← Back to Directory
Tamil Nadu Combined Development and Building Rules, 2019
Tamil Nadu Combined Development and Building Rules, 2019
Sections
Preamble / Statement of Objects
Section 11. Short title, extent and commencement.
Section 12. Definitions.
Section 23. Applicability of these Rule.
Section 34. Written Permission for development.
Section 45. Competent Authority.
Section 56. Application for Planning Permission and Building Permit.
Section 67. Scrutiny fees.
Section 78. Plan Requirements.
Section 89. Inspection.
Section 910. Sanction.
Section 1011. Limitations of Permission.
Section 1112. Demolition of buildings.
Section 1213. Cancellation of Permit.
Section 1314. Renewal of Permit.
Section 1415. The Developments to be in conformity with these Rules.
Section 1516. Designation of use in Master Plan or Detailed Development Plan.
Section 1617. Correlation of land use zones in Master Plan, Detailed Development Plan and Development Rules
Section 1718. Proposed width of roads.
Section 1819. Development prohibited or restricted areas.
Section 1920. Application for Completion Certificate.
Section 2021. Illegal Occupation of Building.
Section 2122. Illegal Developments.
Section 2223. Registration of Architects (RA), Engineers (RE), Structural Engineers (SE), Construction Engineers (CE), Quality Auditors (QA), Town Planners (TP) and Developers (D), and their Duties and Responsibilities.
Section 2324. Appointment of Professionals.
Section 2425. Change of Owner or Developer or Professionals.
Section 2526. Applicability of other Rules.
Section 2627. Requirement for site approval.
Section 2728. Structures in setback spaces.
Section 2829. Spaces excluded from FSI and Coverage Computation.
Section 2930. Area of special character.
Section 3031. Boundaries of land use zones.
Section 3132. Rules to over ride other Rules and Regulations.
Section 3233. Zoning Regulations.
Section 3334. Shelter Charges.
Section 3435. Planning Parameters for Non High Rise Buildings.
Section 3536. Planning Parameters of Industries.
Section 3637. Planning Parameters of Institutional Buildings.
Section 3738. Planning Parameters of Transport Terminals.
Section 3839. Special rules for High Rise Buildings.
Section 3940. Information Technology developments availing additional FSI benefits.
Section 4041. Reservation of land for community recreational purposes in developments.
Section 4142. Corridor/Verandah Width.
Section 4243. Provisions for differently abled, elderly and children.
Section 4344. Solar Energy Capture.
Section 4445. Wind Electricity Generator.
Section 451. Applicant's name
Section 12. Postal Address for correspondence Telephone number for communication:
Section 23. Applicant's right over the land to make the proposed development (documentary evidence to be enclosed)
Section 34. Development site address
Section 45. Present use of the land and
Section 56. Whether all the documents required to be enclosed with the application as per the Schedule II have been enclosed
Section 646. Electrical Transformer Rooms.
Section 4647. Layout and sub-division Rules.
Section 4748. Transferable Development Rights.
Section 4849. Premium FSI.
Section 4950. Repeal and Savings.
Section 5051. Structural Safety.
Section 5152. Requirements of parts of buildings.
Section 5253. Exit Requirements.
Section 5354. Sanitation requirements.
Section 5455. Storm Water Drainage.
Section 5556. Electrical and Allied Installations (Including lightening protection of buildings).
Section 5657. Air conditioning, Heating and Mechanical Ventilation.
Section 5758. Gas supply.
Section 5859. Boiler Room.
Section 5960. Acoustics, Sound Insulation and Noise Control.
Section 6061. Swimming Pool or Pool.
Section 6162. Telecommunication Structure.
Section 6263. Water Conservation.
Section 6364. Fire Safety.
Section 6465. Installation of closed circuit television units in Public Buildings.
Section 6566. Architectural Control.
Section 6667. Conservation of buildings of historical or architectural interest.
Section 6768. Tree preservation.
Section 6869. Discretionary Powers.
Section 6970. Delegation of Powers.
Section 7071. Exemptions from these rules.
Section 7172. Grant of exemptions.
Section 7273. Transitory Provisions.
Section 7374. Repeal and Savings.
Section 742. In cases of flatted residential development where the number of car spaces required for a dwelling unit does not exceed 2 in number separate aisle is not necessary for the second car space required for that dwelling unit.
Section 22. In cases of flatted residential development where the number of car spaces required for a dwelling unit does not exceed 2 in number separate aisle is not necessary for the second car space required for that dwelling unit.
Section 22. For teaching staff, the schedule of sanitary units to be provided shall be the same as in case of office buildings (Table 1).
Section 21. Protection from Earthquakes.
Section 12. Protection from Cyclonic Wind Damage/Flooding/Tsunami.
Section 21. Design
Section 11. Design
Section 11. Site.
Section 12. No. of floors.
Section 23. Stair case and exits
Section 34. Class rooms
Section 45. Fire safety
Section 56. Electrical
Section 67. Others.
Section 72. Restriction on Development/Redevelopment/Repairs, etc.
Section 21. Definitions.
Section 12. Application for Permission for Construction and Operation of a Swimming Pool.
Section 23. Committee.
Section 34. Inspection of Swimming Pool.
Section 45. Appeal.
Section 56. General provision for penalty, punishment of offences.
Section 67. Dimensions.
Section 78. Structure.
Section 89. Material.
Section 910. Floor slopes.
Section 1011. Transition point.
Section 1112. Pool walls.
Section 1213. Water depth.
Section 1314. Walkways and deck areas.
Section 1415. Ladders, Step-Holes, Steps and Ramps.
Section 1516. Diving Area.
Section 1617. Starting Platforms.
Section 1718. Electrical Installation - Lighting.
Section 1819. Ventilation.
Section 1920. Shower and bathroom.
Section 2021. Fencing and Exits.
Section 2122. Swimming Pool Water Treatment System.
Section 2223. Personnel.
Section 2324. Specific Safety Features.
Section 2425. Water Quality.
Section 2526. Operation And Maintenance.
Section 2627. Regulations for swimming pool users.
Section 271. Definitions.
Section 12. Provision of Closed Circuit Television Units.
Section 2
tamil-nadu-combined-development-and-building-rules-2019.json
•
125 Sections
•
Tamil Nadu
{
"id": 23959,
"slug": "tamil-nadu-combined-development-and-building-rules-2019",
"title": "Tamil Nadu Combined Development and Building Rules, 2019",
"short_title": "Tamil Nadu Combined Development and Building Rules, 2019",
"act_number": "Published vide Notification No. G.O. Ms. No. 18, M",
"act_year": 2019,
"act_type": "STATE",
"location": "Tamil Nadu",
"law_status": "unknown",
"enactment_date": null,
"description": "Tamil Nadu Combined Development and Building Rules, 2019",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "Preamble / Statement of Objects",
"chapter": null,
"content": "(37) \"Encroachment\" means an act to enter into the possession or rights either of permanent or temporary nature on a land or built up property of local body or State or Central Government;",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "1",
"title": "1. Short title, extent and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 1
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(1) \"Access\" means way to a plot or a building;\n(2) \"Accessory Use\" means any use of the premises subordinate to the principal use and customarily incidental to the principal use;\n(3) \"Act\" means the Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972), the Chennai City Municipal Corporation Act, 1919 (Tamil Nadu Act IV of 1919), the Tamil Nadu District Municipalities Act, 1920 (Tamil Nadu Act V of 1920), the Madurai City Municipal Corporation Act, 1971 (Tamil Nadu Act 15 of 1971), the Coimbatore City Municipal Corporation Act, 1981 (Tamil Nadu Act 25 of 1981), the Tiruchirapalli City Municipal Corporation Act, 1994 (Tamil Nadu Act 27 of 1994), the Tirunelveli City Municipal Corporation Act, 1994 (Tamil Nadu Act 28 of 1994), the Salem City Municipal Corporation Act, 1994 (Tamil Nadu Act 29 of 1994), the Tiruppur City Municipal Corporation Act, 2008 (Tamil Nadu Act 7 of 2008), the Erode City Municipal Corporation Act, 2008 (Tamil Nadu Act 8 of 2008), the Vellore City Municipal Corporation Act, 2008 (Tamil Nadu Act 26 of 2008), the Thoothukudi City Municipal Corporation Act, 2008 (Tamil Nadu Act 27 of 2008), the Thanjavur City Municipal Corporation Act, 2013 (Tamil Nadu Act 24 of 2013), or the Dindigul City Municipal Corporation Act, 2013 (Tamil Nadu Act 25 of 2013) and the Tamil Nadu Panchayats Act, 1994 (Tamil Nadu Act 21 of 1994);\n(4) \"Addition and/or Alteration\" means a change from one occupancy to another, or a structural change including an addition to the area or change in height or the removal of part of building, or any change to the structure, such as the construction or removal or cutting into of any wall or part of a wall, partition, column, beam, joist, floor including a mezzanine floor or other support, or a change to or closing of any required means of access ingress or egress or a change to fixtures or equipment\" as provided in these Rules;\n(5) \"Advertising Sign\" means any surface or structure with characters, letters or illustrations applied thereto and displayed in any manner whatsoever outdoors for the purpose of advertising or giving information or to attract the public to any place, person, public performance, article, or merchandise, and which surface or structure is attached to, forms part of, or is connected with any building, or is fixed to a tree or to the ground or to any pole, screen, fence or hoarding or displayed in space, or in or over any water body included in the jurisdiction of the competent authority;\n(6) \"Air-conditioning\" means the process of treating air so as to control simultaneously its temperature, humidity, purity, distribution and air movement and pressure to meet the requirements of the conditioned space;\n(7) \"Amenities\" shall have the same meaning as defined in Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(8) \"Application\" means an application made in such form as may be specified by the authority from time to time;\n(8) \"Application\" means an application made in such form as may be specified by the authority from time to time;\n(9) \"Approved\" means approved or sanctioned by the Authority under these Rules.\n(10) \"Area\" In relation to a building means the superficies of a horizontal section thereof made at the plinth level inclusive of the external walls and of such portions of the party walls as belong to the building;\n(11) \"Assembly Building\" means any building or part of a building, where 50 persons or more congregate or gather for amusement, recreation, social, religious, patriotic, civil, travel or other purposes and includes theaters, motion picture houses, assembly halls, Kalyana mandapams, convention centers, auditoria, exhibition halls, museums, skating rinks, large gymnasiums, places of worship, dance halls, club rooms, passenger stations, stadia and terminals of air, surface and marine, public transportation services;\n(12) \"Auxiliary\" means electrically operated or fuel fired boilers or systems to heat water coming out from solar water heating system to meet continuous requirement of hot water;\n(13) \"Balcony\" means a horizontal projection, cantilevered or otherwise including a parapet\" handrail, balustrade, to serve as a passage or sit out place;\n(14) \"Basement or Cellar\" means the lower store or stores of a building below or partly below ground level with majority of its headroom below ground level;\n(15) \"Building\" means any structure for whatsoever purpose and of whatsoever materials constructed and every part thereof whether used as human habitation or not and includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms, verandah, balcony, cornice or projection, part of a building or anything affixed thereto or any wall enclosing or intended to enclose any land or space and signs and outdoor display structures. Tents, shamianahs, pandals, tarpaulin shelters and the like erected for temporary and ceremonial occasions shall not be considered as building;\n(16) \"Building Line\" shall have the same meaning as defined in the Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(17) \"Carpet Area\" The covered area of the usable rooms of a dwelling unit at any floor excluding the area of the walls;\n(18) \"Canopy or portico or porch\" means a cantilever projection at lintel level or ground floor roof level over an entrance of a building and includes cantilever projection anywhere between lintel and roof level;\n(19) \"Chimney\" means an upright shaft containing one or more flues provided for the conveyance to the outer air of any product of combustion resulting from the operation of heat production appliance or equipment employing solid, liquid or gaseous or any other fuel;\n(20) \"Competent Authority\" means an authority as specified in rule 5 of these rules;\n(21) \"Construction\" means any erection of a structure or a building, including any addition or extension thereto either vertically or horizontally, but does not include, any reconstruction, repair and renovation of an existing structure or building, or construction, maintenance and cleansing of drains and drainage works and of public latrines, urinals and similar conveniences or the construction and maintenance of works meant for providing supply of water for public or the construction or maintenance, extension, management for supply and distribution of electricity to the public or provision for similar facilities for publicity;\n(22) \"Conversion of Building Occupied\" means the change from one occupancy to other occupancy or any change in building structure or part thereof resulting in a change of space and use requiring additional occupancy certificate;\n(23) \"Conversion of Land Use\" means the change from one category of land use to another category of land use in the Master Plan and Detailed Development Plan and New Town Development Plan;\n(24) \"Courtyard\" means a space permanently open to sky, enclosed fully or partially by buildings and may be at ground level or any other level within or adjacent to a building;\n(25) \"Covered Area\" means ground area covered by the building above the plinth level and includes parts of the building projecting out in other store, including basement floor levels;\n(26) \"Corridor\" means a common passage or circulation space within a building;\n(27) \"Continuous building\" means buildings constructed without any side set back including row type housing;\n(28) \"Cyclone Prone Areas\" mean the areas close to the coast as specified in the wind velocity map given in I.S. 875, where the cyclonic wind velocities exceed 39 meters per second and prone to cyclonic storms;\n(29) \"Damp Proof Course\" means a course consisting of some appropriate water proofing material provided to prevent penetration of dampness or moisture;\n(30) \"Dead Load\" means the weight of all permanent stationary construction becoming part of a structure;\n(31) \"Development\" shall have the same meaning as defined in Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(32) \"Deemed Approval\" means a clearance deemed to have given by the competent authority on the expiry of time limit for providing such clearance in the absence of sufficient and reasonable cause for not clearing the application within the time limit;\n(33) \"Drain\" shall have the same meaning as defined in Tamil Nadu District Municipalities Act, 1920 (Tamil Nadu Act of 1920) or the respective City Municipal Corporation Act;\n(34) \"Drainage system\" means a system or a line of pipes, with their fittings and accessories, such as manholes, inspection chambers, traps, gullies, floor traps used for drainage of building or yards appurtenant to the buildings within the same cartilage and includes an open channel for conveying surface water or a system for the removal of any waste water;\n(35) \"Dwelling Unit\" means an independent housing unit with separate facilities for living, cooking and sanitary requirements, and may be a part of a building;\n(36) \"Earthquake Prone Areas\" mean the areas as specified in the map given IS: 1893 under seismic zones III, IV & V, which are likely to have moderate to high damage risk due to earthquake;\n(37) \"Encroachment\" means an act to enter into the possession or rights either of permanent or temporary nature on a land or built up property of local body or State or Central Government;\n(38) \"Exit\" means a passage channel or means of egress from the building, its store or floor to a street or, other open space of safety whether horizontal, outside and vertical exits meaning as under:-\n(i) Horizontal exit means an exit, which is a protected opening through or around a fire well or bridge connecting two or more buildings.\n(ii) Outside exit mean an exit from building to a public way to an open area leading to a public way or to an enclosed a fire resistant passage leading to a public way.\n(iii) Vertical exit means an exit used for ascending or descending between two or more levels including stairway, fire towers, ramps and fire escapes;\n(39) \"External Wall\" means an outer wall or vertical enclosure of any building;\n(40) \"Farm House\" means a building constructed for incidental use in an agriculture or horticulture farm and any building constructed but not associated with the farm activities shall not be construed as a \"farm house\" for the purposes of these Rules;\n(41) \"Fire and/or Emergency Alarm System\" means an alarm system comprising of components for manually or automatically detecting a fire, initiating an alarm of fire and initiating other actions as appropriate;\n(42) \"Fire Lift\" means a special lift designed for the use of fire service personnel in the event of fire or other emergency;\n(43) \"Fire Proof Door\" means a door or shutter fitted to a wall opening and constructed and erected with the requirement to check the transmission of heat and fire for a period;\n(44) \"Fire Pump\" means a machine, driven by external power for transmitting energy to fluids by coupling the pump to a suitable engine or motor, which may have varying outputs or capacity but shall be capable of having a pressure of 3.2kg/cm2 at the topmost level of the High Rise building;\n(45) \"Fire Resistance means the time during which a fire resistant material i.e. material having a certain degree of fire resistance, fulfills its function of contributing to the fire safety of a building when subjected to prescribed conditions of heat and load or restraint;\n(46) \"Fire Resistant Building\" means a building in which material, which has appropriate degree of fire resistance is used;\n(47) \"Flood Prone Areas\" means areas likely to have significant flood flow inundation notified by the concerned Authority from time to time, as flood prone areas which may be modified or added or deleted when necessary by due notification;\n(48) \"Floor Space Index (FSI)\" means the quotient obtained by dividing the total covered area (plinth) on all floors excepting the areas specifically exempted under these rules, by the Plot Area and is represented by this formula.-\n(49) \"Footing\" means a foundation unit constructed in brickwork, stone masonry or concrete under the base of a wall or column for the purpose of distributing the load over a larger area;\n(50) \"Foundation\" means that part of the structure, which is in direct contact with ground and transmits loads over it;\n(51) \"Framed Building\" means a building in which the loads either dead or live are carried by timber, steel or reinforced concrete framing;\n(52) \"Gallery\" means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor area, and or additional seating accommodation and includes the structures provided for seating in stadia;\n(53) \"Garage-Private\" means a building or a portion thereof designed and used for the parking of vehicle;\n(54) \"Garage-Public\" means a building or portion thereof, designed other than as a private garage, operated for gain, designed and or used for repairing, servicing, using, selling or storing or parking motor driven or other vehicles;\n(55) \"Government means the State Government;\n(56) \"Habitable Room\" means a room occupied or designed for occupancy by one or more persons for study, living, sleeping, eating, kitchen if it is used as a living room, but not including bathrooms, water-closet compartments, laundries, serving and store pantries, corridors, cellars, attics, and spaces that are not used frequently or during extended periods;\n(57) \"Height of the Building\" means the height measured generally from the formed ground level within the plot abutting the road or passage excluding ramp if any within the plot up to to the roof level of the topmost livable floor. In the case of pitched roof, height of the building means the height measured from the ground level stated above up to the point where external surface of outer wall intersects the finished surface of the sloping roof, and in the case of gables facing the road, the midpoint between the eave's level and the ridge\n(58) \"High Rise Building\" means a building exceeding 18.30m height;\n(59) \"Hut\" means any building which is constructed principally of wood, mud, leaves, grass, thatch or metallic sheets and includes any temporary structure of whatever size or any small building of whatever material made which the council may declare to be a hut for the purpose this rule;\n(60) \"Illuminated Exit Signs\" means a device for indicating the means of escape during normal circumstances and power failure;\n(61) \"Layout\" means laying out and division of land into plots exceeding eight in number, for various uses with introduction of new road or roads for public uses;\n(62) \"Live Load\" means all loads except dead loads that may be imposed on a structure and wind loads will also be considered as live loads;\n(63) \"Lift or Elevator\" means an appliance designed to transport persons or materials between two or more levels in a vertical or substantially vertical direction by means of a guided car or platform;\n(64) \"Load Bearing Wall\" means wall that carries dead load other than its own weight;\n(65) \"Lobby\" means a covered space in to which all the adjoining rooms open;\n(66) \"Local Body\" means Corporation of Chennai, Municipal Corporation, Municipality, Town Panchayat or a Village Panchayat;\n(67) \"Loft\" means an intermediate floor between two floors or a residual space in a pitched roof above normal level constructed for storage with maximum clear height of 1.5 meters;\n(68) \"Masonry\" means an assemblage of masonry units properly bound together by mortar;\n(69) \"Master Plan\" means a plan approved by the Government under section 28 of the Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(70) \"Means of Escape\" means an escape route provided in a building for safe evacuation of occupants;\n(71) \"Mezzanine floor\" means an intermediate floor between two floors above ground level subject to the following:-\n(i) The area of mezzanine floor is restricted to 1/2 of the area of the floor immediately below.\n(ii) The height of the mezzanine floor shall be minimum 2.2 meters for non-habitable purposes and 2.5 meters for habitable purposes; and\n(iii) The head room height of the remaining part of the said floor shall be the total of the height of the mezzanine floor and the space below the mezzanine floor;\n(72) \"Miniature Circuit Breaker or Earth Leakage Circuit Breaker\" means a devices for tripping of electrical circuits in event of any fault in the circuit or installation;\n(73) \"Mitigation\" means the measures taken in advance of a disaster aimed at decreasing or eliminating its impact on society and on environment, including preparedness and prevention;\n(74) \"Non Combustible Material\" means a material which is not liable to burn or add heat to a fire when tested for combustibility in accordance with the latest code of Bureau of Indian Standards Method of Test for combustibility of Building Materials;\n(75) \"Occupancy or use\" means the principal occupancy or use for which a building or a part of a building is intended to be used. For the purposes of classification of a building according to occupancy, an occupancy shall be deemed to include the subsidiary occupancies which are contingent upon it;\n(76) \"Natural Disaster\" means a serious disruption of the functioning of a society, causing widespread human, material or environmental losses caused due to earthquake, cyclone, flood, tsunami, landslide and similar event which exceeds the ability of the affected society to cope using only its own resources;\n(77) \"Natural Hazard\" means the possibility or probability occurrence of a natural event, within a specific period of time in a given area, having potential for damaging widespread area;\n(78) \"Natural Hazard Prone Areas\" means the areas likely to have,-\n(i) moderate to very high damage risk zone of earth quakes or\n(ii) moderate to very high damage risk of cyclones or\n(iii) significant flood flow or inundation, or\n(iv) Tsunami proneness or\n(v) Landslide proneness or potential, or\n(vi) One or more of these hazards;\n(79) \"Non-Structural Component\" means the components of buildings, which do not contribute to the structural strength or stability such as infill walls in Reinforced Cement Concrete frame buildings, glass panes, cladding's, parapet walls, chimneys etc;\n(80) \"Parapet\" means a low wall or railing built along the edge of a roof or a floor;\n(81) \"Parking space\" means an enclosed or unenclosed covered or open area sufficient in size to park vehicles, which is served by a driveway connecting to a street or alley and permitting ingress and egress of vehicles;\n(82) \"Partition\" means an interior non-load bearing barrier, one store or part-store in height.\n(83) \"Partition Wall\" means a wall which supports no load other than its own weight and includes;\n(i) A wall forming part of a building and being used or constructed to be used in any part of the height or length of such wall for separation of adjoining buildings belonging to different owners or constructed or adopted to be occupied by different persons; or\n(ii) A wall forming part of a building and standing in any part of the length of such wall, to a greater extent than the projection of the footing on one side or ground of different owners;\n(84) \"Passage\" means circulation space on land leading from a street or road to the plot or site;\n(85) \"Permit\" means a valid permit or authorization in writing by the competent authority to carryout development or a work regulated by these rules;\n(86) \"Plinth\" means the portion of a structure between the surface of the surrounding ground and surface of the floor immediately above the ground;\n(87) \"Plinth Area\" means the built up covered area measured at the floor level of the basement or of any store;\n(88) \"Plot or site Area\" means the area of a contiguous parcel of land enclosed by definite boundaries over which the applicant has legal right for development and includes part of the site used as exclusive passage, open space reservation area and internal roads within the boundaries;\n(89) \"Plot coverage\" means the extent to which the plot is covered with a building or structure 12-noon shadow and expressed as a percentage of the ratio of the built up area to the plot area, excluding the floor area exempted from the computation of plot coverage as given in rule 29;\n(90) \"Private Street\" shall have the same meaning as defined in the Tamil Nadu District Municipalities Act, 1920 (Tamil Nadu Act V of 1920);\n(91) \"Prohibited Area\" means any area specified or declared to be a Prohibited Area under the relevant Act by the Central or State Government from time to time;\n(92) \"Protected Monument\" means an ancient monument which is declared to be of national importance by or under the Ancient Monuments and Archaeological Sites and Remains Act, 1958 (Central Act 24 of 1958);\n(93) \"Public Buildings\" shall have the same meaning as defined in Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(94) \"Public Street\" shall have the same meaning as defined in Tamil Nadu District Municipalities Act, 1920 (Tamil Nadu Act V of 1920);\n(95) \"Qualified Professional\" means a professional registered under rule 23 of these Rules;\n(96) \"Quality Control\" means control construction quality and to control of variation in the material properties and structural adequacy;\n(97) \"Quality Assurance\" means all planned and systematic actions necessary to ensure that the final product i.e. structure or structural elements will perform satisfactorily during service life;\n(98) \"Quality Audit\" means a requirement for an independent, third party assessment of the quality and seismic or cyclone resistant features of all the High Rise Building and especially in earthquake zone-III and coastal areas of the State. The quality audit report shall consist of conformance or non-conformance of structures with the technical specifications for prevention of progressive collapse during earthquake, cyclone or any other accidental load resistance and to suggest remedies/rectification if any;\n(99) \"Reconstruction\" shall have the same meaning as defined in the Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(100) \"Reconstitution of plots\" shall have the same meaning as defined in Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(101) \"Regulated area\" means any area specified or declared under section 20B under the Ancient Monuments and Archaeological Sites and Remains Act, 1958 (Central Act 24 of 1958);\n(102) \"Retrofitting\" means upgrading the strength of an unsafe building by using suitable engineering techniques;\n(103) \"Road/Street Width\" means any highway, street, service road lane, pathway, alley, stairway, passageway, carriageway, footway, flyover, square, place or bridge over which the public have a right of passage or access or have passed and have access uninterruptedly and includes all bunds channels, ditches, storm water drains, culverts sidewalks, traffic islands, roadside trees and hedges, retaining walls, fences, barriers and railing within the street lines;\n(104) \"Room Height\" means the vertical distance measured from the finished floor surface to the finished ceiling;\n(105) \"Row Housing/Row type Building\" (Continuous Building) means a row of house or buildings with only front and rear open spaces;\n(106) \"Service Road\" means a road or lane provided at the front, rear or side of a plot for service purpose;\n(107) \"Set back\" means the open space across front or sides or rear of a plot between the building and street alignment or boundary of the plot as the case may be;\n(108) \"Stilt floor\" means a part or whole of floor at ground level or the height above the ground level described in these Rules as the building is on stilts;\n(109) \"Street Alignment\" shall have the same meaning as defined in the Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972);\n(110) \"Structural Component\" means component of buildings which contributes to strength and stability of structures under no circumstances these are permitted to be damaged or partially or totally removed;\n(111) \"Structure\" means something constructed or built having a fixed base on or other connection to the ground or other structure;\n(112) \"Site Corner\" means a site at the junction of and fronting on two or more intersecting roads or streets;\n(113) \"Site Depth\" means the mean horizontal distance between the front and rear site boundaries;\n(114) \"Site Plan\" means a detailed Plan showing the proposed placement of structures, parking areas, open space, landscaping, and other development features, on a parcel of land, as required by specific sections of the development code;\n(115) \"Site with Double frontage\" means a site having frontage on two streets other than corner plot;\n(116) \"Store\" means the part of a building between the upper surface of the floor and upper surface of the floor next above or the underside of roof;\n(117) \"Spiral Staircase\" means a staircase forming continuous winding curve round a central point or axis provided in an open space having tread without risers;\n(118) \"Sub-division\" means division of land into plots not exceeding eight in number;\n(119) \"Tsunami Prone Areas\" means an area affected in the past or an area likely to be affected in the future by tsunami, as identified and notified by the Local body as tsunami prone areas;\n(120) \"Un-authorised Construction\" means the erection or re-erection, addition or alterations which are not approved or sanctioned by the competent authority;\n(121) \"Underground or Overhead Water Tank\" means an installation constructed or placed for storage of water;\n(122) \"Ventilation\" means supply of outside air into, or the removal of inside air from an enclosed space, which includes -\n(i) Natural Ventilation - Supply of outside air into a building through window or other openings due to wind outside and convection effects arising from temperature or vapor pressure differences (or both) between inside and outside of the building.\n(ii) Positive Ventilation - the supply of outside air by means of a mechanical device, such as a fan.\n(iii) Mechanical Ventilation - Supply of outside air either by positive ventilation or by infiltration by reduction of pressure inside due to exhaust of air, or by a combination of positive ventilation and exhaust of air.\n(123) Verandah\" means a covered area with at least one side open to the outside with the exception of 1.2 m high parapet to be provided on the open side. It can be a covered one by grill or jolly works, without reducing natural lighting and ventilation;\n(124) \"Water Closet (W.C)\" means a water flushed plumbing fixture designed to receive human excrement directly from the user of the fixture and the room or compartment in which the fixture is placed;\n(125) \"Window\" means an opening to the outside other than a door, which provides all or part of the required natural light or ventilation or both to an interior space and not used as a means of egress or ingress;\n(126) words and expressions used and not defined in these Rules unless the context otherwise requires shall have the meaning as defined in the Tamil Nadu Town and Country Planning Act, 1971 (Tamil Nadu Act 35 of 1972), Tamil Nadu District Municipalities Act, 1920 (Tamil Nadu Act V of 1920) in the cases of municipalities and town panchayats, the concerned Municipal Corporation Act in the cases of Municipal Corporation and the Tamil Nadu Panchayat Act 1994 (Tamil Nadu Act 21 of 1994) in the cases of Village Panchayats.",
"footnote": "",
"is_definition": true,
"sort_order": 2
},
{
"number": "3",
"title": "3. Applicability of these Rule.",
"chapter": null,
