Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015
Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015
Sections
1. Short Title, Extent and Commencement.
Section 12. Definitions and Interpretations.
Section 23. Recovery of Charges.
Section 34. System of Supply.
Section 45. Requisition for Supply.
Section 56. Procedure for providing fresh electricity connection.
Section 67. Procedure for Modification in Existing Connections.
Section 78. Execution of Agreement and General Conditions of Supply.
Section 89. Metering.
Section 910. Billing.
Section 1011. Theft and Unauthorised Use of Electricity.
Section 1112. Disconnection and Reconnection of Service.
Section 1213. General Provisions.
Section 131. Proof of ownership of the premises
Section 12. A map indicating the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1 cm representing 1200 cm.
Section 23. Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statute.
Section 34. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm.
Section 45. In case of partnership firm, partnership deed.
Section 56. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.
Section 67. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Distribution Licensee immediately.
Section 78. Letter of intent for production/ enhancement in production may be furnished.
Section 89. List of equipments proposed to be installed along with the expected load.
Section 910. Resolution for authorised signatory.
Section 1011. Registration from Industries Department.
Section 1112. Extract of project report relevant to power and process requirements (in case of industries).
Section 1213. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.
Section 131. To indemnify the Distribution Licensee against all proceedings, claims, demands, costs, damages, expenses that he licensee may incur by reason of a fresh service connection given to the Applicant.
Section 12. That all Electrical Works done within the premises are as per Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010 and have been carried out by a licensed electrical contractor (in case the Applicant is an owner and wiring in the premises is new)
Section 23. The Distribution Licensee is indemnified against any loss accrued to the applicant on this account. Further, Applicant agrees that if there is any harm/loss to the property of the Distribution Licensee due to the fault in Electrical work within the premises of Applicant, all the liabilities shall be borne by the Applicant.
Section 34. To pay the electricity consumption bills and all other charges at the rates set out in the Distribution Licensee's Tariff Schedule and miscellaneous charges for supply as may be in force from time to time, regularly as and when the same becomes due for payment.
Section 45. To deposit the additional consumption deposit as revised by the Distribution Licensee from time to time based on the consumption of the Applicant in preceding year.
Section 56. To abide by the provisions of the Electricity Act, 2003, ___________ Electricity Supply Code, tariff orders and any other rules or regulations notified by the Commission, as applicable from time to time.
Section 67. That licensee shall be at liberty to adjust the electricity consumption charges along with any other charges against the Consumer Security Deposit paid by the Applicant, in the event of termination of the agreement prior to expiry of the contracted period or in case of nay contractual default.
Section 78. To be responsible for safe custody of Meters, CTs, Cables etc. provided by the Distribution Licensee and in case, there is any damage to equipment due to the reasons attributable to Applicant the same shall be chargeable to the Applicant. Further, all repercussions on account of breakage of seals of meters etc. or Direct/Dishonest Abstraction of energy shall be to the account of Applicant, as per the existing laws.
Section 89. To allow clear and un-encumbered access to the meters for the purpose of meter reading and its checking etc.
Section 910. That the Applicant would let the Distribution Licensee disconnect the Service connection under reference, in the event of any default, non-compliance of statutory provisions and in the event of a legally binding directive by Statutory Authority(ies) to effect such an order. This shall be without prejudice to any other rights of the Distribution Licensee including that of getting its payment as on the date of disconnection.
Section 1011. That the Distribution Licensee shall not be held responsible for any interruption or diminution of supply of Electricity.
Section 1112. All the above declaration given by the Applicant shall be construed to an Agreement between the Distribution Licensee and the Applicant.
Section 121. Copy of latest bill duly paid
Section 12. Proof of ownership / legal occupancy of premises
Section 23. No Objection Certificate from the existing consumer if available/possible.
Section 34. Registered deed/ Succession certificate/_______________ (if any other document, please specify)
Section 41. Copy of latest bill duly paid
Section 12. Proof of ownership / legal occupancy of premises
Section 23. Registered deed/ Succession or Legal Heir certificate/ Mutation deed/ _______________ (if any other document, please specify)
Section 34. NOC from other legal heir(s) in case connection is to be changed in the name of one of the legal heirs
Section 41. Installation inspection report
Section 12. Proof of ownership / legal occupancy of premises, if request is for shifting of premises
Section 23. Any other document (please specify)
Section 31. A work completion certificate & test report from Licensed Electrical Contractor, if the consumer's installation has been altered.
Section 12. Resolution for authorised signatory.
Section 21. Name and address of the Consumer
Section 12. Details of the installation
Section 23. Short circuit fault level of the installation
Section 34. Date of Commissioning of installation (In case of additional supply or reconnection)
Section 45. Results of the tests conducted
Section 51. Service Connection No.: __________________________
Section 12. Name of the consumer: __________________________
Section 23. Address and Telephone No. of the consumer: ____________________________________________
Section 34. Initial cost of meter was borne by (tick one): Consumer / licensee
Section 45. Complainant desires to provide/has provided a new meter for replacement (Yes/No):
Section 56. Any other information
Section 61. Site verification report
Section 12. Comments of concerned official
Section 21. Consumer Particulars
Section 12. Meter Particulars
Section 23. Revolution / Pulse Test.
Section 31. Copy of last bill
Section 12. Copy of payment receipt of last bill
Section 21. Rs. _____________ is payable to you for which Cheque No. _____________ is enclosed.
Section 12. Rs. _____________ is due from you. You are requested to pay the amount within a week of receipt of this letter, failing which, action as prescribed under the law shall be initiated for recovery of the amount.
Section 2
jharkhand-state-electricity-regulatory-commission-electricity-supply-code-regulations-2015.json
•
71 Sections
•
Jharkhand
{
"id": 18100,
"slug": "jharkhand-state-electricity-regulatory-commission-electricity-supply-code-regulations-2015",
"title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015",
"short_title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015",
"act_number": "Published vide Notification No. 45, dated 9.9.2015",
"act_year": 2015,
"act_type": "STATE",
"location": "Jharkhand",
"law_status": "unknown",
"enactment_date": null,
"description": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short Title, Extent and Commencement.",
"chapter": null,
"content": "1.2\n(a) procedure for connection, disconnection, reconnection, assessment of connected load, changes in existing connections (load modifications, change of name, change of tariff category, etc.);\n(b) practices relating to consumer metering, billing, intervals for billing of electricity charges and payment of bills; and\n(c) recovery of electricity charges, measures for preventing tampering, distress or damage to electrical plant, or electrical line or meter, entry of Distribution Licensee or any person acting on his behalf for disconnecting supply and removing the meter; entry for replacing, altering or maintaining electric lines or electrical plants or meter and such other matters.\n1.3\n1.4\n1.5\n1.6 Electricity Supply Code Review Panel.\n(a) To consider views from licensees, consumers and other interested parties about the implementation of the Code;\n(b) To assess compliance by licensees with Conditions of Supply;\n(c) To protect consumer interests and ensure/monitor overall performance of licensees;\n(d) To review the Code due to any operational problems faced by Distribution Licensees or the consumers in implementation of the Code.\n(a) The Chairperson/Member of the Commission shall be Ex-officio Chairperson of ESCRP;\n(b) One representative of the rank not below Chief Engineer from each Distribution Licensee of the State to be nominated by the Distribution Licensee;\n(c) One representative of the rank not below Chief Engineer from STU and transmission licensee (optional);\n(d) Representative of the rank not below Chief Engineer from SLDC (optional);\n(e) Representatives of the consumers to be nominated by the Commission. Of these, three representatives shall be from LT consumers, two from HT /EHT consumers and one each from registered consumer rural and urban bodies. At least two representatives from the above shall be from the category of the domestic consumers;\n(f) Secretary of the ESCRP shall be an officer of Commission nominated by Chairman of the ESCRP;\n(g) And any other member as nominated by the Chairman.\n1.7 Manner of reviewing the Code.\n1.8 Amendment in the Code.\n1.9 Repeal and Savings.\n(a) Anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.\n(b) The Commission may, at any time and on such terms as it may think fit, amend, alter or modify any provision of these Regulations or remove any error or defect in these Regulations.",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions and Interpretations.",
"chapter": null,
"content": "2.2\n(a) Words in the singular or plural term, as the case may be, shall also be deemed to include the plural or the singular term, respectively;\n(b) References to any statutes, regulations or guidelines shall be construed as including all statutory provisions consolidating, amending or replacing such statutes, regulations or guidelines, as the case may be, referred to;\n(c) Terms \"include\" or \"including\" shall be deemed to be followed by \"without limitation\" or \"but not limited to\" regardless of whether such terms are followed by such phrases or words of like import.\n2.3\n(a) \"Act\" means the Electricity Act, 2003, read in conjunction with its latest revisions;\n(b) \"agreement\" means a written agreement with specific terms entered into by the Distribution licensee and the consumer;\n(c) \"Appellate Authority\" means the authority prescribed under sub-section (1) of Section 127 of the Act;\n(d) \"applicant\" means an owner or occupier of any land/premises who files an application form with a licensee for supply of electricity, increase or reduction in sanctioned load/contract demand, change in title, disconnection or restoration of supply, or termination of agreement, as the case may be, in accordance with the provisions of the Act and the Code, rules and regulations made thereunder or other services;\n(e) \"application\" means an application form complete in all respects in the appropriate format, as required by the Distribution licensee, along with documents showing payment of necessary charges and other compliances;\n(f) \"application form\" means an application form complete in all respects in the appropriate format, as required by the Distribution licensee, before any payment of applicable charges;\n(g) \"area of supply\" means the area within which a licensee is authorised by his License to supply electricity;\n(h) \"Assessing Officer\" means an officer of a State Government or Board or licensee or supplier, as the case may be, designated as such by the State Government as per provisions of Section 126 of the Act;\n(i) \"Authorized Officer\" means an officer of the Distribution Licensee or supplier as the case may be, authorized in this behalf by the State Government as per provisions of Section 135 of the Act;\n(j) \"Authorised Representative\" refers to all officers, staff or representative of the Distribution licensee discharging function under general or specific authority of the Distribution Licensee;\n(k) \"billing cycle or billing period\" means the period for which regular electricity bills as specified by the Commission, are prepared for different categories of consumers by the Distribution Licensee;\n(l) \"calendar year\" means the period from the first day of January of a year to the thirty first day of December, of the same year;\n(m) \"check meter\" means a meter connected to the same core of the Current Transformer (CT) and Voltage Transformer (VT) to which main meter is connected;\n(n) \"Class-I cities\" are as defined in the latest Census of India (areas with population of more than 1 lakh) including the cities of Ranchi, Dhanbad and Jamshedpur.