Sections
1. Short title, extent and commencement.
Section 12. Definitions.
Section 23. Introduction.
Section 34. Objective.
Section 45. Scope of Regulations and extent of application.
Section 56. Management of the Delhi Grid Code (DGC).
Section 67. Functional Responsibilities of Entities and their Linkages.
Section 78. Transmission System Planning.
Section 89. Planning Criterion.
Section 910. Planning Data.
Section 1011. Connection Standard.
Section 1112. Safety Standard.
Section 1213. Application for Connection.
Section 1314. Connection Agreement.
Section 1415. Grid Parameter Variations.
Section 1516. Equipment at Connection Points.
Section 1617. Communication Facilities.
Section 1718. System Recording Instruments.
Section 1819. Responsibilities for operational safety.
Section 1920. Access at Connection Site.
Section 2021. Operating Conditions.
Section 2122. System Security Aspects.
Section 2223. Demand forecast.
Section 2324. Manual Demand Disconnection.
Section 2425. Reports.
Section 2526. Operational Liaison.
Section 2627. Outage Planning and Coordination.
Section 2728. Recovery Procedures.
Section 2829. Event Information.
Section 2930. Compatibility with the Regional Scheduling and Despatch.
Section 3031. Scheduling and Despatch Procedure.
Section 3132. Time Table for Scheduling.
Section 3233. Metering requirements.
Section 3334. Compliance.
Section 3435. Power to amend.
Section 3536. Power of relaxation.
Section 3637. Power to remove difficulties.
Section 3738. Interpretation.
Section 38
delhi-electricity-regulatory-commission-state-grid-code-regulations-2008.json
•
38 Sections
•
Delhi
{
"id": 27032,
"slug": "delhi-electricity-regulatory-commission-state-grid-code-regulations-2008",
"title": "Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008",
"short_title": "Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008",
"act_number": "Published vide Notification No. F. 17(14)/Engg./DE",
"act_year": 2008,
"act_type": "STATE",
"location": "Delhi",
"law_status": "unknown",
"enactment_date": null,
"description": "Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, extent and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Electricity Act, 2003 (36 of 2003), including amendments thereto;\n(b) \"Apparatus\" means Electrical Apparatus and includes all machines, fittings, accessories and appliances in which conductors are used;\n(c) \"Automatic Voltage Regulator\" means a continuously acting automatic excitation control system to control the voltage of a Generating Unit measured at the generator terminals;\n(d) \"Black Start Procedure\" means procedure necessary to recover the grid from a partial or a total blackout;\n(e) \"Commission\" means the Delhi Electricity Regulatory Commission;\n(f) \"Connection Agreement\" means an agreement setting out the terms relating to connection to and/or use of the State Transmission System;\n(g) \"Connection Point\" means a point at which a User's or Transmission Licensee's Plant and/or Apparatus connects to the State Transmission System;\n(h) \"df/dt Relay\" means a relay which operates when the rate of change of system frequency (over time) goes higher than a laid down limit and initiates load shedding;\n(i) \"Disturbance Recorder\" means a device provided to record the behaviour of the pre-selected digital and analog values of the system parameters during an Event;\n(j) \"Data Acquisition System\" means a device provided to record the sequence of operation in time, of the relays/equipments/system parameters at a location;\n(k) \"Distribution Control Centre (DCC)\" means the office and associated facilities established by the Distribution Licensee to coordinate with SLDC and to carry out the functions as laid down in the DGC.\n(k) \"Event\" means an unscheduled or unplanned occurrence in the State transmission system including faults, incidents and breakdowns;\n(l) \"Event Logger\" means a device provided to record the sequence of operation in time, of the relays/ equipments at a location during an Event;\n(m) \"Fault Locator\" means a device provided at the end of a transmission line to measure/indicate the distance at which a line fault may have occurred;\n(n) \"Flexible Alternating Current Transmission (FACT)\" means facilities that enable power flows on A.C. lines to be regulated, to control loop flows, line loading etc.