"content": "(i) all developments, redevelopments, erection or re-erection, design, construction or reconstruction and additions and alterations to a building;\n(ii) part Construction where the whole or part of a building is demolished or altered or reconstructed, except where otherwise specifically stipulated, these Rules shall apply only to the extent of the work involved;\n(iii) change of use or Occupancy where use of a building is changed, except where otherwise specifically stipulated, these Rules shall apply to all parts of the building affected by the change;\n(iv) reconstruction where the reconstruction in whole or part of a building which has ceased to exist due to fire, natural collapse or demolition having been declared unsafe, or which is likely to be demolished by or under an order of the Authority as the case may be and for which the necessary certificate has been given by the Authority shall be allowed subject to these Rules.\n(2) Nothing in these Rules shall require the removal, alteration or abandonment or prevent continuance of the lawfully established use or occupancy of any existing approved building.",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "4",
"title": "4. Written Permission for development.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "5",
"title": "5. Competent Authority.",
"chapter": null,
"content": "Part - II\nManner of Obtaining Permission",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "6",
"title": "6. Application for Planning Permission and Building Permit.",
"chapter": null,
"content": "(i) Railways;\n(ii) National Highways;\n(iii) National Waterways;\n(iv) Major ports;\n(v) Airways and Aerodromes;\n(vi) Posts & Telegraphs, Telephone, Wireless, Broadcasting and other like forms of communications;\n(vii) Regional grid for Electricity;\n(viii) Defence;\n(ix) Metro Rail and\n(x) Minor ports;",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "7",
"title": "7. Scrutiny fees.",
"chapter": null,
"content": "(i)\n(a)\nPlans submitted along with planning permission\n\t\t\t\tapplications per sq.m. of floor area of the building\nRs.2.00\n(b)\nIst revised plan per sq.m. of floor area of the\n\t\t\t\tbuilding\nRs.1.00\n(c)\n2nd revised plan per sq.m. of floor area of the\n\t\t\t\tbuilding\nRs.0.40\n(d)\n3rd revised plan per sq.m. of floor area of the\n\t\t\t\tbuilding\nRs.0.20\n(e)\nSubsequent revised plans\nNil\n(ii)\nLayouts/subdivisions, re-constitutions per sq.m.\n\t\t\t\tof land area\nRs. 1.50\n(iii)\nRe-classifications (lumpsum)\nRs.30,000 (for CMA)\nRs.20,000 (for other areas)",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "8",
"title": "8. Plan Requirements.",
"chapter": null,
"content": "(i) Key plan - drawn to a scale of not less than 1 in 10,000 showing the details of the boundary, location of the site with respect to neighbourhood landmarks, and existing network of roads or streets; the minimum dimension of the key plan shall be not less than 10 cm.\n(ii) Topo Plan - drawn to a scale of not less than 1 in 5000 showing the details of the following, which lie within a radius of 500 m:-\n(a) the boundary location of the site with respect to neighbourhood land marks,\n(b) existing network of roads or streets with details of its widths,\n(c) proximity to stone quarries, stone crushers, water bodies, Airport, Aerodrome, Air Force Station, cremation or burial grounds, railway tracks, and reserved forests indicating its distance from the site clearly; and\n(d) such other particulars as may be prescribed by the competent authority.\n(iii) Site plan - drawn to a scale of not less than 1 in 500 for a site up to one hectare, and not less than 1 in 1000 for a site more than one hectare and shall show, -\n(a) the boundaries of the site;\n(b) the position of the site in relation to neighbouring street;\n(c) the extent and dimensions of the site affected by any street alignment or road widening or proposed new road or missing link as per the approved Master Plan or Detailed Development Plan or as notified by the Local body;\n(d) the name of the streets in which the building is proposed to be situated, if any;\n(e) all existing buildings standing on, over or under the site including service lines;\n(f) the position of the building and of all other buildings if any which the applicant intends to erect upon his site in relation to,-\n(1) the boundaries of the site and in case where the site has been partitioned, the boundaries of the portion owned by the applicant and also of the portions owned by others.\n(2) all adjacent street, buildings with number of storied and height and premises within a distance of 15m of the site and of the contiguous land if any referred to in item (a) ; and\n(3) if there is no street within a distance of 15m of the site, the nearest existing street.\n(g) if the site is an unauthorized subdivision, then the details of the residuary plots or subdivisions including the details of the buildings or structures thereon;\n(h) the means of access from the street to the building, and to all other buildings, (if any) which the applicant intends to erect upon the site.\n(i) space to be left about the building to secure a free circulation of air, admission of light and access during emergency;\n(j) vehicle parking arrangements;\n(k) the width of the street if any in front and of the street if any at the side or rear of the building;\n(l) the direction of north point relative to the plan of the buildings;\n(m) any physical features, such as wells, drains, etc;\n(n) alignments of the Low Tension or High Tension electric over head power lines or such underground cables if it lie within the site or within a distance of 10m. from the site, and the spatial location from the same to the building existing or proposed;\n(o) rain water harvesting provisions as specified by the competent authority within the plot;\n(p) provisions for water supply and sewage disposal system wherever required by the competent authority; and\n(q) such other particulars as may be prescribed by the competent authority.\n(iv) Building plan with details of section, elevation etc. drawn to a scale of 1:100; the plans and details shall,-\n(a) include floor plans of all floors together with the covered area clearly indicating the size and spacing of all framing members and sizes of rooms and the position of stair cases, ramps and lift wells;\n(b) show the use or occupancy of all parts of the buildings;\n(c) show exact location of essential services (for example WC, bath and the like);\n(d) show plans, elevations & sections of Private Water Supply and disposal system;\n(e) include at least one elevation from the front showing the height of the building and rooms and also the height of parapet;\n(f) include at least one section through the stair case;\n(g) show all structures existing or proposed to be constructed within the site;\n(h) include the structural arrangements with appropriate sections showing type/arrangement of footings, foundations, basement walls, structural load bearing walls, columns and beams, and shear walls and arrangement/spacing of framing members, floor slabs and roof slabs with the material used for the same including detailed structural drawing showing reinforcement details;\n(i) show all street elevations;\n(j) give dimensions of the projected portions beyond the permissible building line;\n(k) include terrace plan indicating the drainage and the slope of the roofs;\n(l) vehicle parking arrangements within buildings;and\n(m) give indications of the north point relative to the plan.\nNote. - The requirement of 1:100 is permitted to be flexible for specific details needed for further illustration; and also for drawings for these in digital form.\nNote.\n(a) scale used and north point;\n(b) the location of all the proposed and existing roads within the land including details of the extent and dimensions of the site affected by any street alignment or road widening or proposed new road or missing link as per the approved Master Plan or Detailed Development Plan or as notified by the Local body;\n(c) alignments of the Low Tension or High Tension electric over head power lines or such underground cables, Solid waste dumping yards, Oil/Gas Pipe lines, CRZ line if it lie within the site or within a distance of 10m. from the site;\n(d) dimension of plot along with building lines showing the setbacks with dimensions within each plot;\n(e) the location of existing drains, sewers, public facilities and services and electrical lines etc;\n(f) a statement indicating the total area of the site, area utilized under roads, parks and playground, shops and other commercial spaces, schools, public purpose sites etc. along with the percentage;\n(g) in case of plots which are subdivided with built up area, in addition to the above, the details on the means of access to the subdivisions from existing streets;\n(h) if the site is an unauthorized subdivision, then the details of the residuary plots or subdivisions including the details of the buildings or structures thereon; and.\n(i) such other particulars as may be prescribed by the Competent authority.\n(a) access to fire appliances or vehicles with details of vehicular turning circles and clear motor able access way around the building;\n(b) size (width) of main and alternative stair cases along with balcony approach, corridor, ventilated lobby approach;\n(c) location and details of lift enclosures;\n(d) location and size of fire lift;\n(e) smoke stop lobby, door, where provided;\n(f) refuse chutes, refuse chamber, service duct etc;\n(g) refuge area, if any;\n(h) details of building services - air conditioning system with position of fire dampers and mechanical ventilation system, electrical services, boilers, gas pipes etc;\n(i) details of exits including provision of ramps etc., for hospital and special risks;\n(j) location of generator, transformer and switch gear rooms;\n(k) smoke exhauster system, if any;\n(l) details of fire alarm system net work;\n(m) location of centralized control connecting all fire alarm systems, built-in fire protection arrangements and public address system etc;\n(n) location and dimensions of static water storage tank and pump room along with fire service inlets for mobile pump and water storage and tank;\n(o) location and details of fixed fire protection installation, such as sprinklers wet risers, hose-reels, drenchers, etc;\n(p) location and details of first aid fire fighting equipments or installations.\n(a) Details of the machines for manufacturing or production involved both existing and proposed;\n(b) Details of the number of workers both existing and proposed;\n(c) Detailed report on the raw materials used, process and machineries involved, effluent discharge methods proposed, product manufactured, power required (i.e. Low Tension or High Tension), action taken to alleviate or minimize its negative impact, if any, or the environment, etc.\n(a) Non High Rise buildings with height up to 12m. Registered Architect (RA) or Registered Engineer (RE)\n(b) Non High Rise buildings with height more than 12.0m up to 18.30m Industrial Developments and Institutional Developments other than High Rise Buildings\nRegistered Developer (RD),\nRegistered Architect (RA) or Registered Engineer (RE),\nRegistered Structural Engineer (RSE), and\nRegistered Construction Engineer (RCE),\nRegistered Geo-technical Engineer\n(c) High Rise Buildings\nRegistered Developer (RD),\nRegistered Architect (RA) or Registered Engineer (RE),\nRegistered Structural Engineer (RSE),\nRegistered Geo-Technical Engineer (RGE),\nRegistered Construction Engineer (RCE), and\nRegistered Quality Auditor (RQA)\n(d) Sub divisions\nRegistered Architect (RA) or Registered Engineer (RE) or\nRegistered Town Planner (RTP)\n(e) Layout Developments\nRegistered Developers (RD), and\nRegistered Architect (RA) or Registered Engineer (RE) or\nRegistered Town Planner (RTP)",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "9",
"title": "9. Inspection.",
"chapter": null,
"content": "(b) The competent authority may cause inspection for such developments where its risk assessment deems it fit for inspection. In all cases inspection shall be carried out by professionals to be impaneled by the competent authorities. The qualifications and other conditions for impanelment of professionals for carrying out inspection shall be prescribed by the Government from time to time.\n(c) A single joint site inspection shall be carried out by all the concerned authorities for issue of planning permit or building permit or completion certificate)\n(d) The applicant shall permit authorized officers of the competent authority to enter the site at any reasonable time for inspection for the purpose of enforcing these rules.\n(e) The applicant shall keep a copy of the approved plan at the premises where the development is permitted to be carried out.\n(f) Before commencement of the building work at site for which building permission has been granted, the owner shall within the validity period of Building Permission give notice to the Authority, of his intention to start the work at the building site in Form 2 in Annexure - XIV.\n(i) Plinth,\n(ii) Last store.\n(b) At each of the above stages, the owner or developer through the Registered Architect or Registered Engineer shall submit to the designated officer of the competent authority a progress certificate in Form 3 and 4 in Annexure - XIV and the structural Inspection Report in Form 9 in Annexure - XIV. This progress certificate shall be signed also by the Registered Architect or Registered Engineer on record, Construction Engineer on record and structural engineer on record. The Structural Inspection Report shall be signed by the Registered Structural Engineer on record.\n(c) On receipt of the progress certificate from the owner or registered developer, through the Registered Architect or Registered Engineer it shall be the duty of the competent authority, to check any deviation from the approved plan and convey decision within 15 working days to the owner or developer for compliance.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "10",
"title": "10. Sanction.",
"chapter": null,
"content": "(ii) the written permission shall be issued by the competent authority within 45 days after the receipt of the plan and all other requirements; and\n(iii) while granting permission, the competent authority may impose such restrictions and conditions, which may be necessary under these rules.\n(a) plastering and patch repairs;\n(b) re-roofing or renewals of roof including roof of intermediate floors at the same height;\n(c) flooring and re-flooring;\n(d) opening and closing of windows, ventilators and doors not opening towards others properties and/or public road or property;\n(e) replacing fallen bricks/stones\n(f) construction or re-construction of sunshade not more than 75cms. in width within one's land and not overhanging over a public street;\n(g) construction or re-construction of parapet not more than 1.5 m. in height and also construction or re-construction of boundary wall not exceeding 2 m\n(h) white-washing, painting, etc. including erection of false ceiling in any floor at the permissible clear height provided the false ceiling in no way can be put to use as a loft etc.\n(b) The landowner or lessee or power of attorney holder or developer who makes the development, the Registered Architect or Engineer on Record, and the Registered Construction Engineer on Record, shall be jointly and severally held responsible if any unauthorized construction, addition and alternation are done without prior permission of the competent authority.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "11",
"title": "11. Limitations of Permission.",
"chapter": null,
"content": "(a) Title or ownership of the site or building.\n(b) Easement Rights.\n(c) Structural Reports, Structural Drawings and structural aspects. The Registered Architect or Registered Engineer and Structural Engineer on record as the case may be, shall be responsible for defects in the design.\n(d) Workmanship, soundness of structure and materials used.\n(e) Quality of building services and amenities in the construction of building\n(f) Other requirements or licenses or clearances required for the site or premises or activity under various other laws.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "12",
"title": "12. Demolition of buildings.",
"chapter": null,
"content": "(b) The executive authority of local body or agency or person to whom this power has been delegated by the executive authority shall grant permission to execute the work subject to such condition as he may deem necessary for ensuring the health, safety of the people living within or near the building.\n(c) The executive authority of local body or agency or person to whom this power has been delegated by the executive authority shall collect a demolition charges as specified by the competent authority. and that he will abide by the rules and other conditions if any, stipulated for demolition of such buildings.",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "13",
"title": "13. Cancellation of Permit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "14",
"title": "14. Renewal of Permit.",
"chapter": null,
"content": "Part - III\nConformity of Developments",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "15",
"title": "15. The Developments to be in conformity with these Rules.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "16",
"title": "16. Designation of use in Master Plan or Detailed Development Plan.",
"chapter": null,
"content": "(a) the setback shall be regulated with reference to the individual type of development,\n(b) the height of building, abutting road width shall be regulated with reference to the highest order of development existing or proposed\n(c) the Floor Space Index, coverage etc. shall be regulated with reference to the dominant type of development on the basis of floor area within the site.",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "17",
"title": "17. Correlation of land use zones in Master Plan, Detailed Development Plan and Development Rules",
"chapter": null,
"content": "Sl. No.\nSl. No.\nUse classification in Master Plan\nUse classification in Master Plan\nUse classification in Detailed Development\n\t\t\t\tPlan\nUse classification in Detailed Development\n\t\t\t\tPlan\nUse classification in Development Rules\nUse classification in Development Rules\n01.\nPrimary Residential\nUse Primary Residential or Residential use\nResidential\nResidential\n02.\nMixed Residential use\nMixed Residential\nResidential\nResidential\n03.\nCommercial use\nCommercial use\nCommercial use\nCommercial use\n04.\nIndustrial use or Light Industrial use or\n\t\t\t\tControlled Industries use\nIndustrial use or Light Industrial use\nIndustrial use\nIndustrial use\n05.\nGeneral Industrial\nGeneral Industrial\nIndustrial use\nIndustrial use\n06.\nSpecial and Hazardous Industrial Use\nSpecial and Hazardous Industrial use\nSpecial and Hazardous Industrial use\nSpecial and Hazardous Industrial use\n07.\nInstitutional or Educational use or Public and\n\t\t\t\tSemi-public use\nInstitutional or Educational use or Public and\n\t\t\t\tSemi-public use\nInstitutional\nInstitutional\n08.\nOpen space and recreational use\nOpen space and recreational or Park or Play\n\t\t\t\tspace\nOpen space\n\t\t\t\trecreational (in Chennai Metropolitan Area)\nOpen space\n\t\t\t\trecreational\nPublic use zone (in other areas of the State)\n09.\nNon-urban\nNon-urban\nNon - urban only in Chennai Metropolitan Area\nNon - urban only in Chennai Metropolitan Area\n10.\nAgricultural use\nAgricultural use\nAgricultural use\nAgricultural use\n11.\nUrbanisable\n--\nUrbanisable use (only in Chennai Metropolitan\n\t\t\t\tArea)\nUrbanisable use (only in Chennai Metropolitan\n\t\t\t\tArea)",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "18",
"title": "18. Proposed width of roads.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "19",
"title": "19. Development prohibited or restricted areas.",
"chapter": null,
"content": "Part - IV\nCompletion Certificate",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "20",
"title": "20. Application for Completion Certificate.",
"chapter": null,
"content": "(a) the work was executed and the building was completed as per the approved plan as stated in these rules along with the norms prescribed for issuing the completion certificate;\n(b) it shall be obligatory on the part of the applicant to confirm that certificate of Lift Inspector has been obtained regarding satisfactory erection of lift; and\n(c) it shall also be obligatory on the part of the applicant to confirm the certificate to the Directorate of Fire & Rescue Services for completion of fire safety requirements as applicable for the type of building has also been obtained.\n(a) Temporary connection for water, electricity or sewer, permitted for the purpose of facilitating the construction, shall not be allowed to continue in the premises after completion of the building construction.\n(b) No connection to the water mains or sewer line or electricity distribution line with a building shall be made without the prior permission of the authority and without obtaining completion certificate.\n(c) In case the use is changed or unauthorized construction is made, the authority is authorised to discontinue such services or cause discontinuance of such service.",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "21",
"title": "21. Illegal Occupation of Building.",
"chapter": null,
"content": "(a) if such building or portion thereof has been unlawfully occupied in contravention of these Rules\n(b) if a notice has been issued in respect of such building or part thereof requiring the alteration of restriction of any works specified in such notice have not been commenced or completed.\n(c) if the building or part thereof is in a ruinous or dangerous condition, which are likely to fall and cause damage to any person occupying, resorting to or passing by such building or structures or any other structure or place in the neighbourhood thereof.",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "22",
"title": "22. Illegal Developments.",
"chapter": null,
"content": "Part - V\nRegistration of Professionals",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "23",
"title": "23. Registration of Architects (RA), Engineers (RE), Structural Engineers (SE), Construction Engineers (CE), Quality Auditors (QA), Town Planners (TP) and Developers (D), and their Duties and Responsibilities.",
"chapter": null,
"content": "(b) On receipt of such application, and after satisfying the educational qualifications and experience in the field, and the certificate of the screening committee to be constituted by the Chennai Corporation, Commissioner of Municipal Administration, Directorate of Rural Development as the case may be, the competent authority may register on payment of registration fee of five thousand rupees and subject to such other conditions as he may thinks fit.\n(c) Registration shall be valid for a period of five years and shall be renewable.\n(d) The competent authority shall cause to maintain a register of licensed professionals stated above. The list of names shall be updated every year and the updated list shall be placed before the council every year for information.\n(e) Where any registered professional makes any misrepresentation or commits any fraud in certifying the plan and other documents submitted under these rules, the competent authority may suspend or cancel the registration of such professional done under these rules and notify the same in their official website.\n(f) On cancellation of such registration by the competent authority under sub-rule\n(e) above, the name of such registered professional shall be deleted from the register maintained by him and a report in this regard shall also be placed before the council for information.\n(g) The registration, qualification and duties of professionals shall confirm to the rules given in the Annexure - XIII.\nDuties and Responsibilities - General duties and responsibilities applicable to all Professionals.\n(b) They shall inform the competent authority of their employment or assignment or resignation for any work within 7 days of such employment or assignment or resignation.\n(c) They shall prepare and submit all plans, documents and other details they are required to do so in a neat, clean and legible manner and the papers properly arranged.\n(d) They shall submit plans documents and details without any scratches or corrections. Site conditions shall be correctly shown.\n(e) They shall personally comply with all queries or requisitions received from the competent authority in connection with the work under their charge promptly, expeditiously and fully at one time. When they do not agree or cannot comply with the requisition or query, they shall state their objection in writing within the time as may be stipulated so that, the competent authority can decide on its merit in the matter.\n(f) Any corrections or changes made in the plan or additional documents and details by the professionals to the competent authority shall be in consultation with the owners or developer and shall be with their acceptance or agreement.\n(g) They shall clearly indicate on every plan, document or forms in which they sign the details of their designation such as Registered Architect. Registered Engineer, Registered Structural Engineer etc., with registration number and their, full name and address below the signature for identification.\n(h) They shall not accept the employment for preparation and submission of plans, documents and supervision of any work if the same is intended or being proposed to be executed or already executed in contravention of provisions of the Act or the Rules including these rules.\n(i) The registered person shall provide the information and undertaking for the work undertaken by him in the forms prescribed by the competent authority.\n(j) The Owner or Developer shall compulsorily appoint a Construction Engineer for over all constant supervision of construction work on site and such person appointed shall not be allowed to supervise more than one such site at a time.\n(k) The Registered Architect or Registered Engineer and the structural engineer shall be responsible for adhering to the provisions of the relevant and prevailing Indian Standard Specifications including the National Building Code. However they will not be held responsible for the severe damage or collapse that may occur under any natural force going beyond their design courses provided in the above said Standards or National Building Code.\n(l) The Registered Architect or Engineer is solely responsible for obtaining the certificate required under this rule from the registered professionals.\n(m) In the event of any deviations the Registered Architect or Engineer is the solely responsible to bring it to the notice of the competent authority.\nNote. - Specific additional Duties and Responsibilities of the professionals and the owner or developer are stated in the Annexure - XIII.",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "24",
"title": "24. Appointment of Professionals.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "25",
"title": "25. Change of Owner or Developer or Professionals.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "26",
"title": "26. Applicability of other Rules.",
"chapter": null,
"content": "Part - VI\nDevelopment Rules",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "27",
"title": "27. Requirement for site approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "28",
"title": "28. Structures in setback spaces.",
"chapter": null,
"content": "(a) In cases of Non High Rise buildings.-\n(i) Sun-shades not exceeding 0.6m.\n(ii) Motor room of area not exceeding 2 sq.m. each and height not exceeding 1.8m, without affecting parking and driveway requirements.\n(iii) In case of Non High Rise Buildings with height up to 9.0m, open single flight or spiral staircase or open double flight staircase so long as such structure do not fall within 0.50 m from the side boundary or 1m. from the rear or front boundary of the site or street alignment.\n(iv) A compound wall of height not exceeding 2.0m\n(v) Watchman booth not exceeding 2.5m.x 2.5m. in size at each gate and height not exceeding 3m.\n(vi) Gate pillars without or with arches with a minimum headroom clearance of 5.50m available at-least to a width of 3.5m.\n(vii) Meter Rooms for meter boxes or electrical panels along the boundary wall or external walls of the building with the projections not exceeding 0.60 meter from the abutting walls and the open Transformer without affecting parking and drive way, subject to the safety measures stipulated by Tamil Nadu Electricity Board.\n(ii) In the event of the site abutting more than one road one additional gate shall be permitted",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "29",
"title": "29. Spaces excluded from FSI and Coverage Computation.",
"chapter": null,
"content": "(1) In the terrace above the top most store, areas covered by stair-case rooms and lift rooms and passages thereto, architectural features, elevated tanks (provided its height below the tank from the floor does not exceed 1.5 meter) and WC (with floor area not exceeding 10 sq.m)\n(2) Staircase and lift rooms and passage thereto in the stilt parking floor or upper floors used for parking\n(3) Staircase and lift rooms and passage thereto in the basement floor or floors used for parking.\n(4) Area of the basement floor or floors used for parking\n(5) Area of the stilt parking floor provided it is open on sides, and used for parking. In cases where upper floor or floors over a stilt parking floor is proposed for parking.\n(6) Servants or drivers bath room and water closet for each block in cases of Non High Rise Buildings and High Rise Buildings at ground floor or stilt parking floor\n(7) Watchman booth\n(8) caretaker booth or room in ground floor or stilt parking floor\n(9) Ducts and other open to sky arrears",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "30",
"title": "30. Area of special character.",
"chapter": null,
"content": "Economically weaker section areas (EWS).\nCoastal Regulation Zone (CRZ) area.\nConservation zones in the Heritage Towns.\nTransit Oriented Development areas.\n(ii) In case of Metro Rail Corridors, Existing and Proposed properties located within a distance of 500m measured from the centre line of the corridor, Premium FSI shall be charged at 50 % of the normal Premium FSI rate.\nNatural hazard prone areas.",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "31",
"title": "31. Boundaries of land use zones.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "32",
"title": "32. Rules to over ride other Rules and Regulations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "33",
"title": "33. Zoning Regulations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "34",
"title": "34. Shelter Charges.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "35",
"title": "35. Planning Parameters for Non High Rise Buildings.",
"chapter": null,
"content": "(a) The minimum road width, FSI, set back etc. for Non High Rise buildings up to 16 dwellings or such other small developments like commercial, nursery school, primary schools, religious buildings and cottage industries up to 300 sq.mts. shall be regulated according to the table below:\nNo\nNo\nDescription\nDescription\nContinuous Building Areas\nContinuous Building Areas\nEconomically weaker Section Areas\nEconomically weaker Section Areas\nOther area\nOther area\n1\n1\n2\n2\n3\n3\n4\n4\n4\n4\nA\nA\nMinimum road width\n1.5m\n105m\n3.0m up to 6.0 m\n6.0m and above\nB\nB\nMaximum Height\nGF + 2F or Stilt + 3F subject to a maximum of 12m\n\t\t\t\theight\nGF + 1F or Stilt + 2F subject to a maximum of 9m\n\t\t\t\theight\nGF + 2F or Stilt + 3F subject to a maximum of 12m\n\t\t\t\theight\nC\nC\nMaximum number of dwelling units/commercial use\nup to 16 dwellings or up to 300 square meters of\n\t\t\t\tcommercial\nuse up to 16 dwellings\nup to 8 dwellings\nup to 16 dwellings or up to 300 square meters of\n\t\t\t\tcommercial use\nD\nD\nNormally Permissible FSI\n2.0\nE\nE\nMinimum Set backs\nWhere Street Alignment/new road is prescribed, it shall be\n\t\t\t\tfrom that street alignment/new road line. In the case of others,\n\t\t\t\tit shall be from the property boundary.\n(i)\nFront set back\n1.5m\n1.0m\nAbutting road width\nFront set back\nUpto 9.0m.\n1.5m\nMore than 9.0m. up to 18m.\n3.0m.\nMore than 18m. up to 30.5m\n4.5m.\nMore than 30.5m.\n6.0m.\n(ii)\nSide Set back\nNil\nHeight of the building\nPlot width\nSSB\nUpto 7m.\nUp to 9m\n1m on one side\nAbove 9m\n1m on either side\nMore than 7m. up to 12m.\nUp to 6m\n1m on one side\nAbove 6m, upto 9m\n1.5m on one side\nAbove 9m\n1.5m on either side\n(ii)\nRear Set back\nNil\nHeight of the building\nRSB\nUpto 7m.\nNil\nMore than 7m. up to 12m.\n1.5m.\n(b) The minimum road width, FSI, set back etc. for Non High Rise buildings up to 18.30m height and exceeding 16 dwelling units and exceeding 300 square meters of commercial building shall be regulated according to the table below:\nSl No\nSl No\nDescription\nDescription\nContinuous Building Areas\nContinuous Building Areas\nOther areas\nOther areas\n1\n2\n3\n4\nA\nA\nMinimum road width\n9.0 m\nB\nB\nMaximum Height\n18.30 m\nC\nC\nNormally Height\n2.0\nD\nD\nMinimum Set backs\nWhere Street Alignment/new road is prescribed,\n\t\t\t\tit shall be from that street alignment/new road line. In the case\n\t\t\t\tof others, it shall be from the property boundary.\n(i)\nFront set back\nAbutting road width\nFSB\nfrom 9.0m. up to 18m.\n3.0m.\nMore than 18m. up to 30.5m\n4.5m.\nMore than 30.5m.\n6.0m.\n(ii)\nSide Set back/Rear Set back\nNil\nHeight of the building\nSSB/RSB\nUpto 7m.\n1.0m.\nMore than 7m. up to 12m.\n1.5m.\nMore than 12m. up to 16.0m.\n2.5m.\nMore than 16m. up to 18.30m.\n3.0m.\n(c) Passage\nDescription\nPassage width\nA. Non High Rise buildings up to 12m height\nA. Non High Rise buildings up to 12m height\nIf the site does not directly about a public road but gains\n\t\t\t\taccess through a private passage or through a part of the plot\n\t\t\t\twhich can be treated as a passage from a public road of minimum\n\t\t\t\twidth as prescribed above, the minimum width of such passage\n\t\t\t\tshall be as follows:\nWhen it is intended to 8 dwellings\n(a) CBA/EWS areas - 1 m\n(b) Other areas - 3 m\nB. Non High Rise buildings exceeding 12.0m in\n\t\t\t\theight up to 18.30m height or exceeding 16 dwelling units\nB. Non High Rise buildings exceeding 12.0m in\n\t\t\t\theight up to 18.30m height or exceeding 16 dwelling units\nIf the site does not directly about a public road but gains\n\t\t\t\taccess through a private exclusive passage or through a part of\n\t\t\t\tthe plot which can be treated as a passage from a public road of\n\t\t\t\tminimum width as prescribed above, the minimum width of such\n\t\t\t\tpassage shall be as follows:\n(i)\nWhen it is intended to 8 dwellings or up to 600\n\t\t\t\tsquare meters of commercial building and the length of the\n\t\t\t\tpassage does not exceed 80 meters.\n3.6 meters\n(ii)\nWhen it is intended to serve up to 12 dwellings\n\t\t\t\tor up to 2,400 square meters of commercial building and the\n\t\t\t\tlength of the passage does not exceed 100 meters.\n4.8 meters\n(iii)\nWhen it is intended to serve not more than 16\n\t\t\t\tdwellings or up to 3000 square meters of commercial building and\n\t\t\t\tthe length of passage does not exceed 120 meters.\n6 meters\n(iv)\nWhen it is intended to serve not more than 20\n\t\t\t\tdwellings or up to 6000 square meters of commercial building and\n\t\t\t\tthe length of passage does not exceed 120 meters.\n7.2 meters\n(v)\nWhen it is intended to serve more than 20\n\t\t\t\tdwellings or more than 6000 square meters of commercial building.\n9 meters\n(ii) In the event of the road width being less than the qualifying width in certain portions then the total length of such portions shall not be more than 10% of the prescribed length. In such cases the average road width for the prescribed length shall be equal or above the qualifying width.\n(iii) In the event of the sub-division for qualifying road not being incorporated in the Field Measurement Book sketch, in such cases road width certificate shall be obtained from the concerned Executive Authority of Local Body.\n(iv) In the event of variation of site extent and dimension of the site between Patta and document the least extent of the site to be considered along with site dimension corresponding to the least extent.\n(ii) In the event of more than one block with varying height in a site, the setback of each block shall be regulated in accordance with the height of the building.\n(iii) The maximum height of the building shall not exceed 18.30 meters provided water tanks, chimneys, Architectural features such as flag masts, gopurams, minarets, steeples and other ornamental structures which are not intended for human habitation may be permitted subject to a ceiling of 30.5 meters from ground level.\n(iv) Where a site abuts more than one road, then the front setback shall be insisted with reference to wider road width and for the remaining side or sides the side setback space or rear setback space shall be insisted as per the above rules provided in the case of CBA minimum set back of 1m.\n(v) In CBA, there shall be at-least 1m wide internal passage from rear to front in ground level or ground floor, directly accessible to road\n(vi) The minimum road width for conference halls and multi stored parking lots and Air-conditioned cinema theaters shall be 12m. For Community or Kalyana mandapams or Exhibition Hall shall be 15m. For star hotels and multiplex or Malls shall be 18m.\n(vii) For public buildings such as Kalyana mandapam assembly halls, exhibition halls, hospitals, nursing homes, hotels, lodging houses, cinema theaters, multiplex or malls etc. set back all around shall not be less than 6m.\n(viii) FSI benefit shall be permitted for the land left for OSR, link road, street alignment or road widening wherever it is insisted upon by competent authority.\n(ix) FSI benefit shall not be permitted for the land left for road widening to make the road as qualifying road for the proposed development.\n(x) FSI benefit for the OSR area in the approved sub-division shall be permitted in proportionate to the plot extent.\n(a) where number of dwelling units exceeds 50 nos. or 2500sq.m. of commercial area sewage treatment plant shall be provided and maintained for the disposal of the sewage within the site itself as per the designs approved by such other Technical agencies as Government may impaneled from time to time.\n(b) where number of dwelling units is less than 50 nos. or 2500sq.m. of commercial area, septic tank with up-flow filters shall be provided and maintained for the disposal of the sewage within the site itself.\n(b) No part of the basement shall be constructed in the minimum required set back spaces, required for the movement of fire fighting vehicles or equipments.\n(c) In cases where second basement is proposed for parking and incidental uses, sufficient provision for lighting and ventilation and also for protection from fire to the satisfaction of Directorate of Fire and Rescue Services shall be made.\n(d) During the construction of the basement floor, it shall be the sole responsibility of the Building Permit holder to ensure that the building or structure in the adjoining sites are not weakened or damaged.\n(b) The applicant not being a Government department or agency shall pay a sum of Rs. 10,000/- (Rupees ten thousand only) as earnest money non interest bearing refundable deposit and same should be utilized for the purpose of installing the display board as prescribed in Rule 10(8) on the site by Local body, in the event of the applicant not fulfilling the conditions stated in (a) above.\n(c) If the applicant fulfills the conditions (a) above, the deposit shall be refunded after production of the completion certificate.\n(b) Premium FSI charges shall not be collected for the excess FSI area over and above normally permissible FSI area for affordable housing projects.",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "36",