\n(o) \"Commission\" means the Jharkhand State Electricity Regulatory Commission;\n(p) \"conductor\" means any wire, cable, bar, tube, rail or plate used for conducting electrical energy and so arranged as to be electrically connected to a system;\n(q) \"connected load\" expressed in kW, kVA or BHP, means aggregate of the manufacturer's rated capacities of all energy consuming devices or apparatus connected with the Distribution licensee's service line on the consumer's premises which can be simultaneously used and shall be determined as per the procedure laid down in these Regulations;\n(r) \"connection point\" means a point at which the consumer's installation and/or apparatus are connected to Distribution Licensee's distribution system;\n(s) \"consumer\" means any person who is supplied with electricity for his own use by a licensee or the Government or by any other person engaged in business of supplying electricity to the public under this Act or any other law for the time being in force and includes any person whose premises are for the time being connected for the purpose of receiving electricity with the works of a licensee, the Government or such other person, as the case may be;\n(t) \"consumer installation\" or \"consumer's installation\" means any composite portable or stationary electrical unit including electric wires, fittings, motors and apparatus erected and wired by or on behalf of the consumer at the consumer's premises starting from the point of supply and includes apparatus that is available on his premises for being connected or envisaged to be connected to the installation but is for the time being not connected;\n(u) \"Consumption charges\" means charges payable for the consumption of electrical energy in kWh multiplied by appropriate tariff rates, along with Demand /Fixed charges, Fuel Surcharge Adjustment (FSA) and customer and other charges etc, wherever applicable.\n(v) \"Contract Demand\" means demand in Kilowatt (kW) or Kilo Volt amperes (kVA) as mutually agreed between the Distribution Licensee and the consumer and as entered into agreement or agreed through other written communication.\n(w) \"cut-out\" means any appliance or device for automatically interrupting the conduction of electricity through any conductor when the current rises above a pre-determined quantum and shall also include fusible devices;\n(x) \"date of commencement of supply\" is the date when the Distribution Licensee energizes the consumer installation by connecting to the Distribution mains;\n(y) \"days\" means clear working days.\n(z) \"dedicated distribution facilities\" means such facility not including a service line, forming part of distribution system of the Distribution Licensee which are clearly and solely dedicated to the supply of electricity to a single consumer or group of consumers on the same premises or on contiguous premises;\n(aa) \"demand charge\" for a billing period refers to a charge levied on the consumer based on the contracted/sanctioned load or maximum demand (reference to relevant subsection of these Regulations), whichever is higher, and shall be calculated as per the procedure laid down in the Tariff Order approved by the Commission;\n(bb) \"disconnection\" means the physical separation of user or consumer from the system;\n(cc) \"distribution mains\" means the portion of any main with which a service line is, or is intended to be, immediately connected;\n(dd) \"distribution system\" means the system of wires and associated facilities between the delivery points on the transmission lines or the generating station connection and the point of connection to the installation of the consumers;\n(ee) \"earthed\" means connected with the general mass of earth in such manner as to ensure at all times an immediate discharge of energy without danger;\n(ff) \"electric line\" means any line which is used for carrying electricity for any purpose and includes:\n(i) any support for any such line, that is to say, any structure, tower, pole or other thing in, on, by or from which any such line is, or may be, supported, carried or suspended;\n(ii) any apparatus connected to such line for the purpose of carrying electricity;\n(gg) \"emergency rostering\" means load shedding carried out by disconnecting at short notice or no notice for safety of personnel and equipment;\n(hh) \"energy charge\" refers to a charge levied on the consumer based on the quantity of electricity (units in kWh or kVAh as per tariff) supplied;\n(ii) \"Extra High Tension (EHT)\" means a voltage exceeding 33000 Volts.\n(jj) \"financial year\" means the period beginning from first of April in an English calendar year and ending with the thirty first of the March of the next year;\n(kk) \"feeder\" means a LT, HT or EHT distributor, emanating from a sub station, to which a distribution sub station or LT, HT or EHT consumers are connected;\n(ll) \"fixed charges\" shall be as per the provisions of the prevailing Tariff Order issued for the Distribution Licensee by the Commission;\n(mm) \"High Tension (HT)\" means a voltage level between 650 Volts and 33000 Volts;\n(nn) \"independent feeder\" means a feeder constructed at the cost of a consumer or a group of consumers and supplying electricity to only that consumer or group of consumers;\n(oo) \"licence\" means a licence granted under Section 14 of the Act;\n(pp) \"Licensed Electrical Contractor (LEC)\" means a contractor licensed under regulation 29 of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010;\n(qq) \"licensee\" or \"Distribution Licensee\" means a person granted a license under Section 14 of the Act authorising him to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply;\n(rr) \"load factor\" is the ratio of the total number of units consumed during a given period to the total number of units which have been consumed had the load been maintained throughout the same period and shall usually be expressed as the following percentage:\n(ss) \"Low Tension (LT)\" means a voltage that does not exceed 250 volts between phase and neutral or 440 volts between any two phases;\n(tt) \"maximum demand\" means the highest load measured in average kVA or kW at the point of supply of a consumer during any consecutive period of 30 (thirty) minutes or as specified by the Commission, during the billing period;\n(uu) \"meter\" means an equipment used for measuring, indicating and recording electrical quantities like energy in kWh or kVAh, maximum demand in kW or kVA, reactive energy in kVAR hours etc. including accessories like Current Transformer (CT), Voltage Transformer (VT) / Potential Transformer (PT) / Capacitor Voltage Transformer (CVT) etc. where used in conjunction with such meter. It shall also include any seal or sealing arrangement and other measures provided by the Distribution Licensee for sealing, reliability and for preventing theft/unauthorised use of electricity;\n(vv) \"minimum charge\" shall be as approved by the Commission in the prevailing tariff order for the Distribution Licensee;\n(ww) \"month\" means the calendar month. The period of about 30 days between two consecutive meter readings shall also be regarded as month for purpose of billing, wherever applicable;\n(xx) \"Occupier\" means the person in occupation of the premises where energy is used or is proposed to be used;\n(yy) \"overhead line\" means any electric supply-line, which is placed above ground and in the open air but excluding live rails of traction system;\n(zz) \"phased contract demand\" means contract demand agreed to be availed in a phased manner;\n(aaa) \"point of supply\" means the point at the incoming terminals of switchgear installed by Actual units consumed in a given period (in kWh/kVah, as applicable)x 100 (Contracted load or actual demand (in kW/kVa , as applicable) x No. of hours in the period the consumer;\n(bbb) \"power factor\" is the cosine of the electrical angle between the voltage and current vectors in an AC electrical circuit;\n(ccc) \"premises\" means land, building or infrastructure or part or combination thereof in respect of which a separate meter or metering arrangements have been made by the licensee for supply of electricity;\n(ddd) \"rural areas\" means the areas covered by Gram Panchayats;\n(eee) \"sanctioned load\" means the load in kW, kVA or BHP, which the Distribution Licensee has agreed to supply from time to time subject to the governing terms and conditions in the absence of an Agreement between the Distribution licensee and the consumer;\n(fff) \"seasonal consumer\" means a consumer who normally uses electricity supply for a purpose which operates for a particular part of the year not exceeding nine (9) months.\n(ggg) \"service line\" means any electric supply line through which electricity is, or is intended to be, supplied:\n(i) to a single consumer either from a distributing main or immediately from the Distribution licensee's premises; or\n(ii) from a distributing main to a group of consumers on the same premises or on contiguous premises supplied from the same point of the distributing main;\n(hhh) \"supplier\" means any entity authorised to supply electricity to consumer under the provisions of the Act;\n(iii) \"tariff order\" in respect of a licensee means the most recent order issued by the Commission for that licensee indicating the rates to be charged by the Distribution Licensee from various categories of consumers for supply of electrical energy and services;\n(jjj) \"tariff schedule\" means the most recent schedule of charges for supply of electricity and services issued by the Distribution Licensee as per the provisions of the Tariff Order for that licensee;\n(kkk) \"temporary supply\" means supply of electricity for a temporary period, not exceeding one year, as may be agreed between the Distribution Licensee and the applicant.\n(lll) \"theft\" shall mean theft of electricity as defined in Section 135 of the Act;\n(mmm)\"transmission licensee\" means a person who has been granted a license under Section 14 of the Act authorising him to establish or operate transmission lines;\n(nnn) \"transmission system\" means the system consisting of extra high voltage electric lines being operated at EHV (excluding generator interconnection facilities) owned and/or operated by the Transmission licensee for the purposes of the transmission of electricity from one power station to a sub-station or to another power station or between sub-stations or to or from any external interconnection equipment up-to the interconnection with the distribution system and includes the plant and apparatus and meters owned or used by the transmission licensee in connection with the transmission of electricity, but shall not include any part of any licensee's distribution system;\n(ooo) \"urban areas\" means the areas covered by all Municipal Corporations and other Municipalities including the areas falling under the various Urban Development Authorities, Cantonment Authorities and industrial estates or townships, excluding the areas covered under Class-I Cities;\n(ppp) \"user\" means any person having electrical interface with, or using the distribution system of the Distribution Licensee to whom these Regulations is applicable. Any Distribution Licensee, transmission licensee and generating units connected to the distribution system and the person availing Open Access in transmission or distribution system are also included in this term.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Recovery of Charges.",
"chapter": null,
"content": "(a) Recovery of such expenses as may be reasonably incurred by the Distribution Licensee in providing electric line or electrical plant used for giving such supply in accordance with these Regulations;\n(b) Charges for electricity supplied by licensee in accordance with the tariff order issued by the Commission;\n(c) Any other charges as may be approved by the Commission from time to time.\n3.2 Cost of Service Connection/Extension/Upgradation.\n3.3 Charges for Electricity Supplied.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. System of Supply.",
"chapter": null,
"content": "4.2\n(a) Low Tension\n(i) Single Phase: 230 volts between phases and neutral\n(ii) Three Phase: 400 volts between phases\n(b) High Tension (H.T) - Three Phase: 6.6 kV, 11 kV, 22 kV or 33 kV between phases.\n(c) Extra High Tension (EHT) - Three Phase: 66 kV, 110 kV, 132 kV, 220 kV or 400 kV between phases.\n(d) For Railway Traction, two phase HT supply with 25 kV between phases and EHT supply with 132 kV supply between phases may be given.\n4.3\nCategory\nCategory\nSystem of Supply\nSystem of Supply\nLow Tension\nLow Tension\nAll installations (other than irrigation pumping\n\t\t\t\tand agricultural services) with a contracted load upto 5 kW\nSingle phase at 230 V\nIrrigation pumping and agricultural services and\n\t\t\t\tall installations with a contracted load of more than 5 kW and up\n\t\t\t\tto 85 kW/100 kVA\n3 Phase, 4 wire at 400 V\nHigh Tension\nHigh Tension\nContracted load exceeding 100 kVA* and up to\n\t\t\t\t1500 kVA\n3 Phase at 6.6 kV / 11 kV / 22 kV\nContracted load exceeding 1500 kVA** and up to\n\t\t\t\t10000 kVA\n3 Phase at 22 kV/ 33 kV\nContracted load exceeding 10000 kVA and up to\n\t\t\t\t20000 kVA\n3 Phase at 33 kV\nExtra High Tension\nExtra High Tension\nContracted load exceeding 20000 kVA\n3 Phase at 66 kV/ 110 kV/ 132 kV/ 220 kV\n*Assuming a power factor of 0.85\n**Assuming a power factor of 0.85\n4.4\n4.5\n4.6\n4.7",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Requisition for Supply.",
"chapter": null,
