31. Scheduling and Despatch Procedure.

(a) Network Security and System Operation;
(b) System Contingencies;
(c) Demand Estimation and Control;
(d) Exchange of Information for Scheduling and Rescheduling including scheduling of Inter-Distribution Licensee Transfer of Power, if any;
(e) Data requirement and verification in respect of ABT metering and accounts;
(f) Complimentary Commercial Mechanism for ABT;
(g) Monitoring of Generation and Drawal, keeping in view allocation of power by the Government from time to time;
(h) Reactive Power Exchange and Pricing, if any;
(i) Real time Voltage and Frequency Management; and
(j) Any other relevant procedures considered appropriate by SLDC:
(i) To switch a generator into or out of service.
(ii) Details of Spinning Reserve to be maintained.
(iii) To increase or decrease MVAr generation for maintaining the voltage profile.
(iv) To begin pre-planned Black Start procedures.
(v) To hold Generating Units on standby.