38. Petrochemicals (Basic & intermediates)

[A. Effluents]
PH
6.5-8.5
[*BOD (3days at
27°C)]
50
**Phenol
5
Sulphide (as S)
2
COD
250
Cyanide ( as CN)
0.2
***Fluoride (as F)
15
Total suspended
solids
1000
Hexavalent
0.1
Chromium (as
CR+6)]
****Total Chromium
(as CR)
2.0
B.
Emission from Chimney/Stack
B.
Emission from Chimney/Stack
Limiting
concentration in mg/Nm3, unless stated
Limiting
concentration in mg/Nm3, unless stated
"(Furnace,
Boiler, Heater, Vaporiser)
Fuel
Type
Fuel
Type
Existing
plants
Existing
plants
New
Plant/Expansion of Existing Plant
New
Plant/Expansion of Existing Plant
Sulphur Dioxide
(SO2)
Gas
50
50
Liquid
1700
850
Oxides of Nitrogen
(NOx)
Gas
350
250
Liquid
450
350
Particulate Matter
(PM)
Gas
10
05
Liquid
100
50
Carbon Monoxide
(CO)
Gas
150
100
Liquid
200
150
Note,-
Note,-
(i)
All values shall be corrected to 3% Oxygen.
(ii)
Wet scrubber shall necessarily be operated at the time of
decoking.
(iii)
Norms for CO shall be monitored only in case of Phthalic
Anhydride (PA), Maleic Anhydride (MA), Terephthalic Acid (PTA)
and Dimethyl Terephalate (DMT) Plants. Norms for CO emissions
shall not be applicable to PA/MA manufacturing standalone
existing piants with an installed capacity of less than 30,000
metric tonnes per annum, provided that such units have a
chimney/stack of minimum 30 metres height for emitting Carbon
Monoxide.
Process
Emission (Specific Pollutant)
Process
Emission (Specific Pollutant)
Source
Source
Limiting
concentration in mg/Nm3
Limiting
concentration in mg/Nm3
Exiting
Plants
Exiting
Plants
New
Plants
New
Plants
Chlorine
EDC/VCM Plant and
Incinerator
10
10
Hydrochloric Acid
Mist
EDC/VCM Plant and
Incinerator
30
30
Ammonia
Wastewater
stripper, acrylonitrile plant, carpolacturm plant
75
75
Hydrogen Sulphide
Naphtha
pre-treatment plant, olefin plant
05
05
Phosgene
(TDI) and (MDI)
plant
01
01
Hydrogen
Cyanide(HCN)
Acrylonitrile
plant
10
10
VOC (HAPs)-TDI and
MDI
TDI,
Methylenediphenyl Di-isocyante (MDI) Plants
0.1
0.1
VOC (HAPs),
Benzene and Butadiene
Benzene, Butadiene
Plants
5.0
5.0
VOC
(HAPs), EO, VCM, EDC, ACN and PO
EO, VCM, EDC, ACN,
PO Plants
20.0
10.0
Organic
Particulate
PA, MA and TDI
Plants
50
25
Process
Emission (General Pollutant)
Process
Emission (General Pollutant)
Source
Source
Limiting
concentration in mg/Nm3
Limiting
concentration in mg/Nm3
VOC (MA, PA and
Phenol)
MA, PA, Phenol
Plants
20
VOC (EB, Styrene,
Toluene, Xylene, Aromatics, EG and PG)
Ethyl benzene
(EB), Styrene, Toluene, Xylene, Aromatics, EG, PG Plants
10
VOC (Paraffin,
Acetone and Olefins)
Non-methane, HC
(paraffin), Acetone, Olefins Plants
150
Note. - In respect of are furnaces and induction furnaces, provision has to be made for collecting the fumes before discharging the emissions through the stack.
Note.
NOTE.
