81. Conductors at different voltages on same supports

[82. Erection of or alteration to buildings, structures, flood banks and elevation of roads
(b) If the person referred to in sub-rule (1) disputes the supplier's estimated cost of alteration of the overhead line or even the responsibility to pay such cost, the dispute may be referred to the Inspector by either of the parties whereupon the same shall be decided by the Inspector.
(a) the cost of additional material used on the alteration giving due credit for the depreciated cost of the material which would be available from the existing line;
(b) the wages of labour employed in effecting the alteration;
(c) supervision charges to the extent of 15 per cent of the wages mentioned in clause (b); and
(d) any charges incurred by the supplier in complying with the provisions of section 16 of the Act in respect of such alterations.
[82-A. Transporting and storing of material near overhead lines