\n(p) \"Maximum Continuous Rating\" means the normal rated full load MW output capacity of a Generating Unit which can be sustained on a continuous basis at laid down conditions;\n(q) \"Operation\" means a scheduled or planned action relating to the operation of a System;\n(r) \"Single Line Diagram\" means diagrams which are a schematic representation of the HV/EHV apparatus and the connections to all external circuits at a Connection Point incorporating its numbering nomenclature and labelling;\n(s) \"Site Common Drawing\" means drawings prepared for each Connection Point, which incorporates layout drawings, electrical layout drawings, common protection/control drawings and common service drawings;\n(t) \"Spinning Reserve\" means generating capacity with some reserve margin, at standard rated frequency of 50 Hz, that is synchronized to the system and is ready to provide increased generation at short notice pursuant to dispatch instruction or instantaneously in response to a frequency drop;\n(u) \"State Transmission System\" (STS) means the transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by the State Transmission Utility (STU) and/or Transmission Licensee(s).\n(v) \"Static VAR Compensator\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power;\n(x) \"Under Frequency Relay\" means a relay which operates when the system frequency falls below a laid down limit and initiates load shedding;\n(y) \"User\" refers to persons, including in-State Generating Stations, Distribution Licensees, Consumers of the Distribution Licensees directly connected to State Transmission System (STS), and those availing of Open Access and connected to and/or using the STS, as more particularly identified in each Section of the DGC.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Introduction.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Objective.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Scope of Regulations and extent of application.",
"chapter": null,
"content": "(a) the SLDC;\n(b) every Transmission Licensee in the State including the STU;\n(c) every User who is connected to and/or uses the STS:\n(a) Entering into a Connection Agreement in accordance with Regulation 14;\n(b) Providing for protection systems in accordance with Regulations 16.2 and 16.3;\n(c) Providing for communication facilities in accordance with Regulation 17;\n(d) Providing for system recording instruments in accordance with Regulation 18;\n(e) Developing Single Line Diagrams in accordance with Regulation 19.3.1;\n(f) Developing Site Common Drawings in accordance with Regulation 19.4.2; and\n(g ) Installation and Operation of meters in accordance with Metering Procedure developed as per Regulation 33.",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Management of the Delhi Grid Code (DGC).",
"chapter": null,
"content": "(a) facilitating the implementation of these Regulations and the procedures developed under the provisions of these Regulations;\n(b) assessing and recommending remedial measures for issues that might arise during the course of implementation of provisions of these Regulations and the procedures developed under the provisions of these Regulations;\n(c) review of the DGC, in accordance with the provisions of the Act and these Regulations;\n(d) analyse any major grid disturbance after its occurrence,\n(e) examining problems raised by the Users, and\n(f) investigate in case any Beneficiary is indulging in unfair gaming or collusion after getting reported from SLDC.\n(g) review of the complete statement of the State UI and the State Reactive Energy account tabled by the SLDC through its Commercial Committee (a sub-committee of GCC); and\n(h) such other matters as may be directed by the Commission from time to time.\n(a) One member from the STU;\n(b) One member of the SLDC;\n(c) One member to represent the generating companies in the State;\n(d) One member to represent Badarpur Thermal Power Station;\n(e) One member to represent the Transmission Licensees in the State, other than the STU;\n(f) One member each to represent the Distribution Licensees in the State;\n(g) One member to represent the Electricity Traders in the State;\n(h) One member to represent the Northern Regional Load Despatch Centre (NRLDC); and\n(i) Such other persons as may be nominated by the Commission.\n(a) the concerned Director of the STU, having the responsibility of looking after operational activities of the STU shall be the member referred to in clause (a) of Regulation 6.2.3 above;\n(b) the member referred to in clause (b) of Regulation 6.2.3 above shall be the head of the SLDC;\n(c) the members referred to in clauses (c), (e), (g) and (h) of Regulation 6.2.3 above shall be nominated by their respective organizations, which organizations will be selected in rotation from among all such organizations in the State. The term of each such member, selected in rotation, shall be one (1) year.\n(a) outcome of the review; and\n(b) any proposed revisions to the DGC.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Functional Responsibilities of Entities and their Linkages.",
