(a) Violation of security standards;
(b) Grid indiscipline;
(c) Non-compliance of the SLDC's instructions;
(d) System is landing/system split;
(e) Black out/partial system black out;
(f) Protection failure on any element of STS;
(g) Power system instability; and
(h) Tripping of any element of the State Grid.
(a) Time and date of Event;
(b) Location;
(c) Plant and/or Equipment directly involved;
(d) Description and cause of Event;
(e) Antecedent conditions;
(f) Demand and/or Generation (in MW) interrupted and duration of interruption;
(g) All relevant system data including copies of records of all recording instruments including Disturbance Recorder, Event Logger and Data Acquisition System;
(h) Sequence of trippings with time;
(i) Details of Relay Flags; and
(j) Remedial measures.
Chapter V
Scheduling and Despatch Code
Section 29 • Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008
29. Event Information.
delhi-electricity-regulatory-commission-state-grid-code-regulations-2008-sec-29.json
•
Section 29
{
"act_title": "Delhi Electricity Regulatory Commission (State Grid Code) Regulations, 2008",
"act_slug": "delhi-electricity-regulatory-commission-state-grid-code-regulations-2008",
"section_label": "Section",
"section": {
"number": "29",
"title": "29. Event Information.",
"chapter": null,
"content": "(a) Violation of security standards;\n(b) Grid indiscipline;\n(c) Non-compliance of the SLDC's instructions;\n(d) System is landing/system split;\n(e) Black out/partial system black out;\n(f) Protection failure on any element of STS;\n(g) Power system instability; and\n(h) Tripping of any element of the State Grid.\n(a) Time and date of Event;\n(b) Location;\n(c) Plant and/or Equipment directly involved;\n(d) Description and cause of Event;\n(e) Antecedent conditions;\n(f) Demand and/or Generation (in MW) interrupted and duration of interruption;\n(g) All relevant system data including copies of records of all recording instruments including Disturbance Recorder, Event Logger and Data Acquisition System;\n(h) Sequence of trippings with time;\n(i) Details of Relay Flags; and\n(j) Remedial measures.\nChapter V\nScheduling and Despatch Code",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
"prev_section": "28",
"next_section": "30"
}