C. Standards for Fugitive Emission Storage of Volatile Liquids: General Petrochemical/ Petroleum Products.
(1) Storage tanks with capacity between 4 to 75m 3 and total vapour pressure (TVP) of more than 10 kpa should have fixed roof with pressure value vent. (2) Storage tanks with capacity between 75 to 500 m 3 and total vapour pressure (TVP) of 10 to 76 kpa should have internal floating roof or external floating roof or fixed roof with vapour control or vapour balancing system. (3) Storage tanks with the capacity of more than 500 m 3 and total vapour pressure (TVP) of 10 to 76 kpa should have internal floating roof or external floating roof or fixed roof with vapour control system. (4) The tanks with the capacity of more than 75 m 3 and total vapour pressure (TVP) of more than 76 kpa should have fixed roof with vapour control system. (5) Requirement for seals in Floating Roof Tanks- (i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
C. Standards for Fugitive Emission
C. Standards for Fugitive Emission
(2) Storage tanks with capacity between 75 to 500 m 3 and total vapour pressure (TVP) of 10 to 76 kpa should have internal floating roof or external floating roof or fixed roof with vapour control or vapour balancing system. (3) Storage tanks with the capacity of more than 500 m 3 and total vapour pressure (TVP) of 10 to 76 kpa should have internal floating roof or external floating roof or fixed roof with vapour control system. (4) The tanks with the capacity of more than 75 m 3 and total vapour pressure (TVP) of more than 76 kpa should have fixed roof with vapour control system. (5) Requirement for seals in Floating Roof Tanks- (i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(3) Storage tanks with the capacity of more than 500 m 3 and total vapour pressure (TVP) of 10 to 76 kpa should have internal floating roof or external floating roof or fixed roof with vapour control system. (4) The tanks with the capacity of more than 75 m 3 and total vapour pressure (TVP) of more than 76 kpa should have fixed roof with vapour control system. (5) Requirement for seals in Floating Roof Tanks- (i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(4) The tanks with the capacity of more than 75 m 3 and total vapour pressure (TVP) of more than 76 kpa should have fixed roof with vapour control system. (5) Requirement for seals in Floating Roof Tanks- (i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(5) Requirement for seals in Floating Roof Tanks- (i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(i) (a) Internal Floating Roof Tank (IFRT) and External Floating Roof Tank (EFRT) shall be provided double seals with minimum vapour recovery of 96%. (b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(b) Primary seal shall be liquid or shoe mounted for EFRT and vapour mounted for IFRT. Maximum seal gap width will be 4 cm and maximum gap area will be 200 cm 2 /m of tank diameter. (c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(c) Secondary seal shall be rim mounted. Maximum seal gap width will be 1.3 cm and maximum gap area will be 20 cm 2 /m of tank diameter. (d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(d) Material of seal and construction shall ensure high performance and durability. (ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(ii) Fixed roof tanks shall have vapour control efficiency of 95% and vapour balancing efficiency of 90%. (iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(iii) (a) inspection and maintenance of storage tanks shall be carried out under strict control; (b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(b) for the inspection, API RP 575 may be adopted; (c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(c) In-service inspection with regard seal gap should be carried out once in every six months and repair to be implemented in short time; and (d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(d) the possibility of on-stream repair of both shall be examined. (iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(iv) Storage tanks shall be painted with white colour shade, except for derogation of visually sensitive area.D. Storage of Benzene, VCM and ACN D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
D. Storage of Benzene, VCM and ACN (i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
D. Storage of Benzene, VCM and ACN
(i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(i) FRT with vapour for incineration with 99.9% of removal efficiency for volatile organic compounds (VOC) shall be provided; or (ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(ii) IFRT/EFRT with double seals, emission-reducing roof fitting and fitted with fixed roof with vapour removal efficiency of at least 99% shall be provided; or (iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(iii) Internal floating roof and nitrogen blanketing in between fixed and floating roofs shall be provided. (Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(Emission control
for Road tank, truck/Rail tank, wagon loading) Loading of
Volatile Products Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3 (i) >_
99.5 or (ii) <_ 5 Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3 (i) >_
99.99 or (ii) <_ 20 Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3 (i) >_
99.98 or (ii) <_ 150 ]
(Emission control
for Road tank, truck/Rail tank, wagon loading)
Loading of
Volatile Products
Naphtha: (i)
VOC reduction,% or (ii) Emission, gm/m3
(i) >_
99.5 or (ii) <_ 5
Benzene and
Butadience: (i) VOC reduction,% or (ii) Emission, mg/m3
(i) >_
99.99 or (ii) <_ 20
Toluene/Xylene: (VOC)
reduction,% or (ii) Emission, mg/m3
(i) >_
99.98 or (ii) <_ 150
[***]
Sr.No.