"content": "(a) the supply of power is technically feasible;\n(b) the applicant has observed the procedure specified in these Regulations; and\n(c) the applicant agrees to bear the cost of supply and services as specified in the Code.\n[(d) Application form for release of new provisional electricity connection (for load up to 2kW) - Annexure 20.]\n5.2 Licensee's obligation to extend the distribution system and consumer's share in the cost.\n5.3 Conditions for Grant of Connection.\n5.4 Point of Supply.\n(a) Establishments/premises having distinct set up and staff, or\n(b) Establishments/premises owned or leased by different persons, or\n(c) Establishments/premises covered by different licensee or registrations under any law where such procedures are applicable, and\n(d) Establishments/premises for domestic category households having relevant document from the local authorities, identifying the premises as separate.\n(a) a registered Co-operative Group Housing Society (Housing Society), for making electricity available to the members of such Society residing in the same premises. Provided that it shall not in any way prejudicially affect the right of a person residing in the housing unit, sold or leased by such housing society, to demand electricity supply directly from the Distribution Licensee of the area;\n(b) a person (employer) for making electricity available to his employees residing in the same premises.\n(a) the housing society/employer shall apply to the Distribution Licensee for the entire connected load / contract demand of the colony and its additions from time to time;\n(b) the land/ accommodation reasonably required for installation of metering at the point of supply shall be provided by the housing society / employer free of cost to the Distribution Licensee:\n(c) the quality and system of supply shall be as per relevant regulations, as in force from time to time;\n(d) the system of wires and associated facilities from the single point of connection to the installation for making electricity available to the members of such society residing in the same premises of the housing society/employer along with the electrical installations of individuals shall conform to the safety requirements of the Act, and all Rules and Regulations made thereunder. The electrical installation shall be wired as provided in the Rules/Regulations and shall be tested before releasing connection through single point supply;\n(e) all individual connections shall be metered;\n(f) the infrastructure after the point of supply shall be laid by the applicant housing society / employer and the housing society / employer shall retain the ownership of all such assets;\n(g) the housing society/ employer shall be fully responsible for the maintenance of complete infrastructure network beyond the point of supply;\n(h) the housing society / employer shall be fully responsible for various commercial and technical activities for distribution of electricity to the members of such society residing in the same premises;\n(i) the housing society/employer shall not charge more than the slab-wise electricity tariff determined by the Commission for residential consumers located in the area of supply of the Distribution Licensee, where such housing society/premises is located;\n(j) electricity supply by the Distribution Licensee to the housing society /employer shall be governed by these Regulations and the terms and conditions for supply of electricity of the Distribution Licensee for its consumers;\n(k) electrical energy supply to the housing society / employer shall not be utilized by the housing society / employer in any manner pre-judicial to the Distribution Licensee and all usage shall be in accordance with the provisions of the contract entered into in this regard and the statutory provisions applicable thereto. The housing society /employer shall not extend the supply beyond its premises other than that for which it was sanctioned by the Distribution Licensee.\n5.5 Requisition for New Electricity Service Connection.\n(a) Application form for release of new connection (Low Tension) - Annexure 1\n(b) Application form for release of new connection (High Tension/ Extra High Tension) - Annexure 2\n(c) Format for declaration/undertaking to be signed at the time of receiving electricity supply - Annexure 3\n(a) If the applicant is an individual:\n(i) Aadhaar (UID) Card\n(ii) Electoral identity card;\n(iii) Passport;\n(iv) Driving license;\n(v) Ration card;\n(vi) Photo identity card issued by Government agency;\n(vii) PAN card;\n(viii) Photo Certificate from village Pradhan or any village level Government functionary like Patwari/ Lekhpal/ in-charge of primary health centre etc.\n(b) If the applicant is a company, trust, educational institution, government department etc, the application form shall be signed by a competent authority (e.g. Branch Manager, Principal, Executive Engineer, etc) along with a relevant resolution/ authority letter of the institution concerned.\n(a) Copy of registered sale deed or registered lease deed or registered partition deed or in the case of agricultural connections a copy of khasra / khatauni / khata nakal\n(b) Registered General Power of Attorney;\n(c) Municipal tax receipt or Demand notice or any other related document;\n(d) Letter of allotment.\n(e) An applicant who is not an owner but an occupier of the premises shall, along with any one of the documents listed at (a) to (d) above, also furnish a No Objection Certificate from owner of the premises.\n(a) Aadhaar (UID) Card\n(b) Electoral identity card;\n(c) Passport;\n(d) Driving license;\n(e) Ration card;\n(f) Photo identity card issued by any Government agency;\n(g) Statement of running Bank Account;\n(h) Most recent Water / Telephone / Electricity / Gas connection Bill;\n(i) Income Tax assessment order\n(a) Industrial consumers: Valid Industrial License, if applicable;\n(b) Agricultural consumers: No Objection Certificate from competent government authority for tube wells, if required;\n(c) Non-Domestic Khokhas and Temporary Structure: No Objection Certificate for khokha or temporary structure from the nagar nigam / nagar palika / nagar panchayat / gram sabha / gram panchayat / land development authority / land owning agency.\n(a) Provisional connection shall not in any way make the applicant lawful owner or occupier of the premises\n(b) Applicant shall not use such connection as the legal Address Proof Or Proof Of Residence , which shall be printed on the electricity bill of consumer;]",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Procedure for providing fresh electricity connection.",
"chapter": null,
"content": "(a) Issue a duly authorized acknowledgement of each application form accepted, or\n(b) Inform an applicant upon request of the status of his application and the reasons if any, for non-disposal of the application.\n6.2\nNote: 'Acknowledgment' on part of the Distribution Licensee means a written slip/receipt issued to the applicant at the Distribution Licensee's office. Acknowledgment on part of the applicant, e.g. on test / inspection reports, means a signature by the applicant or his authorised representative on the form prepared / being carried by the Distribution Licensee's official / representative.\nNote:\n6.3\n6.4\n6.5\n6.6\n(a) study the technical requirements for giving supply; and\n(b) inspect the premises to which supply is to be given.\n6.7\n(a) five (5) days in case of LT connection in Class-I cities; seven (7) days in case of LT connection in Urban areas and ten (10) days in case of LT connections in rural areas\n(b) ten (10) days in case of HT and EHT connections, from the date of receipt of application form.\n6.8\n6.9\n6.10\n(a) verify that there is no outstanding due in the applicant's name or for the premise for which the new connection is being applied for. If the applicant, in respect of an earlier agreement executed in his name or in the name of a firm or company with which he was associated either as a partner, director or managing director, has any arrears of electricity dues or other dues for the premises where the new connection is applied for and such dues are payable to the licensee, the requisition for supply may not be entertained by the licensee until the dues are paid in full. But if the erstwhile consumer defaulted payment of dues and left the premises for good and the concerned premises has come in legal possession of a new occupant through transfer or a decree/order of the court/authority and who has no nexus with the previous owner/occupant in any manner, applies for connection of the electrical line in the same disconnected premises, the distribution licensee shall provide electrical connection without realization of the arrear/dues of the premises payable by the erstwhile consumer, from the subsequent transferee of the premises and he shall not be held liable to pay/discharge the liability of the previous consumer for securing a fresh connection;\n(b) fix the point of supply, the place where the meter and MCB etc. shall be installed, and layout of the service line, in consultation with the consumer: Provided that the service line shall be laid at an accessible location and the meter shall be fixed outside or at the entry point of the premises in such a manner that it is protected from elements like rain, etc. and is easily accessible without getting the premises unlocked or opened for this purpose;\n(c) record the correct full address of the premises, if not provided in the application form, note down landmarks near the property and the pole number from where service connection is proposed to be given and consumer number of the neighbours or nearest consumer;\n(d) verify the load/ demand, purpose of usage of electricity and consumer category as indicated in the application form; and\n(e) verify all other particulars mentioned in the application form, as required.\n6.11\n6.12\n6.13\n6.14\n6.15\n6.16\n6.17\n6.18\n(a) where LT supply to an applicant is to be given from an existing network of the Distribution Licensee, the Distribution Licensee shall intimate the charges to be borne by the applicant within ten (10) days in Class-I cities, within twelve (12) days in Urban areas and within ten (15) days in Rural areas from the date of receipt of application form for supply;\n(b) where LT supply to an applicant requires extension or augmentation/upgradation of distributing mains or commissioning of a new sub-station, the Distribution Licensee shall intimate the charges to be borne by such applicant within thirty (30) days from the date of receipt of application form for supply;\n(c) where HT or EHT supply to an applicant is to be given from an existing network of the Distribution Licensee, the Distribution Licensee shall intimate the charges to be borne by the applicant not later than twenty (20) days from the date of receipt of application form for supply;\n(d) where EHT supply is to be given or HT supply requires extension or augmentation/upgradation of distributing mains or commissioning of a new substation, the Distribution Licensee shall intimate the charges to be borne by such applicant within thirty (30) days from the date of receipt of application form for supply;\n(e) where an applicant seeks dedicated distribution facilities to his premises, the Distribution Licensee shall intimate the charges to be borne by such applicant within forty five (45) days from the date of receipt of application for supply: Provided that the time taken by the applicant in removing any defects/deficiencies found at the applicant's premises shall not be included in the timeline specified above:\n6.19\n(a) details of the works (including service line) to be undertaken for providing electricity supply;\n(b) charges for the abovementioned works to be paid by the applicant in accordance with the schedule of charges approved by the Commission from time to time:\n(c) amount of security deposit to be deposited by the applicant as specified in Annexure 18 to these Regulations.\n6.20\n6.21\n6.22\n6.23\n6.24\n6.25\n6.26\n(a) the Distribution Licensee shall, on an application by the owner or occupier of any premises, give supply of electricity to such premises, within one (1) month after receipt of the completed application and payment of charges for requiring such supply if the supply to an applicant is to be given from an existing network of the Distribution Licensee;\n(b) where the supply of electricity to a premise requires extension or augmentation of distributing mains, the Distribution Licensee shall give supply to such premises within forty five (45) days in Class-I Cities and Urban areas and within sixty (60) days in Rural areas, from the date of receipt of application and payment of charges. The extension or augmentation of distributing mains may include the extension of HT, LT lines and new or augmentation of distribution transformer;\n(c) where the supply of electricity to a premise requires commissioning of a new substation forming part of the distribution system, the Distribution Licensee shall give supply to such premises within six (6) months from the date of receipt of application and payment of charges. The commissioning of new sub-station forming part of distribution system will include substation having transformation from EHV to HT or HT to LT or switching station from where HT distribution lines originate.\n6.27 Procedure for Providing Temporary Supply.\n(a) For LT supply without extension, within 7 days\n(b) For LT supply with extension, within 15 days\n(c) For HT supply without extension, within 15 days\n(d) For HT supply with extension, within 25 days\n(e) For EHT supply, within thirty (30) days\n6.28 Tatkal Yojana.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Procedure for Modification in Existing Connections.",