"chapter": null,
"content": "• Build, maintain and operate an efficient, coordinated and economical Transmission System.\n• Comply with the directions of SLDC.\n• Provide non-discriminatory Open Access as in 7.2.1 above.\n• Develop and maintain an efficient, coordinated and economical Distribution System in his Area of Supply;\n• Provide non-discriminatory Open Access to its Distribution System for use by\n(i) Any licensee or generating company on payment of the wheeling charges; or\n(ii) Any consumer as per the Open Access Regulation notified by the Commission under sub-section (2) of Section-42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Commission.\nChapter II\nPlanning Code",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Transmission System Planning.",
"chapter": null,
"content": "(a) Plans formulated by the Authority for the transmission system under the provisions of clause (a) of Section 73 of the Act;\n(b) Latest available Electric Power Survey of the Authority;\n(c) Grid Standards specified by the Authority under clause (d) of Section 73 of the Act;\n(d) Transmission Plan formulated by Central Transmission Utility under the provisions of Grid Code specified by Central Electricity Regulatory Commission under clause (h) of Section 79 of the Act;\n(e) Transmission Planning Criteria and Guidelines issued by the Authority;\n(f) Recommendations/ inputs, if any, of the Northern Regional Power Committee (NRPC);\n(g) National Electricity Plan / National Electricity Policy which are relevant for development of STS; and\n(h) Any other information/data source suggested by the Commission.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Planning Criterion.",
"chapter": null,
"content": "(a) Outage of a D/C line of voltage above 66 kV and below 400 kV or,\n(b) Outage of a S/C line of voltage of 400kV and above or,\n(c) Outage of a single Interconnecting Transformer.\n(a) Loss of supply;\n(b) Prolonged operation of the system frequency below and above specified limits;\n(c) Unacceptable high or low voltage;\n(d) System instability;\n(e) Unacceptable overloading of STS elements.",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Planning Data.",
"chapter": null,
"content": "(a) Standard Planning Data;\n(b) Detailed Planning Data\n(a) Preliminary project planning data;\n(b) Committed project planning data; and\n(c) Connected planning data.\nChapter III\nConnection Conditions",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Connection Standard.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Safety Standard.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Application for Connection.",
"chapter": null,
"content": "(a) such further information as shall be reasonably necessary to enable any person seeking Use of System to identify and evaluate the opportunities available when connecting to and making use of such system; and\n(b) a commentary prepared by the STU indicating its views as to those parts of the STS most suited to new connections and transport of further quantities of electricity.\n(a) Report stating the purpose of the proposed connection and/or modification, Transmission Licensee to whose system connection is proposed, description of apparatus to be connected or modification of the apparatus already connected and beneficiaries of the proposed connection;\n(b) Construction schedule and target completion date; and\n(c) Confirmation that the Transmission Licensee or the User shall abide by the provisions of DGC, Indian Electricity Rules, 1956 (until the Regulations under Section 53 of the Act are made and such Regulations specified by the Authority thereafter) and various standards including Grid Connectivity Standards made pursuant to the Act.\n(a) accept the application with such modification or such conditions as may be laid down by the STU;\n(b) reject the application for reasons to be recorded in writing if such application is not in accordance with the provisions of these Regulations.",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Connection Agreement.",
"chapter": null,
"content": "(a) A condition requiring both parties to comply with the DGC;\n(b) Details of connection, technical requirements and commercial arrangements;\n(c) Details of any capital expenditure arising from necessary reinforcement or extension of the system, data communication etc. and demarcation of the same between the concerned parties;\n(d) Site Responsibility Schedule;\n(e) General philosophy and guidelines on protection (i.e., in accordance with the STU's Protection Plan finalised under Regulation 16.3.2);\n(f) Protection systems (i.e., in consonance with the System Protection Schemes prepared/updated under Regulation 22.21);\n(g) System recording instruments;\n(h) Communication facilities; and\n(i) Any other information considered appropriate by the STU or the Commission.",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Grid Parameter Variations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Equipment at Connection Points.",
