenance of equipments in the outdoor switchyard current transformers, potential transformers and lightning arrestors, erection, operation and maintenance\n4\nXVII.\nCables-high voltage, oil filled cable, types of cables used, rating of cables, layout, testing\n4\nXVIII.\nPrinciple of electronic controls and transistorised circuits\n3\nXIX.\nPneumatic and electric transmitters and receivers, servomotors\n3\nXX.\nControl Board-layout, indicating and recording instruments for monitoring and supervision, remote control of various equipments, signalling and interlocking, automatic reclosure of breakers on outgoing lines and enunciation system\n3\nXXI.\nInterlocking sequential control circuits, details of components used\n4\nXXII.\nCalibration and testing of various types of instruments, indicating, recording and analysers\n4\nXXIII .\nStudy of communication/system\n1\nXXIV .\nHouse turbine set-its functions and use\n1\nXXV.\nStation transformers, alternating current, auxiliary supply, essential auxiliaries, auxiliaries in emergency, study of single line diagrams\n3\nXXVI .\nStation Direct Current system-storage battery, rectifiers, motor generator set etc. their control and operation, standby source of station power, automatic change over to standby source of supply\n3\nXXVII.\nRecords-(hourly, daily, monthly, annually) of operations\n2\nXXVIII.\nFlow diagram and single line diagram for hydraulic and electrical system in the station\n5\nXXIX.\nAir conditioning and ventilation plant, compressors\n2\nXXX.\nOperation under emergency conditions\n2\nXXXI.\nGeneral plant maintenance procedures\n3\nXXXII.\nCranes, hoists-characteristics and controls\n2\nXXXIII.\nStatutory Electricity Acts and Rules, permit procedure\n2\nXXXIV.\nFire fighting\n6\nXXXV.\nGeneral safety precautions, first-aid\n6\nXXXVI.\nPersonnel management, duties and responsibilities, labour laws & labour welfare\n4\nTotal hours\nTotal hours\n124\n124\nAPPENDIX VI\nSYLLABUS FOR OPERATION AND MAINTENANCE STAFF IN EXTRA-HIGH VOLTAGE SUB-STATION\nItem No. Particulars Number of Hours 1 2 3 I. Layout and location of 220/132/66/33\nK.V sub-station 4 II. Main equipments used together with their specifications 3 III. Construction of high voltage lines, types of towers, types of insulators and their electrical and mechanical characteristics 3 IV. High tension feeders, their load carrying capacities 1 V. (i)\nAlternating and direct currents, relation between voltage, current, power, reactive power & common units in use. Power factor, Ohm's Law, resistance, reactance, impedance, percentage impedance. Three phase vectors phase, displacement between current and voltage 3 (ii) Basic principle of transformation, magnetization, hysteresis, reluctance, retentivity, electromagnets Flux density, ampere turns, equation for transformation etc. 4 (iii) Two winding, three winding and auto transformers, grounding transformers, salient features of shell type and core type transformers, hot rolled and cold rolled steel cores, Stampings and their assembly 4 Different vector groups and terminal connections. (iv) Transformer fixtures e.g.\nBuchholz relay, on-load and off-load tap changer, breathers, conservators, bushings of different types, thermometers, indicators, alarms 4 (v) Cooling of transformer and oil, different methods of cooling, importance of oil filtering and drying-out of transformers, dielectric strength of oil, different varieties of filters and their comparison, types of radiators 4 (vi) Transformer tests-failures and causes, maintenance and repairs 3 (vii) Parallel operation, regulation, voltage control, tap, changing, commissioning test 5 VI. Breakers: (i)\nFunctions of breakers, their action (ii) Different types of outdoor and indoor breakers e.g. bulk oil, minimum oil and air blast, principles and their applications. (iii) Operating mechanism, manual, spring, hydraulic, pneumatic, motor 8 (iv) Current rating rupturing capacity, clearance time. (v) Breaker maintenance, failures and their causes, commissioning procedure VII. Bus bars: (i) Indoor bus bars, their capacity, forces on them during short circuit, bus bar mountings and their clearances (ii) Strung and tabular type bus bars, their current ratings, supports, jumpers, clearances 6 (iii) Bus bars fittings and connectors (iv) High Voltage and Extra-high voltage cables, types, their maintenance and testing VIII. Current and potential transformers: (i) Types of current and potential transformers, their working principles, ratings, accuracies 3 (ii) Functions of current and potential transformers (iii) Failures of current and potential transformers, their causes IX. Isolators: (i) Tilting and rotating isolators, with and without arcing horns, earthing blades, current ratings, breaking of circuits by isolator, interlocking with circuit breaker 3 (ii) Maintenance of isolators X. Lightning arrestors: (i) Simple description of lightning phenomena and surges (ii) Construction of lightning arrestors and the principles of their working (iii) Different type of lightning arrestors and ratings (iv) Earthing and location of lightning arrestors XI. Control Room: (i)\nNecessity and function of a control board, types of boards, instruments on the board (ii) Functions of the various relays and indicators, Mimic diagram indicators, annunciator and alarm characteristics of relays, testing and setting of relays (iii) Remote control of breakers, isolators, tap changers, indicators on the control board 10 (iv) Control and power cables XII. Auxiliary supply: (i) Current and ampere-hour ratings of batteries, battery charging equipment, checking of specific gravity of electrolyte, maintenance of batteries 3 (ii) Importance of direct current supply and its functions (iii) Auxiliary direct current supply XIII. Clearance and Compliance of I.E.\nRules, 1956: (i) Minimum clearance for different voltages between phases and phase to ground 3 (ii) Indian Electricity Rules pertaining to sub-stations XIV. Earthing : (i) Safety earthing and system earthing, the method of earthing e.g. solid earthing, resistance earthing, peterson coil earthing, earthing of lightning arrestor, importance and advantages of each type 3 (ii) Different types of earth electrodes, earthing mats, recommended values of earth resistance, measurement of earth resistances XV. Maintenance: Maintenance of log sheet and other records 3 The importance of maintenance of good records XVI. Safety: (i) Safety procedures and procedures for giving line clear and taking it back, Maintenance of records of line clear 10 (ii) First-aid, artificial respiration and shock treatment XVII. Interlocking and sequential operation of different equipments 1 XVIII. Synchronising , charging and discharging of high voltage lines. Live line testing 3 XIX. Calibration and testing of various types of equipments indicating and measuring equipments, recorders, analysers 4 XX. Handling emergency conditions 3 XXI. Diagnosing troubles in the plant from instruments and annunciation 3 XXII. Study of carrier system 2 XXIII. Auxiliary equipments such as compressors, Station lighting etc. 1 XXIV. Fire fighting equipment-their operation, maintenance and refilling 1 XXV. Personnel managements, duties and responsibilities, labour welfare and labour laws 4 Total Hours 115\nItem No.\nItem No.\nParticulars\nParticulars\nNumber of Hours\nNumber of Hours\n1\n1\n2\n2\n3\n3\nI.\n4\nII.\n3\nIII.\n3\nIV.\n1\nV.\n3\n4\n4\n4\n4\n3\n5\nVI.\n8\nVII.\n6\nVIII.\n3\nIX.\n3\nX.\nXI.\n10\nXII.\n3\nXIII.\n3\nXIV.\n3\n(ii)\nXV.\n3\nXVI.\n10\nXVII.\n1\nXVIII.\n3\nXIX.\n4\nXX.\n3\nXXI.\n3\nXXII.\n2\nXXIII.\n1\nXXIV.\n1\nXXV.