"chapter": null,
"content": "(a) application format for change in name of registered consumer due to change in ownership/occupancy - Annexure 4;\n(b) application format for transfer of ownership to legal heir - Annexure 5;\n(c) application format for Conversion of Services / Change of Consumer Category / Shifting of Premises - Annexure 6;\n(d) application format for load enhancement/reduction - Annexure 7.\n7.2\n7.3\n7.4\n7.5\n7.6\n7.7\n7.8\n7.9\n7.10\n7.11\n7.12 Transfer of Connection (Change of name).\n(a) The applicant shall apply for change of consumer's name in the format prescribed in Annexure 4 to these Regulations, along with a copy of the latest bill duly paid. The request for transfer of connection shall not be accepted unless all dues recoverable against the concerned connection are settled. The application form shall be accepted on showing proof of ownership/occupancy of property. A No Objection Certificate from the registered consumer/ authorised person/ previous occupant of the premises shall be required for cases involving transfer of security deposit in the name of applicant. The Distribution Licensee shall process the application form in accordance with clauses 7.6 to 7.11 of these Regulations;\n(b) In case the No Objection Certificate from the registered consumer/ authorised person/ previous occupant is not submitted, an application form for change of name shall be entertained only if security deposit as stipulated in these Regulations is paid afresh. However, the original security deposit shall be refunded to the claimant as and when a claim is preferred by the concerned person;\n(c) Change of consumer's name shall be effected within thirty (30) days from receipt of complete application along with payment of necessary charges, if any.\n(a) The applicant shall apply for change of consumer's name in the format prescribed in Annexure 5 to these Regulations, along with a copy of the latest bill duly paid. The application form shall be accepted on showing the Registered Will/deed, Succession/Legal heir Certificate, Mutation in municipal/land records or any other proof of legal heirship. The Distribution Licensee shall process the application form in accordance with clauses 7.6 to 7.11 of these Regulations;\n(b) Change of consumer's name shall be effected within thirty (30) days from receipt of complete application along with payment of necessary charges, if any;\n(c) Any charge for electricity or any sum other than charge for electricity as due and payable to licensee which remains unpaid by a deceased consumer or the erstwhile owner/occupier of any land/premises as the case may be, shall be a charge on the premise transmitted to the legal representative/ successors-in-law or transferred to the new owner of the premise as the case may be, and same shall be recoverable by the Distribution Licensee as due from such legal representative or successor-in-law or new owner/occupier of the premises as the case may be.\n7.13 Conversion of Services.\n7.14 Shifting of Meter / Existing Connection.\n7.15 Reclassification of Consumer Category.\n7.16 Load Enhancement.\n(a) whether the additional power can be supplied at existing voltage or at a higher voltage;\n(b) addition or alterations, if any, required to be made to the system and the cost to be borne by the consumer;\n(c) amount of additional security deposit, cost of additional infrastructure and the system strengthening charges or capacity building charges, if any, to be deposited; and\n(d) change in classification of the consumer and applicability of tariff, if required.\n(a) pay additional security deposit, cost of addition or alteration required to be made to the system, if any, and system strengthening charges/capacity building charges, if any, within fifteen (15) days of receipt of the demand note; and\n(b) execute a revised Agreement.\n7.17 Load Reduction.\n(a) details of alteration/modification/removal of electrical installation with work completion certificate and test report from a Licensed Electrical Contractor where alteration of installation is involved;\n(b) any other reason(s) for reduction of contract demand;\n(c) Details of generator, if any, installed by the consumer with safety clearance certificate form competent authority as applicable.\n7.18 Annual Review of Contract Demand.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Execution of Agreement and General Conditions of Supply.",
"chapter": null,
"content": "(a) name and address of the consumer/applicant;\n(b) address of the premises for which electricity supply has been requisitioned and for which the agreement is being executed;\n(c) sanctioned load/ contract demand;\n(d) purpose of usage of electricity;\n(e) declaration by the applicant/consumer:\n(i) to abide by provisions of Act and these Regulations;\n(ii) to pay for the supply of electricity based on prevailing tariff rates;\n(iii) to pay for all other charges as become due in accordance with these Regulations and the approved schedule of charges of the Distribution Licensee;\n(iv) to deposit such security as the Distribution Licensee may be entitled to require from him under the Act and these Regulations.\n8.2 General Conditions of Supply Connected Load.\nDemand Note.\nPoint of Supply.\nSecurity Deposit.\n(a) the estimated power consumption for the billing cycle period plus forty five (45) days:\n(b) payment due to the Distribution Licensee for any electric line or electrical plant or electric meter that is to be provided for supplying electricity to person.\n8.2.16 Interest on Security Deposit.\n8.2.17 Review of Security Deposit.\n8.2.19 Mode of Payment of Security Deposit.\n8.2.21 Resale of Energy.\n(a) inspecting, testing, repairing or altering the electric supply lines, meters, fittings, works and apparatus for the supply of electricity belonging to the Distribution Licensee;\n(b) ascertaining the amount of electricity supplied or the electrical quantity contained in the supply; or\n(c) removing where a supply of electricity is no longer required, or where the Distribution Licensee is authorised to take away and cut off such supply, any electric supply-lines, meters, fittings, works or apparatus belonging to the Distribution Licensee:\n(a) enter any premises or land referred to in clause 8.2.22 for any of the purposes mentioned therein; or\n(b) enter any premises to which electricity is to be supplied by him, for the purpose of examining and testing the electric wires, fittings, works and apparatus for the use of electricity belonging to the consumer.\n(a) Enter, inspect break open and search any place or premises in which he has to believe that electricity has been, is being, or is likely to be, used un-authorisedly;\n(b) Search, seize and remove all such devices, instrument, wires and any other facilitator or article which has been, is being, or is likely to be, used for unauthorized use of electricity;\n(c) Examine or seize any books of account or documents which in his opinion shall be useful for or relevant to any proceedings in respect of the offence under sub-section (1) and allow the person from whose custody such books of account or documents are seized to make copies thereof or take extracts there from in his presence.\n(a) Power supply shall not be given to any applicant at low or medium voltage for utilizing induction motors of 3 HP capacity or above or welding transformers of 1 kVA capacity or above, unless shunt capacitors of appropriate rating are installed by the consumer across the terminal of such motors and welding transformers to achieve an average monthly power factor that is specified in this Code.\n(b) Motors of low or medium voltage shall be provided with control gear to satisfactorily prevent the maximum current demand from the consumer's installation exceeding the limits given in the following schedule under all possible conditions:\nNature of Supply\nNature of Supply\nSize of Installation\nSize of Installation\nMax. Current Demand\nMax. Current Demand\nSingle phase/ three phase\n(a) Up to and including 1 BHP.\nSix times full load current\n(b) Above 1 BHP and up to and including 10 BHP\nThree times full load current\n(c) Above 10 BHP and up to and including 15 BHP\nTwo times the full load current\n(d) Above 15 BHP\nOne and a half times the full load current\n(c) A triple pole linked switch protected by a no-volt release shall control the motor circuit and triple pole fuses (or overload release). It is important that the release shall be maintained in good working order. Wiring for motors shall be run with all three-phase wire bunches in a metallic conduit, which shall be effectively earthed throughout and shall be connected to the frame of the motor from which two separate earth wires shall run. The minimum permissible size of the earth wire permitted shall be No. 14 SWG. Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010, as amended from time to time, shall be complied with in every respect.\n(d) Total harmonic voltage distortion shall not exceed the limits mentioned below:\n(e) In addition, synchronous motors shall also be provided with an apparatus to control watt-less current.\n8.2.35 Installation of Irrigation/Agriculture Pump Set.\n(a) Friction less foot valve\n(b) HDPE piping suction and delivery\n(c) ISI marked energy efficient monobloc pump set.\n(d) Capacitor of adequate rating for the pump set.\n8.2.36 Parallel Operation with the Supply System of licensee.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Metering.",
"chapter": null,
"content": "(a) Purchase the meter, MCB/CB and associated equipment himself from a vendor(s) provided the equipments are of a make and specification approved by the Distribution Licensee from time-to-time; or\n(b) Require that the meter, MCB/CB and associated equipment be supplied by the Distribution Licensee.\n(a) For LT connections - Electronic Meters with MDI\n(b) For HT/EHT consumers - 3 Phase Tri-vector meters with MDI. The meters shall have a facility for \"Time of the Day\" metering and storage of at least 45 days. The consumer shall have the option to install meter having facility to record peak hours MDI in addition to above features\n9.2 Supply and Installation of Meters and MCBs/CBs.\n9.3 Reading of Meters.\n9.4 Testing of Meters.\n(a) Single phase meters: Once every five (5) years\n(b) LT 3-phase meters: Once every three (3) years\n(c) HT/EHT meters including MDI: At least once every year Wherever applicable, CT and PT shall also be tested along with meters\n9.5 Replacement of Meters.\n(a) If the meter was owned by the consumer, the Distribution Licensee shall inform the consumer to replace the meter and associated equipment as per provisions of clauses 9.1.1 to 9.1.5 of these Regulations within 7 days, after which the Distribution Licensee may be empowered to install a new meter and start charging meter rent, if applicable.\n(b) If the meter was owned by the Distribution Licensee, the Distribution Licensee shall install a new meter at its own cost: Provided that in both the scenarios detailed in sub clauses 9.5.10 (a) and 9.5.10 (b), the Distribution Licensee shall recover the cost of the meter from the consumer in proportion of the remaining useful life of the meter (useful life of the meter as per the depreciation schedule of the Commission - no of years after date of first instalment of the aforesaid meter) that was rendered defective/burnt:",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Billing.",
"chapter": null,