"chapter": null,
"content": "(a) 100 milli seconds for 400 kV and above\n(b) 160 milli seconds for 220 kV and below",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Communication Facilities.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. System Recording Instruments.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "19",
"title": "19. Responsibilities for operational safety.",
"chapter": null,
"content": "(a) Ownership of the Plant/Apparatus;\n(b) Responsibility for control of the Plant/Apparatus;\n(c) Responsibility for operation of the Plant/Apparatus;\n(d) Responsibility for maintenance of the Plant/Apparatus; and\n(e) Responsibility for all matters relating to safety of any persons at the Connection Point.\n(a) Site Layout;\n(b) Electrical Layout including cable/wiring schedule;\n(c) Details of Protection/Control; and\n(d) Common Services Drawings.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "20",
"title": "20. Access at Connection Site.",
"chapter": null,
"content": "Annexure-I to Chapter-III\nAnnexure-I to Chapter-III\nConnection Agreement\nConnection Agreement\n(Refer Regulations - 14.2)\n(Refer Regulations - 14.2)\n(i) Grid Code Compliance\n(i) Grid Code Compliance\nIt is agreed that the User ................ and ---------------------------------(the Transmission Licensee) will abide by the provisions of the Delhi Grid Code (DGC)/Indian Electricity Grid Code (IEGC) in force for the purpose of availing / evacuating power from / to ---------------------(the Transmission Licensee) and to maintain a connectivity with the Transmission System network of ------------------------------------------(the Transmission Licensee).\n(ii) Terms of agreement\n(ii) Terms of agreement\n(a) This agreement shall be deemed to have commenced from....... and shall continue until it is terminated. In case of any differences or disagreements between the Transmission Licensee and the User in regard to any changes required from time to time to the terms of this agreement the same shall be resolved amicably failing which the matters shall be referred to the DERC.\n(b) The term of this Agreement shall stand modified or terminated automatically as per the Regulations which DERC may issue from time to time in accordance with the functions and powers of the Commission under the Act. As soon as practicable following any Regulations of the Commission which has the effect of modifying the terms of this Agreement, the Transmission Licensee shall prepare a revised version of this agreement, incorporating the modified term and following Agreement between the Transmission Licensee and User that the revised version accurately reflects the relevant Regulation, the User shall execute the revised version.\n(c) No User shall assign the Agreement or transfer or part with the benefits under the Agreement in favour of any other person/User without the express consent or approval of the Transmission Licensee.\n(d) Any connection, which has been unauthorisedly transferred or parted with, shall be liable for disconnection after expiry of a seven days notice calling for explanation and considering the explanation submitted.\n(e) The User agrees to bear the cost of stamp duty and all cost incidental to the execution of this agreement in full.\n(iii) Details of Connection\n(iii) Details of Connection\n(a) System of supply voltage:\n(b) Total contract demand:\n(c) Phasing of the contract demand:\n(d) Connection details (Including control details as per the Regulations):\n(LILO arrangement of transmission line with a switching station/from a bay of an existing grid substation of the Transmission Licensee)\n(e) Details of reactive power compensation arrangement:\n(f) Details of the scheme of the switching station/bay\ni. Bus-bar arrangement: Three bus system/Two bus system/main and transfer bus system, Bus-bar type\nii. Provision for future expansion\n(g) Captive Generating Plant :\ni. Rated capacity:\nii. Rated voltage level of generation:\niii. Quantum of surplus power to be evacuated:\niv. Details of the connectivity with the Transmission Licensee's network:\nv. Mode of communication connectivity with SLDC: Telephone / Fax/ Carrier communication.\n(h) Communication arrangement : The User shall be required to provide voice and other data communication facility as decided by SLDC.\n(i) Metering Arrangement : The User shall provide meters for accounting and audit purposes as per the standard specified by CEA.