(a) Issue a duly authorized acknowledgement of each application form accepted, or
(b) Inform an applicant upon request of the status of his application and the reasons if any, for non-disposal of the application.
6.2
Note: 'Acknowledgment' on part of the Distribution Licensee means a written slip/receipt issued to the applicant at the Distribution Licensee's office. Acknowledgment on part of the applicant, e.g. on test / inspection reports, means a signature by the applicant or his authorised representative on the form prepared / being carried by the Distribution Licensee's official / representative.
Note:
6.3
6.4
6.5
6.6
(a) study the technical requirements for giving supply; and
(b) inspect the premises to which supply is to be given.
6.7
(a) five (5) days in case of LT connection in Class-I cities; seven (7) days in case of LT connection in Urban areas and ten (10) days in case of LT connections in rural areas
(b) ten (10) days in case of HT and EHT connections, from the date of receipt of application form.
6.8
6.9
6.10
(a) verify that there is no outstanding due in the applicant's name or for the premise for which the new connection is being applied for. If the applicant, in respect of an earlier agreement executed in his name or in the name of a firm or company with which he was associated either as a partner, director or managing director, has any arrears of electricity dues or other dues for the premises where the new connection is applied for and such dues are payable to the licensee, the requisition for supply may not be entertained by the licensee until the dues are paid in full. But if the erstwhile consumer defaulted payment of dues and left the premises for good and the concerned premises has come in legal possession of a new occupant through transfer or a decree/order of the court/authority and who has no nexus with the previous owner/occupant in any manner, applies for connection of the electrical line in the same disconnected premises, the distribution licensee shall provide electrical connection without realization of the arrear/dues of the premises payable by the erstwhile consumer, from the subsequent transferee of the premises and he shall not be held liable to pay/discharge the liability of the previous consumer for securing a fresh connection;
(b) fix the point of supply, the place where the meter and MCB etc. shall be installed, and layout of the service line, in consultation with the consumer: Provided that the service line shall be laid at an accessible location and the meter shall be fixed outside or at the entry point of the premises in such a manner that it is protected from elements like rain, etc. and is easily accessible without getting the premises unlocked or opened for this purpose;
(c) record the correct full address of the premises, if not provided in the application form, note down landmarks near the property and the pole number from where service connection is proposed to be given and consumer number of the neighbours or nearest consumer;
(d) verify the load/ demand, purpose of usage of electricity and consumer category as indicated in the application form; and
(e) verify all other particulars mentioned in the application form, as required.
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
(a) where LT supply to an applicant is to be given from an existing network of the Distribution Licensee, the Distribution Licensee shall intimate the charges to be borne by the applicant within ten (10) days in Class-I cities, within twelve (12) days in Urban areas and within ten (15) days in Rural areas from the date of receipt of application form for supply;
(b) where LT supply to an applicant requires extension or augmentation/upgradation of distributing mains or commissioning of a new sub-station, the Distribution Licensee shall intimate the charges to be borne by such applicant within thirty (30) days from the date of receipt of application form for supply;
(c) where HT or EHT supply to an applicant is to be given from an existing network of the Distribution Licensee, the Distribution Licensee shall intimate the charges to be borne by the applicant not later than twenty (20) days from the date of receipt of application form for supply;
(d) where EHT supply is to be given or HT supply requires extension or augmentation/upgradation of distributing mains or commissioning of a new substation, the Distribution Licensee shall intimate the charges to be borne by such applicant within thirty (30) days from the date of receipt of application form for supply;
(e) where an applicant seeks dedicated distribution facilities to his premises, the Distribution Licensee shall intimate the charges to be borne by such applicant within forty five (45) days from the date of receipt of application for supply: Provided that the time taken by the applicant in removing any defects/deficiencies found at the applicant's premises shall not be included in the timeline specified above:
6.19
(a) details of the works (including service line) to be undertaken for providing electricity supply;
(b) charges for the abovementioned works to be paid by the applicant in accordance with the schedule of charges approved by the Commission from time to time:
(c) amount of security deposit to be deposited by the applicant as specified in Annexure 18 to these Regulations.