"title": "36. Planning Parameters of Industries.",
"chapter": null,
"content": "Sl. No.\nSl. No.\nDescription\nDescription\nCategory of industries\nCategory of industries\nCottage Industries\nCottage Industries\nGreen & Orange industries\nGreen & Orange industries\nRed industries (Special & Hazardous)\nRed industries (Special & Hazardous)\nA.\nMinimum road width\n7m.\n7m.\n7m.\nB.\nMaximum Height\n18.30m.\n18.30m\n18.30m.\nC.\nNormally Permissible FSI\n1.50\n1.50\n1.50\nD.\nMinimum Setback\nWhere Street\n\t\t\t\tAlignment/new road is prescribed, it shall be from that street\n\t\t\t\talignment/new road line. In the case of others, it shall be from\n\t\t\t\tthe property boundary.\n(i)\nFront Setback\nAbutting road width\nFront Setback\n6.0m\n6.0m\nless than 9m\n1.5m\n9m. to 18m.\n3.0m.\n18m. to 30.50m.\n4.5m\nMore than 30.5m.\n6.0m.\n(ii)\nSide Setback\n1.50m.\n3.0m.\n6.0m.\n(iii)\nRear Setback\nNil\n2.0m.\n6.0m.\nE.\nStructures\n\t\t\t\tpermissible in the minimum prescribed Front set back, Side\n\t\t\t\tsetback and Rear set back are given in the rule 28\nIn addition, incidental structures such as Gate\n\t\t\t\tpillars, servant room, watch man booth, cycle stand and toilets\n\t\t\t\twith height not exceeding 4m are permissible in these minimum\n\t\t\t\tprescribed setback spaces.\nF.\nParking spaces shall be provided within the site\n\t\t\t\tconforming to standards prescribed in the Annexure - IV.\nG.\nRainwater harvesting provisions as prescribed in\n\t\t\t\tthe Annexure - XXII.\nH.\nThe reservation of Land for Community\n\t\t\t\trecreational purpose such as park or play ground required in\n\t\t\t\tthese regulations shall be as given in the rule 41.\nNote. - The maximum height of the building shall not exceed 18.30 meters provided water tanks, chimneys, Architectural features such as flag masts, gopurams, minarets, steeples and other ornamental structures which are not intended for human habitation may be permitted subject to a ceiling of 30.5 meters from ground level. In case total height exceeds, 30.50 m from Ground level necessary NOC from Airport Authority of India (AAI) shall be furnished.\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "37",
"title": "37. Planning Parameters of Institutional Buildings.",
"chapter": null,
"content": "Sl. No.\nSl. No.\nDescription\nDescription\nContinuous Building Areas\nContinuous Building Areas\nOther areas\nOther areas\n1\n2\n3\n4\nA.\nMinimum road width\n7.20m\nMinimum 7.2m for schools up to\n\t\t\t\thigher secondary level and industrial training institutes.\nFor others, min. 9 m\nB.\nMaximum Height\n18.30m.\nC.\nNormally Permissible FSI\n2.0\nD.\nMinimum Setbacks\nWhere Street Alignment/new road is prescribed,\n\t\t\t\tit shall be from that street alignment/narrow line. In the case\n\t\t\t\tof others, it shall be from the property boundary.\n(i)\nFront Setback\n6m\n6m\n(ii)\nSide Setback\nNil\n6m\nFor schools - 2m\n(iii)\nRear Setback\nNil\n6m\nFor schools - 2m\nE.\n(a) Structures\n\t\t\t\tpermissible in the minimum prescribed Front set back, Side\n\t\t\t\tsetback and Rear set back are given in the rule 28\n(b) In addition, Gate pillars, gopurams, and\n\t\t\t\tincidental structures (with height not exceeding 4m) such as\n\t\t\t\tservant room, cloak room, and watch man booth, cycle stand,\n\t\t\t\tKitchen and toilets are permissible in these minimum prescribed\n\t\t\t\tsetback spaces.\nF.\nParking spaces shall be provided within the site\n\t\t\t\tconforming to standards prescribed in the Annexure - IV.\nG.\nRainwater harvesting provisions as prescribed in\n\t\t\t\tthe Annexure - XXII.\nH.\nThe minimum width of corridor shall be as given\n\t\t\t\tin rule 42\nI.\nSpecial regulations for physically disabled\n\t\t\t\tstated in the rule 43 shall be adhered to.\nJ.\nThe applicant not being a government department or agency\n\t\t\t\tshall deposit a sum at the rate of 50% of the infrastructure and\n\t\t\t\tamenity charges as a refundable non-interest earning security and\n\t\t\t\tearnest deposit. The deposit shall be refunded on completion of\n\t\t\t\tdevelopment as per the approved plan as certified by Competent\n\t\t\t\tAuthority; if not, it would be forfeited.\nK.\nThe reservation of Land for Community recreational purpose\n\t\t\t\tsuch as park or play ground required in these regulations shall\n\t\t\t\tbe as given in the rule 41.\nNote. - (i) In Continuous Building Area (CBA), there shall be at-least 1m wide internal passage from rear to front in ground level or ground floor, directly accessible to road.\nNote.\n(ii) In the case of schools, the development shall confirm to the additional safety standards stated in the Annexure - XV.\n(iii) The maximum height of the building shall not exceed 18.30 meters provided water tanks, chimneys, Architectural features such as flag masts, gopurams, minarets, steeples and other ornamental structures which are not intended for human habitation may be permitted subject to a ceiling of 30.5 meters from ground level.\n(iv) In cases of Hospital Buildings with Ground Floor/Stilt Floor + First Floor and above and floor area exceeding 300 sq.m. in each floor, the special provisions for Hospital Buildings prescribed in Annexure - IX shall be adhered to.",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "38",
"title": "38. Planning Parameters of Transport Terminals.",
"chapter": null,
"content": "Sl. No\nSl. No\nDescription\nDescription\nAll areas\nAll areas\nA.\nMinimum road width\n9 meters except for container terminals where it\n\t\t\t\tshall be 18m\nB.\nMaximum Height\n18.30m.\nC.\nNormally Permissible FSI\n1.00\nD.\nMaximum Plot coverage\n75%\nE.\nMinimum Setbacks\nWhere Street Alignment/new road is prescribed,\n\t\t\t\tit shall be from that street alignment/narrow line. In the case\n\t\t\t\tof others, it shall be from the property boundary.\n(i) Front Setback\n6m\n(ii) Side Setback\n6m on either side\n(iii) Rear Setback\n6m\nF.\n(a) Structures\n\t\t\t\tpermissible in the minimum prescribed Front set back, Side\n\t\t\t\tsetback and Rear set back are given in the rule 28\n(b) In additions, incidental structures such as\n\t\t\t\tgate pillars, servant room, watch man booth, cycle stand, kitchen\n\t\t\t\tand toilets with height not exceeding 4m are permissible in these\n\t\t\t\tminimum prescribed setback spaces.\nG.\nParking: 10% of the extent of the site shall be\n\t\t\t\treserved for parking in the part of site carved out in a regular\n\t\t\t\tshape preferably with frontage abutting the road.\nH.\nRainwater harvesting provisions as prescribed in\n\t\t\t\tthe rule 63 shall be provided.\nI.\nSpecial regulations for physically disabled\n\t\t\t\tstated in the rule 43 shall be adhered to.",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "39",
"title": "39. Special rules for High Rise Buildings.",
"chapter": null,
"content": "Sl. No\nSl. No\nDescription\nDescription\nAll Areas\nAll Areas\nA.\nMinimum Road width\n12m.\n15m.\n18m.\nB.\nNormally Permissible FSI\n2.0\n2.5\n3.25\nC.\nMaximum Coverage\n50%\nD.\nMinimum set back all around\nHeight of the building above ground level\nMinimum required setback space from the property\n\t\t\t\tboundary\nUpto 30m.\n7m.\nAbove 30m.\nFor every increase in height of 6m or part\n\t\t\t\tthereof above 30m minimum extent of setback space to be left\n\t\t\t\tadditionally shall be one meter subject to the maximum setback of\n\t\t\t\t20m.\nE.\nSpacing between blocks in case of more than one\n\t\t\t\tblock of High Rise building\nHeight of the building above ground level\nMinimum required spacing between blocks\nUpto 30m.\n7m.\nAbove 30m.\nFor every increase in height of 6m. or par\n\t\t\t\tthereof above 30m. space to be left additionally shall be one\n\t\t\t\tmeter subject to the maximum setback of 20m.\n(ii) In the event of the road width being less than the qualifying width in certain portions then the total length of such portions shall not be more than 10% of the prescribed length. In such cases the average road width for the prescribed length shall be equal or above the qualifying width.\n(iii) In the event of the sub-division for qualifying road not being incorporated in the Field Measurement Book sketch, in such cases road width certificate shall be obtained from the concerned Executive Authority of Local Body.\n(iv) In the event of extent and dimension of the site between Patta and document the least extent of the site to be considered along with site dimension corresponding to the least extent.\n(v) In the cases where street alignment has been prescribed, the front open space shall be left from the street alignment.\n(ii) FSI benefit shall be permitted for the land left for OSR, link road, street alignment or road widening wherever it is insisted upon by competent authority.\n(iii) FSI benefit shall not be permitted for the land left for road widening to make the road as qualifying road for the proposed development.\n(iv) FSI benefit for the OSR area in the approved sub-division shall be permitted in proportionate to the plot extent.\n(b) A watchman or caretaker booth or Kiosk not exceeding 2.5m.x 2.5m. in size at each gate and not exceeding 3m. in height and open transformer yard shall be permitted in the set back space after leaving 7 meters clear set back from the main structure.\n(c) Gate pillars without or with arches with a min. headroom clearance of 5.50m at-least to a width of 3.5m. shall be permitted in the set back space after leaving 7 meters clear set back from the main structure.\n(b) In cases where more than one basement is proposed for parking and incidental uses, sufficient provision for lighting and ventilation and also for protection from fire to the satisfaction of Directorate of Fire and Rescue Services shall be made.\n(c) During the construction of the basement floor, it shall be the sole responsibility of the Building Permit holder to ensure that the building or structure in the adjoining sites are not weakened or damaged.\n(d) The basement shall be permitted below the ground and beyond the building lines at ground level subject to a clear minimum front setback space of 4.5m and side and rear setback of 3m, subject to non habitable uses and provision for mechanical ventilation and all safety provisions and drainage. However, it is essential that the basement top slab below the external circulation at ground level should be designed for firefighting vehicular loads\n(b) Every High Rise Building erected shall be provided with\n(i) lifts as prescribed in National Building Code of India, 2016;\n(ii) a stand-by electric generator of adequate capacity for running lift and water pump, and a room to accommodate the generator;\n(iii) an electrical room confirming to the rule 44.\n(iv) at least one meter room of size 2.4 meters by 2.4 meters for every 10 consumers or 3 floor whichever is less. The meter room shall be provided in the ground floor.\n(ii) In building of such size, arrangement or occupancy that a fire may not itself provide adequate warning to occupants, automatic fire detecting and alarming facilities shall be provided where necessary to warn occupants or the existence of fires, so that they may escape, or to facilitate the orderly conduct of fire exit drills.\n(iii) Fire protecting and extinguishing system shall conform to accepted standards and shall be installed in accordance with good practice as recommended in the National Building Code of India, 2016 and to the satisfaction of the Director of Fire and Rescue Services by obtaining a no objection certificate from him.\n(b) The applicant not being a Government department or agency shall pay a sum of Rs. 10,000/- (Rupees ten thousand only) as earnest money non-interest bearing refundable deposit and same should be utilized for the purpose of installing the prescribed size board on the site by local body, in the event of the applicant not fulfilling the conditions stated in clause (a) above.\n(a) Where number of dwelling units exceeds 50 nos. or 2500 sq.m. of commercial area sewage treatment plant shall be provided and maintained for the disposal of the sewage within the site itself as per the designs approved by such other Technical agencies as Government may impaneled from time to time.\n(b) where number of dwelling units is less than 50 nos. or 2500 sq.m. of commercial area, septic tank with up-flow filters shall be provided and maintained for the disposal of the sewage within the site itself.\n(b) Premium FSI charges shall not be collected for the excess FSI area over and above normally permissible FSI area for affordable housing projects.",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "40",
"title": "40. Information Technology developments availing additional FSI benefits.",
"chapter": null,
"content": "(1) Areas. - The proposed Information Technology development is permissible in the Local body Area, subject to the provision of adequate water supply and sewage disposal arrangements to the satisfaction of the Local body.\nAreas.\n(2) Activities. - Manufacture of hardware, development of software and its associated computer - communication technology applications, bio-informatics units including offices, conference halls and projection theaters connected there with, only shall be permitted. No showrooms, other offices, residential uses and activities of similar nature shall be permitted. Provided that incidental activities such as staff canteen, staff recreational area, guest accommodation, watchmen quarters, and the like not exceeding 10% of the total floor area shall be permitted.\nActivities.\n(3) Road width. - The proposed development shall either abut on a public road of not less than 18 meters in width or gain access from a passage of not less than 18 meters width which connects to a public road of not less than 18 meters width.\nRoad width.\n(4) Floor Space Index. - (a) Normally permissible FSI is allowable according to the development.\nFloor Space Index.\n(b) Premium FSI charges shall not be levied for additional FSI up to 0.5 for High Rise Developments.\n(c) Premium FSI charges are applicable for Premium FSI achieved over and above 0.5 for High Rise Developments\n(5) Caution Deposit. - (a) Caution Deposit to be made by the applicant not being a Government department or agency before issue of planing Permission shall be 10% of the guideline value of the land or 20% of the Guideline Value of the land area equal to which the additional floor area is availed, whichever is higher. The caution deposit is acceptable in the form of an irrevocable Bank Guarantee issued in the format prescribed, in favour of the Competent Authority from any scheduled bank\nCaution Deposit.\n(b) The Bank Guarantee shall be kept alive till a final decision is taken by the Competent Authority.\n(c) The Bank Guarantee towards caution deposit is returnable after a period of five years, from complete occupation and commencement of commercial operation subject to confirmation by a certificate from the appropriate authority (ELCOT) certifying that the building is put into continuous use for Information Technology (IT) parks or Bio Informatics units for the said five years.\n(d) If the building is utilized for any other purpose during this period and the occupancy confirmation certificate from the appropriate authority (ELCOT) is not furnished, the Bank Guarantee shall be invoked and the caution deposit shall be forfeited by transferring the same to the Competent Authority's account.\n(e) The caution deposit referred to above shall be different from, and over and above the security deposit to be paid in the normal course of issue of Building Permit.\n(f) The decision of the Competent Authority is final in the invocation or release of Bank Guarantee.\n(6) Other Parameters. - Except for the above said specific provisions, the developments shall conform to these rules in respect of all other parameters.\nOther Parameters.",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "41",
"title": "41. Reservation of land for community recreational purposes in developments.",
"chapter": null,
"content": "Extent of site\nExtent of site\nReservation\nReservation\n(a)\nFor the first 3,000 square meters\nNil\n(b)\nBetween 3,000 square meters and 10,000 square\n\t\t\t\tmeters\n10% of the area excluding roads or in the alternative he shall\n\t\t\t\tpay the Guideline value of the equivalent land excluding the\n\t\t\t\tfirst 3000 sq.m. as per the valuation of the Registration\n\t\t\t\tDepartment. No such area reserved shall measure less than 100\n\t\t\t\tsquare meters with a minimum Width of 10 meters. Such area to be\n\t\t\t\treserved shall not be more than 2 parcels.\nThe space so reserved shall be transferred to the\n\t\t\t\tLocal body, free of cost, through a registered gift deed. In\n\t\t\t\tcases of residential developments, the local body concerned may\n\t\t\t\tpermit the Residents Association or Flat Owner's Association for\n\t\t\t\tmaintaining such reserved space as park or playground.\n(c)\nAbove 10,000 square meters\nTen per cent of the area excluding road with a minimum width\n\t\t\t\tof 10 meters. and such area to be reserved shall not be less than\n\t\t\t\t500 square meters and this space shall be transferred to the\n\t\t\t\tlocal body designated by it, free of cost, through a gift deed.\n\t\t\t\tIt is obligatory to reserve and hand over the space and no charge\n\t\t\t\tin lieu can be accepted in case of new developments or\n\t\t\t\tredevelopments.\n(ii) The plot area including the area reserved for community recreational purposes shall be considered even when there is change of ownership to determine the plot extent.",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "42",
"title": "42. Corridor/Verandah Width.",
"chapter": null,
"content": "Sl. No.\nSl. No.\nBuilding use or type\nBuilding use or type\nMinimum width of corridor or verandah\nMinimum width of corridor\nverandah\n(i)\nResidential buildings\n1.0 m\n(ii)\nAssembly buildings such as Auditoriums,\n\t\t\t\tKalyanamandapams, cinema theaters, Religious buildings, temples,\n\t\t\t\tmosques or churches and other buildings of public assembly\n2.0 m\n(iii)\nInstitutional buildings\n(a)\nGovernment offices\n2.0 m\n(b)\nHospitals\n2.4 m\n(c)\nEducational Buildings such a schools, colleges,\n\t\t\t\tResearch Institutions\n2.0 m\n(d)\nCommercial buildings such as private offices,\n\t\t\t\tNursing Homes, etc.\n2.0 m\n(e)\nAll other buildings including hotels\n1.5m",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "43",
"title": "43. Provisions for differently abled, elderly and children.",
"chapter": null,
"content": "(a) Types of buildings to adopt barrier free guidelines.\nTypes of buildings to adopt barrier free guidelines.\n(i) Buildings to be designed for Ambulant Disabled People. - Higher Secondary School, Conference Hall, Dance Halls, Youth Centers, Youth Clubs, Sport Centers, Sport Pavilions, Boat Club Houses, Ice Rinks, Bowling Centers, Swimming Pools, Police Stations, Law Courts, Courts Houses, Sport Stadiums, Theaters, Concert Halls, Cinemas, Auditoria, Small Offices (the maximum plinth area 1400 sq.mt) Snack Bars, Cafes and banqueting rooms (for capacity above 50 dinners).\nBuildings to be designed for Ambulant Disabled People.\nNote. - (a) In sport stadiums provisions shall be made for non-ambulant spectators (small wheel chair)\nNote.\n(b) @ 1:1000 up to 10,000 spectators and @ 1:2000 for spectators above 10,000.\n(c) In Theaters, Concert Halls, Cinemas and Auditoria provisions shall be made for non-ambulant spectators (Small Wheel Chairs) @ 1/250 up to 1000 spectators and 1/500 for spectators above 1000.\n(ii) Buildings to be designed for Non-Ambulant Disabled People. - Schools for differently abled and other buildings such as Residential building, Educational building, Institutional building, Assembly building, Business building, Mercantile building, Industrial building, Storage building, Hazardous building, Mixed Land use buildings, Wholesale Establishment and along with Botanical Gardens, Religious Buildings, Elderly People Clubs, Village Halls, Day Centers, Junior Training Centers, Post Offices, Banks, Dispensaries, Railway Stations, Shops, Super Markets, and Departmental Stores.\nBuildings to be designed for Non-Ambulant Disabled People.\nNote. - Large wheel chair criteria shall be applicable on ground floors of the following building, post offices, banks, dispensaries, railway station, shops, supermarkets, and departmental stores.\nNote.\n(iii) Buildings to be designed for Non-Ambulant People (using small wheel chairs). - Public lavatories in Tourist Sports, Clubs, Motels, Professional and Scientific Institution, Museum, Art Galleries, Public Libraries, Laborites, Universities, College for further Education, Teachers Training Colleges, Technical College, Exhibition Halls Dentist Surgeries, Administrative Department of the Hospitals, Service Stations, Car Parking,\nBuildings to be designed for Non-Ambulant People (using small wheel chairs).\nBuildings Airports Terminals, Bus Terminals, Factories.\nEmploying differently-abled for sedentary works, Large Offices, with plinth area abode 1400 sq.mt., Tax Offices, Passport Offices, Pension Offices, and Labour Offices, Cafes, Banqueting Rooms and Snack Bars (For capacity above 100 dinners.\n(b) Site development. - Level of the roads, access paths and parking areas shall be described in the plan along with specification of the materials.\nSite development.\nAccess Path/Walk Way\nAccess path from plot entry and surface parking to building entrance shall be minimum of 1800 mm wide having even surface without any steps. Slope, if any, shall not have gradient greater than 5%. Selection of floor material shall be made suitably to attract or to guide visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons; hereinafter referred \"o as \"guiding floor material\". Finishes shall have a non- slip surface with a texture traversable by a wheel chair. Kerbs wherever provided should blend to a common level.\n(c) Parking. - For parking of vehicles of differently-abled people, the following provisions shall apply:\nParking.\n(i) Surface parking for two car spaces shall be provided near entrance for the physically differently-abled persons with maximum travel distance of 30m. from building entrance.\n(ii) The width of parking bay shall be minimum 3.6 meter.\n(iii) The information stating that the space is reserved for wheel chair users shall be conspicuously displayed.\n(iv) Guiding floor materials shall be provided or a device, which guides visually impaired persons with audible signals, or other devices, which serves the same purpose, shall be provided.\n(d) Building requirements - The specified facilities in buildings for persons shall be as follows:\nBuilding requirements\n(i) Approach to plinth level. - Every building should have at least one entrance accessible to the differently abled and shall be indicated by proper signage. This entrance shall be approached through a ramp together with the stepped entry.\n(i) Approach to plinth level.\n(ii) Ramped Approach. - Ramp shall be finished with non-slip material to enter the building. Minimum width of ramp shall be 1800mm with maximum gradient 1:12. Length of ramp shall not exceed 9.0 meter having 800mm high hand rail on both sides extending 300mm beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.\n(ii) Ramped Approach.\n(iii) Stepped Approach. - For stepped approach size of tread shall not be less than 300mm and maximum riser shall be 150mm. Provision of 800mm high hand rail on both sides of the stepped approach similar to the ramped approach.\n(iii) Stepped Approach.\n(iv) Exit/Entrance Door. - Minimum & clear opening of the entrance door shall be 900mm and it shall not be provided with a step that obstructs the passage of a wheel chair user. Threshold shall not be raised more than 12mm.\n(iv) Exit/Entrance Door.\n(v) Entrance Landing. - Entrance landing shall be provided adjacent to ramp with the minimum dimension 1800mm x 2000mm. The entrance landing that adjoins the top end of a slope shall be provided with floor materials to attract the attention of visually impaired person's (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons. Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Kerbs wherever provided should blend to a common level.\n(v) Entrance Landing.\n(vi) Corridor connecting the entrance/exit for the differently abled. - The corridor connecting the entrance/exit for differently abled leading directly outdoors to a place where information concerning the overall use of the specified building can be provided to visually impaired persons either by a person or by signs, shall be provided as follows:\n(vi) Corridor connecting the entrance/exit for the differently abled.\n(a) Guiding floor materials' shall be provided or device that emits sound to guide visually impaired persons.\n(b) The minimum width shall be 1500mm.\n(c) In case there is a difference of level, slope ways shall be provided with a slope of 1:12.\n(d) Handrails shall be provided for ramps/slope ways.\n(vii) Stair-ways. - One of the stair-ways - near the entrance/exit for the differently abled shall have the following provisions:\n(vii) Stair-ways.\n(a) The minimum width shall be 1350mm.\n(b) Height of the riser shall not be more than 150mm and width of the tread 300mm.\n(c) The steps shall not have abrupt (square) nosing.\n(d) Maximum number of risers on a flight shall be limited to 12.\n(e) Handrails shall be provided on both sides and shall extend 300mm on the top and bottom of each flight of steps.\n(viii) Lifts. - Wherever lift is required as per bye-laws, provision of at least one lift shall be made for the wheel chair user with the following cage dimensions of lift recommended for passenger lift of 13 person's capacity of NBC 2005, BIS. Section 4.9.3 Table no1- Desirable Lift size\n(viii) Lifts.\nClear internal width 1100mm Clear internal depth 2000mm Entrance door width 900mm\n(a) A hand rail not less than 600mm long at 1000mm above floor level shall be fixed adjacent to the control panel.\n(b) The lift lobby shall be of an inside measurement of 1800mm x 200mm or more.\n(c) The time of an automatically closing door should be minimum 5 seconds and the closing speed should not exceed 0.25 m/sec.\n(d) The interior of the cage shall be provided with a device that audibly indicates the floor, the cage has reached indicates that the door of the cage of entrance or exit is either open or closed.\n(e) Graphic or Braille signage, as per the Harmonized Guidelines, shall be provided in the lift lobby.\n(ix) Toilets. - One special W.C. in a set of toilets shall be provided for the use of differently abled with essential provision of washbasin near the entrance for the differently abled.\n(ix) Toilets.\n(a) The minimum size shall be 1500mm x 1750mm.\n(b) Minimum clear opening of the door shall be 900mm and the door shall swing out.\n(c) Suitable arrangement of vertical/horizontal handrails with 50mm clearance from wall shall be made in the toilet.\n(d) The W.C. seat shall be 500mm from the floor.\n(x) Proper signage. - (a) Appropriate identification of specific facilities within a building for the differently abled persons should be done with proper signals.\n(x) Proper signage.\n(b) Visually impaired persons make use of other senses such as hearing and touch to compensate for the lack of vision, whereas visual signals benefit those with hearing disabilities. Signs should be designed and located so that they are easily legible by using suitable letter size (not less than 20 mm high).\n(c) For visually impaired persons, information board in brail should be installed on the wall at a suitable height and it should be possible to approach them closely.\n(d) To ensure safe walking, there should not be any protruding sign which creates obstruction in walking.\n(e) Public Address System may also be provided in busy public areas.\n(f) The symbols/information should be in contrasting colour and properly illuminated because people with limited vision may be able to differentiate amongst primary colours.\n(g) International Symbol Mark for wheel chair be installed in a lift, toilet, staircase, parking areas, etc., that have been provided for the differently abled.",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "44",
"title": "44. Solar Energy Capture.",
"chapter": null,
"content": "(i) If the building is a High Rise Building\n(ii) If the building is intended to be used as:- (a) hospitals and nursing homes; exceeding 150 Square meters in floor area (b) hotels, lodges and guest houses; exceeding 150 square meters in floor area (c) hostels of Schools, Colleges, Training Centers; (d) barracks of arms forces, paramilitary forces and police; (e) individual residential buildings having more than 150 sq.m. plinth area (f) functional buildings of railway stations and airports like waiting rooms, retiring rooms, rest rooms, inspection bungalows and catering units; (g) community centers, banquet halls, Kalyana Mandapams and buildings for similar use; exceeding 200 square meters in floor area (h) Industries wherein hot water is required for processing and (i) Government buildings or quasi -government buildings wherein electric Geyser is used.\n(a) hospitals and nursing homes; exceeding 150 Square meters in floor area\n(b) hotels, lodges and guest houses; exceeding 150 square meters in floor area\n(c) hostels of Schools, Colleges, Training Centers;\n(d) barracks of arms forces, paramilitary forces and police;\n(e) individual residential buildings having more than 150 sq.m. plinth area\n(f) functional buildings of railway stations and airports like waiting rooms, retiring rooms, rest rooms, inspection bungalows and catering units;\n(g) community centers, banquet halls, Kalyana Mandapams and buildings for similar use; exceeding 200 square meters in floor area\n(h) Industries wherein hot water is required for processing and\n(i) Government buildings or quasi -government buildings wherein electric Geyser is used.\n(b) The Executive Authority of Local Body before issuing Building permit for the construction of new building shall ensure if it has a provision in the building design itself for an insulated pipeline from the rooftop in the building to various distribution points where hot water is required. The new building shall have provision for continuous water supply to the solar water heating system. The new building shall also have open space on the rooftop to receive direct sun light. The load bearing capacity of the roof shall at least be 50 kilogram per square meter. All new buildings shall have solar assisted water heating system installed before they are utilized for business or other activity.\n(c) In the existing building, solar assisted water heating system shall be installed at the time of change of use to any of the categories of building mentioned in item 1 above, provided there is a system or installation for supplying hot water therein.\n(d) The capacity of solar water assisted heating system to be installed on the building of different categories mentioned in item 1 above shall be decided in consultation with the Executive Authority. The recommended minimum capacity shall not be less than twenty five liters per person per day for each bath room and kitchen subject to the condition that maximum of 50 per cent of the total roof area is provided with the system as per norms to be fixed by the Tamil Nadu Energy Development Agencies from time to time.\n(e) Installation of solar assisted water heating system shall conform to Bureau of Indian Standards specification Indian Standard 12933. The Technical specifications of solar water heating system shall conform to the specifications defined by Ministry of New and Renewable Energy, Government of India from time to time. The solar collectors used in the solar assisted water heating system shall have the Bureau of Indian Standards Certification mark.\n(f) Wherever hot water requirement is continuous in any building, auxiliary back up arrangement shall be provided.\nErection of solar photo voltaic panels.\n(a) Minimum terrace area to be reserved for erecting solar photo voltaic panels shall be 1/3rd of total terrae area.\n(b) The space required for erecting solar photo voltaic panels is about 10sq.m. for generating 1 KW of electricity.\n(c) The electricity generated from solar photo voltaic system so erected will be used for common electricity requirements like staircase lights, setback lights, lifts, pumps and non-floor space index areas, etc.\n(d) Net metering guidelines of Tamil Nadu Energy Regulatory Commission shall apply to all such installation of solar photo voltaic system.\n(e) The competent authority shall monitor the actual erection and give completion certification to the said buildings only after the erection of solar photo voltaic panels.",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "45",