\n[Details of operational/commercial (tariff) metering scheme to be provided.] Detailed data are to be provided as per provisions of the DGC.\n(j) Other Charges : The operation and maintenance charges of the transmission line details to be indicated, 220 kV/400 kV feeder bay (nos. of bays and location of grid substation to be indicated), 220 kV/400 kV switching station (details of bays etc. to be indicated) shall be governed by applicable provisions of the Act, Regulations, Codes, and Orders of the Commission.\ni. Entry Charges and Exit Charges as fixed by the Transmission Licensee and approved by DERC to be paid where appropriate.\nii. Capital related payment arising from necessary reinforcement or extension of the System is to be paid.\n(k) Site Responsibility Schedule : The Site Responsibility Schedule format is at Annexure-II to Chapter-III of the DGC:\n(l) Protection Scheme : Protection scheme shall be provided in the User's system to protect the grid from the faults originating in their system and so also for safeguarding their system from the fault originating from the Transmission System. The protection scheme of the User's system shall have the approval of the STU, i.e. DTL.\ni. Transmission line protection scheme: (indicate the general philosophy of the scheme)\nii. 220 kV / 400 kV feeder bay protection scheme: (indicate the general philosophy of the scheme)\niii. General protection scheme adopted for the switching station: (indicate the general philosophy of the scheme).\niv. Any other protection scheme provided:\n(m) Documents forming part of this agreement:\ni. Appendix-I: Data to be provided as per provisions of the DGC\nii. Appendix-II: Attested copies of the Transmission Licensee permission letter no __________, date _______________\niii. Duly completed Site Responsibility Schedule as per Annexure-II (to Chapter-III).\niv. Detail of procedure necessary for Site Access, Site Operational activities and maintenance Standards for equipments of the STU/Transmission Licensee at STU/Transmission Licensee premises and vice versa as Appendix-III.\nSIGNED BY\nSIGNED BY\nFor & on behalf of User\nFor & on behalf of the Transmission Licensee\nWITNESSES:\n1)\n1)\n2)\n2)\nAnnexure-II to Chapter-III\nAnnexure-II to Chapter-III\nSite Responsibility Schedule (Refer Regulations - 19.2.3)\nSite Owner: . . . Tel. Number: . . . Fax Number: . . .\nItem of Plant/Apparatus\nPlant Owner\nSafety Responsibility\nControl Responsibility\nOperation Responsibility\nMaintenance Responsibility\nRemarks\n1\n2\n3\n4\n5\n6\n7\n... .... KV Switchyard\nAll equipment including bus bars\nFeeders\nGenerating Units\nChapter IV\nOperating Code",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "21",
"title": "21. Operating Conditions.",
"chapter": null,
"content": "(a) Black start procedures;\n(b) Load shedding procedures;\n(c) Islanding procedures; and\n(d) Any other procedures considered appropriate by the SLDC:",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "22",
"title": "22. System Security Aspects.",
"chapter": null,
"content": "(a) under an emergency, and conditions in which such isolation will prevent a total grid collapse and/or will enable early restoration of power supply;\n(b) when serious damage to a costly equipment is imminent and such isolation will prevent it;\n(c) when such isolation is specifically instructed by the SLDC.\nVoltage - (kV rms)\nVoltage - (kV rms)\nNominal\nMaximum\nMinimum\n400\n420\n360\n220\n245\n200\n66\n73\n60",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "23",
"title": "23. Demand forecast.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "24",
"title": "24. Manual Demand Disconnection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "25",
"title": "25. Reports.",
"chapter": null,
"content": "(a) Frequency profile;\n(b) Voltage profile of selected substations;\n(c) Demand and Supply Situation including Load Shedding, if any;\n(d) Major Generation and Transmission Outages;\n(e) Transmission Constraints; and\n(f) Instances of persistent/significant non-compliance of the DGC.",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "26",
"title": "26. Operational Liaison.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "27",
"title": "27. Outage Planning and Coordination.",
"chapter": null,
"content": "(a) major grid disturbances (e.g. total black out);\n(b) system isolation;\n(c) any other Event in the system that may have an adverse impact on the system security by the proposed outage.",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "28",
"title": "28. Recovery Procedures.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "29",
"title": "29. Event Information.",
"chapter": null,