"content": "(a) Periodicity of billing for his service (monthly or bimonthly);\n(b) Period in the calendar month when his meter will be read;\n(c) Address of the billing office and collection centre;\n(d) Probable week in which bill shall be issued by the Distribution Licensee in every billing cycle;\n(e) Probable due dates for payment of bill; and\n(f) Rebates applicable to consumers, if any:\nProcedure for Billing under Special Circumstances\n10.2 Billing when Meter Not Accessible.\n10.3 Billing in the event of Defective/stuck/stopped/burnt meters.\n(a) As per clause 11.51 of these Regulations, if it is established in the Distribution Licensee's enquiry that the loss of meter was due to a deliberate act of the consumer and/or with his connivance\n(b) As per clauses 10.3.1 and 10.3.2 of these Regulations, in other cases.\n10.4 Change of Occupancy/ Vacancy of Premises.\n10.5 Payment on Self Assessment by the Consumer.\n10.6 Advance Payment of Bills.\n10.7 Billing in case of Disputed Bills.\n10.8 Billing in case of Excess Load.\n(a) In domestic category, 50% of the difference between the actual connected load and two times the contracted load;\n(b) In commercial category, 75% of the difference between the actual load and 1.33 times the contracted load; and\n(c) In other cases difference between the connected load and the contracted load.\n10.9 Information to be included in the bill.\n(1) Address and telephone number of the billing office / distribution centre;\n(2) Service Connection Number;\n(3) Bill Number and Period of Bill;\n(4) Consumer Number, Name and Address;\n(5) Pole Number from which connection is served / Name of sub-division or centre;\n(6) Date of issue of Bill;\n(7) Tariff category of consumer (i.e. domestic/ commercial etc.);\n(8) Tariff, rate of electricity duty and cess applicable;\n(9) Status of meter (OK/defective/not available);\n(10) Billing Status (Regular/ Assessed/ Provisional Bill with reason)\n(11) Supply details:\na. Type of supply (i.e. single phase, three-phase LT or HT)\nb. Contracted load/ Connected load\n(12) Meter number and identification details of meter (in case the meter was replaced during the billing period, the bill must indicate the meter numbers of new as well as old meter, date of replacement, final reading of old meter and initial reading of new meter at the time of replacement of meter)\n(13) Initial meter reading with date;\n(14) Final meter reading with date;\n(15) Multiplying Factor of the meter if any;\n(16) Units consumed;\n(17) Maximum demand;\n(18) Due date of payment (separately specified for payment by cash, cheque, ECS, NEFT, Credit/Debit Card, etc. if necessary);\n(19) Billing details: Item-wise details for the current month as well as past arrears shall be furnished in the bill. A representative list is given below:\ni. Energy Charges\nii. Fixed Charges\niii. Meter rent, if any\niv. Capacitor surcharges\nv. Other Charges, if any\nvi. Electricity Duty\nvii. Fuel Cost adjustment charges\nviii. Power factor adjustment charges, if any\nix. Reactive Energy Charges, if any\nx. Time of Use charges, if any\nxi. Surcharge for delay, if any\nxii. Interest on instalments due\nxiii. Total current month demand\nxiv. Arrears (with details)\nxv. Details of Subsidy, if any, under Section 65 of the Act\nxvi. Others (with details)\nxvii. Total amount due\nxviii. Adjustment\nxix. Net amount to be paid\n(20) Modes of payment accepted;\n(21) In case of cheques and bank drafts, the receiving authority in whose favour the amount should be drawn;\n(22) Security Deposit held and required;\n(23) Interest on security deposit earned till date;\n(24) Details of last six readings.\n(a) Address(es) of collection centre(s) and working hours for collection of bill payments, including the date and time of presence of the mobile van, if any, at different venues for collection of bill payments;\n(b) Designation and address of the authority with whom grievance/complaints pertaining to bills can be lodged;\n(c) Complete address(es) with telephone number(s) of the complaint centers, if any;\n(d) Addresses and telephone numbers of the relevant Grievance Redressal Officers including Central Grievance Redressal Officers as well as the Ombudsman constituted under Section 42 sub-clause 6 of the Act;\n(e) Tariff Schedule applicable to the consumer; and\n(f) Advertisements, if any.\n10.10 Payment of Electricity Bill.\n(a) In person at the designated collection offices of the Distribution Licensee during specified times; or\n(b) By post or courier; or\n(c) By deposit in the drop-boxes maintained by the Distribution Licensee at designated locations; or\n(d) By bank transfer through the internet; or\n(e) By any other scheme notified by the Distribution Licensee for acceptance of bill payment.\n10.11 Receipt of bill payment.\n10.12 Utilization of the Amount Received.\n(a) Late payment surcharge;\n(b) Arrears of electricity charges and corresponding arrears of electricity duty/ tax;\n(c) Current electricity charges and corresponding current electricity duty/tax;\n(d) Miscellaneous charges.\n10.13 Late Payment Surcharge.\n10.14 Instalment Facility.\n10.15 Recovery of Arrears.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Theft and Unauthorised Use of Electricity.",
"chapter": null,
"content": "11.1\nProcedure for booking a case of theft of electricity\n11.2\n11.3\n11.4\n11.5\n11.6\n11.7\n11.8\n11.9\n(a) Actual period from the date of commencement of supply to the date of detection of theft;\n(b) Actual period from the date of replacement of component of metering system in which the evidence is detected to the date of detection of theft;\n(c) Actual period from the date of previous checking of installation to date of detection of theft;\n(d) Meter Reading Instrument (MRI) data or Remote Meter Reading data should be considered wherever available.\n11.10\n11.11\n11.12\n11.13\n11.14\n11.15\n11.16\n11.17\n11.18\n11.20\n11.21\n11.22\n11.23\n11.24 Assessment.\n11.25\n11.26\n11.27\n11.28\n11.29\n11.30\n11.31\n11.32 Default in payment of assessed amount or instalments thereof.\n11.33 Voluntary declaration of tampered meters.\n(a) The tampered meter shall be replaced with a new meter by the Distribution Licensee at the consumer's cost or by the consumer, as the case may be, immediately and the Distribution Licensee shall raise the assessment bill at two times the normal tariff for the period of last six months reckoned from date of declaration.\n(b) The energy bill, for the period the meter is not replaced, shall be sent as per the procedure for defective meters.\n(c) The Distribution Licensee shall not move the Special Court in case a consumer voluntarily declares the tampered meter and pays the requisite charges in time.\n(d) In case of default in payment, the procedure for booking the theft case may be followed.\nUnauthorised Use of Electricity (UUE)\nProcedure for booking a case for Unauthorised Use of Electricity\n11.34\n11.35\n11.36\n11.37\n11.38\n11.39\n11.40\nNotice to consumer.\n11.41\n11.42\n11.43\nSubmission of consumer's reply\n11.44\n11.45\nHearing in case of suspected unauthorised use of electricity.\n11.46\nAssessment.\n11.48\n11.49\n11.50\n(a) Period of assessment: If the Assessing Officer reaches to the conclusion that unauthorised use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorised use of electricity has taken place and if, however, the period during which such unauthorised use of electricity has taken place cannot be ascertained, such period shall be limited to a period of 12 months immediately preceding the date of inspection.\n(b) Assessment charge: The assessment for units assessed as per clause 11.51 of these Regulations shall be done on the basis of applicable tariff and in accordance with the Electricity (Amendment) Act, 2007 and any subsequent amendments, excluding the consumption recorded by the meter or already billed during the assessment period at applicable tariffs.\n(c) If a consumer is found indulging in more than one act of unauthorised use of electricity, the charges payable by the consumer in respect of each such unauthorised use shall be separately assessed and billed accordingly.\n11.51\n= Average Monthly consumption for the period of assessment (units) x Period of assessment (in months or fraction thereof), assessed as per clause 11.50 (a) of these Regulations\n11.52\n11.53\n11.54\n11.55\n11.56\nAppeal to Appellate Authority.\n11.57\n11.58\n11.59\n11.60\n11.61\n11.62\n11.63\n11.64",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Disconnection and Reconnection of Service.",
"chapter": null,
"content": "12.2\n12.3\n(a) On non-payment of the Distribution Licensee's dues: Where a consumer neglects to pay any charge for supply electricity or any other sum due from him to the Distribution Licensee, by the due date mentioned in the bill, the Distribution Licensee may, after giving not less than fifteen (15) clear days' notice in writing to such person and without prejudice to his rights to recover such charge or other sum by suit, cut off supply of electricity and for that purpose disconnect any electric supply line or other works being the property of such licensee through which electricity may have been supplied, distributed or wheeled and may discontinue the supply until such charge or other sum, together with any expenses incurred by him in cutting off and reconnecting the supply, are paid, but no longer:\n(b) If the conduct/continuance of any business/industry/activity being carried out in any premises becomes unlawful due to lack of necessary permission or withdrawal of permission from the competent authority;\n(c) If the wiring, apparatus, equipment or installation at the consumer's premises is found to be defective or there is leakage of electricity or if the consumer is found to have altered the position of the meter and related apparatus or if the consumer uses any apparatus or appliance or uses the energy in such manner as to endanger the service lines, equipment, electric supply mains and other works of the Distribution Licensee, or is found to be using it in any manner which unduly or improperly interferes with the efficient supply of energy to any other consumer.\n(d) If at any time the consumer is found to be using energy for a purpose other than for which it was intended / provided or tampers with the meter and/or other apparatus of the Distribution Licensee on his premises or extends/allows supply of energy to any other premises from his connection.\n12.4\n12.5\n12.6\nPermanent Disconnection.\n12.7\n(a) On the termination of the Agreement\n(b) If the cause for which the supply was temporarily disconnected is not removed within the notice period:\nDisconnection on Consumer's Request.\n12.8\n12.9\n12.10\n12.11\n12.12\nReconnection.\n12.13\n12.14",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. General Provisions.",
"chapter": null,
"content": "13.1 General.\n13.2\n13.3 Provision for load shedding.\nService of Notice.\n13.4\n(a) sent by registered post at the correct postal address of the addressee; or\n(b) delivered by hand to the person residing at the address notified to the Distribution Licensee by the consumer; or\n13.5\n(a) Affixing the notice at a conspicuous place on the consumer's premises in the presence of two witness and photographing the notice; or\n(b) Publication of the notice in daily newspaper(s) commonly read in the concerned locality to be kept on record by the Distribution Licensee.\nDemand Side Management.\n13.6\n13.7\n13.8\nRepeal and Savings.\n13.9\n13.10\n(a) Anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.\n(b) The Commission may, at any time and on such terms as it may think fit, amend, alter or modify any provision of these Regulations or remove any error or defect in these Regulations.\nPower of Relaxation and Power to Remove Difficulties.\n13.11\n13.12\nSchedule for Miscellaneous Charges\nSchedule for Miscellaneous Charges\nS.No.\nS.No.\nPurpose\nPurpose\nScale of Charges\nScale of Charges\nManner in which payment will be realized\nManner in which payment will be realized\n1\nApplication fee\nAgriculture\n10\nApplication should be given in standard\n\t\t\t\trequisition form of the Distribution Licensee which will be\n\t\t\t\tprovided free of cost. Payable in cash in advance along with the\n\t\t\t\tintimation\nStreet light\n20\nDomestic\n15 (Kutir Jyoti) 20 (Others)\nCommercial\n20\nOther LT categories\n50\nHTS\n100\nHTSS, EHTS, RTS\n100\n2\n2\nRevision of estimate when a consumer\n\t\t\t\tintimates changes in his requirement subsequent to the\n\t\t\t\tpreparation of service connection estimate based on his original\n\t\t\t\tapplication\nRevision of estimate when a consumer\n\t\t\t\tintimates changes in his requirement subsequent to the\n\t\t\t\tpreparation of service connection estimate based on his original\n\t\t\t\tapplication\nAgriculture\n10\nPayable in cash in advance along with the\n\t\t\t\tintimation for revision\nDomestic\n30\nCommercial\n30\nOther LT categories\n50\nHT Supply\n150\n3\n3\nTesting of consumers Installation\nTesting of consumers Installation\nFirst test and inspection free of charge but\n\t\t\t\tshould any further test and inspection be necessitated by faults\n\t\t\t\tin the installation or by not compliance with the conditions of\n\t\t\t\tsupply for each extra test or inspection\n100\nPayable in cash in advance along with the\n\t\t\t\trequest for testing\n4\n4\nMeter test when accuracy disputed by consumer\nMeter test when accuracy disputed by consumer\nSingle phase\n40\nTo be deposited in cash in advance. If the meter\n\t\t\t\tis found defective within the meaning of the Indian Electricity\n\t\t\t\tRules 1956, the amount of advance will be refunded and if it is\n\t\t\t\tproved to be correct within the permissible limits laid down in\n\t\t\t\tthe Rules, the amount will not be refunded.\nThree phase\n100\nTrivector/ special type meter\n650\n5\n5\nRemoving/ Refixing of meter\nRemoving/ Refixing of meter\nSingle phase\n50\nPayable in cash in advance along with the\n\t\t\t\tintimation for revision\nThree phase\n100\nTrivector/ special type meter\n300\n6\n6\nChanging of meter /meter equipment/fixing of\n\t\t\t\tsub meter on the request of the consumer/fixing of sub meter\nChanging of meter /meter equipment/fixing of\n\t\t\t\tsub meter on the request of the consumer/fixing of sub meter\nSingle phase\n50\nPayable in cash in advance along with the\n\t\t\t\tintimation for revision\nThree phase\n100\nTrivector/ special type meter\n300\n7\n7\nResealing of meter when seals are found\n\t\t\t\tbroken\nResealing of meter when seals are found\n\t\t\t\tbroken\nSingle phase\n25\nPayable with energy bill\nThree phase\n50\nTrivector/ special type meter\n100\n8\n8\nReplacement of meter card, if lost or damaged\n\t\t\t\tby consumer\nReplacement of meter card, if lost or damaged\n\t\t\t\tby consumer\n10\nPayable with energy bill\n9\n9\nFuse call – Replacement\nFuse call – Replacement\nBoard fuse due to fault of consumer\n15\nPayable with energy bill\nConsumer fuse\n15\n10\n10\nDisconnection/ Reconnection\nDisconnection/ Reconnection\nSingle phase\n30\nPayable in cash in advance along with the\n\t\t\t\trequest by the consumer. If the same consumer is reconnected/\n\t\t\t\tdisconnected within 12 months of the last disconnection/\n\t\t\t\treconnection, 50% will be added to the charges\nThree phase\n75\nLT Industrial Supply\n300\nHT Supply\n500\n11\n11\nSecurity Deposit\nSecurity Deposit\nAs per the JSERC (Electricity Supply Code)\n\t\t\t\tRegulations, 2015\nAnnexure\nAnnexure 1\nAnnexure 1\nApplication form - New Connection (Low Tension Service)\nApplication form - New Connection (Low Tension Service)\n1\nName of the Applicant/Organization:\n2\nName of father/husband/Director/Partner/Trustee:\n3\nAddress:\n(a)\nFor communication\nHouse/Plot/Premise no.