"title": "45. Wind Electricity Generator.",
"chapter": null,
"content": "(a) Wind Electricity Generator (WEG) shall be permitted in all land use zones.\n(b) The minimum required land size shall be not less than 150m x 150m\n(c) The minimum width of public road or uninterrupted access way/passage shall be not less than 7mtrs.\n(d) The reservation of land for community recreational purposes shall not be insisted for development of Wind Electricity Generator (WEG).\n(e) Subdivision rules shall not be applicable\n(a) Chief Electrical Inspector to Government (CEIG) Approval under the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010.\n(b) Location Clearance Approval or Noted for Record, as applicable, issued by Tamil Nadu Generation and Distribution Corporation (TANGEDCO).\n(c) No Objection Certificate issued by the Civil Aviation and Defence Authorities concerned, as applicable for WEG height clearance.\nSchedule I\nForm\nForm\nApplication for Planning Permission/Building Permit for installation of Wind Electricity Generator\nApplication for Planning Permission/Building Permit for installation of Wind Electricity Generator\n........................\nSignature of the applicant\n(continued)",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "1",
"title": "1. Applicant's name",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "2",
"title": "2. Postal Address for correspondence Telephone\n\t\t\t\tnumber for communication:",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "3",
"title": "3. Applicant's right over the land to make the\n\t\t\t\tproposed development (documentary evidence to be enclosed)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "4",
"title": "4. Development site address",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "5",
"title": "5. Present use of the land and",
"chapter": null,
"content": "[Please give details of each use]",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "6",
"title": "6. Whether all the documents required to be\n\t\t\t\tenclosed with the application as per the Schedule II have been\n\t\t\t\tenclosed",
"chapter": null,
"content": "Date:\nSignature of the applicant\nSchedule II\nDetails to be submitted\nI. Location\n(a) SF No.\n(b) Land extent\n(c) Revenue village\n(d) Taluk\n(e) District\nII. Grid interface arrangement\nIII. Expected date of commissioning\nIV. Grid connection\nV. Nearest sub-station of Central Transmission Utility/State Transmission Utility\nI. Details of protection provided at the Wind Electricity Generator\nII. Details of protection provided at the transformer on the LV side\nIII. Details of protection provided at the transformer on the HT side\nIV. Details of lighting protection\nV. Details of Earthing arrangement\nI. Rated capacity of the WEG proposed\nII. Make of the WEG\nIII. Type approval\nIV. Blade length\nV. Hub height\nVI. Types of Tower (metal/concrete)\nVII. Tower height\nVIII. Whether elevator included\nIX. Type of Foundation\nX. Total comprehensive stress",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "46",
"title": "46. Electrical Transformer Rooms.",
"chapter": null,
"content": "(1) Tamil Nadu Electricity Board. - Tamil Nadu Generation and Distribution Corporation (TANGEDCO) Standards:-\n(a) Indoor space required within the premises for installing floor mounted distribution transformer and associated switchgear.\n(i) An electrical room for accommodating the transformers and associated switch gears shall be provided at the ground floor, either within the built up space of the buildings or outside the buildings and within the premises of the buildings nearer the main entrance of the building. The associated switchgear shall be separated from the transformer bays by a fire-resisting wall with a fire resistance of not less than 4 (four) hours.\n(ii) The width of the approach road to the above said electrical room shall not be less than 3.0 meters.\n(iii) The electrical room with RCC roof shall have clear floor area 6m. X 4m. with a vertical clearance of 2.75m.\n(iv) Three sides of this room shall be covered with brick walls. The fourth side, towards the approach road shall be covered with M.S. Rolling Grill Shutter of width not less than 3 meters with locking facility.\n(v) The electrical room shall be fitted with 2 Nos. exhaust fans in the wall facing the approach road, one on either side of the shutter.\n(vi) The electrical room shall have raised cement flooring with cable duct of 450-mm. width and 750-mm. depth, all around inside the room and close to the exterior walls shutters. The flooring shall slope towards the cable duct. The cabled duct shall be covered with RCC slabs of thickness not less than 75 mm. (3 inches). The covered slabs shall flush with the cement flooring. The radius of curvature of the cable ducts at the turnings inside the electrical room shall not be less than one meter.\n(b) The open space within the premises for installation.\n(2) Directorate of Fire and Rescue Services Standards:\n(i) No transformer shall be located below the first basement or above the ground floor\n(ii) A sub-station or switch station with apparatus having more than 2000 liters oil shall not be allowed in the case of indoor transformer.\n(iii) The indoor transformer should preferably be housed in a fireproof room with walls and doors sufficient fire rating.\n(iv) The room in the ground floor of the basement housing the transformer shall have a free access to the outside.\n(v) There shall be a curb or a dwarf wall around the transformer so that oil spills if any, is contained within the curb. There shall also be a suitable drain with a '\n(vi) If in the basement, the transformers shall be adequately protected against fire by a high velocity water spray or a CO2 flooder of suitable capacity, depending upon the size of the transformer.\n(vii) The switch-gears, if any shall be housed in a separate room with suitable fire resistance walls.\n(viii) The transformers shall be located only in the periphery of the basement or ground floor, observing suitable clearances.\n(ix) DCP or CO2 portable fire extinguishers of a minimum capacity of 10 kg. shall be kept near the doorway housing the transformer.\n(x) All indoor transformers shall be subjected to periodic inspection and shall be replaced in good time so that there is no fire risk.\n(xi) The room shall be well ventilated so that the transformer remains cool.\n(xii) The room shall have emergency and automatic lighting with independent power supply.",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "47",
"title": "47. Layout and sub-division Rules.",
"chapter": null,
"content": "(a) The minimum width of the public street or road on which the site abuts or gains access shall be 7.2m. for residential layout developments and 9m. for industrial layout developments. For subdivisions the minimum width of the passage or public streets or road on which the site abuts or gains access shall be as required for different uses and types of developments.\n(b) The minimum width stated above shall be the existing width of the road and not the street alignment prescribed.\n(a) Residential developments. -\nResidential developments.\nDescription\nDescription\nMinimum width\nMinimum width\nRemarks\nRemarks\n(1)\n(2)\n(3)\nA. Passage\nA. Passage\n(i) In Economically Weaker Section\n\t\t\t\tareas and continuous building areas:\n(a) For single plot\n(b) For two to four plots\n1.0 meter\n1.5 meter\nThe passage will remain private\n(ii) When it is intended to serve up to two plots and length\n\t\t\t\tof the passage does not exceed 40 meters.\n3.0 meters\nThe passage will remain private\n(iii) When it is intended to serve up to four plots and length\n\t\t\t\tof the passage does not exceed 80 meters.\n3.6 meters\n-Do-\n-Do-\n(iv) When it is intended to serve up to ten plots and length\n\t\t\t\tof the passage does not exceed 100 meters.\n4.8 meters\n-Do-\n-Do-\nB. Streets and Roads\nB. Streets and Roads\n(i) Streets of length does not exceeds 120 meters\n7.2 meters\nAll streets shall become public\nAll streets shall become public\n(ii) Streets of length more than 120 meters but\n\t\t\t\tbelow 240 meters\n10.0 meters\nAll streets shall become public\nAll streets shall become public\n(iii) Roads of length more than 240 meters but\n\t\t\t\tbelow 400 meters\n12.0 meters\nAll streets shall become public\nAll streets shall become public\n(iv) Roads of length between 400 meters to 1,000 meters\n18.0 meters\nAll streets shall become public\n(v) Roads of length more than 1000 meters\n24.0 meters\nAll streets shall become public\nNote. - (1) In case of layout the minimum extent of plot shall be 32 sq.mts. for EWS and 72 sq.mts. for other category of plots.\nNote.\n(b) Industrial Development\nDescription\nDescription\n(1)\nMinimum width of\n\t\t\t\tpassage\nMinimum width of\n\t\t\t\tpassage\n(2)\nRemarks\nRemarks\n(3)\n(1) When it is intended to serve only one plot and\n\t\t\t\tlength of the passage does not exceed 100 meters\n5.0 meters\nThe passage will remain private\n(2) When it is intended to serve two to five plots\n\t\t\t\tand the length of the passage does not exceed 120 meters\n7.2 meters\nThe passage will remain private\n(3) When it is intended to serve more than 5 plots\n12.0 meters\nThe street shall become public.\nNote. - Not withstanding anything contained above the competent authority reserves the right to revise layouts proposed by the applicant and applied for sanction in order to provide for better or adequate linkages and proper circulation pattern considering local conditions etc.\nNote.\nSl. No\nSl. No\nWhen the narrower road is of width\nWhen the narrower road is of width\nMin. splay\nMin. splay\n1\nUpto 9.0m.\n1.5m. x 1.5m.\n2\nMore than 9.0m. upto 12m\n3.0m. x 3.0m.\n3\nMore than 12m. up to 30.5m\n4.5m. x 4.5m.\n4\nMore than 30.5m.\n6.0m. x 6.0m.\nExtent of layout\nExtent of layout\n(1)\n(1)\nReservation\nReservation\n(2)\n(2)\nFor the first 3000 square meters\nNil\nBetween 3000 square meters and 10,000 square meters\n10 per cent of the area excluding roads or in\n\t\t\t\tthe alternative he shall pay the guideline value of equivalent\n\t\t\t\tland and excluding the first 3000 square meters as per the\n\t\t\t\tvaluation of the registration department. \"No such area\n\t\t\t\treserved shall measures less than 100 square meters with a\n\t\t\t\tminimum dimension of 10 meters.\"\nAbove 10,000 square meters\n10 per cent of the area excluding roads. It is\n\t\t\t\tobligatory to make the reservation and no equivalent land cost in\n\t\t\t\tlieu of the same is acceptable.\n(a) The land for community recreational purposes shall be restricted to ground level, in a shape and location to be specified by the competent authority. The land so reserved shall be free from any construction by the layout owner or developer.\n(b) The building and use of land shall conform to the conditions that may be imposed while sanctioning the layout. The space set apart for commercial, institutional, industrial or other uses shall be used only for the purpose set apart. However conversion of the use of these non-residential use sites can be considered and decided on its merits when it is proved by the developer that demand for the same does not exist.\n(c) Structures for watchman's booth, gardener's instrument room, public toilet and police booth for the purpose of maintenance and toilets may be permitted with total floor area not exceeding 5 percent the total OSR area in one place.\n(d) Public Parking lot may be permitted in basement below the OSR.\n(e) Rain water harvesting water tanks and STP may be permitted below the OSR.\n(b) In cases of industrial estates developed by Government department or agencies, the competent authority reserves the right to allow them to retain the spaces set apart for roads and the recreational spaces as parks or play grounds and maintain them for the purposes to the satisfaction of the competent authority.\n(c) The competent authority reserves the right to reserve space for recessed bus stops as part of the road space in the layouts exceeding 2 hectares, where found necessary on public interest and this part of the road space also be transferred free of cost as stated in the clause (a) above.",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "48",
"title": "48. Transferable Development Rights.",
"chapter": null,
"content": "(i) any road widening or new road formation as proposed and notified by the local body or the Government department or agency\n(ii) any traffic and transport infrastructure development such as bus stops or Bus stands, metro rail, Bus Rapid Transits System etc.\n(iii) any other urban infrastructure development such as water supply, sewerage, drainage, electricity, education, health, notified by the State Government Department or Government Agency or local body.",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "49",
"title": "49. Premium FSI.",
"chapter": null,
"content": "Sl. No.\nSl. No.\nRoad Width\nRoad Width\nPremium FSI (% of normally allowable FSI)\nPremium FSI (% of normally allowable FSI)\n1.\n18.0 m and above\n50%\n2.\n12.0 m - below 18.0 m\n40%\n3.\n9.0 m - below 12.0 m\n30%",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "50",
"title": "50. Repeal and Savings.",
"chapter": null,
"content": "Part - VII\nBuilding Rules",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "51",
"title": "51. Structural Safety.",
"chapter": null,
"content": "Structural design.\nStructural Design Basis Report [SDBR].\nReview of Structural Design.\nCertification Regarding Structural Safety in Design.\nConstructional Safety.\n(b) CER shall give a certificate of structural safety of construction while submitting the progress report as per proforma given in Form 3 and 4 in Annexure - XIV at the different stages of construction and at the time of completion as per proforma given in Form 7 in Annexure - XIV.\nQuality Control and Inspection.\n(b) The Registered Quality Auditor on Record (QAR) shall give a certificate of quality control as per proforma given in Form 10 in Annexure - XIV.\n(c) Quality Inspection Programme to be carried on the site shall be worked out by QAR in consultation with the owner, builder, CER.\nProtective Measures in Natural Hazard Prone Areas.\nMaintenance of buildings in seismic Zone-III.\n(b) Seismic Strengthening or Retrofitting. - Prior to seismic strengthening or retrofitting of any existing structure, evaluation of the existing structure as regards structural vulnerability in the specified windor seismic hazard zone shall be carried out by a Registered Structural Engineer. If as per the evaluation of the Registered Structural Engineer the seismic resistance is assessed to be less than the specified minimum seismic resistance as given in the \"note\" below, action should be initiated to carry out the upgrading of the seismic resistance of the building as per applicable standard guidelines.\nNote. - (i) for masonry buildings reference is to be made to IS: 4326 and IS: 13935 and\nNote.\n(ii) for concrete buildings and structures reference to be made to IS code on evaluation and seismic strengthening for retrofitting of RCC buildings under preparation at present.",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "52",
"title": "52. Requirements of parts of buildings.",
"chapter": null,
"content": "(b) Interior court yards and covered parking areas shall be raised at least 15cm above the determining ground level and shall be satisfactorily drained.\nWalls.\n(b) All walls of a building must be properly bonded.\n(c) Damp-Proof\n(i) Every wall and pier of the building except when built on materials such as steel or reinforced cement concrete shall be provided with a dampproof course.\n(ii) Damp-proof course shall be laid at a level not higher than the lowest part of underside of the construction of the ground floor and shall extend to the full width and extent of such walls or piers. It shall be at least two centimeters thick. Where the damp-proof course is provided below the plinth level, vertical damp-proof course shall be provided between the floor and the inside of the plinth.\nPaving materials.\nStructural metal.\nHabitable rooms.\n(b) Size. - The area of habitable room shall not be less than 7.5sq.m with a minimum width of 2.4m. Pooja room, or store room shall not be taken as a habitable room]\nKitchen.\n(b) Size. The area of a kitchen where separate dining area is provided shall be not less than 5.0sq.m. with a minimum width of 1.8m. where there is a separate store, the area of the kitchen may be reduced to 4.5sq.m. A kitchen, which is intended for use as a dining area also, shall have a floor area of not less than 7.5 sq.m. with a minimum width of 2.1m.\n(c) Other requirements. - Every room to be used as kitchen shall have:\n(i) Unless separately provided in a pantry, means for the washing of kitchen utensils which shall lead directly are through a sink to a grated and trapped connection to the waste pipe;\n(ii) an impermeable floor;\n(iii) a flue, if found necessary; and\n(iv) a window or ventilator or opening.\nBathrooms and Water closets.\n(b) Size. - The area of a bath room shall not be less than 1.4sq.m. with a minimum width of 1.0m. The floor area of water closet shall be 1.0 sq.m. with a minimum width of 0.9m. If bath and water closet are combined, its floor area shall not be less than 2.4sq.m. with a minimum width of 1.2m.\n(c) Other requirements. - Every bath room or water closet shall:\n(i) be so situated that at least one of its walls shall open to external air;\n(ii) not be directly over or under any room other than another water closet,\n(iii) washing place, bath or terrace, unless it has a water-tight floor;\n(iv) be enclosed by walls or partitions and the surface of every such wall or partitions shall be finished with a smooth impervious material to a height of not less than 1m above the floor of such a room;\n(v) be provided with an impervious floor covering, sloping towards the drain with a suitable grade and not towards varandah or any other room; and have a window or ventilator, opening to a shaft or open space, of area not less than 0.3sq.m.\n(vi) the door of the water closet or bath not to be directly opened to a kitchen\nMezzanine Floor.\n(b) Size. - The minimum size of the mezzanine floor, if it is to be used as a living room shall not be less than 9.5sq.m.. The aggregate area of such mezzanine floor in a building shall in no case exceed 1/2nd the plinth area of the building.\n(c) Other Requirements. - A mezzanine floor may be permitted over a room or a compartment provided:\n(i) it conform to the standard of living rooms as regards lighting and ventilation in case the size of mezzanine floor is 9.5sq.m. or more;\n(ii) it is so constructed as not to interfere under any circumstances with the ventilation of the space over and under it;\n(iii) such mezzanine floor is not sub-divided into smaller compartments;\n(iv) such mezzanine floor or any part of it shall not be used as a kitchen; and\n(v) in no case shall a mezzanine floor be closed so as to make it liable to be converted into unventilated compartments.\nStore room.\nSize. - The size of a storeroom, where provided in a residential building, shall be not less than 3sq.m.\nGarage.\nHeight.\nSize. - The size of garages shall be as below:\n(a) Private Garage - 3.0m × 6.0m, minimum; and\n(b) Public Garage - Based on the number of vehicles parked by Equivalent Car Unit.\nBasement.\n(b) The basement shall have the following requirements:\n(i) Every basement used for non-habitable purposes shall be in every part at least 2.4m in height from the floor to the underside of the roof slab or ceiling; for habitable purposes, it shall conform to the standards prescribed for habitable rooms above.\n(ii) Adequate ventilation shall be provided for the basement. The ventilation requirements shall be the same as required by the particular occupancy according to National Building Code. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans, air conditioning systems, etc.;\n(iii) Adequate arrangements shall be made such that surface drainage does not enter the basement;\n(iv) The walls and floors of the basement shall be water-tight and be so designed that the effects of the surrounding soil and moisture, if any, are taken into account in design and adequate damp proofing treatment is given; and\n(v) The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors. Where the staircase is continuous in the case of building served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floors.\n(vi) The exit requirements in basements shall comply with the provisions of the NBC Part 4 'Fire and Life Safety'\nChimneys.\nParapet.\nRoofs.\n(b) Rain-water pipes shall be affixed to the outside of the external walls of the building or in recesses or chases cut or formed in such external walls or in such other manner.\n(c) Conservation of rain-water using suitable rainwater harvesting techniques including by roof water collection shall be made.\nMosquito-proof Water Tank.\nLighting and Ventilation.\n(a) Notwithstanding the area of openings stated above, the minimum aggregate area of such openings, excluding doors inclusive of frames, shall be not less than one- eighth of the floor area;\nNote.\nNote.\n(i) If a window is partly fixed, the open able area shall be counted\n(ii) No portion of a room shall be assumed to be lighted, if it is more than 7.5m away from the opening assumed for lighting that portion.\n(iii) The area of openings as given above shall be increased by 25% in the case of a kitchen\n(iv) in cases where the ventilation is derived through open to sky. the dimensions of the open to sky need to be 1.5m x 2.5m. This will apply to kitchens and store rooms but not to lavatories and bath rooms which shall have windows or ventilators of not less than 0.5sq.m. abutting such open space\n(b) For requirements regarding lighting and ventilation for different uses and occupancy reference shall be made to the NBC Part 8 'Building Services, Section 1 Lighting and Ventilation'.\nStairways Requirements.\n(i) (a) Ordinary Residential buildings............. 0.75 m\n(b) Other Residential buildings................ 0.90 m\n(ii) Assembly buildings like :\nAuditoria, assembly halls......................... 2.00 m\n(iii) All other buildings..................................... 1.50 m\n(iv) Educational institutions............................ 2.00 m\n(b) Minimum tread - The minimum width of tread without nosing shall be 250mm for residential buildings. The minimum width of tread for other buildings shall be 300mm. In case of spiral staircases, it shall have the above minimum tread width at the outer end.\n(c) Maximum riser - The maximum height of riser shall be 190mm for residential buildings and 150mm for other buildings and these shall be limited to 15 per flight.\n(d) The minimum headroom in a passage under the landing of a staircase shall be 2.2m. The minimum clear headroom in any staircase shall be 2.2m.",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "53",
"title": "53. Exit Requirements.",
"chapter": null,
"content": "(a) Every building meant for human occupancy shall be provided with exits sufficient to permit safe movement and also escape of occupants in case of fire or other emergency.\n(b) All exits shall be free of obstructions.\n(c) No building shall be altered so as to reduce the number, width or portion of exits to less than required.\n(d) Exits shall be clearly visible and the routes to reach exits shall be clearly marked and signs posted to guide the occupants of floor concerned.\n(e) All exit ways shall be properly illuminated.\n(f) Fire fighting equipment where provided along exits shall be suitably located and clearly marked but must not obstruct the exit way and there should be clear indication about its location from either side of the exit way.\n(g) Alarm devices shall be installed to ensure prompt evacuation of the occupants concerned through the exits, wherever required.\n(h) All exits shall provide continuous means of egress to the exterior of a building or to an exterior open space leading to a street.\n(i) Exits shall be so arranged that they may be reached without passing through another occupied unit, except in the case of residential buildings.\nTypes of Exits.\n(b) Lifts, escalators and revolving doors shall not be considered as exits.\nNumber and size of Exits.\nArrangement of Exits.\n(b) The travel distance to an exit from the dead end of a corridor shall not exceed half the distance as stated above except in the case of institutional occupancy in which case it shall not exceed 6m.\nPassenger elevators or lifts.\n(b) Every lift shall be in conformity with the following requirements:\n(i) The lift way and the car shall be enclosed.\n(ii) The lift shaft shall be enclosed with fire resisting materials and shall be ventilated from the highest point direct to the open air.\n(iii) The motors, the winding gear and the operating mechanism shall be installed in a chamber constructed of fire resisting materials and shall be ventilated from the highest point direct to the open air.\n(iv) These shall be fitted with an inter-locking device of such a type as will prevent,\n(a) all landing doors, other than the door to be opening at which the lift car is at rest, from being opened and\n(b) the car being moved until all doors, including the car door, are closed.\n(v) Precautionary measures shall be adopted to ensure the safety of passengers in the event of:-\n(a) an interruption or failure of electric supply;\n(b) a defect or failure in the controlling mechanism;\n(c) the rupture or displacement of ropes or shelves;\n(d) over running or excessive speed of the lift-car due to electrical or other defects in the motor or other mechanism;\n(e) the loading of the car in excess of its maximum capacity; and\n(f) articles falling upon the lift.\n(vi) The safe carrying capacity of the lift or elevator shall be conspicuously posted in or on the car or platform.\n(vii) Every lift shall be properly lighted.\n(viii) Once in every year, lift shall be got inspected and certified by a competent Engineer\n(c) For requirements regarding planning, designing and installation, etc. of lifts and escalators, reference shall be made to the NBC Part 8 'Building Services Section 5 Installation of Lifts and Escalators'.",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "54",
"title": "54. Sanitation requirements.",
"chapter": null,
"content": "(b) Each family dwelling unit shall have at least one water closet and one kitchen sink. A bath or shower shall also be installed to meet the basic requirements of sanitation and personal hygiene.\n(c) All other structures for human occupancy shall have adequate sanitary facilities, but in no case less than one WC and one other fixture for cleaning purposes.\n(d) All materials, fittings and sanitary appliances shall conform to the National Building Code.\n(a) One bath room provided with a tap and a floor trap;\n(b) One WC with flushing apparatus with an ablution tap\n(c) One tap with a floor trap or a sink in kitchen or wash place.\n(ii) Where only one WC is provided in a dwelling, the bath and WC desirably be separated accommodated\n(iii) Dwellings without individual conveniences shall have the following fitments:\n(a) One water tap with flow trap desirably in each tenement\n(b) One WC with flushing apparatus and an ablution tap for every two tenements\n(c) One bath with water tap and flow trap for every two tenements.\n(b) For Buildings Other than Residences.- The requirements for fitments for sanitation in the case of buildings other than residences shall be in accordance with the Tables given in the Annexure - X. Provided further that the respective toilets or sanitary arrangements shall be kept open for the ladies and children in restaurants, petrol pumps & hotels.\nSewerage.\n(b) Septic Tanks. - (i) Where a septic tank is used for sewage disposal, the location, design and construction of the septic tank shall conform to requirements of the National Building Code and as per provisions in G.O.Ms. No 106, MAWS Dept., dated 01.09.2014 (operative guidelines for sept age management for local bodies)\n(ii) Location of the Septic Tanks and Subsurface Absorption System: A subsoil dispersion system should preferably not be closer than 18m from any source of drinking water, such as well, to mitigate the possibility of bacterial pollution of water supply.\n(iii) Requirements.-\n(a) Dimensions of septic tanks - Septic tanks shall have a minimum width of 75cm, a minimum depth of 1m below the water level and a minimum liquid capacity of 1 cu.m. The length of tanks shall be 2 to 4 times the width;\n(b) Septic tanks may be constructed of brickwork, stone masonry, concrete or other suitable materials as approved by the Authority;\n(c) Under no circumstances shall effluent from a septic tank be allowed into an open channel, drain or water body without adequate treatment;\n(d) The minimum nominal diameter of the pipe shall be 10cm. Further, at junctions of pipes in manholes, direction of flow from a branch connection shall not make an angle exceeding 45 degrees with the direction of flow in the main pipe;\n(e) The gradients of land drains, under-drainage as well as the bottom of dispersion trenches and soak ways shall be between 1:300 and 1:400;\n(f) Every septic tank shall be provided with ventilating pipe of at least 5cm diameter. The top of the pipe shall be provided with a suitable cage of mosquito-proof wire mesh. The ventilating pipe shall extend to a height which would cause no smell nuisance to any building in the area. Generally, the ventilating pipe may extend to a height of about 2m, when the septic tank is at least 15m away from the nearest building and to a height of 2m above the top of the building when it is located closer than 15m.\n(g) When the disposal of septic tank effluent is to a seepage pit, the seepage pit may be of any suitable shape with the least cross-sectional dimension of 0.90m and not less than 1.00m in depth below the invert level of the inlet pipe. The pit may be lined with stone, brick or concrete blocks with dry open joints which should be backed with at least 7.5cm of clean coarse aggregate. The lining above the inlet level should be finished with mortar. In the case of pits of large dimensions, the top portion may be narrowed to reduce the size of the RCC cover slabs. Where no lining is used, especially near trees, the entire pit should be filled with loose stones. A masonry ring may be constructed at the top of the pit to prevent damage by flooding of the pit by surface runoff. The inlet pipe may be taken down a depth of 0.90m from the top as an anti-mosquito measure; and\n(h) When the disposal of the septic tank effluent is to a dispersion trench, the dispersion trench shall be 0.50m to 1.00m deep and 0.30m to 1.00m wide excavated to a slight gradient and shall be provided with 150mm to 250mm of washed gravel or crushed stones. Open jointed pipes placed inside the trench shall be made of unglazed earthenware clay or concrete and shall have a minimum internal diameter of 7.5cm to 10cm. Each dispersion trench shall not be longer than 30m and trenches shall not be placed closer than 1.8m.",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "55",
"title": "55. Storm Water Drainage.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "56",
"title": "56. Electrical and Allied Installations (Including lightening protection of buildings).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "57",
"title": "57. Air conditioning, Heating and Mechanical Ventilation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "58",
"title": "58. Gas supply.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "59",
"title": "59. Boiler Room.",
"chapter": null,
"content": "(a) The boiler shall not be allowed in sub-basement but be allowed in the first basement away from the escape routes.\n(b) The boilers shall be installed in a fire resisting room of 4 hours fire resistance rating, and this room shall be situated on the periphery of the basement. Catch pit shall be provided at the low level. Entry to this room may be provided with a composite door of two hour fire resistance.\n(c) The boiler room shall be provided with fresh air inlets and smoke exhausts directly to the atmosphere.\n(d) Foam inlets shall be provided on the external walls of the building at the ground floor level to enable the fire services to use foam in case of fire.\n(e) The furnace oil tank for the boiler, if located in the adjoining room shall be separated by fire resisting wall of 4 hour rating. Entry to this room shall be provided with a composite door of 2 hour fire resistance. A curb of suitable height shall be provided at the entrance in order to prevent the flow of oil into the boiler room in case of tank rupture.",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "60",
"title": "60. Acoustics, Sound Insulation and Noise Control.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "61",
"title": "61. Swimming Pool or Pool.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "62",
"title": "62. Telecommunication Structure.",
"chapter": null,