"content": "(a) Violation of security standards;\n(b) Grid indiscipline;\n(c) Non-compliance of the SLDC's instructions;\n(d) System is landing/system split;\n(e) Black out/partial system black out;\n(f) Protection failure on any element of STS;\n(g) Power system instability; and\n(h) Tripping of any element of the State Grid.\n(a) Time and date of Event;\n(b) Location;\n(c) Plant and/or Equipment directly involved;\n(d) Description and cause of Event;\n(e) Antecedent conditions;\n(f) Demand and/or Generation (in MW) interrupted and duration of interruption;\n(g) All relevant system data including copies of records of all recording instruments including Disturbance Recorder, Event Logger and Data Acquisition System;\n(h) Sequence of trippings with time;\n(i) Details of Relay Flags; and\n(j) Remedial measures.\nChapter V\nScheduling and Despatch Code",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "30",
"title": "30. Compatibility with the Regional Scheduling and Despatch.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "31",
"title": "31. Scheduling and Despatch Procedure.",
"chapter": null,
"content": "(a) Network Security and System Operation;\n(b) System Contingencies;\n(c) Demand Estimation and Control;\n(d) Exchange of Information for Scheduling and Rescheduling including scheduling of Inter-Distribution Licensee Transfer of Power, if any;\n(e) Data requirement and verification in respect of ABT metering and accounts;\n(f) Complimentary Commercial Mechanism for ABT;\n(g) Monitoring of Generation and Drawal, keeping in view allocation of power by the Government from time to time;\n(h) Reactive Power Exchange and Pricing, if any;\n(i) Real time Voltage and Frequency Management; and\n(j) Any other relevant procedures considered appropriate by SLDC:\n(i) To switch a generator into or out of service.\n(ii) Details of Spinning Reserve to be maintained.\n(iii) To increase or decrease MVAr generation for maintaining the voltage profile.\n(iv) To begin pre-planned Black Start procedures.\n(v) To hold Generating Units on standby.",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "32",
"title": "32. Time Table for Scheduling.",
"chapter": null,
"content": "Process for Scheduling (for succeeding day)\nProcess for Scheduling (for succeeding day)\nChapter VI\nMetering Details",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "33",
"title": "33. Metering requirements.",
"chapter": null,
"content": "(a) approve the Metering Procedure, with such conditions or modifications as the Commission may deem appropriate; or\n(b) reject the Metering Procedure for reasons to be recorded in writing if the Metering Procedure is not in accordance with the Act or these Regulations or with the Grid Code specified under clause (h) of sub-section (1) of Section 79 of the Act and direct the STU to submit a revised draft Metering Procedure.\n(a) provisions related to location and installation of meters;\n(b) specifications and accuracy limits for the meters;\n(c) rights, responsibilities and procedures related to recording, collection, transfer, processing and storage of data collected from meters;\n(d) provisions related to ownership of metering data;\n(e) calibration procedures to be carried out by each concerned agency to ensure conformance to the above accuracy limits;\n(vi) procedures associated with maintenance of the meters in proper functioning state, safety of meters, testing of the new or replacement meters, sealing of meters and inspection of meters;\n(f) provisions related to right of access to the meters;\n(g) procedures to address metering discrepancies, defective equipments and meter failures;\n(h) procedures for resolution of disputes on matters related to metering; and\n(i) any other aspect considered appropriate, for inclusion in the Metering Procedure, by the STU or the Commission.\nChapter VII\nMiscellaneous",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "34",
"title": "34. Compliance.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "35",
"title": "35. Power to amend.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "36",
"title": "36. Power of relaxation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "37",
"title": "37. Power to remove difficulties.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "38",
"title": "38. Interpretation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 37
}
],
"metadata": {
"Act ID": "dl121",
"Act Number": "Published vide Notification No. F. 17(14)/Engg./DERC/2003-04/---, dated 31st March, 2008",
"Enactment Date": "",
"Act Year": "2008",
"Short Title": "Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008",
"Type": "UNION_TERRITORY",
"Location": "Delhi"
},
"updated_at": "2026-09-29 21:55:22"
}