\n4\nTotal Hours\nTotal Hours\n115\n115\nAPPENDIX VII\n(I) ASSESSMENT FORM FOR OPERATING AND SUPERVISORY STAFF\nSl . No. Particulars Marks allotted Marks given Remarks 1 2 3 4 5 1. (a) Punctuality and attendance +(5) (b) Is he reluctant to continue on overtime -(1) (c) Is he in the habit of taking leaves at the eleventh hour -(1) (d) Does he insist on compensatory off -(1) 2. Intelligence and grasp: (a) Does he have full knowledge of the plant and equipment on which he is working and follows the instructions given to him and can execute them properly +(10) (b) Is he industrious, hard working and painstaking +(5) (c) Has he shown any special skill of operation in saving plant & equipment in trouble or emergency? +(10) 3. Temperament and behaviour: (a) Behaviour with superiors/colleagues and subordinates +(5) (b) Capacity to take quick and correct decisions +(5) (c) Capacity to handle independent responsibility +(10) 4. Any special qualifications-capacity to execute a particular or difficult job economically, intelligently, resourcefully with special skill +(10) 5. Judgment of the candidate by taking viva-voce test or by asking questions verbally +(40) Total Marks 100 The Marks may be given as below:- Excellent Very good Good Average Below average 100-91% 90-71% 70-61% 60-51% Below 51% Special Remarks if any:- Station Superitendent Section-in-Charge\nSl . No.\nSl\n. No.\nParticulars\nParticulars\nMarks allotted\nMarks allotted\nMarks given\nMarks given\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\n(a) Punctuality and attendance\n+(5)\n(b) Is he reluctant to continue on overtime\n-(1)\n(c) Is he in the habit of taking leaves at the eleventh hour\n-(1)\n(d) Does he insist on compensatory off\n-(1)\n2.\nIntelligence and grasp:\n(a) Does he have full knowledge of the plant and equipment on which he is working and follows the instructions given to him and can execute them properly\n+(10)\n(b) Is he industrious, hard working and painstaking\n+(5)\n(c) Has he shown any special skill of operation in saving plant & equipment in trouble or emergency?\n+(10)\n3.\nTemperament and behaviour:\n(a) Behaviour with superiors/colleagues and subordinates\n+(5)\n(b) Capacity to take quick and correct decisions\n+(5)\n(c) Capacity to handle independent responsibility\n+(10)\n4.\nAny special qualifications-capacity to execute a particular or difficult job economically, intelligently, resourcefully with special skill\n+(10)\n5.\nJudgment of the candidate by taking viva-voce test or by asking questions verbally\n+(40)\nTotal Marks\nTotal Marks\n100\n100\nExcellent\nExcellent\nVery good\nVery good\nGood\nGood\nAverage\nAverage\nBelow average\nBelow average\n100-91%\n100-91%\n90-71%\n90-71%\n70-61%\n70-61%\n60-51%\n60-51%\nBelow 51%\nBelow 51%\n(II) ASSESSMENT FORM FOR OPERATING AND SUPERVISORY STAFF\n(For use of the Training Department)\nTest Date Written Viva Total (75) (25 I Test II Test III Test Final Test\nTest\nTest\nDate\nDate\nWritten\nWritten\nViva\nViva\nTotal\nTotal\n(75)\n(75)\n(25\n(25\nI Test\nII Test\nIII Test\nFinal Test\n..........................................................\nDirector of the Institute\n(III) ASSESSMENT FORM FOR SKILLED PERSONS TO ASSIST OPERATORS AND SUPERVISORS\nSl . No. Particulars Marks Allotted Marks given Remarks 1 2 3 4 5 1. Punctuality and Attendance: (a)\nDoes he attend the duty punctually or remain absent without prior intimation frequently +(5) (b)\nIs he reluctant to continue on overtime -(1) (c)\nIs he in the habit of taking leave at the eleventh hour -(1) (d)\nIs he even prepared to take leave without wages -(4) (e)\nWhether he availed medical leave often -(1) 2. Intelligence and Grasp: (a) Does he have full knowledge of the plant and equipment on which he is working and follows the instructions given to him and can execute them properly +(10) (b)\nIs he industrious, hard working and painstaking +(5) (c)(i) Has he shown any special skill of operation in saving plants and equipment in trouble or emergency? OR (ii)\nHas he shown any special skill or innovation in any maintenance job +(10) 