Sr.No.
Industry
Industry
Parameter
Parameter
Standards
Standards
1
1
2
2
3
3
4
4
39
Hotel
Industry
Effluent
Standards
(i) Hotel with atleast 20 bedrooms
limiting concentration in mg/1, except for pH
Inland Surface Water
On land for Irrigation
pH
5.5-9.0
5.5-9.0
BOD 3days, 27 0 C
30
100
Total Suspended Solids
50
100
Oil & Grease
10
10
Phosphate as P
1
-
(ii) Hotel with less than 20 bedrooms or a
Banquet Hall with minimum floor area of 100 m 2 or a Restaurant
with minimum seating capacity of 36
pH
5.5-9.0
5.5-9.0
BOD 3days, 27 0 C
100
100
Total Suspended Solids
100
100
Oil & Grease
10
10
Notes:
i. Hotels, banquet
halls, restaurants, etc. located in coastal area shall also
comply with the provisions of the Coastal Regulation Zone, as
applicable
ii. If, the effluent
is discharged into a municipal sewer leading to a Sewage
Treatment Plant, the hotel or restaurant or banquet hall, as the
case may be, shall provide a proper Oil and Grease Trap for
effluent arising from its kitchen and laundry and shall have to
comply with the 'General Standards for Discharge of Environmental
Pollutants Part-A: Effluents' notified under Schedule-VI
OLD LAW ▼
OLD LAW ▼
"39. Pharmaceutical Manufacturing and Formulation Industry Effluents 1. pH 5.5-9.0 2. Oil and Grease 10 3. Total Suspended solids 100 4. [BOD (3 days at 27°C)] 30 5. Bio-assay test 90% survival of fish after 96 hrs. in 100% effluent 6. Mercury 0.01 7. Arsenic Chromium 0.20 8. Chromium (Hexavalent) 0.10 9. Lead 0.10 10. Cyanide 0.10 11. Phenolics (as C 6 H 5 OH) 1.00 12. Sulphides (as S) 2.00 13. Phosphates (as P) 5.00
Note.
S.No.
S.No.
Industry
Industry
Parameter
Parameter
Standard
Standard
(1)
(1)
(2)
(2)
(3)
(3)
(4)
(4)
A.
Emission Standards
A.
Emission Standards
40
Pesticide Industry
Limiting
concentration in mg/Nm3
HCI
20
Cl 2
5
H 2 S
5
P 2 O 5 as H 3 PO 4
10
NH 3
30
Pesticides
compounds in the form of particulate matter
20
CH 3 CI
20
HBr
5
B.
Effluent Standards
B.
Effluent Standards
Limiting
concentration in mg/l, except for pH and Bioassay test
(i)
Compulsory Parameters
pH
6.5-8.5
BOD, 3 days, 27°C
Formulation unit
30
Technical graed
unit
100
Oil
and Grease
10
Suspended
Solids
100
Bioassay
Test
90
percent survival of fish after 96 hours in 100% effluent*
(ii)
Additional Parameters
Arsenic
(as As)
0.2
Copper
1.0
Manganese
1.0
Mercury
0.01
Antimony
(as Sb)
0.1
Zinc
1.0
Nickel, etc.
(heavy metals individually)
Shall not exceed
individually 5 times the drinking water standards as per Bureau
of Indian Standards
Cyanide
(as CN)
0.2
Nitrate
(as NO3)
50
Phosphate
(as P)
5.0
Phenol
and Phenolic Compounds as C6H5OH
1.0
Sulphur
0.03
Benzene
Hexachloride (BHC)
0.01
Carbonyl
0.01
Copper
Oxychloride
9.6
DDT
0.01
Dimethoate
0.45
24D
0.4
Endosulfan
0.01
Fenitothrion
0.01
Malathion
0.01
Methyl
parathion
0.01
Paraquat
2.3
Phenathoate
0.01
Phorate
0.01
Proponil
7.3
Pyrethrums
0.01
Ziram
1.0
Other
Pesticide (individually)
0.10
*Bioassay Test
shall be carried out as per IS: (6582-1971). Note: 1. The concerned State Pollution Control Board/Pollution Control
Committee shall prescribe limits of Total Dissolved Solids (TDS),
Sulphates and Chlorides depending on the usages of recipient
water body in down stream, in which effluent shall be disposed
off. 2. No limit for chemical Oxygen Demand (COD) is
prescribed but, COD in the treated effluent shall be monitored.
