9. Planning Criterion.

(a) Outage of a D/C line of voltage above 66 kV and below 400 kV or,
(b) Outage of a S/C line of voltage of 400kV and above or,
(c) Outage of a single Interconnecting Transformer.
(a) Loss of supply;
(b) Prolonged operation of the system frequency below and above specified limits;
(c) Unacceptable high or low voltage;
(d) System instability;
(e) Unacceptable overloading of STS elements.