(ii) In case of private development agency, land for sub-station duly approved by the civic body or built up space for sub-station shall be provided to the Licensee by the developer. In case development is carried out by a Government Agency, the land for sub-station shall be provided through the Government of National Capital Territory of Delhi. The same procedure for acquisition of land and levy of cost shall be applicable in case the grid sub-station is required for electrification of the area.
(iii) In case the area/colony is electrified by the Licensee, the SLD charges shall be payable by all consumers irrespective of whether it is electrified or un-electrified area. SLD charges, as given in Table-4, shall be leviable.
Table 4
Table 4
Service Line cum Development Charge
Service Line cum Development Charge
S.No.
S.No.
Sanctioned Load (kW)
Sanctioned Load (kW)
Amount (Rs)
Amount (Rs)
1
Upto 5
3000
2.
More than 5 upto 10
7000
3.
More than 10 upto 20
11000
4.
More than 20 upto 50
16000
5.
More than 50 upto 100
31000
6.
More than 100 kW (at 11kV)
50 % of the cost of HT cables/line/switchgear
Section 30 • The Delhi Electricity Supply Code And Performance Standards Regulations, 2007
30. Service line cum Development (SLD) Charges.
the-delhi-electricity-supply-code-and-performance-standards-regulations-2007-sec-30.json
•
Section 30
{
"act_title": "The Delhi Electricity Supply Code And Performance Standards Regulations, 2007",
"act_slug": "the-delhi-electricity-supply-code-and-performance-standards-regulations-2007",
"section_label": "Section",
"section": {
"number": "30",
"title": "30. Service line cum Development (SLD) Charges.",
"chapter": null,
"content": "(ii) In case of private development agency, land for sub-station duly approved by the civic body or built up space for sub-station shall be provided to the Licensee by the developer. In case development is carried out by a Government Agency, the land for sub-station shall be provided through the Government of National Capital Territory of Delhi. The same procedure for acquisition of land and levy of cost shall be applicable in case the grid sub-station is required for electrification of the area.\n(iii) In case the area/colony is electrified by the Licensee, the SLD charges shall be payable by all consumers irrespective of whether it is electrified or un-electrified area. SLD charges, as given in Table-4, shall be leviable.\nTable 4\nTable 4\nService Line cum Development Charge\nService Line cum Development Charge\nS.No.\nS.No.\nSanctioned Load (kW)\nSanctioned Load (kW)\nAmount (Rs)\nAmount (Rs)\n1\nUpto 5\n3000\n2.\nMore than 5 upto 10\n7000\n3.\nMore than 10 upto 20\n11000\n4.\nMore than 20 upto 50\n16000\n5.\nMore than 50 upto 100\n31000\n6.\nMore than 100 kW (at 11kV)\n50 % of the cost of HT cables/line/switchgear",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
"prev_section": "29",
"next_section": "31"
}