If COD is persistently reported more than 250 mg/l, the
industrial units discharging such an effluent shall be required
to identify chemical causing the same. In case, these are found
to be toxic, as defined in Schedule I of the Manufacture, Storage
and Import of Hazardous Chemicals Rules, 1989, the concerned
State Pollution Control Board/Pollution Control Committee in such
cases shall direct the industries to install tertiary treatment
system by 31st MArch, 2012. 3. Parameters listed as
"Additional parameters" shall be prescribed depending
upon the process and product, on a case basis.
Note:
C.
Emission Standards for Incinerator
C.
Emission Standards for Incinerator
Limiting
concentration in mg/Nm3, unless stated
Sampling Duration
in minutes, unless stated
Particulate
Matter
50
30 or more (for
sampling of 300 litres of emission)
HCI
50
30
SO2
200
30
CO
100
Daily
average
Total
organic Carbon
20
30
Total Dioxins and
Furans*
Existing
Incinerator
0.2
ng TEQ//Nm3
8
hours
New Incinerator
0.1
ng TEQ/NM3
8
hours
Sb+As+Pb+Cr+Co+Cu+Mn+Ni+V
and their compounds
1.5
2
hours
*The existing
plant shall comply with norms for Dioxins and Furans as 0.1 ng
TEQ/Nm3 by 18th August, 2013. Note : i. All
monitored values shall be corrected to 11% oxygen on dry
basis. ii. The CO2 concentration in tail gas shall not be less
than 7%. iii. In case, halogenated organic waste is less than 1%
by weight in input waste, all the facilities in single chamber
incinerators shall be designed so as to achieve a minimum
temperature of 1100°C in the incinerator. For fluidized bed
technology based incinerator, temperature shall be maintained at
950°C. iv. In case, halogenated organic waste is less than
1% by weight in input waste, waste shall be incinerated only in
twin chamber incinerators and all the facilities shall be
designed to achieve a minimum temperature of 850±25°C
in primary chamber and 1100°C in secondary combustion chamber
with a gas residence time in secondary combustion chamber not
less than two seconds. v. Scrubber meant for scrubbing
emissions shall not be used as quencher. vi. Incineration plants
shall be operated (combustion chambers) with such temperature,
retention time and turbulence, as to achieve Total Organic Carbon
(TOC) content in the incineration ash and residue less than 3%,
and their loss on ignition is less than 5% of the dry weight. In
case of non-conformity, ash and residue as the case may be, shal
be re-incinerated. vii. The incinerator shall have a chimney
of atleast thirty metres height.
Note :
D.
Effluent from Incinerator
D.
Effluent from Incinerator
Note: (i)
Stormwater shall not be allowed to mix with scrubber water and/or
floor washings. (ii) Stormwater shall be channelized through
separate drains passing through a HDPE lined pit having holding
capacity of 10 minutes (hourly average) of rainfull.
Note:
E.
Stormwater
E.
Stormwater
Note: (i)
Stormwater shall not be allowed to mix with scrubber water and/or
floor washings. (ii) Stormwater shall be channelized through
separate drains passing through a HDPE lined pit having holding
capacity of 10 minutes (hourly average) of rainfall.
Note:
Substituted by Notification No. G.S.R. 446(E) dated 13.6.2011 (w.e.f. 19.11.1986) OLD LAW ▼
Substituted by Notification No. G.S.R. 446(E) dated 13.6.2011 (w.e.f. 19.11.1986)
Substituted by Notification No. G.S.R. 446(E) dated 13.6.2011 (w.e.f. 19.11.1986)
OLD LAW ▼