8. Execution of Agreement and General Conditions of Supply.

(a) name and address of the consumer/applicant;
(b) address of the premises for which electricity supply has been requisitioned and for which the agreement is being executed;
(c) sanctioned load/ contract demand;
(d) purpose of usage of electricity;
(e) declaration by the applicant/consumer:
(i) to abide by provisions of Act and these Regulations;
(ii) to pay for the supply of electricity based on prevailing tariff rates;
(iii) to pay for all other charges as become due in accordance with these Regulations and the approved schedule of charges of the Distribution Licensee;
(iv) to deposit such security as the Distribution Licensee may be entitled to require from him under the Act and these Regulations.
8.2 General Conditions of Supply Connected Load.
Demand Note.
Point of Supply.
Security Deposit.
(a) the estimated power consumption for the billing cycle period plus forty five (45) days:
(b) payment due to the Distribution Licensee for any electric line or electrical plant or electric meter that is to be provided for supplying electricity to person.
8.2.16 Interest on Security Deposit.
8.2.17 Review of Security Deposit.
8.2.19 Mode of Payment of Security Deposit.
8.2.21 Resale of Energy.
(a) inspecting, testing, repairing or altering the electric supply lines, meters, fittings, works and apparatus for the supply of electricity belonging to the Distribution Licensee;
(b) ascertaining the amount of electricity supplied or the electrical quantity contained in the supply; or
(c) removing where a supply of electricity is no longer required, or where the Distribution Licensee is authorised to take away and cut off such supply, any electric supply-lines, meters, fittings, works or apparatus belonging to the Distribution Licensee:
(a) enter any premises or land referred to in clause 8.2.22 for any of the purposes mentioned therein; or
(b) enter any premises to which electricity is to be supplied by him, for the purpose of examining and testing the electric wires, fittings, works and apparatus for the use of electricity belonging to the consumer.
(a) Enter, inspect break open and search any place or premises in which he has to believe that electricity has been, is being, or is likely to be, used un-authorisedly;
(b) Search, seize and remove all such devices, instrument, wires and any other facilitator or article which has been, is being, or is likely to be, used for unauthorized use of electricity;
(c) Examine or seize any books of account or documents which in his opinion shall be useful for or relevant to any proceedings in respect of the offence under sub-section (1) and allow the person from whose custody such books of account or documents are seized to make copies thereof or take extracts there from in his presence.
(a) Power supply shall not be given to any applicant at low or medium voltage for utilizing induction motors of 3 HP capacity or above or welding transformers of 1 kVA capacity or above, unless shunt capacitors of appropriate rating are installed by the consumer across the terminal of such motors and welding transformers to achieve an average monthly power factor that is specified in this Code.
(b) Motors of low or medium voltage shall be provided with control gear to satisfactorily prevent the maximum current demand from the consumer's installation exceeding the limits given in the following schedule under all possible conditions:
Nature of Supply
Nature of Supply
Size of Installation
Size of Installation
Max. Current Demand
Max. Current Demand
Single phase/ three phase
(a) Up to and including 1 BHP.
Six times full load current
(b) Above 1 BHP and up to and including 10 BHP
Three times full load current
(c) Above 10 BHP and up to and including 15 BHP
Two times the full load current
(d) Above 15 BHP
One and a half times the full load current
(c) A triple pole linked switch protected by a no-volt release shall control the motor circuit and triple pole fuses (or overload release). It is important that the release shall be maintained in good working order. Wiring for motors shall be run with all three-phase wire bunches in a metallic conduit, which shall be effectively earthed throughout and shall be connected to the frame of the motor from which two separate earth wires shall run. The minimum permissible size of the earth wire permitted shall be No. 14 SWG. Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2010, as amended from time to time, shall be complied with in every respect.
(d) Total harmonic voltage distortion shall not exceed the limits mentioned below:
(e) In addition, synchronous motors shall also be provided with an apparatus to control watt-less current.
8.2.35 Installation of Irrigation/Agriculture Pump Set.
(a) Friction less foot valve
(b) HDPE piping suction and delivery
(c) ISI marked energy efficient monobloc pump set.
(d) Capacitor of adequate rating for the pump set.
8.2.36 Parallel Operation with the Supply System of licensee.