3. Temperament and Behaviour : (a)\nBehaviour with superiors and colleagues +(5) (b) Capacity to take quick and correct decisions by himself or to point out the discrepancies to superiors promptly while attending auxiliary plant and equipment +(5) (c)\nCapacity to take independent charge as auxiliary plant attendants (Name of the auxiliary plant) +(10) 4. Any Special Qualifications: (a)\nIs he suitable for any other plant other than the one mentioned above at 3(c) (b)\nCan he record the readings correctly (c)\nIs he suitable for any particular skilled maintenance job, as an artisan +(10) (d)\nHas he specialized in any particular trade such as winder, high pressure welding, etc. 5. Judgment of the candidate by taking viva voce test or by asking questions verbally about power plant and equipment +(40) Total Marks +100 The Marks may be given as below:- Excellent Very good Good Average Below average 100-91% 90-71% 70-61% 60-51% Below 51% Special Remarks if any: - Station Superintendent\nSl . No.\nSl\n. No.\nParticulars\nParticulars\nMarks Allotted\nMarks Allotted\nMarks given\nMarks given\nRemarks\nRemarks\n1\n1\n2\n2\n3\n3\n4\n4\n5\n5\n1.\nPunctuality and Attendance:\n(a)\nDoes he attend the duty punctually or remain absent without prior intimation frequently\n+(5)\n(b)\nIs he reluctant to continue on overtime\n-(1)\n(c)\nIs he in the habit of taking leave at the eleventh hour\n-(1)\n(d)\nIs he even prepared to take leave without wages\n-(4)\n(e)\nWhether he availed medical leave often\n-(1)\n2.\nIntelligence and Grasp:\n(a) Does he have full knowledge of the plant and equipment on which he is working and follows the instructions given to him and can execute them properly\n+(10)\n(b)\nIs he industrious, hard working and painstaking\n+(5)\n(c)(i) Has he shown any special skill of operation in saving plants and equipment in trouble or emergency?\nOR\n(ii)\nHas he shown any special skill or innovation in any maintenance job\n+(10)\n3.\nTemperament and Behaviour :\n(a)\nBehaviour with superiors and colleagues\n+(5)\n(b) Capacity to take quick and correct decisions by himself or to point out the discrepancies to superiors promptly while attending auxiliary plant and equipment\n+(5)\n(c)\nCapacity to take independent charge as auxiliary plant attendants (Name of the auxiliary plant)\n+(10)\n4.\nAny Special Qualifications:\n(a)\nIs he suitable for any other plant other than the one mentioned above at 3(c)\n(b)\nCan he record the readings correctly\n(c)\nIs he suitable for any particular skilled maintenance job, as an artisan\n+(10)\n(d)\nHas he specialized in any particular trade such as winder, high pressure welding, etc.\n5.\nJudgment of the candidate by taking viva voce test or by asking questions verbally about power plant and equipment\n+(40)\nTotal Marks\nTotal Marks\n+100\n+100\nThe Marks may be given as below:-\nExcellent\nExcellent\nVery good\nVery good\nGood\nGood\nAverage\nAverage\nBelow average\nBelow average\n100-91%\n100-91%\n90-71%\n90-71%\n70-61%\n70-61%\n60-51%\n60-51%\nBelow 51%\nBelow 51%\nSpecial Remarks if any: -\nStation Superintendent\n(IV) ASSESSMENT FORM FOR SKILLED PERSONS TO ASSIST OPEITATORS AND SUPERVISORS\n(For the use of Training Department)\nTest Date Written Viva Total (60) (40) I Test II Test III Test\nTest\nTest\nDate\nDate\nWritten\nWritten\nViva\nViva\nTotal\nTotal\n(60)\n(60)\n(40)\n(40)\nI Test\nII Test\nIII Test\n....................................\nDirector of Institute",
"footnote": "",
"is_definition": false,
"sort_order": 350
}
],
"metadata": {
"Act ID": "9/476",
"Act Number": "Published vide S.R.O. 1455, dated 26.6.1956, published in the Gazette of India, Extraordinary, Part II, Section 3(i), dated 26.6.1956.",
"Enactment Date": "30th June, 1966",
"Act Year": "1956",
"Short Title": "The Indian Electricity Rules, 1956",
"Type": "CENTRAL",
"Location": "India (Central)"
},
"updated_at": "2026-09-29 21:55:18"
}