6.20
6.21
6.22
6.23
6.24
6.25
6.26
(a) the Distribution Licensee shall, on an application by the owner or occupier of any premises, give supply of electricity to such premises, within one (1) month after receipt of the completed application and payment of charges for requiring such supply if the supply to an applicant is to be given from an existing network of the Distribution Licensee;
(b) where the supply of electricity to a premise requires extension or augmentation of distributing mains, the Distribution Licensee shall give supply to such premises within forty five (45) days in Class-I Cities and Urban areas and within sixty (60) days in Rural areas, from the date of receipt of application and payment of charges. The extension or augmentation of distributing mains may include the extension of HT, LT lines and new or augmentation of distribution transformer;
(c) where the supply of electricity to a premise requires commissioning of a new substation forming part of the distribution system, the Distribution Licensee shall give supply to such premises within six (6) months from the date of receipt of application and payment of charges. The commissioning of new sub-station forming part of distribution system will include substation having transformation from EHV to HT or HT to LT or switching station from where HT distribution lines originate.
6.27 Procedure for Providing Temporary Supply.
(a) For LT supply without extension, within 7 days
(b) For LT supply with extension, within 15 days
(c) For HT supply without extension, within 15 days
(d) For HT supply with extension, within 25 days
(e) For EHT supply, within thirty (30) days
6.28 Tatkal Yojana.
Section 6 • Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015
6. Procedure for providing fresh electricity connection.
jharkhand-state-electricity-regulatory-commission-electricity-supply-code-regulations-2015-sec-6.json
•
Section 6
{
"act_title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015",
"act_slug": "jharkhand-state-electricity-regulatory-commission-electricity-supply-code-regulations-2015",
"section_label": "Section",
"section": {
"number": "6",
"title": "6. Procedure for providing fresh electricity connection.",
"chapter": null,
"content": "(a) Issue a duly authorized acknowledgement of each application form accepted, or\n(b) Inform an applicant upon request of the status of his application and the reasons if any, for non-disposal of the application.\n6.2\nNote: 'Acknowledgment' on part of the Distribution Licensee means a written slip/receipt issued to the applicant at the Distribution Licensee's office. Acknowledgment on part of the applicant, e.g. on test / inspection reports, means a signature by the applicant or his authorised representative on the form prepared / being carried by the Distribution Licensee's official / representative.\nNote:\n6.3\n6.4\n6.5\n6.6\n(a) study the technical requirements for giving supply; and\n(b) inspect the premises to which supply is to be given.\n6.7\n(a) five (5) days in case of LT connection in Class-I cities; seven (7) days in case of LT connection in Urban areas and ten (10) days in case of LT connections in rural areas\n(b) ten (10) days in case of HT and EHT connections, from the date of receipt of application form.\n6.8\n6.9\n6.10\n(a) verify that there is no outstanding due in the applicant's name or for the premise for which the new connection is being applied for. If the applicant, in respect of an earlier agreement executed in his name or in the name of a firm or company with which he was associated either as a partner, director or managing director, has any arrears of electricity dues or other dues for the premises where the new connection is applied for and such dues are payable to the licensee, the requisition for supply may not be entertained by the licensee until the dues are paid in full. But if the erstwhile consumer defaulted payment of dues and left the premises for good and the concerned premises has come in legal possession of a new occupant through transfer or a decree/order of the court/authority and who has no nexus with the previous owner/occupant in any manner, applies for connection of the electrical line in the same disconnected premises, the distribution licensee shall provide electrical connection without realization of the arrear/dues of the premises payable by the erstwhile consumer, from the subsequent transferee of the premises and he shall not be held liable to pay/discharge the liability of the previous consumer for securing a fresh connection;\n(b) fix the point of supply, the place where the meter and MCB etc. shall be installed, and layout of the service line, in consultation with