"content": "(a) Steel fabricated tower or antenna's on steel pole;\n(b) Pre-fabricated shelter of fiber glass or P.V.C. on the building roof top/terrace for equipment;\n(c) Masonry Structure or Shelter on the ground for equipment;\n(d) D.G. Set with sound proof covers to reduce the noise level.\nLocation.\n(a) Base Trans Receiver Station (BTS) Towers and installation of equipment for Telecommunication Networks:\n(i) BTS structures are not considered as buildings and only structures for telecommunication. It can be allowed either on a plot or on top of a building.\n(ii) When proposed in a plot, it shall have proper access, which may be a private access.\n(iii) When the proposed BTS tower is on a roof top, for the purpose of deciding on the height of the building defined in these rules, it shall not be taken into account, hence the question of additional setback if any for the building does not arise.\n(iv) It shall not be located either within a Heritage precinct or on a heritage building listed for conservation.\n(v) BTS room size shall not exceed 15 sq.m. in floor area and 3 m in height.\n(vi) Height of these structures shall conform to the regulations of the Civil Aviation Department, Indian Air Force and Director of Fire and Rescue Service.\n(vii) Building over which BTS towers proposed shall be structurally strong to take the load of these structures including the wind load to be certified by the Registered Structural Engineer.\n(viii) These BTS structures shall be sound and safe.\n(ix) The generator shall not cause noise or air pollution.\n(x) The service provider shall pay the fees as may be uniformly fixed by the Government and notified from time to time.\nRequirement.\n(b) Applicant has to produce or submit plans of structure to be erected.\n(c) Projections: No Pager and/or Telephone Tower shall project beyond the existing building line of the building on which it is erected in any direction.",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "63",
"title": "63. Water Conservation.",
"chapter": null,
"content": "(2) Additional regulations for all buildings.\n(b) All centrally air conditioned buildings shall have their own waste water reclamation plant and use reclaimed waste water for cooling purposes.\n(c) A separate sump shall be constructed for storing potable where the water is supplied by the Local Body and the volume of such sump shall not exceed 1,000 liters per dwelling unit. This sump shall be independent of other tanks, which may be constructed for storing water obtained from other sources.",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "64",
"title": "64. Fire Safety.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 70
},
{
"number": "65",
"title": "65. Installation of closed circuit television units in Public Buildings.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "66",
"title": "66. Architectural Control.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "67",
"title": "67. Conservation of buildings of historical or architectural interest.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "68",
"title": "68. Tree preservation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "69",
"title": "69. Discretionary Powers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "70",
"title": "70. Delegation of Powers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "71",
"title": "71. Exemptions from these rules.",
"chapter": null,
"content": "(i) Any building which is the property of the State or Central Government.\n(ii) Any building constructed, reconstructed, altered or added to or intended to be constructed, reconstructed, altered or added to by the Government in accordance with such plan and in such manner as may be approved or directed in pursuance of any statutory provisions in that behalf.\n(iii) Any building constructed, reconstructed, altered or added to or intended to be constructed, reconstructed, altered, or added to, to function solely as a temporary hospital for the reception and theater for persons suffering from infectious disease.",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "72",
"title": "72. Grant of exemptions.",
"chapter": null,
"content": "(b) The Government, may either suo motu or on appeal against any orders of the authority empowered by them, pass such orders, as deemed fit, provided such an appeal is made within thirty days from the date of receipt of the order of the authority empowered by the Government: recorded in writing, if applications under the rule (a) above or appeals under this clause are not made to Government or the authority empowered by the Government, as the case may be, within the prescribed time.",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "73",
"title": "73. Transitory Provisions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
{
"number": "74",
"title": "74. Repeal and Savings.",
"chapter": null,
"content": "(ii) Tamil Nadu District Municipalities Building Rules, 1972\n(iii) The Multi Storied Building & Public Building Rules, 1973\n(iv) Tamil Nadu Cyclone Prone Area Special Building Rule, 1982\n(v) Special Rules for relating the construction and maintenance and facility civil aero dram, 1970\n(vi) Chennai City Corporation Building Rules, 1975\n(vii) Special Rules for the Multi Storied Building & Public Buildings Rule, 1974\n(viii) Development Regulations approved in G.O.Ms.No.190, 191, Housing and Urban Development Department as part of second master plan of Chennai Metropolitan Area.\n(ix) Development Control Regulations vide G.O.Ms.No.130, Housing and Urban Development Department, dated.14.6.2010\n(x) The building rules framed/followed under the Municipal corporation act of Madurai, Coimbatore, Trichy, Tirunelveli, Thoothukudi, Thanjavur, Dindigul, Salem, Erode, Tiruppur, Vellore\nAnnexure - I\nAnnexure - I\n[ See rule 6 (7)]\nForm-A\nForm-A\nApplication for Permission for subdivision/layout or reconstitution or amalgamation of land for building purposes. And for change of use of land\nApplication for Permission for subdivision/layout or reconstitution or amalgamation of land for building purposes. And for change of use of land\nFrom\n--------------------------\n-----------------------------\n------------------------------\n(Affix stamp size photograph of the applicant)\n(a) The plans are prepared by Registered Architect/Engineer/Town Planner ------------------- [name]\n(b) The execution of the development will be supervised by Registered Architect/Engineer/Town Planner-------------[name]\nSignature of the Owner/Developer\n1.\nApplicant's name\n:\n2.\nPostal Address for correspondence\n:\nTelephone number for communication e mail ID\n:\n3.\nApplicant's right over the land to make the proposed\n\t\t\t\tdevelopment (documentary evidence to be enclosed)\n:\n4.\nDevelopment site address\n:\n5.\nExtent of the site applied for\n:\n6.\nPresent use of the land and the existing Building if any\n\t\t\t\t[Please give details of each use]\n:\n7.\nProposed use of land and/the building, [Please give details of\n\t\t\t\teach use]\n:\n8.\nWhether the site applied for forms part of/lie in an approved\n\t\t\t\tlayout. If yes, please give date of approval and reference no,\n\t\t\t\twith a copy of the approved layout plan duly authenticated\n:\n9.\nExisting use of the adjoining lands in the North\nthe East\n-\nthe South\n-\nthe West\n-\n10.\nThe width and status of the\n\t\t\t\tabutting road\n(i.e. private or public)\n11.\nWhether all the documentary evidences, plans details,\n\t\t\t\tcertificates required to be enclosed with the application as per\n\t\t\t\tthe Building Rules have been enclosed\nSignature of Owner/Registered\nDeveloper or\nAuthorised agent of the owner:\nAnnexure - II\nAnnexure - II\n[ See rule 6 (8)]\nForm - B\nForm - B\nApplication for Permission for carrying out construction of building or structure, change of use of building\nApplication for Permission for carrying out construction of building or structure, change of use of building\nFrom\n--------------------------\n-----------------------------\n------------------------------\n(Affix stamp size photograph of the applicant)\n(a) The plans have been prepared by Registered Architect/Engineer --------------- [name and registration number]\n(b) The structural report, details and drawings have been prepared and supplied by the Registered Structural Engineer --------------------- [name and registration number]\n(c) The construction of the proposed buildings will be carried under the supervision of the Registered Construction Engineer on Record...............(name and registration number)\n(d) For the foundation work of the High rise building, the services of the Registered Geo-technical Engineer.............. (name and registration number) will be availed.\n(e) The construction work of a High rise building executed by Registered Construction Engineer on the record will be under the independent quality inspection programme prepared and implemented under the supervision of the independent Registered Quality Auditor on record............... (name and registration number)\nSignature of the Owner/Registered Developer\n1.\nApplicant's name\n:\n2.\nPostal Address for correspondence Telephone number\n\t\t\tfor communication\n:\n3.\nApplicant's right over the land to make the proposed\n\t\t\tdevelopment (documentary evidence to be enclosed\n:\n4.\nDevelopment site address\n:\n5.\nPresent use of the land and/or the building [Please\n\t\t\tgive details of each use]\n:\n6.\nProposed use of the land and/the building, [Please\n\t\t\tgive details of each use]\n:\n7.\nWhether the site applied for forms part of/lie in an\n\t\t\tapproved layout. If yes, please give date of approval and\n\t\t\treference no, with a copy of the approved layout plan duly\n\t\t\tauthenticated\n:\n8.\nExisting building\n-Floor area-\n-Number of dwelling units-\n9.\nProposed building\n-Floor area\n- Number of dwelling Units\n10.\nWhether all the documentary evidence, plans details,\n\t\t\tcertificates required to be enclosed with the application as per\n\t\t\tthe Building Rules have been enclosed\n:\n11.\nIn industrial use machineries\n(a)\nExisting\nH.P.\nProposed\nH.P.\n(b)\nNumber of workers-Existing\n-Proposed\n(c)\nWhether detailed report on the raw materials used,\n\t\t\tprocess and machineries involved, effluent discharge methods\n\t\t\tprogressed, product manufactured, category of power consumption\n\t\t\t(i.e. LT/HT), action taken and minimize its negative impact, if\n\t\t\tany, or the environment, etc. enclosed\nSignature of the Owner/Builder\nAnnexure - III\nAnnexure - III\n[ See rule 6 (9)]\nForm - C\nForm - C\nForm of undertaking to be executed by the land owner or power of attorney holder or builder or promoter and structural engineer, architect, geo-tech expert and site engineer.\nForm of undertaking to be executed by the land owner or power of attorney holder or builder or promoter and structural engineer, architect, geo-tech expert and site engineer.\nS.No./R.S.No./T.S.No.\nBlock No.\nVillage\nTaluk\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nLand Owner or Power of Attorney Holder or Builder or Promoter\nConsultant\nName and Address\nRegistration No.\nE-Mail ID & Mobile No.\nSignature\nArchitect/L.S. Structural Engineer\nGeo-Tech Expert\nSite Supervision Engineer\nThis is to certify that I the Architect/LS of the site has inspected the site at\nS.No./R.S.No./T.S.No.\nBlock No.\nVillage\nTaluk\n(If yes, to be shown in the site plan)\n(White washing, colouring, fixing, water supply, drainage or other sanitary fitments) and before obtaining regular connection for water supply/electricity.\nSignature of The Architect/engineer\nSignature of The Architect/engineer\n(Owner/Builder/Structural Engineer/Architect/Geo-Tech Expert)\nStructural Engineer/Architect/Site Engineer\nBuilder/Structural Engineer/Architect\nConsultant\nName and Address\nRegistration No.\nE-Mail ID & Mobile No.\nSignature\nOwner of the land/Power of Attorney Holder/Lease\n\t\t\t\tHolder\nArchitect/L.S.\nStructural Engineer\nGeo-Tech Expert\nSite Supervision Engineer\nDeponent\nDeponent\nWitnesses:\nWitnesses:\nDuly attested by the\nDuly attested by the\nNotary Public\nNotary Public\nAnnexure - IV\nAnnexure - IV\n[ See rule 38 (4) and 39 (8)]\nParking Requirements (a) For the use of the occupants and of persons visiting the premises for the purposes of profession, trade, business, recreation or any other activity parking spaces and parking facilities shall be provided within the site to the satisfaction of the Competent Authority and conforming to the standards specified below. (b) The portion of the site affected by street alignment shall not be reserved for parking. Part - I (1) Residential\nParking Requirements\n(a) For the use of the occupants and of persons visiting the premises for the purposes of profession, trade, business, recreation or any other activity parking spaces and parking facilities shall be provided within the site to the satisfaction of the Competent Authority and conforming to the standards specified below.\n(b) The portion of the site affected by street alignment shall not be reserved for parking.\nPart - I\n(1) Residential\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\nDwelling Unit with\nNumber of Parking Spaces\nDwelling Unit with\nNumber of Parking Spaces\nFloor area up to 25 sq.m\nNil\nFloor area up to 50 sq.m\nNil\nFloor area above 25 sq.m and up to 50 sq.m\n1 Two Wheeler space\nFloor area above 50 sq.m and up to 75 sq.m\n1 Two Wheeler space\nFloor area above 50 sq.m and up to 75 sq.m\n1 car space for every 2 dwelling units and 1 Two Wheeler space\n\t\t\t\tfor every dwelling unit\nFloor area above 75 sq.m and up to 100 sq.m\n1 car space for every 2 dwelling units and 1 Two Wheeler space for every dwelling unit\n1 Two Wheeler space\nFloor area above 75 sq.m\n1 car space for every 75 sq.m\nFloor area above 100 sq.m\n1 car space for every 100 sq.m\nVisitors Parking:\nVisitors Parking:\nIn addition to the parking spaces specified\n\t\t\t\tabove, parking spaces for visitors shall be provided to the\n\t\t\t\textent of 10% of the number stipulated above rounded to the\n\t\t\t\tnearest whole number where number of dwelling units exceeds six.\nNote. - 1. In cases where the\n\t\t\t\tnumber of car parking spaces required in an ordinary residential\n\t\t\t\tbuilding does not exceed 3 in number, separate driveway or aisle\n\t\t\t\tis not necessary. 2. In cases of flatted\n\t\t\t\tresidential development where the number of car spaces required\n\t\t\t\tfor a dwelling unit does not exceed 2 in number separate aisle is\n\t\t\t\tnot necessary for the second car space required for that dwelling\n\t\t\t\tunit.\nNote. - 1. In cases where the\n\t\t\t\tnumber of car parking spaces required in an ordinary residential\n\t\t\t\tbuilding does not exceed 3 in number, separate driveway or aisle\n\t\t\t\tis not necessary.\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 80
},
{
"number": "2",
"title": "2. In cases of flatted\n\t\t\t\tresidential development where the number of car spaces required\n\t\t\t\tfor a dwelling unit does not exceed 2 in number separate aisle is\n\t\t\t\tnot necessary for the second car space required for that dwelling\n\t\t\t\tunit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
{
"number": "2",
"title": "2. In cases of flatted\n\t\t\t\tresidential development where the number of car spaces required\n\t\t\t\tfor a dwelling unit does not exceed 2 in number separate aisle is\n\t\t\t\tnot necessary for the second car space required for that dwelling\n\t\t\t\tunit.",
"chapter": null,
"content": "(2) Shops/Shopping Centers/Departmental Stores/Super Markets\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\nFloor Area\nNumber of Parking Spaces\nFloor Area\nNumber of Parking Spaces\nUpto 50sq.m\nNil\nUpto 75sq.m\nNil\nAbove 50sq.m\n1 car space and 1 Two wheeler space for every\n\t\t\t\t50sq.m or part thereof excluding the first 50sq.m\nAbove 75sq. m\n1 car space and 1 Two wheeler space for every\n\t\t\t\t75sq.m or part thereof excluding the first 75sq.m\n(3) Automobile Showrooms\n1 car space for every 100sq.m of gross area\n\t\t\t\tincluding the office area, service area, wash area, etc. This\n\t\t\t\tspace is exclusive of the space provided for the display of new\n\t\t\t\tvehicles but inclusive of the space required for parking of\n\t\t\t\tservice vehicles.\n(4) Government Offices\nFloor Area\nFloor Area\nNumber of Parking Spaces\nNumber of Parking Spaces\nUpto 500sq.m\n1 car space for every 150sq.m or part thereof\n\t\t\t\tand 1 Two Wheeler space for every 25sq.m or part thereof.\nAbove 500sq.m\n1 car space for every 100sq.m or part thereof\n\t\t\t\tand 1 Two Wheeler space for every 25sq.m or part thereof\nVisitors Parking:\nVisitors Parking:\nIn addition to the parking spaces specified\n\t\t\t\tabove, parking spaces for visitors shall be provided to the\n\t\t\t\textent of 10% of the number stipulated above subject to a minimum\n\t\t\t\tof 1 car space and 1 Two Wheeler space.\n(5) Other Offices including regional offices of banks, etc.\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 100 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 25 sqm of floor\n\t\t\t\tarea or part thereof\n1 car space for every 100 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 25 sqm of floor\n\t\t\t\tarea or part thereof\nVisitors Parking:\nVisitors Parking:\nIn addition to the parking spaces specified\n\t\t\t\tabove, parking spaces for visitors shall be provided to the\n\t\t\t\textent of 10% of the number stipulated above subject to a minimum\n\t\t\t\tof 1 car space and 1 Two wheeler space.\n(6) Banks - service branches\n(A) Corporation Limit, Municipalities,\n(A) Corporation Limit, Municipalities,\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 75 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 25 sq.m of floor\n\t\t\t\tarea or part thereof.\n1 car space for every 125 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 25 sq.m of floor\n\t\t\t\tarea or part thereof\n(7) ATM Centers\n1 car space for every\n\t\t\t\t25 sq.m of floor area or part thereof\n(8) Post Offices, Telegraph Offices, Telephone Offices and Similar establishments\n(A) Corporation/Municipal Areas\n(A) Corporation/Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 150 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two-wheeler space for every 50 sq.m of floor\n\t\t\t\tarea or part thereof.\n1 car space for every 250 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 100 sq.m of floor\n\t\t\t\tarea or part thereof\n(9) IT Offices, IT Enabled Services, Bio Informatics Centers\n1 car space for every\n\t\t\t\t50 sq.m of floor area or part thereof and 1 two-wheeler space for\n\t\t\t\tevery 25 sq.m of floor area or part thereof.\n(10) Restaurants and Hotels\n(a) Restaurants, Fast Food outlets\n(a) Restaurants, Fast Food outlets\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 50 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 25 sq.m of floor\n\t\t\t\tarea or part thereof\n1 car space for every 100 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 50 sq.m of floor\n\t\t\t\tarea or part thereof\n(b) Starred Hotels, Major Hotels and Lodges with more than\n\t\t\t\t50 rooms in CMA\n(b) Starred Hotels, Major Hotels and Lodges with more than\n\t\t\t\t50 rooms in CMA\n1 car space for every 4-guest rooms and for the non-room area,\n\t\t\t\t1 car space for every 100sq.m of floor area or part thereof and 1\n\t\t\t\ttwo wheeler space for every 50sq.m of floor area or part thereof.\n\t\t\t\tFor restaurants in these hotels - same as that specified for\n\t\t\t\trestaurants specified above.\n(c) Un-starred Hotels, other Hotels &\n\t\t\t\tLodges\n(c) Un-starred Hotels, other Hotels &\n\t\t\t\tLodges\n1 car space for every 10-guest rooms and for the non-room\n\t\t\t\tarea, 1 car space for every 100 sq.m of floor area or part\n\t\t\t\tthereof and 1 two wheeler space for every 50 sq.m of floor area\n\t\t\t\tor part thereof. For restaurants in these hotels - same as that\n\t\t\t\tspecified for restaurants specified above.\n(11) Hostels\n1 Two Wheeler for every 10 rooms\n(12) Auditorium, Kalyana Mandapams, Cinema Halls\n(A) Corporation/Municipal Areas\n(A) Corporation/Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space and 1 two wheeler space for the every\n\t\t\t\t20sq.m of Auditorium/Kalyana Mandapam area or part thereof\n1 car space and 1 two wheeler space for the every\n\t\t\t\t50sq.m of Auditorium/Kalyana Mandapam area or part thereof\n(13) Educational Institutions\n(a) Government Schools or Local Body schools\n(a) Government Schools or Local Body schools\n(A) Corporation/Municipal Areas\n(A) Corporation/Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 500 sq.m of class room area or part\n\t\t\t\tthereof and 1 two wheeler space for every 50 sq.m of class room\n\t\t\t\tor part thereof and one cycle space for every 10 sq.m of class\n\t\t\t\troom area or part thereof.\n1 two-wheeler space for every 50 sq.m of class room area or\n\t\t\t\tpart thereof and one cycle space for every 5 sq.m of class room\n\t\t\t\tarea or part thereof.\n(b) Private Schools\n(b) Private Schools\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 100 sq.m of class room area or part\n\t\t\t\tthereof and 1 two wheeler space for every 50 sq.m of class room\n\t\t\t\tor part thereof and one cycle space for every 10 sq.m of class\n\t\t\t\troom area or part thereof.\n1 car space for every 300 sq.m of class room area or part\n\t\t\t\tthereof and 1 two-wheeler space for every 50 sq.m of class room\n\t\t\t\tarea or part thereof and one cycle space for every 5 sq.m. of\n\t\t\t\tclass room area or part thereof.\nNote. -\n\t\t\t\t50% of the car spaces specified above shall be provided in the\n\t\t\t\tfront area abutting the road so as to act as a recessed parking area for the vehicles coming\n\t\t\t\tfor drop/pick up for students.\nNote. -\n\t\t\t\t50% of the car spaces specified above shall be provided in the\n\t\t\t\tfront area abutting the road so as to act as a recessed parking area for the vehicles coming\n\t\t\t\tfor drop/pick up for students.\nNote.\n(c) Colleges\n(c) Colleges\n1 car space for every 100 sq.m of class room\n\t\t\t\tarea or part thereof and 1 two-wheeler space for every 50 sq.m of\n\t\t\t\tclass room area or part thereof.\n(d) Tutorial/Parallel colleges\n(d) Tutorial/Parallel colleges\n1 car space for every 200 sq.m of class room\n\t\t\t\tarea or part thereof and 1 two-wheeler space for every 50 sq.m of\n\t\t\t\tclass room area or part thereof.\n(e) Software/Hardware and other training\n\t\t\t\tinstitutes\n(e) Software/Hardware and other training\n\t\t\t\tinstitutes\n1 car space for every 100 sq.m of floor area or\n\t\t\t\tpart thereof and 1 two-wheeler space for every 30 sq.m of floor\n\t\t\t\tarea or part thereof.\nHospitals and Nursing Homes\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\nFloor Area\nNumber of Spaces\nNumber of Spaces\nUp to 3000sqm\n1 car space and 1 Two wheeler space for every 50sq.m or part\n\t\t\t\tthereof\n1 car space and 1 Two wheeler space for every 100sq.m or part\n\t\t\t\tthereof\nAbove B3000sqm\n1 car space and 1 Two wheeler space for every 75sq.m or part\n\t\t\t\tthereof\n1 car space and 1 Two wheeler space for every 150sq.m or part\n\t\t\t\tthereof\nHealth Clubs and Recreational Centers.\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space and 1 Two wheeler space for every\n\t\t\t\t50sq.m of floor area or part thereof\n1 car space and 1 Two wheeler space for every\n\t\t\t\t75sq.m of floor area or part thereof\nRecreational Clubs\n(A) Corporation or Municipal Areas\n(A) Corporation or Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 75sq.m of floor area or\n\t\t\t\tpart thereof\n1 car space for every 100sq.m of floor area or\n\t\t\t\tpart thereof.\nIndustries\n(a) Manufacturing industries, service industries,\n\t\t\t\tbiotechnology industries\n(a) Manufacturing industries, service industries,\n\t\t\t\tbiotechnology industries\n1 car space for every 100sq.m of office floor area or part\n\t\t\t\tthereof and 1 two wheeler space and 1 cycle space for every\n\t\t\t\t50sq.m of workshop floor area or part thereof and 1 lorry space\n\t\t\t\tfor every 500sqm or workshop floor area or part thereof\n(b) Cottage Industries\n(b) Cottage Industries\n1 car space for every 100sq.m of office floor area or part\n\t\t\t\tthereof and 1 two-wheeler space and 1 cycle space for every\n\t\t\t\t50sq.m of workshop floor area or part thereof.\n(c) Garments/Packaging Industries\n(c) Garments/Packaging Industries\n1 car space for every 200sq.m of office floor area or part\n\t\t\t\tthereof and 1 two-wheeler space and 1 cycle space for every\n\t\t\t\t50sq.m of workshop floor area or part thereof.\n(d) Electrical and Electronic Industries including Computer\n\t\t\t\thardware industries\n(d) Electrical and Electronic Industries including Computer\n\t\t\t\thardware industries\n1 car space for every 100sq.m of office floor area or part\n\t\t\t\tthereof and 1 two-wheeler space and 1 cycle space for every\n\t\t\t\t50sq.m of workshop floor area or part thereof.\n(e) IT Industries, Software, Bio\n\t\t\t\tInformatics Industries\n(e) IT Industries, Software, Bio\n\t\t\t\tInformatics Industries\n1 car space for every 50sq.m of floor area or part thereof and\n\t\t\t\t1 two-wheeler space for every 25sq.m of floor area or part\n\t\t\t\tthereof.\nGodown's, Ware Houses & Wholesale Stores, etc.\n(a) Godown, Warehouses, Freight Stations,\n\t\t\t\tContainerization Units\n(a) Godown, Warehouses, Freight Stations,\n\t\t\t\tContainerization Units\nIf the area is open,\n\t\t\t\t1 lorry space for every 300sq.m of plot area or part thereof\nIf the area is covered, 1 lorry space for every\n\t\t\t\t300sq.m of covered area or part thereof.\n(b) Cold Storage\n(b) Cold Storage\n1 lorry space for every 500sqm of floor area or\n\t\t\t\tpart thereof.\nReligious Buildings\n(A) Corporation/Municipal Areas\n(A) Corporation/Municipal Areas\n(B) Panchayat Areas\n(B) Panchayat Areas\n1 car space for every 100sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 50sqm of floor\n\t\t\t\tarea or part thereof\n1 car space for every 250sq.m of floor area or\n\t\t\t\tpart thereof and 1 two wheeler space for every 100sqm of floor\n\t\t\t\tarea or part thereof\nGeneral Note\nGeneral Note\nWhere the prescriptions are based\n\t\t\t\ton the total Floor Space Index (FSI) area, the number of car/two\n\t\t\t\twheeler parking spaces required shall be calculated for 75% of\n\t\t\t\tthe total plinth area in the buildings.\nIn cases of residential developments, the number of car/two\n\t\t\t\twheeler parking spaces required for a dwelling shall be based on\n\t\t\t\tthe size of the dwelling unit, excluding the common areas like\n\t\t\t\tcommon corridors, staircases, etc.\nPart - II\nOff Street Parking Standards\n(A) Stall Size.\nVehicle Type\nVehicle Type\nBreadth (m)\nBreadth (m)\nLength (m)\nLength (m)\nCar\n2.5\n5.0\nTwo Wheelers\n1.0\n1.8\nLCV\n3.5\n7.0\nLorry/Bus\n3.5\n10.0\nArticulated Vehicles [Container Vehicles]\n3.5\n16.0\n(B) Parking for Special (physically challenged) persons\n(C) Driveway and Aisle Widths\nAisle Widths.\nVehicle Type\nVehicle Type\nParallel Parking\nParallel Parking\nAll angles up to 60 0\nAll angles up to 60 0\nAngles above 60 0 &\n\t\t\t\tPerpendicular parking\nAngles above 60 0 &\n\t\t\t\tPerpendicular parking\nTwo Wheeler\n1.5m\n1.5m\n1.5m\nCar\n3.0m\n3.0m\n4.5m.\nLCV/Truck/Bus\n7.0m\n7.0m\n10.0m\n(D) Width Entry and Exit Gates.\n(E) Gradient.\n(F) Turning Radius.\n(G) Ramps.\n(H) Headroom.\nPart - III\nStandards for Multi Level Parking Lots.\n(A) Location of Multi Level Parking Lots.\n(B) Setbacks.\n(C) Width of Entry and Exit.\n(D) Other Requirements.\n(ii) Ventilation - In case of parking on ground floor, all sides shall be left open for ventilation and lighting. In case of all floors above ground floor, adequate natural ventilation and lighting should be provided. In case of basement or sub basement parking, adequate mechanical ventilation and adequate lighting should be provided.\n(iii) Where car/two wheeler lifts are proposed/provided there shall be at least one ramp to standards from the parking floors to the ground level.\nAnnexure - V\nAnnexure - V\n[ See rule 36]\nList of cottage Industries\nList of cottage Industries\nNote. - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be applicable.\nNote.\nAnnexure - VI\nAnnexure - VI\n[ See rule 36]\nIndustries classified as \"Green\"\nIndustries classified as \"Green\"\nNote. - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be applicable.\nNote.\nAnnexure - VII\nAnnexure - VII\n[ See rule 36]\nIndustries classified as \"Orange\"\nIndustries classified as \"Orange\"\nNote. - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be applicable.\nNote.\nAnnexure - VIII\nAnnexure - VIII\n[ See rule 36]\nList of Industries Permissible in Special and Hazardous Industries Zone\nList of Industries Permissible in Special and Hazardous Industries Zone\nNote. - Category of Industries modified time to time by Tamil Nadu Pollution Control Board will be applicable.\nNote.\nAnnexure - IX\nAnnexure - IX\n[ See rule 35 (23)]\nRegulations for Special Provisions for Hospital Buildings.\nRegulations for Special Provisions for Hospital Buildings.\n(i) For buildings less than 18.30 meters height, 6.0 meters wide set back all round.\n(ii) For buildings between 18.30 meters and 30.0 meters height, 7.0 meters set back all round.\n(iii) Set back area should be free of any obstruction, such as fountains, statues, flower pots, decorative idols, ramps etc., to facilitate movement of vehicle and people during emergency.\nAnnexure - X\nAnnexure - X\n[ See rule 54 (2) (b)]\nSanitation requirements\nSanitation requirements\nTable: 1. Sanitation requirements for shops and Commercial Offices\nSl. No.\nSl. No.\nSanitary Unit/Fittings\nSanitary Unit/Fittings\nFor Personnel\nFor Personnel\n1.\nWater closet\nOne for every 25\n\t\t\t\tpersons or part thereof, exceeding 15 (including employees and\n\t\t\t\tcustomers).\nFor female personnel 1 for every 15 persons or\n\t\t\t\tpart thereof, exceeding 10.\n2.\nDrinking Water Fountain\nOne for every 100 persons with a minimum of one\n\t\t\t\ton each floor.\n3.\nWash Basin\nOne for every 25 persons or part thereof.\n4.\nUrinals\nNil up to 6 persons\n1 for 7-20 persons\n2 for 21-45 persons\n3 for 40-70 persons\n4 for 71-100 persons\nFrom 101 to 200 add\n\t\t\t\tat the rate of 3%;\nFor over 200 persons add at the rate of 2.5%.\n5.\nCleaners' Sink\nOne per floor minimum, preferably in or adjacent\n\t\t\t\tto sanitary rooms.\nNote. - Number of customers for the purpose of the above calculation shall be the average number of persons in the premises for a time interval of one hour during the peak period. For male-female calculation a ratio of 1: 1 may be assumed.\nNote.\nTable: 2 Sanitation Requirements for Hotels.\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Residential Public staff\nFor Residential Public staff\nFor non residential Staff\nFor non residential Staff\nFor male\nFor male\nFor female\nFor female\n1.\nWater Closet (W.C.)\nOne per 8 Persons omitting occupants of the\n\t\t\t\tattached water closet minimum of 2 if both sexes are lodged\n1 for 1-15 persons\n2 for 16-35 persons\n3 for 36-65 persons\n4 for 66-100 persons\n1 for 1-12 persons\n2 for13-25 persons\n3 for 26-40 persons\n4 for 41-57 persons\n5 for 58-77 persons\n6 for 78-100 persons Add 1 for every 6 persons\n\t\t\t\tor part thereof\n2.\nAblution Taps\nOne in each W.C\nOne in each W.C\nOne in each W.C.\n3.\nUrinals\nNil\nNil up to 6 persons\n1 for 7-20 persons\n2 for 21-45 persons\n3 for 40-70 persons\n4 for 71-100 persons\nNil\n4.\nWash Basins\nOne per 10 persons\n1 for 15 persons\n2 for 16-35 persons\n3 for 36-65 persons\n4 for 66-100 persons\n1 for 1-12 persons\n2 for 13-25 persons\n3 for 26-40 persons\n4 for 41-57 persons\n5 for 58-77 persons\n6 for 78-100 persons\n5.\nBaths\nOne per 10 persons\nNil\nNil\n6.\nCleaner's sinks\nOne per 10 persons. Less occupants of room with\n\t\t\t\tbath in suite\nNil\nNil\n7.\nKitchen Sink\nOne in each Kitchen\nOne in each Kitchen\nOne in each Kitchen\nNote. (i) It may be assumed that the two-thirds of the number are males and one- third females\nNote.\n(ii) One water tap with drainage arrangements shall be provided for every 50 persons or part there of in the vicinity of water closet and urinals.\nTable: 3 Sanitation Requirements For Public halls\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Male\nFor Male\nFor Female\nFor Female\n1.\nWater Closet\nOne per 100 persons up to 400 persons; for over\n\t\t\t\t400 add at the rate of one per 250 persons or part thereof.\nTwo for 10 persons up to 200 persons; over 200\n\t\t\t\tadd at the rate of one per 100 persons or part thereof.\n2.\nAblution Taps\nOne in each W.C.\nOne in each W.C.\n3.\nUrinals\nOne for 50 persons or part thereof.\nNil, up to 6 persons\n1 for 7-20 persons\n2 for 21-45 persons\n3 for 46-70 persons\n4 for 71-100 persons\n4.\nWash Basins\nOne per W.C. and urinal provided\nOne per W.C. provided\n5\nKitchen Sink\nOne in each kitchen\nOne in each kitchen\n6.\nBath (shower)\nOne per 10 persons\n7.\nCleaner's sinks\nOne per 30 Bed rooms (one per floor minimum)\nNote. (i) It may be assumed that the two-thirds of the number are males and one- third females ii) One water tap with drainage arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closet and urinals.\nNote.\nTable: 4 Sanitation Requirements for Educational Occupancy\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nBoarding Institutions\nBoarding Institutions\nOther educational Institutions\nOther educational Institutions\nBoys\nBoys\nGirls\nGirls\nBoys\nBoys\nGirls\nGirls\n1.\nWater Closet (W.C.)\nOne for 8 boys or part thereof\nOne for 6 girls or part thereof\nOne for 40 boys or part thereof\nOne for 25 girls or part thereof\n2.\nAblution Taps\nOne in each W.C.\nOne in each W.C.\nOne in each W.C.\nOne in each W.C.\n3.\nUrinals\nOne per every 25 pupils or part thereof\n--\nOne per every 20 pupils or part thereof\n--\n4.\nWash Basins\nOne for every 8 pupils or part thereof\nOne for every 6 pupils or part thereof\nOne for every 40 pupils or part thereof\nOne for every 40 pupils or part thereof\n5.\nBaths\nOne for every 8 pupils or part thereof\nOne for every 6 pupils or part thereof\n--\n--\n6.\nDrinking Water Fountains\nOne for every 50 pupils or part thereof\nOne for every 50 pupils or part thereof\nOne for every 50 pupils or part thereof\nOne for every 50 pupils or part thereof\n7.\nCleaner's Sink\nOne per Floor minimum\nOne per Floor minimum\nOne per Floor minimum\nOne per Floor minimum\nTable: 5 Sanitation Requirements for Nursery Schools\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nRequirement\nRequirement\n1.\nWater Closet\nOne for 15 boys, one for 6 girls\n2.\nAblution Taps\nOne in each W.C.\n3.\nUrinals\none for 12 boys\n4.\nWash Basins\nOne for every 15 pupils or part thereof\n5.\nBaths\nOne bath sink per 40 pupils\n6.\nDrinking Water Fountains\nOne for every 50 pupils or part thereof\n7.\nCleaner's Sink\nOne per floor minimum\nNote. - 1. One water tap with draining arrangements shall be provided for every 50 persons or part thereof, in the vicinity of water closets and urinal.",
"footnote": "",
"is_definition": false,
"sort_order": 82
},
{
"number": "2",
"title": "2. For teaching staff, the schedule of sanitary units to be provided shall be the same as in case of office buildings (Table 1).",
"chapter": null,
