5. Requisition for Supply.

(a) the supply of power is technically feasible;
(b) the applicant has observed the procedure specified in these Regulations; and
(c) the applicant agrees to bear the cost of supply and services as specified in the Code.
[(d) Application form for release of new provisional electricity connection (for load up to 2kW) - Annexure 20.]
5.2 Licensee's obligation to extend the distribution system and consumer's share in the cost.
5.3 Conditions for Grant of Connection.
5.4 Point of Supply.
(a) Establishments/premises having distinct set up and staff, or
(b) Establishments/premises owned or leased by different persons, or
(c) Establishments/premises covered by different licensee or registrations under any law where such procedures are applicable, and
(d) Establishments/premises for domestic category households having relevant document from the local authorities, identifying the premises as separate.
(a) a registered Co-operative Group Housing Society (Housing Society), for making electricity available to the members of such Society residing in the same premises. Provided that it shall not in any way prejudicially affect the right of a person residing in the housing unit, sold or leased by such housing society, to demand electricity supply directly from the Distribution Licensee of the area;
(b) a person (employer) for making electricity available to his employees residing in the same premises.
(a) the housing society/employer shall apply to the Distribution Licensee for the entire connected load / contract demand of the colony and its additions from time to time;
(b) the land/ accommodation reasonably required for installation of metering at the point of supply shall be provided by the housing society / employer free of cost to the Distribution Licensee:
(c) the quality and system of supply shall be as per relevant regulations, as in force from time to time;
(d) the system of wires and associated facilities from the single point of connection to the installation for making electricity available to the members of such society residing in the same premises of the housing society/employer along with the electrical installations of individuals shall conform to the safety requirements of the Act, and all Rules and Regulations made thereunder. The electrical installation shall be wired as provided in the Rules/Regulations and shall be tested before releasing connection through single point supply;
(e) all individual connections shall be metered;
(f) the infrastructure after the point of supply shall be laid by the applicant housing society / employer and the housing society / employer shall retain the ownership of all such assets;
(g) the housing society/ employer shall be fully responsible for the maintenance of complete infrastructure network beyond the point of supply;
(h) the housing society / employer shall be fully responsible for various commercial and technical activities for distribution of electricity to the members of such society residing in the same premises;
(i) the housing society/employer shall not charge more than the slab-wise electricity tariff determined by the Commission for residential consumers located in the area of supply of the Distribution Licensee, where such housing society/premises is located;
(j) electricity supply by the Distribution Licensee to the housing society /employer shall be governed by these Regulations and the terms and conditions for supply of electricity of the Distribution Licensee for its consumers;
(k) electrical energy supply to the housing society / employer shall not be utilized by the housing society / employer in any manner pre-judicial to the Distribution Licensee and all usage shall be in accordance with the provisions of the contract entered into in this regard and the statutory provisions applicable thereto. The housing society /employer shall not extend the supply beyond its premises other than that for which it was sanctioned by the Distribution Licensee.
5.5 Requisition for New Electricity Service Connection.
(a) Application form for release of new connection (Low Tension) - Annexure 1
(b) Application form for release of new connection (High Tension/ Extra High Tension) - Annexure 2
(c) Format for declaration/undertaking to be signed at the time of receiving electricity supply - Annexure 3
(a) If the applicant is an individual:
(i) Aadhaar (UID) Card
(ii) Electoral identity card;
(iii) Passport;
(iv) Driving license;
(v) Ration card;
(vi) Photo identity card issued by Government agency;
(vii) PAN card;
(viii) Photo Certificate from village Pradhan or any village level Government functionary like Patwari/ Lekhpal/ in-charge of primary health centre etc.
(b) If the applicant is a company, trust, educational institution, government department etc, the application form shall be signed by a competent authority (e.g. Branch Manager, Principal, Executive Engineer, etc) along with a relevant resolution/ authority letter of the institution concerned.
(a) Copy of registered sale deed or registered lease deed or registered partition deed or in the case of agricultural connections a copy of khasra / khatauni / khata nakal
(b) Registered General Power of Attorney;
(c) Municipal tax receipt or Demand notice or any other related document;
(d) Letter of allotment.
(e) An applicant who is not an owner but an occupier of the premises shall, along with any one of the documents listed at (a) to (d) above, also furnish a No Objection Certificate from owner of the premises.
(a) Aadhaar (UID) Card
(b) Electoral identity card;
(c) Passport;
(d) Driving license;
(e) Ration card;
(f) Photo identity card issued by any Government agency;
(g) Statement of running Bank Account;
(h) Most recent Water / Telephone / Electricity / Gas connection Bill;
(i) Income Tax assessment order
(a) Industrial consumers: Valid Industrial License, if applicable;
(b) Agricultural consumers: No Objection Certificate from competent government authority for tube wells, if required;
(c) Non-Domestic Khokhas and Temporary Structure: No Objection Certificate for khokha or temporary structure from the nagar nigam / nagar palika / nagar panchayat / gram sabha / gram panchayat / land development authority / land owning agency.
(a) Provisional connection shall not in any way make the applicant lawful owner or occupier of the premises
(b) Applicant shall not use such connection as the legal Address Proof Or Proof Of Residence , which shall be printed on the electricity bill of consumer;]