\nStreet\nArea/Colony\nDistrict\nTelephone No.:\n(b)\nWhere the new connection is applied for /\n\t\t\t\texisting connection is required to be shifted\nHouse/Plot/Premise no.\nStreet\nArea/Colony\nDistrict\n(Indicate landmarks to identify the location)\n4\nPlot size: ........................sq. feet\nCovered area: ........................sq. feet\n5\nCategory of Supply: (list of categories\n\t\t\t\tattached)\n6\nPurpose of Supply:\n7\nTotal Load applied for (in kW):\n8\nType of Supply (Permanent / Temporary):\n8(a)\nIf Temporary supply, specify period of\n\t\t\t\trequirement:\nFrom (date):\nTo (date):\n9\nPlease indicate whether you want to carry out\n\t\t\t\tthe works of laying service line and/or dedicated distribution\n\t\t\t\tfacility for the electricity supply requisitioned (Yes/No)\n10\nPlease indicate whether you want to install\n\t\t\t\tyour own CEA approved meter (Yes/No)\n11\nList of documents attached:\n(a)\nPhotograph to be affixed on application form\n\t\t\t\t(Yes/No)\n(b)\nIdentity Proof submitted along with this\n\t\t\t\tapplication form:\n- If Applicant is a person (Tick any one)\n(i) Electoral\n\t\t\t\tidentity card;\n(ii) Passport;\n(iii) Driving\n\t\t\t\tlicense;\n(iv) Ration card;\n(v) Photo identity\n\t\t\t\tcard issued by Government agency;\n(vi) PAN card;\n(viii) Certificate from village Pradhan/\n\t\t\t\tPatwari/ Lekhpal/ village level worker/ village chowkidar/\n\t\t\t\tPrimary school teacher/ in-charge of primary health centre etc.\n- If Applicant is an organization (Tick any one)\nSignature of competent authority (e.g. Branch\n\t\t\t\tManager, Principal, Executive Engineer, etc) along with relevant\n\t\t\t\tresolution/authority letter of the institution concerned\n(c)\nProof of ownership of occupancy of premises for\n\t\t\t\twhich electricity connection is required (Tick any one)\n(i) Copy of sale deed\n\t\t\t\tor lease deed or in the case of agricultural connections a copy\n\t\t\t\tof khasra / khatauni / khata nakal\n(ii) Registered\n\t\t\t\tGeneral Power of Attorney;\n(iii) Municipal tax\n\t\t\t\treceipt or Demand notice or other related document;\n(iv) Letter of\n\t\t\t\tallotment.\n(v) An applicant who is not an owner but an\n\t\t\t\toccupier of the premises shall along with any one of the\n\t\t\t\tdocuments listed at (i) to (iv) above also furnish a no objection\n\t\t\t\tcertificate from owner of the premises\n(d)\nProof of current address (Tick any one)\n(i) Electoral\n\t\t\t\tidentity card; (ii) Passport; (iii) Driving license; (iv) Ration\n\t\t\t\tcard;\n(v) Photo identity\n\t\t\t\tcard issued by any Government agency;\n(vi) Statement of\n\t\t\t\trunning Bank Account;\n(vii) Water /\n\t\t\t\tTelephone / Electricity / Gas connection Bill;\n(viii) Income Tax assessment order.\n(e)\nAny other document as applicable (Please\n\t\t\t\tspecify)\n12\nAny electricity dues outstanding in licensee’s\n\t\t\t\tarea of operation in consumer’s name: Yes/ No\n13\nAny electricity dues outstanding for the\n\t\t\t\tpremises for which connection applied for: Yes/ No\n14\nAny electricity dues outstanding with the\n\t\t\t\tDistribution Licensee against any firm with which the consumer is\n\t\t\t\tassociated as an Owner, Partner, Director or Managing Director:\n\t\t\t\tYes/ No\n(For questions 13, 14 & 15 if the answer\n\t\t\t\tis ‘Yes’ in any case please provide details on a\n\t\t\t\tseparate sheet)\n(a) The information provided in this application is true to my knowledge.\n(b) I/ We have read the ......................... Electricity Supply Code and agree to abide by the conditions mentioned therein.\n(c) I/ We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/ We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\nSignature of the consumer/ Authorised Signatory Name:\nNote. - Apart from documents for identity proof, proof of ownership/occupancy of premises and proof of current address, the following documents shall be attached with the application form\nNote.\n(a) Industrial consumers: Valid Industrial License, if applicable\n(b) Agricultural consumers: No Objection Certificate from competent government authority for tube wells, if required\n(c) Non-Domestic Khokhas and Temporary Structure: No Objection Certificate for khokha or temporary structure from the nagar nigam / nagar palika / nagar panchayat / gram sabha / gram panchayat / land development authority / land owning agency\n-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 2\nAnnexure 2\nApplication form - New Connection (High Tension / Extra High Tension Service)\nApplication form - New Connection (High Tension / Extra High Tension Service)\n1\nName of the Applicant/Organization:\n2\nName of father/husband/Director/Partner/Trustee:\n3\nAddress for communication\n4\nAddress where the new connection is applied for\n\t\t\t\t/ existing connection is required to be shifted\n(Indicate landmarks to identify the location)\n5\nVoltage at which\n\t\t\t\tsupply is required (kV)\n(Please tick the category applicable)\n11 kV\n33 kV\n66 kV\n110 kV\n132 kV\n220 kV\n6\nType of Supply (Permanent / Temporary):\n6(a)\nIf Temporary supply, specify period of\n\t\t\t\trequirement:\nFrom (date):\nTo (date):\n7\nTotal Contract Demand applied for (in kW / kVA):\n8\nBasis for projection of Contract Demand -\n\t\t\t\tDiversity Factor assumed:\n9\nPhasing of Contract Demand required (Yes/No):\nIf Yes, then provide the following details in\n\t\t\t\tthe given format:\nCD required (kVA) along with remarks, if any\nTentative Date from which required\n(a)\n(b)\n(c)\n10\nPurpose of Installation:\n11\nCategory of Tariff opted for:\n12\nProduction capacity:\n13\nCategory of Industry: (Tick the applicable\n\t\t\t\tone)\nSSI\nMSI\nLSI\nType of unit:\n(viz. Ownership/Partnership/Private\n\t\t\t\tLtd./Public Ltd./Society/ Govt Dept./Govt undertaking)\n14\nName of Institution developing Industrial\n\t\t\t\tPremises:\n15(a)\nPossession Letter or No-Objection Certificate\n15(b)\nIssued by the Institution (attach a copy)\nNumber:\nDate:\n16\nWhether supply is needed through an independent\n\t\t\t\tfeeder\n17\nWhether the above\n\t\t\t\tunit ever operated at some other place or applied for connection?\n\t\t\t\t(If Yes, please provide details)\n(a) Sanctioned Load:\n(b) Service Connection No.:\n(c) Arrears of payment (if any):\n18\nIf electricity connection for the premises was\n\t\t\t\trequested in the past? (If Yes, please provide details)\n(a) Name of unit:\n(b) Service Connection No.:\n(c) Arrears of payment (if any):\n19\nStatus of land acquisition:\n20\nExpected date by which finance will be\n\t\t\t\tavailable:\n21\nWhether the requisite consent / NOC (if\n\t\t\t\tapplicable as per the list of Pollution Control Board) has been\n\t\t\t\tobtained from ......................... as per statutory\n\t\t\t\trequirements (If yes, attach a copy):\n22\nAny electricity dues outstanding in licensee’s\n\t\t\t\tarea of operation in consumer’s name: Yes/ No\n23\nAny electricity dues outstanding for the\n\t\t\t\tpremises for which connection applied for: Yes/ No\n24\nAny electricity dues outstanding with the\n\t\t\t\tDistribution Licensee against any firm with which the consumer is\n\t\t\t\tassociated as an Owner, Partner, Director or Managing Director:\n\t\t\t\tYes/ No\n(For questions 22, 23 & 24 if the answer\n\t\t\t\tis ‘Yes’ in any case please provide details on a\n\t\t\t\tseparate sheet)\n(a) The information provided in this application is true to my knowledge.\n(b) I/ We have read the ......................... Electricity Supply Code and agree to abide by the conditions mentioned therein.\n(c) I/ We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/ We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\nSignature of the consumer/ authorised signatory Name:\nNote. - The following documents shall be attached with the application form:\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "1",
"title": "1. Proof of ownership of the premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "2",
"title": "2. A map indicating the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1 cm representing 1200 cm.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "3",
"title": "3. Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statute.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "4",
"title": "4. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "5",
"title": "5. In case of partnership firm, partnership deed.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "6",
"title": "6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "7",
"title": "7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Distribution Licensee immediately.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "8",
"title": "8. Letter of intent for production/ enhancement in production may be furnished.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "9",
"title": "9. List of equipments proposed to be installed along with the expected load.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "10",
"title": "10. Resolution for authorised signatory.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "11",
"title": "11. Registration from Industries Department.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "12",
"title": "12. Extract of project report relevant to power and process requirements (in case of industries).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "13",
"title": "13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.",
"chapter": null,
"content": "Acknowledgement\nAcknowledgement\nAnnexure 3\nAnnexure 3\nDeclaration / Undertaking\nDeclaration / Undertaking",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "1",
"title": "1. To indemnify the Distribution Licensee against all proceedings, claims, demands, costs, damages, expenses that he licensee may incur by reason of a fresh service connection given to the Applicant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "2",
"title": "2. That all Electrical Works done within the premises are as per Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010 and have been carried out by a licensed electrical contractor (in case the Applicant is an owner and wiring in the premises is new)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "3",
"title": "3. The Distribution Licensee is indemnified against any loss accrued to the applicant on this account. Further, Applicant agrees that if there is any harm/loss to the property of the Distribution Licensee due to the fault in Electrical work within the premises of Applicant, all the liabilities shall be borne by the Applicant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "4",
"title": "4. To pay the electricity consumption bills and all other charges at the rates set out in the Distribution Licensee's Tariff Schedule and miscellaneous charges for supply as may be in force from time to time, regularly as and when the same becomes due for payment.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "5",
"title": "5. To deposit the additional consumption deposit as revised by the Distribution Licensee from time to time based on the consumption of the Applicant in preceding year.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "6",
"title": "6. To abide by the provisions of the Electricity Act, 2003, ___________ Electricity Supply Code, tariff orders and any other rules or regulations notified by the Commission, as applicable from time to time.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "7",
"title": "7. That licensee shall be at liberty to adjust the electricity consumption charges along with any other charges against the Consumer Security Deposit paid by the Applicant, in the event of termination of the agreement prior to expiry of the contracted period or in case of nay contractual default.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "8",
"title": "8. To be responsible for safe custody of Meters, CTs, Cables etc. provided by the Distribution Licensee and in case, there is any damage to equipment due to the reasons attributable to Applicant the same shall be chargeable to the Applicant. Further, all repercussions on account of breakage of seals of meters etc. or Direct/Dishonest Abstraction of energy shall be to the account of Applicant, as per the existing laws.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "9",
"title": "9. To allow clear and un-encumbered access to the meters for the purpose of meter reading and its checking etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "10",
"title": "10. That the Applicant would let the Distribution Licensee disconnect the Service connection under reference, in the event of any default, non-compliance of statutory provisions and in the event of a legally binding directive by Statutory Authority(ies) to effect such an order. This shall be without prejudice to any other rights of the Distribution Licensee including that of getting its payment as on the date of disconnection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "11",
"title": "11. That the Distribution Licensee shall not be held responsible for any interruption or diminution of supply of Electricity.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "12",