"content": "Table: 6 Sanitation Requirements for Governmental and Public Business Occupancy and Offices\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Male Personnel\nFor Male Personnel\nFor female Personnel\nFor female Personnel\n1.\nWater Closet (W.C.)\nOne for 25 persons or part thereof\nOne for 15 persons or part thereof\n2.\nAblution taps One in each W.C. One in each W.C.\n3.\nUrinals\nNil up to 6 persons\n1 for 7-20 persons\n2 for 21-45 persons\n3 for 46-70 persons\n4 for 71-100 persons\nFrom 101 to 200 add\n\t\t\t\tat the rate of 3%;\nFor over 200 persons add at the rate of 2.5%.\n--\n4.\nWash Basins\nOne for every 25 persons or part thereof\nOne for every 25 persons or part thereof\n5.\nDrinking water fountains\nOne for every 100 persons with a minimum of one\n\t\t\t\ton each floor\nOne for every 100 persons with a minimum of one\n\t\t\t\ton each floor\n6.\nCleaner's Sinks\nOne per floor minimum; preferably in or adjacent\n\t\t\t\tto sanitary rooms.\n--\n7.\nExecutive Room/Conference Hall\nToilet Suite (1 WC, 1\n\t\t\t\twashbasin, optional shower for 24hr usage)\nUnit could be common for Male/Female or separate\n\t\t\t\tdepending on the number of user of each facility\nNote. - One water tap with drainage arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closet and urinals.\nNote.\nTable: 7 Sanitation Requirements for Residences\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nDwelling with individual conveniences\nDwelling with individual conveniences\nDwelling without individual conveniences\nDwelling without individual conveniences\n1.\nBath Room\nOne provided with water tap\nOne for every two tenement\n2.\nWater Closet (W.C.)\nOne\nOne for every two tenement\n3.\nSink (or Nahani) in the Floor\nOne\n--\n4.\nWater Tap\nOne\nOne with drainage\n\t\t\t\tarrangement in each tenement\nOne in common bath rooms and common water\n\t\t\t\tcloset.\nNote. - Where only one water closet is provided in a dwelling, the bath and water closet shall be separately accommodated.\nNote.\nTable: 8 Sanitation Requirements for Assembly Occupancy Buildings (Cinema, Theaters, Auditoria. etc.)\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Public\nFor Public\nFor Staff\nFor Staff\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\n1.\nWater Closet\nOne for 100 persons up to 400 persons. For over\n\t\t\t\t400 persons, add at the rate of 1 per 250 persons or part thereof\nTwo per 100 persons up to 200 persons. For over\n\t\t\t\t200 persons add at the rate of 1 per 100 persons or part thereof\nOne for 15 persons.\nTwo for 16-35 persons\nOne for 1-12 persons.\nTwo for 13- 25 persons add at the rate of 1 per\n\t\t\t\t6 persons or part thereof\n2.\nAblution Taps\nOne in each W.C.\nOne in each W.C.\nOne in each WC\nOne in each WC\n3.\nUrinals\nOne for 50 persons or part thereof\n_____\nNil upto\n6 persons\nOne for 7-20 persons\nTwo for 21-45 persons\n_____\n4.\nWash Basins\nOne for every 200 persons or part thereof\nOne for every 200 persons or part thereof\nOne for 1-15 persons\nTwo for 16-35\nOne for 1-12 persons\nTwo for 13- 25 persons\n5.\nDrinking Water Fountain\nOne per 100 persons or part thereof\n6.\nCleaner's sink\nOne per floor\n7.\nShower/Bathing\nAs per trade requirement\nNote. - (i) One water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water closets and urinals.\nNote.\n(ii) It may be assumed that two thirds of the numbers are males and one third females.\nTable:9 Sanitation Requirements for Assembly Buildings (Art, Galleries, Libraries and Museums)\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Public\nFor Public\nFor Staff\nFor Staff\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\n1.\nWater Closet (W.C.)\nOne for 200 persons up to 400 persons. For over\n\t\t\t\t200 persons, add at the rate of 1 per 250 persons or part thereof\nOne per 100 persons up to 200 persons. For over\n\t\t\t\t200 persons, add at the rate of 1 per 150 persons or part thereof\nOne for 1-15 persons.\nTwo for 16- 35 persons\nOne for 1-12 persons.\nTwo for 13-25 persons, add at the rate of 1 per\n\t\t\t\t6 persons or part thereof\n2.\nAblution Taps\nOne in each W.C.\nOne in each W.C.\nOne in each W.C\nOne in each W.C\n3.\nUrinals\nOne for 50 persons or part thereof\n--\nNil up to persons\nOne for 7-20 persons\nTwo for 21- 45 persons\n--\n4.\nWash Basins\nOne for every 200 persons or part thereof. For\n\t\t\t\tover 400 persons, add at the rate of 1 per 250 persons or part\n\t\t\t\tthereof.\nOne for every 200 persons or part thereof. For\n\t\t\t\tover 200 persons, add at the rate of 1 per 150 persons or part\n\t\t\t\tthereof\nOne for 1-15 persons\nTwo for 16- 35\nOne for 1-12 persons\nTwo for 13-25 persons\n5.\nCleaner's Sink\nOne per floor, minimum\n6.\nDrinking Water Fountain\nOne per 100 persons or part thereof\n7.\nShower/Bath\nAs per each kitchen\nTable :10 Sanitation Requirements for Restaurants\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Public\nFor Public\nFor Staff\nFor Staff\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\n1.\nWater Closet (W.C.)\nOne per 50 seats up to 200 seats. For over 200\n\t\t\t\tseats, add at the rate of 1 per 100 seats or part thereof\nOne per 50 seats up to 200 seats. For over 200\n\t\t\t\tseats, add at the rate of 1 per 100 seats or part thereof\n1 for 15 persons.\n2 for 16-35 persons.\n3 for 36-65 persons.\n4 for 66-100 persons.\n1 per 1-12 persons.\n2 for 13-25 persons.\n3 for 26-40 persons.\n4 for 41-57 persons.\n5 for 58-77 persons.\n6 for 78-100. persons.\n2.\nAblution Taps\nOne in each W.C.\nOne in each W.C.\nOne in each W.C.\nOne in each W.C.\n3.\nUrinals\nOne for 50 persons or part thereof\n--\nNil up to 6 persons.\n1 for 7-20 persons.\n2 for 21-45 persons.\n3 for 46-70 persons.\n4 for 71-100 persons.\n--\n4.\nWash Basins\nOne for every water closet\n5.\nKitchen Sinks & Dish Washer\nOne per each Kitchen\n6.\nService Sink\nOne in the restaurant\nTable:11 Sanitation Requirements for Factories\nSl. No.\nSl. No.\nSanitary Unit\nSanitary Unit\nFor Male Personnel\nFor Male Personnel\nFor female Personnel\nFor female Personnel\n1.\nWater Closet\n1 for 15 persons\n2 for 16-35 persons\n3 for 36-65 persons.\n4 for 66-100 persons.\nFor 101 to 200\n\t\t\t\tpersons add at rate of 3%.\nFrom over 200\n\t\t\t\tpersons, add at the rate of 2.5%.\nFor 101 to 200 persons, add at the rate of 5%.\n\t\t\t\tFrom over 200 persons add at the rate of 4%.\n1 for 1-12 persons\n1 for 13-25 persons.\n2 for 26-40 persons.\n3 for 41-57 persons.\n4 for 58-77 persons.\n5 for 78-100 persons.\n2.\nAblution Taps\nOne in each W.C\nOne in each W.C.\n3\nUrinals\nNil up to 6 persons\n1 for 7-20 persons\n2 for 21-45 persons\n3 for 46-70 persons\n4 for 71-100 persons\nFrom 101 to 200 persons add at the rate of 3%;\n\t\t\t\tfor over 200 persons add at the rate of 2.5%.\n--\n4.\nWashing Taps with draining arrangement\nOne for every 25 persons or part thereof\n5.\nDrinking Water Fountains\nOne for every 100 persons with a minimum of one\n\t\t\t\ton each floor\n6.\nBaths Preferably Showers\nAs required for particular trade or occupation\n7.\nEmergency shower and eye wash fountain\n1 per every shop floor per 500 persons\nNote. - (i) For many trades of a dirty or dangerous character, more extensive provisions are required.\nNote.\n(ii) One water tap with draining arrangement shall be provided for every 50 persons or part thereof in the vicinity of water closet and urinal iii) Crèches where provided shall be fitted with water closets (One for 10 persons or part thereof), wash basins (1 for 15 persons or part thereof) and drinking water tap with drinking arrangement for every 50 persons or part thereof.\nTable -12 Sanitary Requirements for Large Stations and Airports\nSl. No.\nSl. No.\nPlace\nPlace\nW.C. for Males\nW.C. for Males\nW.C. for Females\nW.C. for Females\nUrinals for Males only\nUrinals for Males only\n1.\nJunction Stations, Intermediate Stations and\n\t\t\t\tSubstations\n3 for first 1000 persons, add 1 for subsequent\n\t\t\t\t1000 persons or part thereof.\n8 for first 1000 persons, add 1 for every\n\t\t\t\tadditional 1000 persons or part thereof.\n4 for every 1000 person, add 1 for every\n\t\t\t\tadditional 1000 persons or part thereof.\n2.\nTerminal Stations and Bus Terminals\n4 for first 1000 persons and 1 for every\n\t\t\t\tadditional 1000 persons or part thereof.\n10 for every 1000 person and 1 for every\n\t\t\t\tadditional 1000 persons or part thereof.\n6 for every 1000 person and 1 for every\n\t\t\t\tadditional 1000 persons or part thereof.\n3.\nDomestic Airports\n2*\n4*\n1 per 40 persons or part\nMinimum.\nFor 200 persons\n5\n16\nthereof.\nFor 400 persons\n9\n30\nFor 600 persons\n12\n40\nFor 800 persons\n16\n52\nFor 1000 persons\n18\n58\n4.\nInternational\n\t\t\t\tAirports\nFor 200 persons\nFor 600 persons\nFor 1000 persons\n6\n20\n1 per 40 persons or part\nthereof.\n12\n40\n18\n58\nNote. - Provision for wash basins, baths including shower stalls, shall be in accordance with part ix section 2- Drainage and Sanitation of National Building Code of India.\nNote.\n* At least one Indian style water closet shall be provided in each toilet. Assume 60 % males and 40% females in any area. At least 50 % of female WCs may be Indian pan and 50% EWC.\nNote. - Provision for wash basins, baths including shower stalls, shall be in accordance with part ix section 2- Drainage and Sanitation of National Building Code of India.\nNote.\nTable. 13 General Standards/Guidelines for Public Toilets in Public Area\nPublic Toilet\nOn roads and for open areas: At every 1 km,\n\t\t\t\tincluding in parks, plaza, open air theater, swimming area, car\n\t\t\t\tparks, fuel stations. Toilets shall be disabled-friendly and in\n\t\t\t\t50-50 ratio (M/F). Provision may be made as for Public Rooms\n\t\t\t\t(Table 4.10 Contd)\nSignage\nSignboards on main streets shall give directions\n\t\t\t\tand mention the distance to reach the nearest public convenience.\n\t\t\t\tToilets shall have multi-lingual signage for the convenience of\n\t\t\t\tvisitors. Helpline number shall be pasted on all toilets for\n\t\t\t\tcomplaints/queries.\nModes\nPay and use or free. In pay and use toilets\n\t\t\t\tentry is allowed on payment to the attendant or by inserting coin\n\t\t\t\tand user gets 15 minutes.\nMaintenance/Cleaning\nThe toilet should\n\t\t\t\thave both men and women attendants. Alternatively automatic\n\t\t\t\tcleaning cycle covering flush, toilet bowl, seat, hand wash\n\t\t\t\tbasin, disinfecting of floor and complete drying after each use\n\t\t\t\tcan be adopted, which takes 40 seconds.\nPublic toilet shall be open 24 hours.\nAnnexure - XI\nAnnexure - XI\n[ See rule 51]\nStructural Design and Safety\nStructural Design and Safety\nFor General Structural Safety\nPile Foundation Section 1\nPart 1: Section 2 Bored Cast-in-situ Piles\nPart 1: Section 3 Driven Precast Concrete Piles\nPart 1: Section 4: 1984 Bored precast Concrete Piles\nPart 2: 1980 Timber Piles\nPart 3 1980: Under Reamed Piles\nPart 4 1985: Load Test on Piles\"\nFor Cyclone/Wind Storm Protection.\nFor Earthquake Protection\nFor Protection of Landslide Hazard\nNote. - Whenever an Indian Standard including those referred in the National Building Code or Bureau of Indian Standards is referred, the latest revision and additions of the same shall be followed except specific criteria, if any, mentioned above against that code.\nNote.\nAnnexure - XII\nAnnexure - XII\n[ See rule 51 (8)]\nProtection against Natural Hazards\nProtection against Natural Hazards",
"footnote": "",
"is_definition": false,
"sort_order": 83
},
{
"number": "1",
"title": "1. Protection from Earthquakes.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 84
},
{
"number": "2",
"title": "2. Protection from Cyclonic Wind Damage/Flooding/Tsunami.",
"chapter": null,
"content": "(a) Raising the site above the high flood level.\n(b) Construction or improvement of drainage paths to effectively drain the water from the site area\n(c) Construction of buildings and structures on deep foundations going below the depth of scour or on stilts with deep enough foundations under water.\nAnnexure - XIII\nAnnexure - XIII\n[ See rule 23]\nRegistration, Qualification and Duties and Responsibilities of Architects, Engineers, Structural Engineers, Construction Engineers, Quality Auditors, Geo-Technical Engineer, Town Planners and Developers\n(1) Registered Architect (RA).\n(i) Architect Grade-I\nScope of work. - To prepare plans, designs and drawings for any type of buildings or developments including High rise buildings and layout developments\nEligibility. - The person with B.Arch or equivalent degree with minimum 2 years experience (after obtaining the degree) in professional work shall have registered with Council of Architects under the provisions of the Architects Act, 1972.\nAnd\n(ii) Architect Grade-II\nScope of work. - To prepare plans, designs and drawings for small developments stated in clause (1) (a) of Rule 35\nEligibility. - Diploma in Architecture with 5 years experience (after obtaining the Diploma) in professional work.\n(b) Duties and responsibilities. - He shall be responsible for making adequate arrangements to ensure not only that the work is executed as per the approved plans but also is in conformity with the stipulations of the NBC for safe and sound construction and smooth functioning of the services provided in the building and for making adequate provisions for services and equipments and protection from fire hazards as per NBC.\n(ii) He shall on behalf of the owner obtain and submit the progress certificates, completion report and other details required for occupancy certificate and any other report as required under the rule and obtain the same and keep it ready in the site for inspection by the competent authorities.\n(iii) He is solely responsible for obtaining the certificates required under this rule from the registered professionals.\n(iv) In the event of any deviations he is the solely responsible to bring it to the notice of the competent authority\n(v) If the services of the registered architect on record are terminated he shall immediately inform the competent authority about his termination and the stage of work at which his services have been terminated. The registered architect appointed as replacement of the preceding architect shall inform about his appointment on the job and inform the competent authority of any deviation that might have occurred on the site with reference to the approved plan and the stage at which he is taking over the charge.\n(vi) The registered architect appointed shall inform the competent authority immediately on termination of the services of the registered structural engineer on record, registered construction engineer on record, or any change of owner or registered developer.\n(vii) He shall instruct the concerned person or agency that adequate provisions are made for ensuring the safety of workers and others during excavation, construction and erection.\n(viii) He shall instruct the concerned person or agency that adequate provisions are made for providing safe and adequate temporary structures required for construction and development\n(ix) He should inform in the progress report about satisfactory working conditions for the workers as per the various acts in force and binding on the employers of workers,\n(x) If there are deviations to approved plan or unauthorized additional construction, the same has to be intimated immediately\n(xi) He should provide all certificates and reports as required under these rules\n(2) Registered Engineer (RE)\n(a) Registration - On the basis of their academic qualifications and experience, Engineers shall be \"Registered\" in three \"Grades\". The eligibility criteria for registration in each \"Grade\" and the \"Scope of Work\" which can be entrusted to the Engineer of each \"Grade\" are given below.\n(i) Grade-I\nScope of work. - To prepare plans, designs and drawings for any type of buildings or developments including High rise buildings and layout developments;\nEligibility. - B. E. Civil or equivalent degree or A.M.I.E. with minimum 10 years experience (after obtaining the degree) in professional work.\n(ii) Grade-II.\n(i) Scope of work. To prepare plans, designs and drawings for Non High rise building (i.e. up to 18.30m. in height) and layout developments on lands up to 10 hect. in extent.\nEligibility. - B. E. Civil or equivalent degree with minimum 5 years experience (after obtaining the degree) in professional work.\n(iii) Grade-III\nScope of work. - To prepare plans, designs and drawings for small developments stated in clause (1) (a) rule 35 and excluding the above mentioned structures for Grade-I and Grade-II and layout developments on lands up to 5 hect. in extent.\nEligibility. - (i) Diploma in Civil Engineering with 5 years experience (after obtaining the diploma) in professional work, or\n(ii) B. E. Civil or equivalent degree with minimum 3 years experience (after obtaining the degree) in professional work,\n(b) Duties and responsibilities. - i. He shall be responsible for making adequate arrangements to ensure not only that the work is executed as per the approved plans but also is in conformity with the stipulations of the NBC for safe and sound construction and smooth functioning of the services provided in the building and for making adequate provisions for services and equipments and protection from fire hazards as per NBC.\n(ii) He shall be responsible to see that the structure serviceable for its intended uses.\n(iii) To inspect the building construction work periodically and maintain such records as cube strength, steel test certificate, etc. as envisaged in NBC. He is responsible for quality of material and execution.\n(iv) He shall on behalf of the owner obtain and submit the progress certificates, completion report and other details required for occupancy certificate and any other report as required under the rule and obtain the same and keep it ready in the site for inspection by competent authorities.\n(v) He is solely responsible for obtaining the certificates required under this rule from the registered professionals\n(vi) In the event of any deviations he is the solely responsible to bring it to the notice of the competent authority.\n(vii) In the event of any deviations he is the solely responsible to bring it to the notice of the competent authority.\n(viii) If the services of the registered engineer on record are terminated, he shall immediately inform the competent authority about his termination and the stage of work at which his services have been terminated. The registered engineer appointed as replacement of the preceding engineer shall inform about his appointment on the job and inform the competent authority of any deviation that might have occurred on the site with reference to the approved plan and the stage at which he is taking over the charge.\n(ix) If there are deviations to approved plan or unauthorized additional construction, the same has to be intimated immediately.\n(x) The registered engineer appointed shall inform the competent authority immediately on termination of the services of the registered structural engineer on record, registered construction engineer on record, or any change of owner or registered developer.\n(xi) He shall instruct the concerned person or agency that adequate provisions are made for ensuring the safety of workers and others during excavation, construction and erection and that the employment of workers are made satisfying the statutory Acts\n(xii) He shall instruct the concerned person or agency that adequate provisions are made for providing safe and adequate temporary structures required for construction and development\n(xiii) He should inform in the progress report about satisfactory working conditions for the workers as per the various acts in force and binding on the employers of workers,\n(xiv) To provide all certificates and reports as required under this rule.\n(3) Registered Structural Engineer (RSE).\n(a) Registration.\n(i) Grade-I\nScope of work. - To prepare structural design and structural drawings for any type of buildings including High rise buildings\nEligibility. - M. E., or equivalent degree in structures or Earthquake Engineering or Ph.D. in the subject with minimum 5 years of experience (after obtaining the degree) in structural design work at a responsible position as a structural designer.\nNote. - The experience as stated above shall be under a Structural Engineer on Record. (This requirement shall be waived for the first ten years of the notification of these Rules)\nNote.\n(ii) Grade-II\n(ii) Grade-II\nScope of work. - To prepare structural design and structural drawings for small developments stated in clause (1) rule 35 and excluding the above mentioned structures for Grade-I\nEligibility. - (ii) B. E. Civil or equivalent degree with minimum 3 years experience (after obtaining the degree) in structural design work at a responsible position as a structural engineer, or\n(iii) M.E. or equivalent degree in Structures/Earthquake Engineering or Ph.D. in the subject with minimum 1 years of experience (after obtaining the degree) in structural design work at a responsible position as a structural engineer.\nNote. - The experience as stated above shall be under a Structural Engineer on Record. (This requirement shall be waived for the first ten years of the notification of these Rules)\nNote.\n(b) Duties and responsibilities. - i. To prepare a report on the structural design and to prescribe the method and techniques of its execution as per relevant IS specifications and NBC.\n(a) To get required soil (geo-technical) investigation done from an approved laboratory and submit the report concerning the same in prescribed format to the competent authority.\n(b) To get the structural Design checked through third party verification and submit a certificate concerning the same to the competent authority.\n(ii) To prepare and submit design basis report\n(iii) To prepare a detailed report on structural drawings and specifications for execution indicating thereon design live loads, safe soil baring capacity, specification of materials, assumption made in the design, special precautions to be taken by contractor or builder to suit the designs and assumptions etc.\n(iv) To supply copies of structural drawings to the Registered Construction Engineer on Record (CER) and the site supervisor and keep it ready for inspection of the competent authority during progress certification.\n(v) To ensure that the structural components are executed without any deviation of the submitted structural drawing.\n(vi) to inspect the work at all important stages and certify the work being executed for structural safety and over all structural soundness of the building and as per the original structural drawings and furnish a copy of the certificate to Registered Architect or Registered Engineer for submission to the competent authority periodically along with progress report, structural inspection report and completion report.\n(vii) To advice the owner or developer or architect or engineer for arranging for tests purpose and their report for soil, building material etc., for his evaluation and design consideration.\n(viii) To review field test result at progressive stages as per NBC and submit the same to the competent authority. He shall also inform the competent authority if any deviations in quality of materials or execution.\n(ix) to inform the Registered Architect or Registered Engineer of any structural deviations noticed by him during the progress of work, who in turn will inform the same to the competent authority\n(x) To inform in writing the competent authority within 7 days if for any reason he is relieved of appointment or responsibilities as the registered structural engineer(RSE) for the development.\n(xi) Not to provide services to further or advance work of any type of development that does not comply with these rules or is unauthorized as per these rules.\n(xii) If there are deviations to approved plan or unauthorized additional construction, the same has to be intimated immediately to Registered Architect or Registered Engineer who will in turn will inform the same to the competent authority\n(xiii) To provide all certificates and reports as required under this rule.\n(4) Registered Construction Engineer (RCE).\n(i) B.E. Civil or equivalent degree or A.M.I.E. with five years experience (after obtaining the degree) in construction, or\n(ii) Diploma in Civil Engineering with seven years experience (after obtaining the diploma) in construction, or\n(iii) B. Arch or equivalent with 5 years of experience (after obtaining the degree) in construction registered with Council of Architects under the provision of Architects Act\nNote. - The experience as stated above shall be under one or more Construction Engineer on Record of one or more reputed construction companies. Such company or companies established within or outside the area of jurisdiction of the competent authority shall be of minimum ten years of standing.\nNote.\n(b) Duties and responsibilities. - All construction works (except the small developments defined in the clause (1) (a) rule 35) shall be carried out under the supervision of a CER.\n(i) To adhere strictly to the structural drawings, specifications and written instructions of the Registered Structural Engineer on Record and Registered Architect on Record or Registered Engineer on Record\n(ii) To ensure that the structural components are executed without any deviation of the submitted structural drawing.\n(iii) To follow the provisions of NBC. or I.S. specifications as regards materials, components, quality control and the process of construction.\n(iv) He shall be responsible to see that the structure serviceable for its intended uses.\n(v) To inspect the building construction work periodically and maintain such records as cube strength, steel test certificate, etc. as envisaged in NBC and submit the reports to Registered Architect or Registered Engineer. The same has to be kept in the site for inspection by the competent authority.\n(vi) He is responsible for quality of material and execution.\n(vii) To provide for safety of workers and others during excavation, construction and erection.\n(viii) To provide safe and adequate temporary structures required for construction and erection.\n(ix) To bring to the notice of the registered Structural Engineer on record and Registered Architect on record or Registered Engineer on record any situation of circumstances which in his opinion are liable to endanger the safety of the structure. The Registered Architect or Registered Engineer will in turn intimate to the competent authority\n(x) To deposit with the Registered Architect or Registered Engineer for submission to the competent authority one set of working drawings of the works executed along with the progress certificates before proceeding with the next stage of the work.\n(xi) He/she shall be in overall charge of the site and responsible for overall supervision of the work.\n(xii) He/she shall ensure that all the work under his charge is carried out in conformity with the approved drawings and as per the details and specifications supplied by the registered Architect on record or Registered Engineer on record.\n(xiii) He/she shall take adequate measures to ensure that no damage is caused to the work under construction and adjoining properties.\n(xiv) He/she shall also ensure that no undue inconvenience is caused in the course of his/her work to the people in the neighborhood.\n(xv) He shall also ensure that no nuisance is caused to traffic & neigh boring people by way of noise, dust, smell, vibration etc. in the course of his/her work. If there are deviations to approved plan/unauthorized additional construction, the same has to be intimated to Registered Architect or Registered Engineer who will in turn will inform the same to the competent authority\n(xvi) To provide all certificates and reports as required under this rule.\n(5) Registered Quality Auditor (RQA).\n(i) B.E. Civil or equivalent degree with five years experience (after obtaining the degree) in testing of building materials including concrete and/or experience in quality control work with a reputed construction agency.\n(ii) M.E. (Civil) or equivalent with two years experience (after obtaining the degree) stated above.\nNote. - The experience as stated above shall be under one or more registered quality auditors/under one or more reputed construction companies or agencies. Such companies or agencies established within or outside the area of jurisdiction of the competent authority shall be of minimum ten years of standing.\nNote.\n(b) Duties and responsibilities\n(i) The construction work of a High rise building executed by CER shall be under an independent quality inspection programme prepared and implemented under the supervision of an independent QAR.\n(ii) At the time of seeking permission from competent authority for starting construction of a High rise building of special structures CER shall submit an undertaking from QAR that:\n(a) The QAR is agreeable to accept the assignment to implement the quality inspection programme, and that the appointed QAR is acceptable to the Owner/Developer.\n(b) The QAR will get all the testing of building materials, concrete etc. done by an independent approved testing laboratory.\n(iii) During construction of a High rise building the QAR shall carry out necessary testing of materials as well as non-destructive testing of structural components with the help of approved testing laboratory and submit to the CER, Registered Architect/ Registered Engineer and the owner/developer, the reports as per quality inspection programme.\n(iv)Upon completion of the construction of High rise building or the special structure the QAR shall submit the report and certificate in the prescribed format based on the quality inspection programme. This report and certificate will be submitted to the CER, Registered Architect/Registered Engineer and the owner/developer for final submission to the competent authority to provide all certificates and reports as required under this rule.\n(6) Registered Geo-Technical Engineer (RGTE).\n(i) M.E. (or equivalent) in Geo-technical Engineering with minimum 5 years of experience(after obtaining the degree)\n(ii) The experience as stated above shall be under one or more Geo-technical Engineer or agency. Such agencies established within of outside the area of jurisdiction of the competent authority shall be of minimum ten years of standing.\n(iii) The Geo-technical Engineer shall state the Laboratory he will be using.\n(b) Duties and Responsibilities. - All High Rise Buildings shall have, for foundation work, the services of a Registered Geo-technical Engineer on Record.\n(i) To carry out soil investigation at proposed locations as per specifications of Registered Structural Engineer on Record (SER)\n(ii) To recommend various type foundation for proposed structure and loading with supporting calculations\n(iii) To enable SER to take site decision in case strata different investigation report is met with.\n(iv) To list out precautionary measures so that there is no damage to adjacent property.\n(7) Registered Town Planner.\n(b) Duties and Responsibilities. - i. Preparation of plans for land subdivisions/layouts,\n(ii) He shall be responsible for making adequate arrangements to ensure not only that the work is executed as per the approved plan but also is in conformity with the stipulations/conditions of approval. He shall inform the competent authority of any deviation with reference to the approved plan.\n(iii) If the services of the Registered Town Planner are terminated he shall immediately inform the competent authority about his termination. The Registered Town Planner appointed as replacement of the preceding Town Planner shall inform about his appointment on the job and inform the competent authority of any deviation that might have occurred on that site with reference to the approved plan and the stage at which he is taking over the change.\n(iv) The Registered Town Planner shall inform the competent authority immediately any change of owner or developer before getting permission for sub division/ layout under these rules.\n(v) He shall instruct the concerned person/agency that adequate provisions are made for ensuring the safety of workers and others during the layout development.\n(vi) to provide all certificates and reports as required under this rule.\n(8) Registered Landscape Architect.\n(b) Duties and Responsibilities. - (i) Preparation of landscape designs for buildings/layout developments\n(ii) Shall be responsible for the maintenance of the natural eco system\n(iii) shall inform the competent authority if there are any intervention to the natural scape\n(iv) He shall be responsible for making adequate arrangements to ensure not only that the work is executed as per the approved plan but also is in conformity with the stipulations/conditions of approval.\n(v) If the service of the Registered Landscape Architect is terminated he shall immediately inform the competent authority about his termination. The Registered Landscape Architect appointed as replacement of the preceding Landscape Architect shall inform about his appointment on the job and inform the competent authority of any deviation that might have occurred on that site with reference to the approved plan and the stage at which he is taking over the change.\n(vi) The Registered Landscape Architect shall inform the competent authority immediately any change of owner or developer before getting permission for sub division/layout under these rules.\n(9) Registered Developer.\n(ii) The developer have to be an IT Assessee.\n(b) Duties and responsibilities. - The responsibilities of developers shall be:\n(i) To obtain planning permission from Competent Authority and building permission from the Executive Authority of Local body prior to commencement of construction/development\n(ii) To appoint Registered Architect/Registered Engineer/Construction Engineer and Registered Structural Engineer and other required professionals stated in these rules\n(iii) The appointment of the Registered Architect/Registered Engineer/Registered Construction Engineer/Registered Structural Engineer shall mean that he (the Developer) has authorised the Registered Architect/Registered Engineer to do all things necessary and to take all adequate measures for preparing the design, drawings and specifications for the project and to appoint on his behalf appropriate persons to act as CER, required for the proper execution of the project and to retain on behalf of the owner any other specialist or expert required on the work of the project, in consultation with the developer.\n(iv) To obtain and submit to the competent authority, along with application for building permission the required certificates/report/undertakings, each progress report through Registered Architect/Registered Engineer and application for occupancy certificate.\n(v) To obtain at relevant stages certificates from them, for submission to the competent authority, through Registered Architect/Registered Engineer that in designing the building/development and providing detailed drawings and specifications for it they have complied with requirements as laid out in these rules\n(vi) To obtain and adhere to the quality assurance procedure prepared by the CER.\n(vii) To adequately enable the CER to carry out his responsibilities.\n(viii) To certify along with the CER that construction/development has been carried out as per the design, detailed drawings and specifications provided by the Registered Architect on Record/Registered Engineer on Record and Registered Structural Engineer on Record.\n(ix) To regularly submit progress reports and certificates through Registered Architect/Registered Engineer as required by the competent authority.\n(x) To inform in writing the competent authority within 7 days, if for any reason he ceases to be the developer or is relieved of his responsibilities as the developer.\n(xi) To inform in writing to the competent authority within 7 days, if for any reason any of the registered professionals appointed by him have been relieved of their responsibilities or have resigned.