the consumer: Provided that the service line shall be laid at an accessible location and the meter shall be fixed outside or at the entry point of the premises in such a manner that it is protected from elements like rain, etc. and is easily accessible without getting the premises unlocked or opened for this purpose;\n(c) record the correct full address of the premises, if not provided in the application form, note down landmarks near the property and the pole number from where service connection is proposed to be given and consumer number of the neighbours or nearest consumer;\n(d) verify the load/ demand, purpose of usage of electricity and consumer category as indicated in the application form; and\n(e) verify all other particulars mentioned in the application form, as required.\n6.11\n6.12\n6.13\n6.14\n6.15\n6.16\n6.17\n6.18\n(a) where LT supply to an applicant is to be given from an existing network of the Distribution Licensee, the Distribution Licensee shall intimate the charges to be borne by the applicant within ten (10) days in Class-I cities, within twelve (12) days in Urban areas and within ten (15) days in Rural areas from the date of receipt of application form for supply;\n(b) where LT supply to an applicant requires extension or augmentation/upgradation of distributing mains or commissioning of a new sub-station, the Distribution Licensee shall intimate the charges to be borne by such applicant within thirty (30) days from the date of receipt of application form for supply;\n(c) where HT or EHT supply to an applicant is to be given from an existing network of the Distribution Licensee, the Distribution Licensee shall intimate the charges to be borne by the applicant not later than twenty (20) days from the date of receipt of application form for supply;\n(d) where EHT supply is to be given or HT supply requires extension or augmentation/upgradation of distributing mains or commissioning of a new substation, the Distribution Licensee shall intimate the charges to be borne by such applicant within thirty (30) days from the date of receipt of application form for supply;\n(e) where an applicant seeks dedicated distribution facilities to his premises, the Distribution Licensee shall intimate the charges to be borne by such applicant within forty five (45) days from the date of receipt of application for supply: Provided that the time taken by the applicant in removing any defects/deficiencies found at the applicant's premises shall not be included in the timeline specified above:\n6.19\n(a) details of the works (including service line) to be undertaken for providing electricity supply;\n(b) charges for the abovementioned works to be paid by the applicant in accordance with the schedule of charges approved by the Commission from time to time:\n(c) amount of security deposit to be deposited by the applicant as specified in Annexure 18 to these Regulations.\n6.20\n6.21\n6.22\n6.23\n6.24\n6.25\n6.26\n(a) the Distribution Licensee shall, on an application by the owner or occupier of any premises, give supply of electricity to such premises, within one (1) month after receipt of the completed application and payment of charges for requiring such supply if the supply to an applicant is to be given from an existing network of the Distribution Licensee;\n(b) where the supply of electricity to a premise requires extension or augmentation of distributing mains, the Distribution Licensee shall give supply to such premises within forty five (45) days in Class-I Cities and Urban areas and within sixty (60) days in Rural areas, from the date of receipt of application and payment of charges. The extension or augmentation of distributing mains may include the extension of HT, LT lines and new or augmentation of distribution transformer;\n(c) where the supply of electricity to a premise requires commissioning of a new substation forming part of the distribution system, the Distribution Licensee shall give supply to such premises within six (6) months from the date of receipt of application and payment of charges. The commissioning of new sub-station forming part of distribution system will include substation having transformation from EHV to HT or HT to LT or switching station from where HT distribution lines originate.\n6.27 Procedure for Providing Temporary Supply.\n(a) For LT supply without extension, within 7 days\n(b) For LT supply with extension, within 15 days\n(c) For HT supply without extension, within 15 days\n(d) For HT supply with extension, within 25 days\n(e) For EHT supply, within thirty (30) days\n6.28 Tatkal Yojana.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
"prev_section": "5",
"next_section": "7"
}