"title": "12. All the above declaration given by the Applicant shall be construed to an Agreement between the Distribution Licensee and the Applicant.",
"chapter": null,
"content": "Name of Witness\nAnnexure 4\nAnnexure 4\nApplication form - Change in Name of Registered Consumer\nApplication form - Change in Name of Registered Consumer\n1\nService Connection No.\n2\nName of Registered Consumer (at present)\n3\nConsumer category\n4\nContracted load\n5\nAddress:\nTelephone no.:\n6\nName of the person in whose name connection to\n\t\t\t\tbe changed (in CAPITAL LETTERS)\nNote. - The following documents are attached with the application form:\nNote.\n(Tick whichever applicable)",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "1",
"title": "1. Copy of latest bill duly paid",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "2",
"title": "2. Proof of ownership / legal occupancy of premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "3",
"title": "3. No Objection Certificate from the existing consumer if available/possible.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "4",
"title": "4. Registered deed/ Succession certificate/_______________ (if any other document, please specify)",
"chapter": null,
"content": "-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 5\nAnnexure 5\nApplication form - Transfer of Ownership to Legal Heir\nApplication form - Transfer of Ownership to Legal Heir\n1\nService Connection No.\n2\nName of Registered Consumer (at present)\n3\nConsumer category\n4\nContracted load\n5\nAddress:\nTelephone no.:\n6\nName of the person in whose name connection to\n\t\t\t\tbe changed (in CAPITAL LETTERS)\nNote. - The following documents are attached with the application form:\nNote.\n(Tick whichever applicable)",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "1",
"title": "1. Copy of latest bill duly paid",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "2",
"title": "2. Proof of ownership / legal occupancy of premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "3",
"title": "3. Registered deed/ Succession or Legal Heir certificate/ Mutation deed/ _______________ (if any other document, please specify)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "4",
"title": "4. NOC from other legal heir(s) in case connection is to be changed in the name of one of the legal heirs",
"chapter": null,
"content": "Signature of the Consumer #Name:\n-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 6\nAnnexure 6\nApplication form - Conversion of Services / Change of Consumer Category / Shifting of Premises\nApplication form - Conversion of Services / Change of Consumer Category / Shifting of Premises\n(Tick the applicable purpose)\n1\nService Connection No.\n2\nName of Consumer\n3\nConsumer category\n4\nContracted load\n5\nAddress:\nTelephone no.:\n6\nRequest for change in service:\n(i)\nIF request is for conversion of service: (Tick\n\t\t\t\twhichever applicable)\n(a) Conversion from\n\t\t\t\tLT single phase to LT 3-phase\n(b) Conversion from\n\t\t\t\tLT 3-phase to LT single phase\n(c) Conversion from\n\t\t\t\tLT to HT\n(d) Conversion from\n\t\t\t\tHT to LT\n(e) Conversion from\n\t\t\t\tHT to EHT\n(f) Conversion from\n\t\t\t\tEHT to HT\n(g) Other (Please specify)\n(ii)\nIF request is for change in consumer category,\n\t\t\t\tmention the tariff category to which Consumer wants to shift:\n(See list of all tariff categories attached with\n\t\t\t\tthis form)\n(iii)\nIF request is for change in premises:\n(a) New address to\n\t\t\t\twhich existing service connection is to be shifted:\n(b) Details of equipment to be shifted\n\t\t\t\t(Meter/service line, LT/HT line, transformer, etc.):\n7\nReason for change in service\nNote. - The following documents are attached with the application form: (Tick whichever applicable)\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "1",
"title": "1. Installation inspection report",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "2",
"title": "2. Proof of ownership / legal occupancy of premises, if request is for shifting of premises",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "3",
"title": "3. Any other document (please specify)",
"chapter": null,
"content": "Signature of the Consumer Name:\n--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 7\nAnnexure 7\nApplication form - Load Enhancement / Load Reduction\nApplication form - Load Enhancement / Load Reduction\n(Tick the applicable purpose)\n1\nName of the Applicant/Organization:\n2\nService Connection Number\n3\nAddress of premises to which electricity is\n\t\t\t\tbeing supplied\nTelephone No.:\n4\nIn case of Load Enhancement:\nExisting sanctioned load (in kW):\nEnhanced load requested (in kW):\n5\nIn case of Load Reduction:\nExisting sanctioned load (in kW):\nReduced load requested (in kW):\n6\nReason(s) for Load Enhancement / Reduction:\n7\nDetails of load\n\t\t\t\tadded/ disconnected from supply, if applicable.\n(Please attach\n\t\t\t\tlist of equipments category-wise)\n(a) Lighting\n(b) Motive Power\n(c) Agricultural\n(d) Other (please specify)\nSignature of the Consumer Name:\nNote. - The following documents are attached with the application form (if applicable)\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "1",
"title": "1. A work completion certificate & test report from Licensed Electrical Contractor, if the consumer's installation has been altered.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "2",
"title": "2. Resolution for authorised signatory.",
"chapter": null,
"content": "--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 8\nAnnexure 8\nProcedure for Determination of Connected Load\nProcedure for Determination of Connected Load\n(Domestic Connection)\nElectrical equipments proposed to be put to use:\nItem\nItem\nLoad per item (Watts)\nLoad per item (Watts)\nNo.\nNo.\nTotal load (Watts)\nTotal load (Watts)\n1\n1\n2\n2\n3\n3\n4 = 2x3\n4 = 2x3\nCFL\n15\nBulb\n60\nTube light\n50\nFan\n60\nTape-recorder/ Music system\n100\nTelevision\n90\nMixie\n375\nElectric iron\n750\nFridge\n150\nCooler\n250\nHeater (for cooking and water heating)\n1000\nWashing machine\n750\nGeyser\n2000\nMicrowave oven\n2000\nAir Conditioner (1 ton)\n1500\nAir Conditioner (1.5 Ton)\n2250\nComputer\n100\nPrinter\n150\nPump-set\n375\nTotal\nTotal\nAnnexure 9\nAnnexure 9\nTest Result Report of Applicant's Installation\nTest Result Report of Applicant's Installation\nIn accordance with Regulation 31 of\nCentral Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010\n(To be filled by licensee's representative)\nDate _____________",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "1",
"title": "1. Name and address of the Consumer",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "2",
"title": "2. Details of the installation",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "3",
"title": "3. Short circuit fault level of the installation",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "4",
"title": "4. Date of Commissioning of installation (In case of additional supply or reconnection)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "5",
"title": "5. Results of the tests conducted",
"chapter": null,
"content": "S No\nS No\nEquipment\nEquipment\nTest Conducted\nTest Conducted\nTest Results\nTest Results\nRemarks\nRemarks\n1\nLinked Switch with Fuse(s)\n(a) Mechanical\n\t\t\t\toperation\n(b) Rating of Fuse\n(c) Contact of Blades\nSmooth/Troublesome\n_______ Amp\nFull/Partial\n1 a\nIsolator\n(a) Mechanical\n\t\t\t\toperation\n(b) Remote operation\n(c) Local operation\n(d) Measurement of\n\t\t\t\tContact resistance\n(e) Interlocking with\n\t\t\t\tearth switch\n(f) Interlocking with\n\t\t\t\tCB\n(g) IR Values\nOpen Condition\nClosed Condition\nOK/Not OK\nOK/Not OK\nOK/Not OK\n______micro Ohm\nOK/Not OK\nOK/Not OK\n______ M Ohm Ph-Ph\n\t\t\t\tPh-E\n___ ___\n___ ___\n2\nCircuit Breaker S No\nRating of the Circuit\n\t\t\t\tBreaker\n(i) Type\n(ii) Voltage\n(iii) Normal Current\n(iv) Rupturing\n\t\t\t\tcapacity\nIR Values\nOpen Condition\nClosed Condition\nContact Resistance\nMechanical Operation\nRemote Operation\nLocal Operation\nInterlocking with\n\t\t\t\tIsolator\nInterlocking with\nEarth switch Alarm\n\t\t\t\tand Trip for OTI/WTI/Buchholz/PRV\nEarth Fault Relay\nOver Current Relay\nUnder Voltage Relay\nSF6 Pressure Alarm and trip Operation Test\n__________\n__________kV\n__________Amps\n\t\t\t\t__________KA Ph-Ph Ph-E\n___ ___\n___ ___\n_______micro Ohm\n\t\t\t\tInstant Smooth / Time Gap ( Sec)\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\n3\nTransformer S No\n(a) Insulation\n\t\t\t\tresistance Value\n(i) HT to LT\n(ii) HT to Earth\n(iii) LT to Earth\n\t\t\t\tBreak down Voltage Test\nOil Sample - I (Top)\nOil Sample - II\n\t\t\t\t(Bottom)\nVector Group Test\nPolarity Test\nMagnetizing Balance\nTan Delta Test (as\n\t\t\t\tper capacity)\nOil level in\n\t\t\t\tconservator tank\nOil level in breather\n\t\t\t\tcup\nOTI/WTI settings\nOTI / WTI Alarm and\n\t\t\t\tTrip operation Operation of Buchholz relay\nOperation of PRV\nOil leakage\nInterlock of door\n\t\t\t\tswitch for dry transformer\nClearance for side\n\t\t\t\tclearance:\nBetween two\n\t\t\t\tTransformers : (P) Body Earth resistance\nNeutral Earth resistance\n_____ M Ohm\n_____ M Ohm\n_____ M Ohm\n_____kV\n_____kV\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nA/T _0C A/T _0C\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\n_____ Cms\n_____Meters\n_____Ohm\nN1___Ohm\nN2___Ohm\n4\nDG Sets S No for 1. Alternator 2. Engine\n(a) Interlocking with\n\t\t\t\tother Supply Sources\nBody Earth resistance\nNeutral Earth resistance\nOK/Not OK -\n____Ohm\nN1___Ohm\nN2___Ohm\n5\nCable Size: Sq mm\n(a) Insulation\n\t\t\t\tResistance Values\n(i) Ph-Ph\n(ii) PH –Earth\n(iii) Ph-Earth +\n\t\t\t\tOther Ph\n(b) Bending Radius\n_____M Ohm\n_____M Ohm\n_____M Ohm\nOK/Not OK\n6\nEarthing\n(a) Metal and Size of\n\t\t\t\tEarth Strips\nType of Earthing\n(i) Plate Earthing\n(ii) Pipe Earthing\n(iii) Counter Poise\n\t\t\t\tEarthing\nValue of Earth\n\t\t\t\tresistance of earth electrodes for\n(i) Reactor Neutral\n(ii) Las\n(iii) Structure\n(iv) Frame/Bodies of\n\t\t\t\tequipment\n(v) Motors\nCu/Al/GI __Sq mm\nYes/No\nYes/No\nYes/No\nN1__Ohm N2__Ohm (R)__\n\t\t\t\tOhm (Y)__ Ohm (B) __Ohm\n____Ohm\n____Ohm\n___Ohm\n7\nPotential Transformer\n(a) Ratio Test\n(b) Polarity Test\n(c) BDV of Oil\n(d) IR Test\nOK/ Not OK\nOK/ Not OK\n_____kV\n(R) P-E___M Ohm\n(Y) P-E___M Ohm\n(B) P-E___M Ohm\n8\nCurrent Transformer\n(a) Ratio Test\n(b) Polarity Test\n(c) BDV of Oil\n(d) IR Test\nOK/ Not OK\nOK/ Not OK\n_____kV\n(R) P-E___M Ohm\n(Y) P-E___M Ohm\n(B) P-E___M Ohm\n9\nTransmission Line\n(a) Physical\n\t\t\t\tcondition of conductor / tower\n(b) Check of tower\n\t\t\t\taccessories\n(c) Tower footing\n\t\t\t\tresistance\n(d) Conductor\n\t\t\t\tcontinuity test\n(e) Check of ground\n\t\t\t\tclearance\n(f) Check of electrical clearance along the\n\t\t\t\troute\nOk/Not OK\nOk/Not OK\n_____Ohm\nOk/Not OK\nOk/Not OK\nOk/Not OK\nGeneral Observations\nGeneral Observations\nS No\nS No\nItem\nItem\nObservation\nObservation\n1\nCheck of required phase to phase, phase to\n\t\t\t\tground and sectional clearance\n2\nCheck for equipment layout and overall\n\t\t\t\tinstallation details\n3\nTest of resistance of earth mat or earth\n\t\t\t\telectrodes as applicable\n4\nCheck of consumer’s pre-commissioning test\n\t\t\t\treports of individual equipments\n5\nCheck of manufacturer’s routine /type\n\t\t\t\ttest reports of individual equipments\n6\nWhether Inspector’s approval if applicable\n\t\t\t\tis obtained\n7\nWhether owner’s self certification about\n\t\t\t\tcompliance with the Regulations is obtained?\n8\nGeneral observations and views (specific\n\t\t\t\tdeviation from the requirements of the Regulations shall be\n\t\t\t\tclearly brought out)\nAnnexure 10\nAnnexure 10\nMeter Related Complaints / Request for Testing of Meter\nMeter Related Complaints / Request for Testing of Meter\n(Tick the applicable purpose)",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "1",
"title": "1. Service Connection No.: __________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "2",
"title": "2. Name of the consumer: __________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "3",
"title": "3. Address and Telephone No. of the consumer: ____________________________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "4",
"title": "4. Initial cost of meter was borne by (tick one): Consumer / licensee",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "5",
"title": "5. Complainant desires to provide/has provided a new meter for replacement (Yes/No):",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "6",
"title": "6. Any other information",
"chapter": null,
"content": "(Signature of Consumer)\n-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "1",
"title": "1. Site verification report",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "2",
"title": "2. Comments of concerned official",
"chapter": null,
"content": "Signature (concerned official)\n--------------------------------------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 11\nAnnexure 11\nMeter Testing Result Report\nMeter Testing Result Report",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "1",
"title": "1. Consumer Particulars",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "2",
"title": "2. Meter Particulars",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "3",
"title": "3. Revolution / Pulse Test.",
"chapter": null,