\n(xii) He shall not cause or allow any deviations from the approved drawings in the course of the execution of the project against the instruction of Registered Architect on Record/Registered Engineer on Record/Registered Construction Engineer on Record/Registered Structural Engineer on Record and shall bear all responsibilities for any irregularity committed in the use and function of the building or its parts for which the approval has been obtained.\n(xiii) He shall not commence the use of building or shall not give the possession to occupy the building to any one before obtaining the completion certificate or occupancy certificate as applicable from the competent authority.\n(xiv) He shall provide adequate safety measures for structural stability and protection against fire hazards likely from installation of services like electrical installation, plumbing, drainage, sanitation, water supply etc. wherever required under the rules.\n(xv) He shall make available copies of titles for the land, approved plans and all certificates issued by the competent authority under these rules to the prospective purchasers of the premises.\n(xvi) He should inform in the progress report about satisfactory working conditions for the workers as per the various acts in force and binding on the employers of workers,\n(xvii) He shall instruct the concerned person/agency that adequate provisions are made for ensuring the safety of workers and others during excavation, construction and erection and that the employment of workers are made satisfying the statutory Acts\n(xviii) If there are deviation to approved plan/unauthorized additional construction, the same has to be intimated immediately to the competent authority and Registered Architect/Registered Engineer.\n(xix) He shall be responsible to see that the structure serviceable for its intended uses.\n(xx) To provide all certificates and reports as required under this rule.\nAnnexure - XIV\nAnnexure - XIV\n[ See rule 51 (3)]\nForm 1\nForm 1\nStructural Design Basis Report.\nStructural Design Basis Report.\nPart 1\nPart 1\nGeneral Data\nGeneral Data\nS.No.\nS.No.\nDescription\nDescription\nInformation\nInformation\nNotes\nNotes\n1.\nSite Address\n.............................\n2\nName of Owner\n3\nName of Registered Developer along with the\n\t\t\t\tRegistration Number\n4\nName of Registered Architect/Engineer along with\n\t\t\t\tthe Registration Number\n5\nName of Registered Structural engineer along\n\t\t\t\twith the Registration Number\n6\nUse of the building\n7\nNumber of stories above ground level (including\n\t\t\t\tstores to be added later, if any)\n8\nNumber of basements below ground level\n9\nType of structure\nLoad bearing walls\nR.C.C. frame\nR.C.C. frame and\n\t\t\t\tShear Walls\nSteel frame\n10\nSoil data\nType of soil\nDesign safe bearing capacity\nIS:1893 C1.6.3.5.2\nIS: 1904\nIS: 1892\nIS: 2131\nIS: 2720\n11\nDead loads (unit\n\t\t\t\tweight adopted)\n• Earth\n• Water\n• Brick masonry\n• Plain cement concrete\n• Reinforced cement\n\t\t\t\tconcrete\n• Floor finish\n• Other fill materials\nIS: 875 Part 1\n12\nImposed (live) loads\nIS: 875 Part 2\nFloor loads\nRoof loads\n13\nCyclone/Wind\n• Speed\n• Design pressure intensity\nIS: 875 Part 3\n14\nSeismic zone\nIS: 1893 (2002)\n15\nImportance factor\nIS:1893(2002)\nTable 6\n16\nSeismic zone factor (Z)\nIS:1893 Table 2\n17\nResponse reduction factor\nIS:1893 Table 7\n18\nFundamental natural period - approx.\nIS:1893 C1.7.6\n19\nDesign horizontal acceleration spectrum value\n\t\t\t\t(Ah)\nIS: 1893 C1.6.4.2\n20\n* Expansion/Separation Joints\n21\nBuilding is regular/irregular\nIS 1893\n* Enclose detailed drawings drawn to scale for each floor\n• In case terrace garden is provided, indicate additional fill load and live load along with the detailed drawings drawn to scale\nPart 2\nPart 2\nLoad bearing masonry buildings\nLoad bearing masonry buildings\nSl. No.\nSl. No.\nDescription\nDescription\nInformation\nInformation\nNotes\nNotes\n1\nBuilding category\nIS: 4326 C1.7 Read with IS:1893 Zone Bldg. II III IV V Ordinary B C D E Important C D E E\nIS: 4326 C1.7\nRead with IS:1893\nZone\nBldg.\nII III IV V\nOrdinary\nB C D E\nImportant\nC D E E\n2\nBasement Provided\n3\nNumber of floors including Ground Floor (all\n\t\t\t\tfloors including stepped floors in hill slopes)\n4\nType of wall masonry\n5\nType and mix of Mortar\nIS: 4326 C1.8.1.2\n6\nRe: size and position\n\t\t\t\tof openings (See note No.[i])\n• Minimum distance (b5)\n• Ratio (b 1 +b 2 +b 3 )/1 1 or (b 6 +b 7 )/1 2\n• Minimum pier width\n\t\t\t\tbetween consequent opening (b4)\n• Vertical distance\n\t\t\t\t(h3)\n• Ratio of wall height\n\t\t\t\tto thickness 4\nRatio of wall length between cross wall to\n\t\t\t\tthickness\nIS: 4326 Table 4, Fig.7\n7\nHorizontal seismic\n\t\t\t\tband\n• at plinth level\n• at window sill level\n• at lintel level\n• at ceiling level\n• at eave level of\n\t\t\t\tsloping roof\n• at top of gable walls\n• at top of ridge walls\nP IP NA\nP\nIP\nNA\n(see note No.2)\nIS:4326 C1 8.4.6\nIS: 4326 C1 8.3\nIS: 4326 C1 8.4.2\nIS: 4326 C1 8.4.3\nIS: 4326 C1 8.4.3\nIS: 4326 C1 8.4.3\nIS: 4326 C1 8.4.4\n8\nVertical reinforcing\n\t\t\t\tbar at corners and T junction of walls\nat jambs of doors and window openings\nIS: 4326 C1 8.4.8.\nIS: 4326 C1 8.4.9.\n9\nIntegration of prefab roofing/flooring elements\n\t\t\t\tthrough reinforced concrete screed.\nIS:4326 C1 9.1.4\n10\nHorizontal bracings in pitched truss in\n\t\t\t\thorizontal plane at the level of ties in the slopes of pitched\n\t\t\t\troofs\nNotes. (i) Information in Item 6 should be given on separate A4 sheets for all walls with large number of openings\nNotes.\n(ii) IP indicated \"Information Provided\"\nIP indicates \"Information to be provided\"\nNA indicates \"Not Applicable\"\nTick mark one box\nPart 3\nPart 3\nReinforced concrete framed buildings\nReinforced concrete framed buildings\nSl. No.\nSl. No.\nDescription\nDescription\nInformation\nInformation\nNotes\nNotes\n1\nType of building\n• Regular frames\n• Regular frames with\n\t\t\t\tShear Walls\n• Irregular frames\n• Irregular frames with\n\t\t\t\tShear Walls\n• Soft store\nIS: 1893 C1 7.1\n2\nNumber of basements\n3\nNumber of floors including ground floor\n4\nHorizontal floor\n\t\t\t\tsystem\n• Beams and slabs\n• Waffles\n• Ribbed floor\n• Flat slab with drops\n• Flat plate without drops\n5\nSoil data\n• Type of soil\n• Recommended type of\n\t\t\t\tfoundation\n-Independent footings\n-Raft\n-Piles\n• Recommended bearing\n\t\t\t\tcapacity of soil\n• Recommended type,\n\t\t\t\tlength, diameter and load capacity of piles\n• Depth of water table\n• Chemical analysis of\n\t\t\t\tground water\n• Chemical analysis of soil\nIS: 1498\n6\nFoundations\nDepth below ground\n\t\t\t\tlevel Type\nIndependent\nInterconnected\nRaft\nPiles\n7\nSystem of\n\t\t\t\tinterconnecting foundations\nPlinth beams\nFoundation beams\nIS: 1893 C1 7.12.1\n8\nGrades if concrete used in different parts of\n\t\t\t\tbuilding\n9\nMethod of analysis used\n10\nComputer software used\n11\nTorsion included IS: 1893 C1 7.9\n12\nBase shear\na. Based on\n\t\t\t\tapproximate fundamental period\nb. Based on dynamic\n\t\t\t\tanalysis\nc. Ratio of a/b\nIS: 1893 Cl. 7.5.3\n13\nDistribution of seismic forces along the height\n\t\t\t\tof the building.\nIS:1893 Cl.7.7 (Provide sketch)\n14\nThe Column of soft ground store specially\n\t\t\t\tdesigned.\nIS: 1893 Cl.7.10\n15\nClear minimum cover\n\t\t\t\tprovided in\n• Footing\n• Column\n• Beams\n• Slabs\nWalls\nIS: 456 Cl. 26.4\n16\nDuctile detailing of\n\t\t\t\tRC frame\n• Type of reinforcement\n\t\t\t\tused\n• Minimum dimension of\n\t\t\t\tbeams\n• Minimum dimension of\n\t\t\t\tcolumns\n• Minimum percentage of\n\t\t\t\treinforcement of beams at any cross section\n• Maximum percentage of\n\t\t\t\treinforcement at any section of beam\n• Spacing of transverse\n\t\t\t\treinforcement in 2-d length of beams near the ends\n• Ratio of capacity of\n\t\t\t\tbeams in shear to capacity of beams in flexure\n• Maximum percentage of\n\t\t\t\treinforcement in column\n• Confining stirrups\n\t\t\t\tnear ends of columns and in beam-column joints\nDiameter\nSpacing\n• Ratio of shear capacity of columns to maximum\n\t\t\t\tseismic shear in the store.\nIS: 456 Cl. 5.6\nIS: 13920 Cl.6.1\nIS: 13920 Cl.7.1.2\nIS: 456 Cl.26.5.1(a)\nIS: 13920 Cl.6.2.1\nIS: 456\nCl.26.5.1.1(b)\nIS: 13920 Cl.6.2.2\nIS: 13920 Cl.6.3.5\nIS: 456 Cl.26.5.3.1\nIS: 13920 Cl. 7.4\n17\nDoes the features\n\t\t\t\trequire clearance by SDRP\nExample: High rise\n\t\t\t\tbuilding\nPrefab building\nBuilding in hazard prone areas\nFoundation.\n(ii) In case pile foundations have been used, give full particulars of the piles, type, dia, length, capacity\n(iii) In case of high water table, indicate system of countering water pressure, and indicate the existing water table, and that assumed to design foundations.\nIdealization for Earthquake analysis.\n(ii) Indicate the idealization of frames and shear walls adopted in the analysis with the help of sketches.\n(iii) Submit framing plans of each floor\n(iv) In case of basements, indicate the system used to contain earth pressures.\nPart 4\nPart 4\nBuildings in structural steel\nBuildings in structural steel\n1\nAdopted method of design\nSimple Semi-rigid Rigid\nSimple\nSemi-rigid\nRigid\nIS:800 Cl 3.4.4\nIS:800 Cl.3.4.5\nIS:800 Cl.3.5.6\n2\nDesign based on\nElastic analysis Plastic analysis\nElastic analysis\nPlastic analysis\nIS: 800 Section-9\nSP;6 (6)\n3\nFloor construction\nComposite Non composite Boarded\nComposite\nNon composite\nBoarded\n4\nRoof construction of Composite\nComposite Non composite Metal Any other\nComposite\nNon composite\nMetal\nAny other\n5\nHorizontal force resisting system adopted\nFrames Braced frames Frames & shear walls\nNote. - Seismic force As per IS:1893 Would depend\n\t\t\t\ton system\nNote. - Seismic force As per IS:1893 Would depend\n\t\t\t\ton system\nNote.\n6\nSlenderness ratios maintained\nMembers defined in Table 3.1, IS:800\nIS 800; Cl.3.7\n7\nMember deflection limited to\nBeams, Rafters Crane Girders, Purlins Top of\n\t\t\t\tcolumns\nIS:800 Cl.3.13\n8\nStructural members\nEncased in\n\t\t\t\tconcrete Not encased\nEncased in\n\t\t\t\tconcrete Not encased\nIS: 800 Section-10\n9\nProposed material\nGeneral\n\t\t\t\tweld-able High strength Cold formed Tubular\nGeneral\n\t\t\t\tweld-able\nHigh strength\nCold formed\nTubular\nIS: 2062\nIS: 8500\nIS: 801, 811\nIS: 806\n10.\nMinimum metal thickness Specified for corrosion\n\t\t\t\tprotection\nHot rolled\n\t\t\t\tsections Cold formed sections Tubes\nHot rolled\n\t\t\t\tsections\nCold formed sections\nTubes\nIS: 800, Cl.3.8\nCl.3.8.1 to Cl.3.8.4\nCl.3.8.5\n11\nStructural connections\nRivets CT Bolts S H F G Bolts Black Bolts Welding field Shop (Specify welding type proposed) Composite\nRivets\nCT Bolts\nS H F G Bolts\nBlack Bolts\nWelding field\nShop (Specify welding type proposed) Composite\nIS: 800, Section-8\nIS: 1929, 2155, 1149\nIS 6639, 1367\nIS 3757, 4000\nIS: 1363, 1367\nIS: 816, 814,1395, 7280, 3613, 6419, 6560, 813,\n\t\t\t\t9595\n12\nMinimum Fire rating proposed, with method\nRating...............hours Method proposed. -In tumescent painting -Spraying -Quilting -Fire retardant boarding\nRating...............hours\nMethod proposed.\n-In tumescent painting\n-Spraying\n-Quilting\n-Fire retardant boarding\nIS: 1641, 1642, 1643\nPart-5\nPart-6\nForm 2\nForm 2\n[ See rule 9 (1) (f)]\nNotice for Commencement of work\nNotice for Commencement of work\nLocation:\nReceived on:\n.......................................................\n........................................................\nSignature of Owner/Registered Developer with date\nName of Owner/Registered Developer in Block Letters\n___________________\nAddress of Owner\n_______________________________\nTel. No.\n______________________________\nForm 3\nForm 3\n[ See rule 9 (2) (b)]\nProgress Certificate\nProgress Certificate\nPlinth Stage/In case of basement, casting of basement slab stage\nLocation:\nReceived on:\n----------------------------\n----------------------------\n(i) We hereby inform you that the work of execution of the building as per approved plan, working drawing, detailed structural drawings and structural specifications prepared by the Registered Structural Engineer on Record, the detailed Architectural drawings and Architectural specifications prepared by the Registered Architect on Record, has reached the Plinth Level casting of basement slab level and is executed under our supervision.\n(ii) We declare that revised/amended plan is not necessary at this stage.\n(iii) We also undertake to comply with the rule no. 19 regarding the change of owner/ Developer/Professionals\nYours faithfully,\nSignature of the Owner/Registered Developer (with Registration No,)\nDate: ____________________\n(with Registration No.)\nName in block letters__________\nAddress ___________________\n(with Registration No.)\nSignature of Structural Engineer\nAddress: _________________________\nForm 4\nForm 4\n[ See rule 9 (2) (b)]\nProgress Certificate - Last Storey\nProgress Certificate - Last Storey\nLocation:\nReceived on:\nYours faithfully,\nSignature of the Owner/Registered Developer (with Registration No.)\nDate: ________________________\n(with Registration No.)\nName in block letters: __________\nAddress___________________\nSignature of Structural Engineer\nForm 5\nForm 5\n[ See rule 21 (1)]\nCompletion Report\nCompletion Report\nLocation:\nReceived on:\nYours faithfully,\n(Developer's Signature)\n(Owner's Signature)\nForm 6\nForm 6\n[ See rule 20 (1)]\nBuilding Completion Report by Registered Architect or Engineer\nBuilding Completion Report by Registered Architect or Engineer\nLocation:\nReceived on:\nSignature of Registered Registered Architect on Record/Registered Engineer on Record\nDate\nName in block letters:\n(with Registration No.)\nAddress: ___________________\nForm 7\nForm 7\n[See rule 20 (1)]\nBuilding Completion Report by Registered Construction Engineer\nBuilding Completion Report by Registered Construction Engineer\nLocation:\nReceived on :\n- the detailed structural drawings and structural specifications prepared by the Registered Structural Engineer on Record\n- the detailed Architectural drawings and Architectural specifications prepared by the Registered Architect on Record.\n- detailed drawings and specifications of all services\nSignature of Registered Construction Engineer on Record\nDate\nName in block letters:\n(with Registration No.)\nAddress: ___________________\nForm 8\nForm 8\n[ See rule 20 (1)]\nBuilding Completion Report of Registered Structural Engineer\nBuilding Completion Report of Registered Structural Engineer\nLocation :\nReceived on :\nSignature of Registered Structural on Record\nDate\nName in block letters:\n(with Registration No.)\nAddress: ________________\nForm 9\nForm 9\n[ See rules 9 (2) (b) and 51 (5)]\nStructural Inspection Report (to be submitted at plinth level and last store)\nStructural Inspection Report (to be submitted at plinth level and last store)\n(This form has to be completed by Registered Structural Engineer after his site inspection and verification regarding compliance of all his recommendations by the owner, which in the opinion of the registered structural engineer are necessary for safety of the structure)\nClass I or Class II (Briefly describe the property in general and the structure in particular) Indicate whether the structure is regular/irregular as per IS1893 of the structure is in Zone-III.\n(a) Function\n(b) Framed construction\nResidence (with or without shops)\nApartments (with or without shops)\nOffice Bldg.\nShopping Centre\nSchool, College\nHostel\nAuditorium\nFactory or any other building (pl. state)\n1\n2\n3\n4\n5\n6\n7\n8\nA. Load bearing masonry wall construction\nB. Framed structure\nConstruction and structural materials\nCritical load bearing element\nBrick\nRCC\nStone\nTimber\nSteel\nRoof Floor\nRCC\nTimber\nRBC\nSteel\nJack-arch\nYear of subsequent additions or rectifications (Please describe briefly the nature of additions or rectifications).\n(i) Any change subsequent to construction\n(ii) Nearby open excavation\n(iii) Nearby collection of water\n(iv) Proximity of drain\n(v) Underground water-tank\n(vi) RW. Pipes out-lets\n(vii) Settlements\n(i) Crack in beam or column nature and extent of crack probable causes.\n(ii) Cover spell\n(iii) Exposure of reinforcement\n(iv) subsequent damage by user for taking pipes, : conduits, hanging, fans or any other fixtures, etc.\n(v) Crack in slab\n(vi) Spelling of concrete or plaster of slab\n(vii) Corrosion of reinforcement\n(viii) Loads in excess of design loads\n(i) Paintings\n(ii) Corrosion\n(iii) Joint, nuts, bolts, rivets, welds, gusset plates\n(iv) Bending or buckling of members\n(v) Base plate connections with columns or pedestals\n(vi) Loading\n(Please describe some of the major cracks, their nature, extent and location, with a sketch, if necessary.\nSignature of the Registered Structural Engineer on Record\nDate:\nName of the registered structural Engineer:\nRegistration No.\nAddress:\nForm 10\nForm 10\n[ See rule 51 (9)]\nModel Proforma for Technical Audit Report\nModel Proforma for Technical Audit Report",
"footnote": "",
"is_definition": false,
"sort_order": 85
},
{
"number": "1",
"title": "1. Design",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 86
},
{
"number": "1",
"title": "1. Design",
"chapter": null,
"content": "Comments\n1.1\nDesign/Drawings available?\nY/N\nDesign category\nType design?\nSpecific design?\nY/N\nDesign to be collected to\nrefer to Design\nConsultant/H.O.\nDrawings prepared/checked by competent\n\t\t\t\tauthority?\nY/N\nDesign Drawings/details\nStructural detailed include\nEarthquake/cyclone resistant features included?\nY/N\nY/N\nDesign verified/vetted by Dept./Govt. approved\n\t\t\t\tagency/competent authority?\nY/N\nDesign changes approved by dept./govt. approved\n\t\t\t\tagency/competent authority?\nY/N\n2\nFoundation\n2.1\nFoundation used\nExisting/New\n2.2.1\n2.2.1\n2.2.2\n2.2.3\n2.2.4\n2.2.5\n2.2.6\n2.2.7\n2.2.7.1\n2.2.7.2\n2.3\n2.3.1\n2.3.2\n2.3.3\n2.3.4\n2.3.5\n2.3.6\n2.3.7\n2.3.7.1\n2.3.7.2\n2.4\nIf existing\n\t\t\t\tfoundation used\nDepth of foundation\n\t\t\t\tbelow ground\nType of masonry\nThickness of\n\t\t\t\tmasonry (above ground)\nMortar used\nMix of cement\n\t\t\t\tmortar\nHeight up to Plinth\nIf stone masonry\nThrough Stones\nCorner Stones\nIf new foundation\n\t\t\t\tused\nDepth of foundation\n\t\t\t\tbelow ground\nType of masonry\n\t\t\t\tblocks\nThickness of\n\t\t\t\tMasonry above plinth\nMortar used\nMix of cement\n\t\t\t\tmortar (1:4)\nHeight up to Plinth\nIf stone masonry\nThrough Stones\nCorner Stones\nVertical reinforcement in foundation\n: <50cm/50-70/>70cm\n: Stone/Bricks/PCC\n\t\t\t\tBlocks\n: 23cm/35/>35\n:\n\t\t\t\tCement-Sand/Lime/Mud\n: 1:4/1:6/Leaner\n:\n\t\t\t\t______________________ cm\n: Yes/No, if Yes\nAdequate/Inadequate\n: Yes/No, if Yes\nAdequate/Inadequate\n: _____\n\t\t\t\t<50/50-70/>70cm\n: stone/bricks/PCC\n: 23cm/35/>35cm\n: Cement -\n\t\t\t\tsand/lime/mud\n: Yes/No\n: <60/>60cm\n: Yes/No, if Yes\nAdequate/Inadequate\n: Yes/No, if Yes\nAdequate/Inadequate\n: Yes/No\n3\n3\n3.1\n3.2\n3.3\n3.4\n3.5\n3.6\n3.7\n3.8\n3.9\nWalling\nWalling\nType of masonry\nMortar used\nMix of cement\n\t\t\t\tmortar\nThickness of wall\nMixing of mortar\nJoint Property\n\t\t\t\tfilled\nWetting of bricks\nIf stone masonry\n3.8.1 Through Stones\n3.8.2 Corner Stones\nOverall workmanship\n: Stone/Brick/PCC\n\t\t\t\tBlocks\n: Cement -\n\t\t\t\tSand/Lime/Mud\n: 1:4/1:6/Leaner\n: <23cm/23cm/23cm\n: OK/Not OK\n: OK/NOT OK\n: Good/Medium/Poor\n: Yes/No\n: Yes/No\n: Good/Medium/Poor\n4\n4\n4.1\n4.2\n4.3\n4.4\n4.5\n5\n5\n5.1\n5.1.1\nRoofing\nRoofing\nType of roof\nIf sloped\nPurlins\nTruss type\nAnchorage with wall\nMaterials\nMaterials\nCement\nSource\n: Flat/Sloping\n: Morbid tiles/A.C.\n\t\t\t\tsheet/G.I. sheet\n:\n\t\t\t\tAngle-Iron/Timber/NA\n____________\n:\n\t\t\t\tAdequate/Inadequate/NA\nAuthorised Dealer/Market\n5.1.2\n5.1.3\n5.2\n5.2.1\n5.2.2\n5.3\n5.3.1\n5.3.2\nType of cement\nIf OPC\nSand\nType of sand\nPresence of\n\t\t\t\tdeleterious materials\nCoarse Aggregates\nType coarse\n\t\t\t\tAggregates\nPresence of deleterious material\n: OPC/PPC/PSC\n: Grade (33/43/53)\n: River sand/Stone\n\t\t\t\tdust\n:\n\t\t\t\tMild/Moderate/High\n: Gravel/Crushed\n\t\t\t\tStone\n: Mild/Moderate/High\nP.C.C. Blocks (Applicable for on-site production)\n5.4.1\n5.4.2\n5.4.3\n5.4.4\n5.5\n5.5.1\n5.5.2\nType of P.C.C.\n\t\t\t\tBlocks\nRatio of concrete\n\t\t\t\tin blocks\nInterlocking\n\t\t\t\tfeature\nCourse aggregates\n\t\t\t\tused\nBricks Blocks,\n\t\t\t\tStone etc.\nStrength (field\n\t\t\t\tassessment)\nDimensional accuracy\n: Solid blocks/Hollow blocks\n:\n\t\t\t\t______________________\n: Yes/No\n: Natural/Crushed\n\t\t\t\tstone\nLow/Medium/High\n: Yes/No\n5.6.3\n5.6.4\n5.6.5\n5.6.6\n5.7\n5.7.1\n5.7.2\n5.7.3\n5.7.4\n5.7.5\n5.7.6\n5.7.7\n5.7.8\n5.8\n5.8.1\n5.8.2\n5.8.3\n5.9\n5.9.1\nCompaction\nWorkability\nAvailability of\n\t\t\t\twater\nCuring\nReinforcing Steel\nType of Steel\nSource\nWhether IS marked\nConditions of bars\nFixing of\n\t\t\t\treinforcement as per drawing\nSuitable cover\nSpacing of bars\nOverlaps as per\n\t\t\t\tspecifications\nForm Work\nType of Form Work\nUse of mould oil\nLeakage of cement\n\t\t\t\tslurry\nSource\nCement\n:\n\t\t\t\tVibrators/Thappies and rods\n: Low/Medium/High\n:\n\t\t\t\tSufficient/Insufficient\n:\n\t\t\t\tSatisfactory/Unsatisfactory.\n: Plain mild\n\t\t\t\tsteel/HYSD bars\n: Authorised\n\t\t\t\tDealer/Market\n: Yes/No\n: Clean/Corroded\n: Yes/No\n: Yes/No\n: Regular/Irregular\n: Yes/No\n: Timber/Ply board\n\t\t\t\tSteel\n: Yes/No\n: Observed/Not observed\n5.9.2\nSand\n5.9.3\nCoarse Agg.\n5.9.4\nBricks\n5.9.5\nPCC Blocks\n6\n6\nSeismic Resistance Features\nSeismic Resistance Features\n6.1\nMasonry Structures\n6.1.1\nProvision of bands\n\t\t\t\tat\n6.1.1.1 Plinth\n\t\t\t\tlevel\n6.1.1.2 Sill level\n6.1.1.3 Lintel\n\t\t\t\tlevel\n6.1.1.4 Roof level (if applicable)\nProvided Adequate\nYes/No Yes/No\nYes/No Yes/No\nYes/No Yes/No\nYes/No Yes/No\n6.1.2\nIf sloped roof, whether seismic bands are\n\t\t\t\tprovide at\n6.1.2.1 Gable wall top\nYes/No\n6.1.2.2 Eaves level\nYes/No\n6.1.3\nProvision of\n\t\t\t\tvertical steel in masonry at\nProvided Adequate\nEach corner\nEach T-junction\nEach door joint\nAround each window\nYes/No\nYes/No\nYes/No\nYes/No\n6.1.4\nOpenings\n6.1.4.1 Total width\n\t\t\t\tof openings : <50%/50*-60%/>60% (*-42% for double store)\n6.1.4.2 Clearance\n\t\t\t\tfrom corner\n6.1.4.3 Pier width between two openings\nOK/Not OK\nOK/Not OK\n6.2\nFramed structures\n6.2.1 Ductile\n\t\t\t\tdetailing\n6.2.1.1 Spacing of\n\t\t\t\tstirrup\n6.2.1.2 Sizes of\n\t\t\t\tmembers\n6.2.1.3 End\n\t\t\t\tanchorage\n6.2.1.4 Lapping\n\t\t\t\t(length, location, etc.)\n6.2.1.5 Angle of stirrup hook\nOK/Not OK\nOK/Not OK\nOK/Not OK\nOK/Not OK\n90/135 degrees\n6.3\nAny testing carried\n\t\t\t\tout by owner/Engineering Supervisor on\nTesting done Testing results\n6.3.1 Water\n6.3.2 Cement\n6.3.3 Bricks/PCC\n\t\t\t\tblocks/Stones\n6.3.4 Aggregate\n6.3.5 Mortar\n6.3.6 Concrete\n6.3.7 Reinforcement\nYes/No \n\t\t\t\t OK/Not OK\nYes/No \n\t\t\t\t OK/Not OK\nYes/No \n\t\t\t\t OK/Not OK\nYes/No \n\t\t\t\t OK/Not OK\nYes/No \n\t\t\t\t OK/Not OK\nYes/No \n\t\t\t\t OK/Not OK\nYes/No OK/Not OK\nSignature of the Registered quality Auditor\nName and Address (with Registration No.)\nAnnexure - XV\nAnnexure - XV\n[ See rule 37]\nSpecial regulations for schools\nSpecial regulations for schools",
"footnote": "",
"is_definition": false,
"sort_order": 87
},
{
"number": "1",
"title": "1. Site.",
"chapter": null,
"content": "(a) shall not have opening direct to the National/State Highways with heavy vehicular traffic.\n(b) shall not be close to water bodies and forests.\n(c) shall not be in the close proximity of garbage dumps, dusty and noisy roads or factories.",
"footnote": "",
"is_definition": false,
"sort_order": 88
},
{
"number": "2",
"title": "2. No. of floors.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 89
},
{
"number": "3",
"title": "3. Stair case and exits",
"chapter": null,
"content": "(a) Minimum width 1.6m\n(b) One stair case for every 6 class rooms\n(c) Mid landing not less than 1.6m in width\n(d) Continuous stairs from ground level to the terrace level.\n(e) Travel distance to the stair case from any part of upper floors shall not be more than 22.6m.\n(f) Exit door if any from the stair case at the ground level shall open directly to the open space and it shall not be less than 2m in width and 2.1m in height.",
"footnote": "",
"is_definition": false,
"sort_order": 90
},
{
"number": "4",
"title": "4. Class rooms",
"chapter": null,
"content": "(a) Minimum size shall be 6m x 6m for student strength of not exceeding 40 Nos.\n(b) Thickness of wall shall not be less than 23 cms.\n(c) Head room height of the class rooms shall be minimum 3meters.\n(d) Each class room shall have at least 2 doors and 2 windows\n(e) Doors and windows should be made of materials with high fire resistance rating.",
"footnote": "",
"is_definition": false,
"sort_order": 91
},
{
"number": "5",
"title": "5. Fire safety",
"chapter": null,
"content": "(a) Adequate no. of fire extinguishers shall be provided\n(b) Provision of separate water tank/sump to meet the requirement of fire fighting during emergency shall be provided.\n(c) Buildings shall be constructed using non-combustible materials.",
"footnote": "",
"is_definition": false,
"sort_order": 92
},
{
"number": "6",
"title": "6. Electrical",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 93
},
{
"number": "7",
"title": "7. Others.",
"chapter": null,
"content": "(b) Where covered verandah/corridor is provided, it shall be minimum 1.8m. in width in front of class rooms.\n(c) The parapet wall in the open terrace shall be minimum 23cm in thickness and 100cm in height.\n(d) Toilets enough in number and with adequate water supply shall be provided.\nAnnexure - XVI\nAnnexure - XVI\n[ See rule 6]\nConservation of heritage sites including heritage buildings, heritage precincts and natural feature areas\nConservation of heritage sites including heritage buildings, heritage precincts and natural feature areas",
"footnote": "",
"is_definition": false,
"sort_order": 94
},
{
"number": "2",
"title": "2. Restriction on Development/Redevelopment/Repairs, etc.",
"chapter": null,
"content": "(ii) In relation to religious buildings in the said list, the changes, repairs, additions, alterations and renovations required on religious grounds mentioned in sacred texts, or as a part of holy practices laid down in religious codes shall be treated as permissible, subject to their being in accordance and consonance with the original structure and architecture, designs, aesthetics and other special feature thereof.\nGrade-I\nGrade-II\nGrade-III\nA. Definition\nHeritage Grade-I comprise of buildings, and\n\t\t\t\tprecincts of national or historical importance, embodying\n\t\t\t\texcellence in architectural style, design, technology and\n\t\t\t\tmaterial usage. They may be associated with a great historical\n\t\t\t\tevent, personality, movement or institution. They have been and\n\t\t\t\tare, the prime landmarks of the City.\nHeritage Grade-II (A and B) comprises of\n\t\t\t\tbuildings, or regional or local importance, possessing special\n\t\t\t\tarchitectural or aesthetical merit, cultural or historical value,\n\t\t\t\tthough of a lower scale than in Heritage Grade. They are local\n\t\t\t\tlandmarks, contributing to the image and identity of the City.\n\t\t\t\tThey may not be the work of master, craftsman or may be models or\n\t\t\t\tproportion and ornamentation, or designed to suit particular\n\t\t\t\tclimate.\nHeritage Grade-III comprises importance for town\n\t\t\t\tspace; they evoke architectural aesthetic or sociological\n\t\t\t\tinterest though not as much as in Heritage Grade-II. These\n\t\t\t\tcontribute to determine the character of the locality, and can be\n\t\t\t\trepresentative of lifestyle of a particular community or region\n\t\t\t\tand may, also be distinguished by setting on a street line, or\n\t\t\t\tspecial character of the facade and uniformity of height width\n\t\t\t\tand scale.\nB. Objective -\nHeritage Grade-I richly deserves careful\n\t\t\t\tpreservation.\nHeritage Grade-II deserves intelligent\n\t\t\t\tConservation.\nHeritage Grade-III deserves protection of unique\n\t\t\t\tfeatures and attributes.\nC. Scope for changes.\nNo interventions would be permitted either on\n\t\t\t\tthe exterior or interior unless it is necessary in the interest\n\t\t\t\tof strengthening, and prolonging, the life of the buildings or\n\t\t\t\tprecincts or any part or features thereof. For this purpose,\n\t\t\t\tabsolutely essential and minimal changes would be allowed and\n\t\t\t\tthey must be in accordance with the original.\nGrade-II (A)\nInternal changes and\n\t\t\t\tadaptive reuse will be generally allowed, but external changes\n\t\t\t\twill be subject to scrutiny. Care would be taken to ensure the\n\t\t\t\tconservation of all special aspects for which it is included in\n\t\t\t\tHeritage Grade-II.\nGrade-II (B)\nIn addition to above extension or additional\n\t\t\t\tbuildings in the same plot or compound could in certain\n\t\t\t\tcircumstances, be allowed provided that the extension/additional\n\t\t\t\tbuildings is in harmony with (and does not detract from) existing\n\t\t\t\theritage building(s) or precincts especially in terms of height\n\t\t\t\tand facade.\nExternal and internal\n\t\t\t\tchanges, and adaptive reuse would generally be allowed. Changes\n\t\t\t\tcan include extensions, additional buildings in the same plot or\n\t\t\t\tcompound provided that extension/additional buildings is in\n\t\t\t\tharmony with and does not attract from the existing heritage\n\t\t\t\tbuildings/ Precinct especially in terms of height and/or facade.\n\t\t\t\tReconstruction may be allowed when the building is structurally\n\t\t\t\tweak or unsafe or when it has been affected by accidental fire or\n\t\t\t\tany other calamity or if reconstruction is required to consume\n\t\t\t\tthe permissible FSI and no option other than reconstruction is\n\t\t\t\tavailable.\nHowever unless absolutely essential, nothing\n\t\t\t\tshould spoil or destroy any special features or attributes for\n\t\t\t\twhich it is placed in the Heritage List.\nD. Procedure\nDevelopment permission for the changes would be\n\t\t\t\tgiven by the Planning Authority on the advice of the Heritage\n\t\t\t\tConservation Committee to be appointed by State Government.\nDevelopment permission for the changes would be\n\t\t\t\tgiven by the Planning Authority on the advice of the Heritage\n\t\t\t\tConservation Committee to be appointed by State Government.\nDevelopment permission would be given for\n\t\t\t\tchanges by the Planning Authority on the advice of the Heritage\n\t\t\t\tConservation Committee to be appointed by State Government.\nE. Vistas/Surrounding Development.\nAll development in areas surrounding Heritage\n\t\t\t\tGrade-I shall be regulated and controlled, ensuring that it does\n\t\t\t\tnot mar the grandeur of or views from, Heritage Grade-I.\n1.\nDistrict Collector\nChairman\n2.\nRepresentative from PWD at District level\nMember\n3.\nRepresentative from State Archeology\nMember\n4.\nRepresentative from Central Archeology\nMember\n5.\nTown Planning Officer from the concerned local\n\t\t\t\tbody\nMember\n6.\nHistorian\nMember\n7.\nConservation Architect\nMember\n8.\nRepresentative from DTCP\nMember Secretary\n(a)The Committee shall have the powers to co-opt up to three additional members who may have related experience.\n(b) The tenure of the Chairman and Members of other than Government Department/ Local Bodies shall be three years.\n(C) The Committee already constituted for Chennai Metropolitan Area shall continue.\nAnnexure - XVII\nAnnexure - XVII\n[ See rule 19]\nDevelopment Prohibited or Restricted areas:\nDevelopment Prohibited or Restricted areas:\nArea around Indian Air Force or Naval Air station.\nArea around Airport or Aerodrome.\n(b) The area around Hill stations which are those areas where the Tamil Nadu District Municipalities (Hill Stations) Building Rules, 1993 apply, land surrounding the nuclear station notified by the Ministry of Atomic Energy, Government of India as \"Sterlised Zone\", areas in the vicinity of reserved forests/wild life/bird sanctuaries would be permitted for development after taking into account the provisions in the relevant Act and Rules.\nProximity to quarries and crushers.\n(b) No subdivision or layout for building purposes shall be made and no residential or commercial or institutional building shall be constructed within the radius of 500m from an existing crusher.\n(c) No crusher is permissible within a distance of 500m. from an existing residential area.\nConstruction of buildings in other restricted or prohibited areas.\nOthers\nSI. No.\nSI. No.\nDescription\nDescription\nMinimum Requirement\nMinimum Requirement\n1.\n*Low tension power\n\t\t\t\tlines.-\n(a) From the portion of building accessible to Persons\n(b) From the portion of building inaccessible to persons\nMin. Horizontal\n\t\t\t\tclearance - 1.50 m\nMin. Vertical\n\t\t\t\tclearance - 4.50 m\nMin. Horizontal\n\t\t\t\tclearance - 1.25 m\nMin. Vertical clearance - 2.50 m\n2.\n*High tension power\n\t\t\t\tlines.-\n(a) From the portion of building accessible to persons\n(b) From the portion of building inaccessible to persons\nMin. Horizontal\n\t\t\t\tclearance - 1.75 m\nMin. Vertical\n\t\t\t\tclearance - 4.50 m\nMin. Horizontal\n\t\t\t\tclearance - 1.25 m\nMin. Vertical clearance - 2.50 m\n3.\nCremation and burial Grounds\n30m from the cremation or burial grounds\n\t\t\t\twherever piped water supply system not available.\n4\nElectric/Gasified crematorium\nFor constructions around the crematoria site, no\n\t\t\t\tclearance is required; however the crematorium structure shall be\n\t\t\t\tconstructed with a setback of minimum 10m all around within its\n\t\t\t\tsite.\n5\nRailway tracks\n30m from the railway boundary; however with\n\t\t\t\tclearance obtained by the applicant from the Railway authority\n\t\t\t\tconcerned, constructions can be permitted.\n* In sites which about or affected by the alignments of the LT/HT electric over head power lines or such underground cables, constructions can be permitted only with the no objection certificate obtained by the applicant from the TANGEDCO for such constructions.\nConstruction of religious buildings.\nConstructions around the ASI notified monuments.\n(ii) For sites located within the distance of above 100 m to 300m in all directions from the protected monuments as notified under the Archaeological Monuments and Ancient Sites and Remains Act 2010, the construction is allowed only after obtaining prior permission from the competent authority under the above said act.\nDefence Establishments.\nOil/Gas Pipelines.\nSolid Waste Dumping Yards.\nAquifer recharge area.\nCatchment area (only for CMA).\nPallikaranai Swamp area (only for CMA).\nAppendix -A\nAppendix -A\nRegulation for developments in the Aquifer Recharge Area\nRegulation for developments in the Aquifer Recharge Area\n(i) Kottivakkam\n(ii) Palavakkam\n(iii) Neelankarai\n(iv) Okkiamthuraipakkam\n(v) Injambakkam\n(vi) Karapakkam\n(vii) Sholinganallur\n(viii) Uthandi\nPermissible Developments.