← Back to Directory

The Delhi Electricity Supply Code And Performance Standards Regulations, 2007

The Delhi Electricity Supply Code And Performance Standards Regulations, 2007

Raw JSON API

Sections

1. Short title, commencement and interpretation.

Section 1

2. Definitions.

Section 2

3. System of Supply.

Section 3

4. Classification of Supply.

Section 4

5. Non – Domestic Low Tension (NDLT-I).

Section 5

6. Mixed Load High Tension (MLHT).

Section 6

7. Small Industrial Power (SIP).

Section 7

8. Large Industrial Power.

Section 8

9. Agriculture Connection.

Section 9

10. Mushroom cultivation.

Section 10

11. Street lighting.

Section 11

12. Signal and Blinkers.

Section 12

13. Railway Traction.

Section 13

14. Delhi Metro Rail Corporation Ltd.

Section 14

15. General.

Section 15

16. Electricity Connection in Electrified Colonies/Areas.

Section 16

17. Connection where system augmentation is required.

Section 17

18. Connection in Un-electrified areas.

Section 18

19. Temporary Supply.

Section 19

20. Transfer of Connection.

Section 20

21. Load Reduction.

Section 21

22. Change of category.

Section 22

23. Load Enhancement

Section 23

24. Conversion from 1 phase to 3 phase LT and vise-versa

Section 24

25. Conversion from LT to HT and vice-versa

Section 25

26. Agreement.

Section 26

27. Termination of Agreement.

Section 27

28. Registration-cum-Processing Fees.

Section 28

29. Security Deposit.

Section 29

30. Service line cum Development (SLD) Charges.

Section 30

31. Service Line shall include the following.

Section 31

32. Installation Inspection Fee.

Section 32

33. Sub-station space for HT/EHT Supply.

Section 33

34. Additional Charges.

Section 34

35. General.

Section 35

36. Wiring.

Section 36

37. Reading of meters.

Section 37

38. Testing of meters.

Section 38

39. Meter not recording.

Section 39

40. Burnt meter.

Section 40

41. General.

Section 41

42. Bill particulars.

Section 42

1. K.No - This is the unique consumer identification number, which can be referred to for any communication.

Section 1

2. Book No./DT No./Reading Repository/Binder details - Meter book no. is the book where in the consumers meter reading details taken during the meter reading cycle is noted down /compiled in soft form.

Section 2

3. Bill Number

Section 3

4. Bill Month

Section 4

5. Bill type - Provisional or Regular

Section 5

6. Meter Number

Section 6

7. Meter type

Section 7

8. Supply type

Section 8

9. Applicable tariff

Section 9

10. Security deposit with the Licensee.

Section 10

11. Sanctioned Load

Section 11

12. Fixed charge

Section 12

13. Meter Reading of previous billing cycle and date of reading

Section 13

14. Current Meter Reading and date of reading

Section 14

15. Billed Units- This shows the total units consumed for the particular billing cycle.

Section 15

16. Slab Calculation (units, rate, amount)- This gives the breakup of charges for the billed units for each slab of tariff.

Section 16

17. Energy charge

Section 17

18. Arrear amount

Section 18

19. Arrear Details - indicating period for which arrears are due, energy charges, fixed/demand charges, LPSC, electricity tax etc.

Section 19

20. Amount payable (rounded off) after the due date- net amount to be paid after the due date.

Section 20

21. Due Date including last date before which the bill has to be paid.

Section 21

22. Late Payment Surcharge- fees that is charged in case the payment is not made within the due date/ amount payable after due date within one month from due date

Section 22

23. Amount payable (rounded off) within the due date- net amount to be paid before the due date.

Section 23

24. Amount payable after due date

Section 24

25. Government subsidy, if any

Section 25

26. Compensation to the consumer, if any

Section 26

27. Previous Consumption Pattern (Bill Month, Units, Status)- This shows the consumption pattern for last six months

Section 27

28. Other information as applicable to kVAh billing and HT consumers to be appropriately added and unrelated items to be deleted