"content": "Result\nCertificate\nSignature of Consumer Name:\nSignature of Company Official Name and Designation:\nNote. - Approximate time taken for test for different external loads is as under:\nNote.\nLoad in kW\nLoad in kW\nApproximate time in minutes\nApproximate time in minutes\n1 kW\n60\n2 kW\n30\n4 kW\n15\n5 kW\n12\nAnnexure 12\nAnnexure 12\nApplication for Self Assessed Bill\nApplication for Self Assessed Bill\n1\nName of the Consumer\n2\nService Connection Number\n3\nAddress\n4\nAverage consumption of last 6 months\n5\nAmount paid by\n\t\t\t\tConsumer based on reading (Self assessed)\n(Must not be less than average consumption of\n\t\t\t\tlast 6 months)\nPrevious Reading\nCurrent Reading\nNet Consumption\nAmount\n6\nMode of Payment\nCheque\nDD/Money Order\nCash\nAnnexure 13\nAnnexure 13\nFormat for Application of Advance Payment\nFormat for Application of Advance Payment\nAnnexure 14\nAnnexure 14\nFormat for Inspection Report in case of UUE/Theft\nFormat for Inspection Report in case of UUE/Theft\nS.No.: ______________\nService Connection No.\nName of Consumer\nConsumer category\nAddress:\nLoad Details\n(a) Sanctioned/Contracted Load\n(b) Billing Load\n(c) Total Connected Load\nType of Irregularity: (Tick \n\t\t\t\twhichever applicable)\nUnauthorised Use of Electricity\nExcess Load\nTheft\nOther\n(Specify in detail)\nInspection Result:\nInspection Result:\nMeter No. (Painted):\nCT Box Seal No.:\nFound:\nMeter No. (Dial):\nMeter Box Seal No.:\nFound:\nReading (kWh):\nMeter Terminal Seal No.:\nFound:\nReading (kVAh):\nHalf Seal No.:\nFound:\nReading (kVARh):\nWorking Meter:\nMDI:\nCable Status:\nPower Factor:\nCT Ratio:\nSize:\nType:\nShunt Capacitor (Tick one)\nShunt Capacitor\n\t\t\t\t__________________ No. of ______________ rating and\n\t\t\t\t_________________ make found installed in working order to\n\t\t\t\tmaintain the power factor; OR\nNo shunt capacitor found installed. Power factor\n\t\t\t\tmeasured _____ lagging\nNote to Consumer. - You are requested to please appear before _____________ on the time and date mentioned in the Show-Cause Notice issued by inspection team member/police officer.\nNote to Consumer.\nSignature:\n1. _______________________________\n2. _______________________________\n3. _______________________________\n4. _______________________________\nName:\n1. _______________________________\n2. _______________________________\n3. _______________________________\n4. _______________________________\nDesignation:\n1. _______________________________\n2. _______________________________\n3. _______________________________\n4. _______________________________\nEmployee No.:\n1._______________________________\n2. _______________________________\n3. _______________________________\n4. _______________________________\nAnnexure 15\nAnnexure 15\nRequest for Permanent Disconnection & Termination of Agreement\nRequest for Permanent Disconnection & Termination of Agreement\nNote. - The following documents are attached with the application form:\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "1",
"title": "1. Copy of last bill",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "2",
"title": "2. Copy of payment receipt of last bill",
"chapter": null,
"content": "Signature of the Consumer Name: Phone no.: Address:\n-------------------------------------------------------------------------------------------------------------------------------\nAcknowledgement\nAcknowledgement\nAnnexure 16\nAnnexure 16\nFormat for Intimation to Consumer after Termination of Agreement\nFormat for Intimation to Consumer after Termination of Agreement",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "1",
"title": "1. Rs. _____________ is payable to you for which Cheque No. _____________ is enclosed.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "2",
"title": "2. Rs. _____________ is due from you. You are requested to pay the amount within a week of receipt of this letter, failing which, action as prescribed under the law shall be initiated for recovery of the amount.",
"chapter": null,
"content": "Annexure 17\nAnnexure 17\nFormat for Intimation to Consumer after Temporary Disconnection of Supply\nFormat for Intimation to Consumer after Temporary Disconnection of Supply\nDate ______________\nAnnexure 18 Determination of Security Deposit amount Security deposit amount for a consumer = Load x Load Factor of the category in which the consumer falls x (Billing cycle + 45 days) x Current tariff S. No. Particulars Load factor 1. Domestic 30% 2. Commercial 50% 3. LT Industrial 50% 4. HT/EHT Industrial: • \n\t\t\t\tSingle shift industries 50% • \n\t\t\t\tDouble shift industries 75% • \n\t\t\t\tContinuous industries 100% 5. Agriculture / Water Supply 33% 6. Street lights 40% 7. Signals & blinkers 75% 8. Railway Traction 50%\nAnnexure 18\nAnnexure 18\nDetermination of Security Deposit amount\nDetermination of Security Deposit amount\nSecurity deposit amount for a consumer = Load x Load Factor of the category in which the consumer falls x (Billing cycle + 45 days) x Current tariff\nS. No.\nS. No.\nParticulars\nParticulars\nLoad factor\nLoad factor\n1.\nDomestic\n30%\n2.\nCommercial\n50%\n3.\nLT Industrial\n50%\n4.\nHT/EHT Industrial:\n• \n\t\t\t\tSingle shift industries\n50%\n• \n\t\t\t\tDouble shift industries\n75%\n• \n\t\t\t\tContinuous industries\n100%\n5.\nAgriculture / Water Supply\n33%\n6.\nStreet lights\n40%\n7.\nSignals & blinkers\n75%\n8.\nRailway Traction\n50%\nAnnexure 19\nAnnexure 19\nAssessment of Energy in cases of Theft\nAssessment of Energy in cases of Theft\nUnits assessed = L x D x H x F\nS. No.\nS. No.\nParticulars\nParticulars\nLoad factor\nLoad factor\n1.\nHT (including load above 75 kW for non domestic\n\t\t\t\tand above107 HP or 100 kVA for industries on LT)\n100%\n2.\nLT Industrial (107 HP or 100 kVA)\n75%\n3.\nNon- domestic (up to 75kW)\n50%\n4.\nDomestic (up to 75 kW)\n40%\n5.\nDomestic HT (including load above 75kW on LT)\n40%\n6.\nAgriculture\n50%\n7.\nWater supply\n50%\n8.\nStreet light\n50%\n9.\nDirect theft – All categories\n100%\nAssessment of energy in case of temporary connection\n[ Annexure 20 ]\nAnnexure 20\n1\nName of the Applicant:\n2\nName of father/husband:\n3\nAddress:\n(a)\nAddress for communication\nHouse/Plot/Premise\n\t\t\t\tno.\nStreet\nArea/Colony\nDistrict\nTelephone No.:\nWhere the new connection is applied for /\n\t\t\t\texisting connection is required to be shifted\nHouse/Plot/Premise\n\t\t\t\tno.\nStreet\nArea/Colony\nDistrict\n(b)\n(Indicate landmarks to identify the location)\n4\nPlot size: ..................sq. feet\nCovered area: ...............sq. feet\n5\nCategory of Supply: (Such as DS (KutirJyoti), DS\n\t\t\t\t(Urban- upto 2 kW), DS (Rural-upto 2 kW), CS (Rural- upto 2 kW),\n\t\t\t\tCS (Urban-upto 2kW)\n6\nPurpose of Supply: (Only Domestic and Commercial\n\t\t\t\tCategory)\n7\nTotal Load applied for (in kW): (upto 2 kW)\n8\nPlease indicate whether you want to carry out\n\t\t\t\tthe works of laying service line and/or dedicated distribution\n\t\t\t\tfacility for the electricity supply requisitioned (Yes/No)\n9\nPlease indicate whether you want to install your\n\t\t\t\town CEA approved meter (Yes/No)\n10\nList of documents attached:\n(a)\nPhotograph to be affixed on application form\n\t\t\t\t(Yes/No)\n(b)\nIdentity Proof submitted along with this\n\t\t\t\tapplication form:\nFor individual\n\t\t\t\tapplicant\n(Tick any one)\n(i) Aadhaar (UID)\n\t\t\t\tCard\n(ii) Electoral\n\t\t\t\tidentity card;\n(iii) Passport;\n(iv) Driving license;\n(v) Ration card;\n(vi) Photo identity\n\t\t\t\tcard issued by Government agency;\n(vii) PAN card;\n(viii) Photo Certificate from village Pradhan or\n\t\t\t\tany village level Government functionary like Patwari/ Lekhpal/\n\t\t\t\tin-charge of primary health centre etc.\n(e)\nAny other document as applicable (Please\n\t\t\t\tspecify)\n11\nAny electricity dues outstanding in licensee’s\n\t\t\t\tarea of operation in consumer’s name: Yes/ No\n12\nAny electricity dues outstanding for the\n\t\t\t\tpremises for which connection applied for: Yes/ No\n13\n(For questions 11 & 12 if the answer is\n\t\t\t\t‘Yes’ in any case please provide details on a\n\t\t\t\tseparate sheet\n14\nDeclaration:\nI hereby declare that I fully understand that\n\t\t\t\tthis application is for provisional connection only and shall not\n\t\t\t\tbe produced as a legal address proof or proof of residence and\n\t\t\t\tthat this provisional connection shall not in any way make me the\n\t\t\t\tlawful owner or occupier of the premises.\n15\nDate & Signature of the Applicant\nAppendix\nAppendix\nComparison of Existing Schedule for Miscellaneous Charges in Jharkhand with other States\nComparison of Existing Schedule for Miscellaneous Charges in Jharkhand with other States\nTable 1: Comparison of JSERC existing schedule of charges with other states\nTable 1: Comparison of JSERC existing schedule of charges with other states\nS. No.\nS. No.\nParticulars\nParticulars\nJharkhand (Existing)\nJharkhand (Existing)\nBihar\nBihar\nChhattisgarh\nChhattisgarh\nMaharashtra\nMaharashtra\nHaryana\nHaryana\nMSEDCL\nMSEDCL\nBEST\nBEST\nTPC-D\nTPC-D\nR Infra-D\nR Infra-D\n1\n1\nApplication fee\nApplication fee\nDomestic\nRs 15 (Kutir Jyoti) Rs 20 (Others)\nRs 20 (Kutir Jyoti)\nCommercial\nRs 20\nAgriculture\nRs 10\nRs 50\nStreet light\nRs 20\nOther LT Supply\nRs 50\nLT Single ph - Rs 75\nLT Three ph - Rs 200\nLT Industrial - Rs 300\nNon Industrial - Rs\n\t\t\t\t200\nLT Industrial - Rs 1000\nHT Supply\nRs 100\nRs 750\nRs 5000\nSingle phase - Rs 25\nThree phase - Rs 50\nUp to 33 kV - Rs 100 / 150\nEHT Supply\nRs 2000\nChange of Name\nNA\nRs 25 / 50\nRs 25\nNA\nRs 10 up to 2 kW Rs 20 per kW subject to max Rs\n\t\t\t\t10,000\n2\n2\nRevision of estimate when a consumer\n\t\t\t\tintimates changes in his requirement subsequent to the\n\t\t\t\tpreparation of service connection estimate based on his original\n\t\t\t\tapplication\nRevision of estimate when a consumer\n\t\t\t\tintimates changes in his requirement subsequent to the\n\t\t\t\tpreparation of service connection estimate based on his original\n\t\t\t\tapplication\nAgriculture\nRs 10\nSame as application fee\nSame as application fee\nSame as application fee\nSame as application fee\nDomestic\nRs 30\nDifferent rates for different LT categories\nCommercial\nRs 30\nOther LT categories\nRs 50\nHT Supply\nRs 150\nRs 750\n3\n3\nTesting of consumers Installation\nTesting of consumers Installation\nTesting / Inspection charge subsequent to the\n\t\t\t\tfirst one\nRs 100\nSingle ph - Rs 100 for Three ph - Rs 200 HT\n\t\t\t\tSupply - Rs 800\nRs 200\nSingle ph - Rs 25 Three ph - Rs 50 HT - Rs 200\nRs 50\nRs 100\nSingle ph - Rs 100 Three ph - Rs 200 HT - Rs 500\n4\n4\nMeter test when accuracy disputed by consumer\nMeter test when accuracy disputed by consumer\nSingle phase\nRs 40\nRs 100\nRs 130\nRs 100\nRs 100\nRs 100\nRs 100\nRs 50\nThree phase\nRs 100\nRs 200\nRs 300\nRs 300\nRs 300\nRs 100\n3 ph, 4 Wire meter, without CT\nRs 200\n3 ph, 4 Wire meter, with CT\nRs 300\nRs 880\nTri vector/ special type meter\nRs 650\nRs 1800\nRs 1200\nRs 500\nRs 500\nRs 500\n33/11 kV metering equipment\nRs 5000\nRs 2680\nRs 1000\n132/220 kV metering equipment\nRs 8000\nRs 3750\nLT CT (per unit)\nRs 170\nRs 1000\nRs 500\nHT CT (per unit)\nRs 1000\nRs 1000\nABT meter\nRs 9310\nPolyphase meter/ RkVAH\nRs 300\nLTMD (with/without CTs)\nRs 500\n5\n5\nRemoving/ Fixing / Re-fixing of meter\nRemoving/ Fixing / Re-fixing of meter\nSingle phase\nRs 50\nRs 200\nRs 100\nThree phase\nRs 100\nRs 400\nRs 200\nTri vector/ special type meter\nRs 300\nRs 600\nThree Phase meter with CT\nRs 500\n3% of meter equipment cost subject to minimum Rs\n\t\t\t\t500\nHT metering equipment Rs\n1200\n6\n6\nResealing of meter when seals are found\n\t\t\t\tbroken\nResealing of meter when seals are found\n\t\t\t\tbroken\nSingle phase\nRs 25\nRs 25\nThree phase\nRs 50\nTrivector/ special type meter\nRs 100\nd\nWhere cut-out is independently seale\nRs 25\nMeter cover or Meter Terminal Cover\nSingle ph - Rs 100\nThree ph - Rs 250\nMaximum Demand Indicator / CT chamber / PT fuses\nRs 550\n7\n7\nFuse call – Replacement\nFuse call – Replacement\nBoard fuse due to fault of consumer\nRs 15\nRs 25\nRs 50\nRs 50\nConsumer fuse\nRs 15\nNil\n8\n8\nDisconnection/ Reconnection\nDisconnection/ Reconnection\nSingle phase\nRs 30\nDisconnection - Rs 75\nReconnection - Rs 100\nRs 60\nReconnection - Rs 25 / 50 / 200\nReconnection: Domestic / AP - Rs 100 Non\n\t\t\t\tDomestic - Rs 200\n3-ph LT up to 25 HP/19 KW\nRs 75\nDisconnection - Rs\n\t\t\t\t200\nReconnection - Rs 200\nRs 150\n3- ph LT above 25 HP/19 KW\nRs 500\nLT Industrial Supply\nRs 300\nDisconnection - Rs\n\t\t\t\t300\nReconnection - Rs 900\nUp to 20 kW: Rs 500\nAbove 20 kW: Rs 1500\nHT Connection up to 5 MVA\nRs 500\nDisconnection - Rs\n\t\t\t\t750\nReconnection - Rs 3000\nRs 1750\n300\n200\n200\n200\nRs 3000\nHT Connection above 5 MVA\nRs 2500\nConnection at remote end\n200\nReconnection of Service Cable\n500\nBulk Supply & Street Lighting Rs\n1500\n9\n9\nExtension In Load\nExtension In Load\nExtension in single phase Non Domestic load\nRs 350 per kW (extension only)\nExtension in three phase Non Domestic load\nRs 750 per kW (extension only)\nExtension in load in Bulk / LT Industrial / HT\n\t\t\t\tIndustrial\nRs 500 / 750 per kW (extension only)",
"footnote": "",
"is_definition": false,
"sort_order": 70
}
],
"metadata": {
"Act ID": "jhr248",
"Act Number": "Published vide Notification No. 45, dated 9.9.2015",
"Enactment Date": "",
"Act Year": "2015",
"Short Title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015",
"Type": "STATE",
"Location": "Jharkhand"
},
"updated_at": "2026-09-29 21:55:19"
}