Emissions
(a) Alumina Plant
:
(i) Raw Material
Handling
Primary and
Secondary Crusher
150
Particulate matter
(ii) Precipitation
Area
Particulate Matter
250
-Calcinations
Carbon Monoxide
1% max.
Stack height
H = 14 (Q) (0.3) where Q is emission rate of SO 2 in kg/hr. and H
is Stack height in metres
(b) Smelter Plant
(i) Green Anode
Shop
Particulate matter
150
[(ii) Anode Bake
Oven
-do-
50 mg/Nm 3
(iii) Pot room
Total Fluoride
2.8 kg/ton by 31 st December 2006
For Soderberg*
Technology
For Pre-baked
Technology
0.8 kg/ton by 31 st December 2006
*Separate
standards for VSS, HSS, PBSW and PBCW as given in column 4 stands
abolished.]
(c) Standards for forage fluoride -
-Twelve
consecutive months average
40 ppm
-Two consecutive
months average
60 ppm
-One month average
80 ppm]
*37. Stone
Crushing Unit
Suspended
particulate matter (SPM)
The Standards
consist of two parts:
(i) Implementation
of the following Pollution Control measures:
(a) Dust
containment cum suppression system for the equipment.
(b) Construction
of wind breaking walls.
(c) Construction
of the metalled roads within the premises.
(d) Regular
cleaning and wetting of the ground within the premises.
(e) Growing of a
green belong along the periphery.
(ii) Quantitative
standard for the SPM:
The
Suspended Particulate Matter contribution value at a distance of
40 metres from a controlled isolated as well as from a unit
located in a cluster should be less than 600 mg/Nm 3 .
The measurements are to be conducted at least twice a month for
all the 12 months in a year.
Section 36 • The Environment (Protection) Rules, 1986
36. Aluminium Plants
the-environment-protection-rules-1986-sec-36.json
•
Section 36
{
"act_title": "The Environment (Protection) Rules, 1986",
"act_slug": "the-environment-protection-rules-1986",
"section_label": "Section",
"section": {
"number": "36",
"title": "36. Aluminium\n\t\t\t\tPlants",
"chapter": null,
"content": "Emissions\n(a) Alumina Plant\n\t\t\t\t:\n(i) Raw Material\n\t\t\t\tHandling\nPrimary and\n\t\t\t\tSecondary Crusher\n150\nParticulate matter\n(ii) Precipitation\n\t\t\t\tArea\nParticulate Matter\n250\n-Calcinations\nCarbon Monoxide\n1% max.\nStack height\nH = 14 (Q) (0.3) where Q is emission rate of SO 2 in kg/hr. and H\n\t\t\t\tis Stack height in metres\n(b) Smelter Plant\n(i) Green Anode\n\t\t\t\tShop\nParticulate matter\n150\n[(ii) Anode Bake\n\t\t\t\tOven\n-do-\n50 mg/Nm 3\n(iii) Pot room\nTotal Fluoride\n2.8 kg/ton by 31 st December 2006\nFor Soderberg*\n\t\t\t\tTechnology\nFor Pre-baked\n\t\t\t\tTechnology\n0.8 kg/ton by 31 st December 2006\n*Separate\n\t\t\t\tstandards for VSS, HSS, PBSW and PBCW as given in column 4 stands\n\t\t\t\tabolished.]\n(c) Standards for forage fluoride -\n-Twelve\n\t\t\t\tconsecutive months average\n40 ppm\n-Two consecutive\n\t\t\t\tmonths average\n60 ppm\n-One month average\n80 ppm]\n*37. Stone\n\t\t\t\tCrushing Unit\nSuspended\n\t\t\t\tparticulate matter (SPM)\nThe Standards\n\t\t\t\tconsist of two parts:\n(i) Implementation\n\t\t\t\tof the following Pollution Control measures:\n(a) Dust\n\t\t\t\tcontainment cum suppression system for the equipment.\n(b) Construction\n\t\t\t\tof wind breaking walls.\n(c) Construction\n\t\t\t\tof the metalled roads within the premises.\n(d) Regular\n\t\t\t\tcleaning and wetting of the ground within the premises.\n(e) Growing of a\n\t\t\t\tgreen belong along the periphery.\n(ii) Quantitative\n\t\t\t\tstandard for the SPM:\nThe\n\t\t\t\tSuspended Particulate Matter contribution value at a distance of\n\t\t\t\t40 metres from a controlled isolated as well as from a unit\n\t\t\t\tlocated in a cluster should be less than 600 mg/Nm 3 .\n\t\t\t\tThe measurements are to be conducted at least twice a month for\n\t\t\t\tall the 12 months in a year.",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
"prev_section": "34",
"next_section": "38"
}