Section 28

29. Any other information which the Licensee deems fit.

Section 29

30. Meter Remark- This indicates the meter status.

Section 30

43. Billing during the period defective/stuck/stopped/burnt meter remained at site.

Section 43

44. Complaint on consumer bills.

Section 44

45. Arrears appearing in bills.

Section 45

46. Change of occupancy/vacancy of premises.

Section 46

47. Payment on self assessment by the consumer.

Section 47

48. Advance payment of anticipated bills by consumer.

Section 48

49. Disconnection on non-payment of the Licensees Dues.

Section 49

50. Disconnection on Consumer’s request.

Section 50

51. Reconnection.

Section 51

52. Procedure for booking a case for Theft of Electricity.

Section 52

53. Personal hearing in case of suspected Theft.

Section 53

54. Default in payment of assessed amount or installments thereof.

Section 54

55. Voluntary declaration of tampered meters.

Section 55

56. General.

Section 56

57. Procedure for booking a case for unauthorized use of electricity.

Section 57

58. Submission of consumer’s reply.

Section 58

59. Personal hearing.

Section 59

60. Default in payment of assessed amount or installments thereof.

Section 60

61. General.

Section 61

62. General.

Section 62

63. Procedure for lodging complaint:.

Section 63
CHAPTER IX

CHAPTER IX

Section 94

64. Guaranteed standards of performance.

Section 64

65. Compensation.

Section 65

66. Information on Standards of Performance.

Section 66

67. General.

Section 67

68. Notice to the Consumer.

Section 68

69. Exemption.

Section 69

70. Power of relaxation and power to remove difficulties.

Section 70

71. Repeal and Savings.

Section 71

1. Restoration of Power Supply

Section 1

1. Restoration of Power Supply

Section 1

2. Quality of Power Supply

Section 2

2. Quality of Power Supply

Section 2

3. Harmonics

Section 3

4. Complaints about meters

Section 4

5. Applications for New connections/Additional Load

Section 5

5. Applications for New connections/Additional Load

Section 5

6. Transfer of Consumer’s connection and conversion of services

Section 6

6. Transfer of Consumer’s connection and conversion of services

Section 6

7. Complaints about consumer’s bills

Section 7

7. Complaints about consumer’s bills

Section 7

8. Issues relating to disconnection/ reconnection of supply

Section 8

8. Issues relating to disconnection/ reconnection of supply

Section 8

4. The Licensee shall propose the target level of these indices annually while submitting ARR.

Section 4

1. New Connection

Section 1

1. New Connection

Section 1

2. Billing

Section 2

2. Billing

Section 2

3. Network expansion/enhancement required to release supply

Section 3

3. Network expansion/enhancement required to release supply

Section 3

4. Transfer of consumer’s connection and conversion of services

Section 4

4. Transfer of consumer’s connection and conversion of services

Section 4

5. Meter complaints

Section 5

5. Meter complaints

Section 5

6. Power supply failure

Section 6

6. Power supply failure

Section 6

7. Voltage fluctuation

Section 7

7. Voltage fluctuation

Section 7

1. Signature of the Applicant 2. Signature of the BM (D) Inspection Report From M/s (Wiring Contractor) Ref. No...........................................- M/s..............................................................................................................................(Name of the Licensee) Dear Sir, We hereby inform you that Electrical installation at the premises bearing no. ..........................................................situated on ..................................

Section 1

2. Signature of the BM (D) Inspection Report

Section 2

1. Installation Inspection Report

Section 1

1. Previous Reading

Section 1

2. Current reading

Section 2

3. Net Consumption

Section 3

1. Copy of latest bill duly paid

Section 1

1. Name of the Consumer:

Section 1

2. Address and contact No:

Section 2

3. Area affected due to load shedding:

Section 3

4. Date of load shedding

Section 4

5. Duration of load shedding

Section 5