\n(ii) Professional consulting offices and incidental uses thereto occupying a floor area not exceeding 40 sq.m. and G+1 floors in height\n(iii) Schools of Commerce including Tutorial Institutions not exceeding 100 sq.m. in floor area and G+1 floors in height\n(iv) Petty shops dealing with daily essentials like retail sale of provisions, soft drinks, etc., tea stalls, bakery, confectionary, retail shops, mutton stalls, milk kiosk, cycle repair shops, tailoring shops etc. occupying a floor area not exceeding 40 sq.m. and G+1 floors in height\n(v) Nursery schools, Primary Schools, High Schools, Higher Secondary Schools, Libraries and reading rooms.\n(vi) Parks, play grounds, farms, gardens, nurseries, including incidental buildings thereon\n(vii) Cottage industries listed in Annexure - V (with number of workers not exceeding 8 and electric machineries not exceeding 5 H.P.) with G+1 floors in height\n(viii) Storage of domestic cooking gas cylinders not exceeding 300 M 2 in floor area subject to the conditions prescribed in G.O.Ms No.329 dated 24.2.1977 viz. necessary the Applicant should obtain clearance from the Director of Fire & Rescue Services and from the Dept. of Explosives of the Govt. of India.\n(ix) Hostels and dormitories not exceeding 500 sq.m. in floor area and G+1 floors in height\n(x) Working women's hostel/old age homes with G+1 floors in height\n(xi) Assembly halls, welfare institutions not exceeding 300sq.m. in floor area and 8.30m in height (upto crown level in case of leaned roofs).\n(xii) Govt./Semi Govt. Offices, Banks, Pay Offices, Post Office, Offices of Electricity Board, Tamil Nadu Cooperative Milk Producers Federation Limited, etc. occupying a floor area not exceeding 300 sq.m. and G+1 floors in height\n(xiii) Daily or weekly markets serving local needs not exceeding G+1 floors.\n(xiv) Transport depots, bus terminals and railway stations.\n(xv) Service industries serving the local needs such as flour mills, repair shops, service workshops with installations not exceeding 15 HP, 300sq.m. in floor area and G+1 floor in height.\n(xvi) Public Utility Buildings like sewage-pumping stations, water works, Fire stations, Telephone exchanges not exceeding 18.30m in height.\n(xvii) Restaurants not exceeding 300 sq.m. in floor area with G+1 floors in height provided the width of the abutting road is minimum 10 meters\n(xviii) Clinics, Nursing Homes, Dispensaries and other Health facilities not exceeding 300sq.m. in floor area with G+1 floors in height provided the width of the abutting road is minimum 10 meters\n(xix) Departmental stores with a floor area not exceeding 100 Sq.m and with G+1 floors in height provided the width of the abutting road is minimum 10 meters\n(xx) Fuel filling stations and service stations with installations not exceeding 5 HP and with G+1 floors in height provided the width of the abutting road is minimum 10 meters\n(xxi) Swimming Pools attached to residential activity in a plot.\n(xxii) Air-conditioned Cinema Theaters and open-air theaters not exceeding 18.30m in height abutting min. 12 m wide road.\n(xxiii) Burning burial grounds, crematoria and cemeteries.\n(xxiv) Religious buildings not exceeding 300 sq.m. in floor area\n(xxv) On plots/sites not less than 1 Hect. in extent:\n(a) Beach cottages, hotels and tourism-based developments as may be decided by the Authority not exceeding 18.30m in height.\n(b) Recreational activities not exceeding 18.30m. in height\n(c) Educational, technical and research institutions not exceeding 18.30m in height\n(b) In other areas, all the activities listed in (3)A and (3)B are permissible.\n(c) Permissible non-residential activity shall be limited to one in a subdivision/ plot in cases where it is a residential plot in an approved layout.\n(i) Non High Rise Buildings up to 9m height Residential/Commercial Buildings and Other Small developments :\n(i) Non High Rise Buildings up to 9m height Residential/Commercial Buildings and Other Small developments\n• Non High Rise building up to 9m height residential/predominantly residential, clinics, Dispensaries, Nursing homes stated above\n• Working women hostels stated above\n• Service apartments stated above\n• Cottage industries (with number of workers not exceeding 8 and electric machineries not exceeding 5 H.P.) stated above\n• Nursery schools, primary schools not exceeding 300 sq.m.\n• Reading rooms, libraries, post office, EB office, telegraphic office, Local body maintenance offices not exceeding 300 sq.m.\n• Govt., semi Govt. office stated above\n• Religious building stated above\nNatham/declared EWS areas/EWS plots\nOther Areas\nMinimum plot extent\n80 sq.m.\n220 sq.m.\nMinimum frontage\n4.5m\n12 m\nMaximum FSI\n1.00\n0.80\nMaximum Plot coverage\n50%\n40%\nMaximum height\n9.0m\n(G+1 or stilt +2 floors)\n9.0m\n(G+1 or stilt +2 floors)\nMinimum set back: In accordance with the Rule 8\n\t\t\t\twhere street alignment and building lines have not been\n\t\t\t\tspecified, it shall be as given below.\nMinimum Front Set Back\n1.5m\nAbutting road Width\nAbutting road Width\nMin. FSB\nMin. FSB\nUpto 9m\n1.5 m\nAbove 9m but less than 18m\n3.0 m\nAbove 18m but less than 30.5m\n4.5 m\nAbove 30.5m\n6.0m\nSSB\nNil\n2m on either side\nRSB\nNil\n2m\nNote. - (a) Other parameters such as Parking, width of corridor etc shall be regulated as provided elsewhere in these rules.\nNote.\n(b) For New Sub-divisions and layouts, plot extent and frontage shall be minimum as prescribed above.\n(c) In cases of earlier approved layout plots or approved sites, it shall be as per the approved layout plan or approved site plan and no further sub division shall be allowed or recognised after the date of coming into force of these rule unless it satisfies the regulations applicable for development in Restricted Development Zone. Further even in such approved layout plots or approved sites construction for which permissions sought shall comply with these rules applicable for developments in RDZ.\n(d) In the rear set back of residential premises structures like lavatory, lumber room, garage, etc. not intended for human habitation and servant quarters may be permitted provided that such structures do not occupy more than one-third of the rear width of the site and 6 m from the rear boundary; provided further that the height of such structures do not exceed 4 m measured from the ground level of the site.\n(ii) Other large institutional developments such as Religious Buildings, Higher Educational, Technical and Research Institutions shall be regulated with reference to the planning parameters given in rule 37 subject to a maximum FSI of 0.80 and maximum plot coverage of 40%. Assembly halls and other assembly buildings/places of public assembly shall have minimum set back of 6m all around.\n(iii) Service industries stated in (3) (xiv) above shall be regulated with reference to the planning parameters given in rule 36 subject to maximum FSI of 0.80 and maximum plot coverage of 40 %.\n(iv) Beach cottages, hotels, tourism based developments and recreational activities stated in sub rule (3) (xxv) (a) and (b) and also daily or weekly markets and other commercial activities stated above shall be regulated with reference to planning parameters given in rule 35, subject to a maximum FSI of 0.80 and maximum plot coverage of 40%.\nRain water harvesting.\n(b) Any direction/instruction given by the approving authority in the matter of preservation of the aquifer recharge shall be carried out by the applicant, land owners, buyers, developers. If any direction/instruction is not carried out, action may be taken by the approving authorities to carry out the work and the expenditure incurred for that work shall be collected from those who failed to carry out the direction/instruction as if it is an arrear of land revenue by the authority concerned or by the Taluk Tahsildar.\n(c) Any failure to carry out the direction/instruction or fulfil the condition shall be the sufficient ground for ordering for discontinuance of the activity in the premises.\nAppendix B\nAppendix B\nRegulations for Redhills catchment area\nRegulations for Redhills catchment area\n(1) Attanthangal\n(2) Pammadukulam\n(3) Pothur\n(4) Vellanur\n(5) Morai\n(6) Pulikutti\n(7) Tenambakkam\n(8) Arakkambakkam\n(9) Pandeswaram\n(10) Melpakkam\n(11) Kadavur\n(12) Karlambakkam\n(13) Kilkondaiyur\n(14) Alathur\n(15) Vellacheri\n(16) Pakkam\n(17) Palavedu\n(18) Mittanamallee\n(19) Muktha pudupattu\n(20) Kovil padagai\n(21) Vijayanallur\n(22) Palaya Erumaivetti palayam\n(23) Alamadi\n(24) Thirumullaivoyal (Part) - (All S.Nos. north of M.T.H. Road)\n(25) Nallur (Part) - (All S.Nos. west of G.N.T. Road)\n(26) Oragadam (Part) - (All S.Nos. north of Ambattur Redhills Road)\n(27) Padianallur (Part) - (All S.Nos. west of G.N.T. Road)\nAnnexure - XVIII\nAnnexure - XVIII\n[ See rule 33] Zoning Regulations Residential use zone. - (1) In this zone buildings or premises shall be permitted only for the following purposes and accessory uses. Permissible non-residential activity shall be limited to one in a sub-division.\nZoning Regulations\nZoning Regulations\nResidential use zone.\n(i) Any residence including dwelling, detached, semi-detached, tenements or flats and service apartments.\n(ii) Nursery schools, Primary Schools, High Schools, Higher Secondary Schools, Libraries and reading rooms.\n(iii) Parks, play grounds, farms, gardens, nurseries, including incidental buildings thereon.\n(iv) Cottage Industries listed in G.O.Ps.Nos.565 and 566 dated 12.3.1962 as amended and indicated in Annexure - V, with number of workers not exceeding 8 and electric machineries not exceeding 5 H.P.\n(v) Installation of Motor for pumping water, Air conditioning, Lifts, Solar Heaters, Dish Antennas, etc.\n(vi) Storage of domestic cooking gas cylinders subject to the conditions prescribed in G.O.Ms No.329 dated 24.2.1977 viz. the applicant should obtain necessary clearance from the Director of Fire and Rescue Services and from the Dept. of Explosives of the Govt. of India.\n(vii) Working women hostels, old age homes\n(viii) Professional consulting offices, Schools of Commerce including Tutorial Institutions, Govt./Semi Govt. Offices, Banks, Pay Offices, Post Office, Offices of Electricity Board, Chennai City Corporation, Tamil Nadu Cooperative Milk Producers Federation Limited, etc. occupying a floor area not exceeding 300 sq.m.\n(ix) Public Utility Buildings like sewage pumping stations, water works, Fire stations, Telephone exchanges.\n(x) Swimming Pool attached to residential activity in a plot.\n(xi) Daily or weekly markets serving local needs.\n(xii) Transport depots, Bus Terminus and Railway Stations.\n(xiii) Burning, Burial grounds, crematoria and cemeteries.\n(xiv) Air-conditioned Cinema Theaters abutting min. 12 m wide road.\n(xv) Banks and Safe Deposit Vaults, Business Office and other Commercial or Financial Institutions occupying floor area not exceeding 500sq.m. provided the width of the abutting road is minimum 10m.\n(xvi) Hotels, Restaurants occupying a floor area not exceeding 500sq.m.\n(xvii)Hostels, Dormitories, Boarding and Lodging houses and Welfare Institutions occupying a floor area not exceeding 500sq.m.\n(xviii) Clinics, Hospitals, Dispensaries, Nursing Homes and other Health facilities occupying a floor area not exceeding 500sq.m. provided the width of the abutting road is minimum 10m.\n(xix) Establishments and shops retailing in vegetables, fruits, flowers, fish, meat and such other daily necessities of the residents, including provisions, soft drinks, newspapers, tea stalls, milk kiosks, cycle repair shops, internet/ computer centres, ATMs etc. departmental stores occupying floor area not exceeding 500sq.m. or organized markets.\n(xx) Bakeries, Confectionaries, Laundries, tailoring, Goldsmith shops, hairdressing saloons occupying floor area not exceeding 500 sq.m.\n(xxi) Fuel filling stations, and automobile service stations with installation not exceeding 30 HP.\n(xxii) Industries listed by the Tamil Nadu Pollution Control Board as 'Green' Industries listed in Annexure - VI and subject to maximum installation of 30 HP.\n(xxiii) Taxi stands and car parking including multilevel parking\n(xxiv) Automobile workshop with floor area not exceeding 300 sq.m and electrical installations not exceeding 15 H.P.\n(xxv) Religious buildings and welfare institutions occupying a floor area not exceeding 500sq.m.\nCommercial use zone.\n(i) All activities that is permissible in Residential Zone without restriction of floor area (except industries)\n(ii) All commercial and business uses including all shops, stores, markets, shopping centers and uses connected with the display and retail sale of merchandise but excluding explosives, obnoxious products and other materials likely to cause health hazards and danger to lives.\n(iii) Fuel filling stations, automobile service stations and workshops with installation not exceeding 50 HP.\n(iv) Industries listed out by the Tamil Nadu Pollution Control Board as \"Green\" Industries listed in Annexure - VI and as \"Orange Industries\" listed in Annexure - VII subject to a maximum installation of 50 HP.\n(v) Research, Experimental and Testing laboratories not involving danger of fire, explosives or health hazards.\n(vi) Warehouses and other uses connected with storage of wholesale trade in commodities not notified under the Specified Commodity Act, but excluding storage of explosives or products which are either obnoxious or likely to cause health hazards.\n(vii) Buildings for development of software and its associated computer technology applications, IT Parks.\n(viii) Broadcasting, telecasting and telecommunication stations.\n(ix) Helipads subject to clearance by Civil Aviation department, Directorate of Fire and Rescue Services and police department.\n(x) Manufacture of computer hardware\n(xi) Preview theaters and dubbing theaters.\n(xii) Colleges, higher educational, technical and research institutions.\n(xiii) Foreign Missions, Embassies and Consulates.\n(xiv) Air-conditioned Cinema Theaters along roads of width min. 12 m and Assembly Halls and Kalyana Mandapams along roads of width min. 15 m and Multiplex/Malls along roads of width min. 18m.\nIndustrial use zone.\n(i) In approved layouts residential, commercial, institutional and other activities as designated therein.\n(ii) Using electrical H.P or with employees not exceeding 100 in number but excluding industries of obnoxious and hazardous nature by reasons of odour, effluent, dust, smoke, gas, vibration or other wise likely to cause danger or nuisance to public health or amenity.\n(iii) Residential buildings for security and other essential staff required to be maintained in the premises.\n(iv) All use permissible in Residential and commercial use zones\n(v) Storage of petroleum timber and explosives and inflammable and dangerous materials\n(vi) All industries (without restrictions of H.P or floor area or number of workers) except those industries listed under as Red category in Annexure of these regulations.\n(vii) Container terminals (at sites abutting or gaining access from minimum 18 meter wide public road)\nSpecial and Hazardous Industrial use zone.\n(i) All Industrial activities permissible in Industrial zone\n(ii) All special and hazardous industries (classified as 'Red' by the Tamil Nadu Pollution Control Board) without restriction of Horse Power that are likely to be dangerous to human life or health or amenity, but sufficient precaution to the satisfaction of the TNPC Board have been taken to eliminate noxious or dangerous effluents and to alleviate danger to human life or health or amenity (Annexure - VIII).\n(iii) Uses involving storage, handling and other uses, incidental to such industries.\n(iv) Residential, commercial, Institutional and recreational uses incidental to the uses listed above.\nInstitutional use zone.\n(i) Educational institutions including colleges and institutions of higher education, research, technical and training in nature.\n(ii) Govt. and quasi Govt. offices and institutions\n(iii) Professional and business offices\n(iv) Art galleries, Archives, Museums, Public Libraries, Social and Cultural Institutions and Religious buildings.\n(v) Hospitals, Sanatoria, and other medical and public health institutions.\n(vi) Parks, Play fields, Swimming pools and other public and Semi public open spaces.\n(vii) Broadcasting, telecasting, installations and Weather stations.\n(viii) Public utilities, municipal and community facilities.\n(ix) Nursery, Primary and Secondary Schools.\n(x) Social and Cultural Institutions including Sabhas.\n(xi) Residential and commercial spaces not exceeding 500 sq.m.permissible in this use zone.\n(xii) Transport terminals, bus and railway stations, Airport, Harbour, and parking lots including multilevel parking lots\n(xiii) Cinema theaters and others entertainment centers and Kalyana mandapams.\n(xiv) Clubs, community halls, Assembly halls, Auditoriums and Theaters\n(xv) Sports stadium, Recreation Complexes, Exhibition, Fares.\n(xvi) Burial Ground, Burning Ground, Cemeteries, crematoria\n(xvii) Buildings for development of software and its associated computer technology applications I.T.Parks\n(xviii) Manufacture of computer hardware\n(xix) Bio- informatics centers.\n(xx) Container terminals at sites abutting and gaining access from public roads of width minimum 18 meters\n(xxi) Foreign mission, Embassies, Consulates\n(xxii) All public and semi public recreational uses and open spaces, parks and play grounds, zoological and botanical gardens, nurseries, waterfront developments, museums and memorials.\n(xxiii) Theme parks and amusement parks\n(xxiv) Open Air Theater, Exhibitions, Circuses, Fairs and Festival grounds, public utilities.\n(xxv) Installations that may be necessary for the uses mentioned above.\nNote. - In the rest of the state, areas zoned for public and semi public use zone and educational use zone shall be equated to institutional use zone and the activities shall be regulated accordingly.\nNote.\nOpen Space and Recreational use zone (only in CMA).\n(i) All public and semi public recreational uses and open spaces, parks and play grounds, zoological and botanical gardens, nurseries, waterfront developments, museums and memorials.\n(ii) Theme parks and amusement parks\n(iii) Open Air Theater, Exhibitions, Circuses, Fairs and Festival grounds, public utilities.\n(iv) Burial and burning grounds or crematoria.\n(v) Incidental residential uses for essential staff required to be maintained in the premises.\n(vi) Incidental commercial uses\n(vii) Hotels and restaurants not exceeding 300sq.m.\n(viii) Beach cottages each not exceeding 100sq.m. in floor area and 7.5 m in height.\n(ix) Sports stadium and recreational complexes.\n(x) Installations that may be necessary for the uses mentioned above.\nUrbanisable use zone (only in CMA).\n(i) All uses permissible in commercial and institutional use zones\nNon-Urban use zone(only in CMA).\n(i) All Agriculture uses\n(ii) Burning, Burial grounds, crematoria and cemeteries\n(iii) Salt pans and salt manufacturing.\n(iv) Brick, earthen tile or pottery manufacturing.\n(v) Stone crushing and quarrying.\n(vi) Sand, clay and gravel quarrying.\n(vii) Installation of electrical motors not exceeding 50 HP that may be required for the uses mentioned above.\n(viii) Incidental residential uses\nAgricultural use zone.\nA. Normally permissible uses.\n(ii) Farm houses and buildings for agricultural activities.\n(iii) All the uses permissible in the residential use zone within the natham boundaries (settlements)\n(iv) Dairy and cattle farms\n(v) Piggeries and poultry farms\n(vi) Forestry\n(vii) Storing and drying of fertilizers\n(viii) Installation of electric machinery of not exceeding 15 horse power may be allowed for the uses mentioned above.\n(ix) Sewage farms and garbage dumping sites.\n(x) Mills for grinding, hulling, etc. of cereals, pulses, food grains and oil seeds provided the site has proper access and installations do not exceed 50 H.P.\n(xi) Burning and Burial grounds, Crematoria and Cemeteries.\nAnnexure - XIX\nAnnexure - XIX\n[ See rule 39]\nAreas set apart for High Rise Buildings in Chennai Metropolitan Planning Area\nAreas set apart for High Rise Buildings in Chennai Metropolitan Planning Area\n(a) Area bounded by two arms of Cooum river starting near Park Station to the mouth of Cooum river (Napier Bridge) generally known as Island Grounds.\n(b) Aquifer Recharge Area bounded in\nthe North by\nThiruvanmiyur Village\nthe East by\nBay of Bengal\nthe West by\nBuckingham Canal\nthe South by\nChennai Metropolitan Area boundary\n(c) Redhills Catchments Area stated in the Rule 19, Annexure XVII(12) Appendix B\nAnnexure - XX\nAnnexure - XX\n[ See rule 61]\nSwimming Pool and Pool\nSwimming Pool and Pool",
"footnote": "",
"is_definition": false,
"sort_order": 95
},
{
"number": "1",
"title": "1. Definitions.",
"chapter": null,
"content": "(i) \"Executive Authority\" means the Commissioner of a Municipal Corporation or a Municipality or the Executive Officer of a Municipality or a Town Panchayat, as the case may be;\n(ii) \"Urban Local Body\" means a Municipal Corporation, Municipality or Town Panchayat in the State;\n(iii) \"Appurtenance\" means an accessory facility or feature at a swimming pool;\n(iv) \"Bather Load\" means the maximum number of persons that may be allowed in the pool area at one time without creating undue health or safety hazards;\n(v) \"Competent Authority\" means the Member-Secretary of Composite Local Planning Authority or the Member-Secretary of New Town Development Authority or Regional Deputy Director of Town and Country Planning or Regional Assistant Director of Town and Country Planning or the Member Secretary of Chennai Metropolitan Development Authority, as the case may be;\n(vi) \"Committee\" means the Committee constituted under rule 4 to examine and consider the issue 'No Objection Certificate' to use a swimming pool;\n(vii) \"Deep Area\" means an area of a swimming pool in which the water depth exceeds 1.5 meter;\n(viii) \"Diving Pool\" means a pool designed and intended exclusively for diving;\n(ix) \"Form\" means a Form appended to these Rules;\n(x) \"Inlet\" means an opening or fitting through which filtered water enters the pool;\n(xi) \"Inspecting Authority\" means -\n(a) The Commissioner of Police, Chennai City in respect of Chennai Metropolitan Area;\n(b) The District Collector concerned in respect of districts, except Chennai Metropolitan Area;\n(c) Regional Senior Manager, Sports Development Authority of Tamil Nadu (SDAT);\n(d) Joint Director, Public Health and Preventive Medicine Department of every District or area concerned;\n(e) Divisional Officer (Fire and Rescue Services) of the respective District or area concerned;\n(f) Member-Secretary of composite local planning authority/Member- Secretary of new town development authority/Regional Deputy Director of Town and Country Planning/Regional Assistant Director of Town and Country Planning of the area concerned;\n(g) Member Secretary of Chennai Metropolitan Development Authority in respect of Chennai Metropolitan Area;\n(h) Executive Engineer, Tamil Nadu Water Supply and Drainage Board in the respective area except Chennai Metropolitan Area;\n(i) Executive Engineer, Metro Water in respect of Chennai Metropolitan area;\n(j) Joint Director in the office of the Directorate of School Education of the concerned area;\n(k) The Joint Director of Collegiate Education in the office of the Collegiate Education of the concerned area;\n(l) The Executive Engineer, Public Works Department of the area concerned, in respect of swimming pools with a diving board.\n(xii) \"Main Drain\" means the outlet or outlets in the floor of the swimming pool;\n(xiii) \"Make-up Water\" means the water added to a pool to replace the water which is lost;\n(xiv) \"No Objection Certificate\" means a certificate to be issued to operate swimming pool;\n(xv) \"Pool Depth\" means the vertical distance between the pool floor and the water level;\n(xvi) \"Pool manager\" means the person entirely responsible for the actual daily operation, or for the supervision of the operation of a swimming pool;\n(xvii) \"Shallow Area\" means an area in a swimming pool, in which the water depth does not exceed 1.5 m at any point;\n(xviii) \"Skimmer\" means a mechanical device connected to the recirculation piping which is used to skim the pool surface;\n(xix) \"Swimming Pool or Pool\" means a n artificial body of water having the water surface area of 7.0 square meter or more and having water depth of 0.6 meter or more used by an individual or collectively by a number of individuals primarily for the purpose of swimming and includes related equipment, structures, areas, and enclosures intended for the use of individuals using or operating the swimming pool such as equipment, dressing booth, locker, shower and bath rooms;\n(xx) \"Swimming pool in-ground\" means any pool whose sides rest in partial or full contact with the natural ground; and\n(xxi) \"Swimming pool on-ground or suspended pool\" means any pool whose sides rest fully above the natural ground;\n(xxii) Public Swimming Pool. - The Swimming Pool in schools, amusement parks of public congregation, hotels and similar places\n(xxiii) Residential Swimming Pool. - The Swimming Pool in Residential Complex\n(xxiv) \"Transition Point\" means a location in a shallow area of a swimming pool where an area, having a floor slope of not more than 30cm vertical in 3.65m horizontal, adjoins an area where the floor slope exceeds one in 12;\n(xxv) \"Turnover Period\" means the time required to re-circulate a volume of water equivalent to the water volume of the pool through the filtration system;\n(xxvi) \"Water Level\" means the level of the overflow lip of a perimeter overflow system or the mid level of surge weirs, if present, or the mid-level of the skimmer operating range;\n(xxvii) \"Zero-Depth Edge\" means that portion of the perimeter of a zero-depth pool where the pool floor intersects the pool water surface; and\n(xxviii) \"Zero-Depth Pool\" means a swimming pool where the pool floor intersects the water surface along a portion of its perimeter.",
"footnote": "",
"is_definition": true,
"sort_order": 96
},
{
"number": "2",
"title": "2. Application for Permission for Construction and Operation of a Swimming Pool.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 97
},
{
"number": "3",
"title": "3. Committee.",
"chapter": null,
"content": "(i) Regional Senior Manager, Sports Development Authority of Tamil Nadu (SDAT);\n(ii) Joint Director, Public Health and Preventive Medicine Department of the Local Body concerned;\n(iii) Divisional Officer (Fire and Rescue Services);\n(iv) Executive Authority of the local body concerned in which the swimming pool is constructed-Convener;\n(v) Member Secretary of the composite local planning authority/Member- Secretary of the new town development authority/Regional Deputy Director of Town and Country Planning/Regional Assistant Director of Town and Country Planning/Member-Secretary of Chennai Metropolitan Development Authority, as the case may be, in which the swimming pool is constructed;\n(vi) Executive Engineer, Metro Water in respect of Chennai Metropolitan area and the Executive Engineer, Tamil Nadu Water Supply and Drainage Board in respect of other areas:",
"footnote": "",
"is_definition": false,
"sort_order": 98
},
{
"number": "4",
"title": "4. Inspection of Swimming Pool.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 99
},
{
"number": "5",
"title": "5. Appeal.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 100
},
{
"number": "6",
"title": "6. General provision for penalty, punishment of offences.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 101
},
{
"number": "7",
"title": "7. Dimensions.",
"chapter": null,
"content": "(a) The shape shall be rectangular only; and\n(b) The dimensions shall be:-\n(i) category-I: 50m x 25m;\n(ii) category-II: 25m x 16m;\n(iii) category-III: 15m x 10m; or\n(iv) category-IV: 10m x 6m.",
"footnote": "",
"is_definition": false,
"sort_order": 102
},
{
"number": "8",
"title": "8. Structure.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 103
},
{
"number": "9",
"title": "9. Material.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 104
},
{
"number": "10",
"title": "10. Floor slopes.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 105
},
{
"number": "11",
"title": "11. Transition point.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 106
},
{
"number": "12",
"title": "12. Pool walls.",
"chapter": null,
"content": "(a) The wall shall be vertical for a distance of at least 1.5 m below the water level, below which the wall may angle to the floor; or\n(b) The wall shall be vertical for a distance of at least 1 m below the water level, below which the wall shall form a curve to the floor. The curve shall be tangent to the pool wall and shall have a radius of curvature at least equal to the vertical distance between the centre of curvature and the pool floor.",
"footnote": "",
"is_definition": false,
"sort_order": 107
},
{
"number": "13",
"title": "13. Water depth.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 108
},
{
"number": "14",
"title": "14. Walkways and deck areas.",
"chapter": null,
"content": "(i) Non-fibrous material which allows drainage and will not remain wet or retain moisture;\n(ii) Inert material, which will not support bacterial or fungal growth;\n(iii) Durable;\n(iv) Cleanable; and\n(v) Provides a slip-resistant finish.",
"footnote": "",
"is_definition": false,
"sort_order": 109
},
{
"number": "15",
"title": "15. Ladders, Step-Holes, Steps and Ramps.",
"chapter": null,
"content": "(1) Step-holes shall have a minimum tread depth of 12cm. Where step-holes or ladders are provided, there shall be a handrail or grab rail at the top on both sides which extends to the edge of the pool.\n(2) Steps shall be of contrasting color or marked to contrast from the pool floor and have uniform size treads of at least 30cm and a rise of not more than 23 cm. Steps shall be located where the water depth is 1.4 m or less and shall have no pointed or sharp edges. One sturdy handrail or grab rail per 4 m of step width or fraction thereof, extending the length of the steps shall be provided. In case of category - IV swimming pool of educational institutions, the overall dimension of the steps shall be over and above the required 10 m of minimum length of the pool.\n(3) All ladders, step-holes and steps shall have slip-resistant surfaces and provisions may be made for the use of physically challenged persons also.\n(4) Slope of the ramp shall not be more than one in twelve. Ramp shall have a slip resistant surface; handrails on both sides and its width shall not be more than 1.4 m.",
"footnote": "",
"is_definition": false,
"sort_order": 110
},
{
"number": "16",
"title": "16. Diving Area.",
"chapter": null,
"content": "(i) The dimensions of the diving area of a pool that has diving boards or platforms of three meter or less in height shall conform to those shown in the figure in Annexure - II. In such pools, the distance from the plummet to the pool wall ahead shall be at least 11 m.\n(ii) Swimming pools with the diving, facilities in excess of three meters in height shall comply with dimensions illustrated in the figure in Annexure - III and the Table there under. If the pool is used for swimming as well as diving, then transition slope from the deep to the shallow end shall not be steeper than one in three.\n(iii) There shall be no obstruction extending from the wall or the floor into the clear area of the diving portion of the pool. There shall be an unobstructed distance of 5 m above the diving board measured from the centre of the front end of the board and this clearance shall extend at least 2.5 m behind, 2.5 m to each side, and 5 m ahead of the measuring point.\n(iv) Handrails shall be provided at all steps and ladders leading to diving boards. Platforms and diving boards which are one meter or higher shall be protected with guard railings. One meter diving board guard rails shall be at least 76cm above the diving board and extend to the pool water's edge. All platforms or diving boards higher than one meter shall have guard rails which are at least 76cm above the diving board or platform and extend to the pool water's edge. Three meter platforms and boards shall have a side rail barrier.",
"footnote": "",
"is_definition": false,
"sort_order": 111
},
{
"number": "17",
"title": "17. Starting Platforms.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 112
},
{
"number": "18",
"title": "18. Electrical Installation - Lighting.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 113
},
{
"number": "19",
"title": "19. Ventilation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 114
},
{
"number": "20",
"title": "20. Shower and bathroom.",
"chapter": null,
"content": "A Minimum of one shower and one dressing room for each gender up to a area of 75 sq.m of swimming pool, with additional one shower and one dressing room for additional each 75sq.m of swimming pool area or part there of.",
"footnote": "",
"is_definition": false,
"sort_order": 115
},
{
"number": "21",
"title": "21. Fencing and Exits.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 116
},
{
"number": "22",
"title": "22. Swimming Pool Water Treatment System.",
"chapter": null,
"content": "Hair and Lint Strainer.\nInlets.\nOutlets.\nMake-up Water.\nFiltration.\nDisinfection.",
"footnote": "",
"is_definition": false,
"sort_order": 117
},
{
"number": "23",
"title": "23. Personnel.",
"chapter": null,
"content": "Life Guard and Swimming Coach/Instructor.\n(ii) In case of swimming pools in educational institutions, in addition to the life guard, competent swimming coach/instructor shall also be provided, who has adequate knowledge of first aid and artificial respiration. At least two coaches or instructors for category-I and II pools and at least one coach or instructor for category-III and IV pools shall be provided. At least four life guards for category-I and II pools and at least 2 life guards for category-III and IV pools shall be provided.\nQualification for the coach, instructor and life guard.\n(ii) Swimming coach.-A person possessing National Institute of Sports diploma course (Regular) in coaching swimming issued by National Institute of Sports is eligible for appointment as a swimming coach to coach swimmers for competitive swimming training and for teaching novices.\n(iii) Life guard.-For appointment as a Life Guard, a person must possess the following qualifications, namely:-\n(a) Minimum 8th standard pass;\n(b) Pool life guard course certificate conducted by Rashtriya Life Saving Society -India (RLSS)\n(c) experience in Cardio Pulmonary Resuscitation (CPR) Procedure.\n(iv) The working hours of the Life Guards shall not be more than 4 hours at a stretch. He shall be rested for at least four hours before he is put on duty again. Sufficient number of reserve life guards with prescribed qualification shall be made available.\n(v) The practical ability and alertness of the Instructors, coaches and life guards in rescuing children during emergency times should be tested before they are actually deployed. The Fire and Rescue Service personnel, shall, before the grant of No Objection Certificate for operating the swimming pools, verify the abilities of the life guards, instructors and coaches.\nDuty time of personnel.",
"footnote": "",
"is_definition": false,
"sort_order": 118
},
{
"number": "24",
"title": "24. Specific Safety Features.",
"chapter": null,
"content": "(i) place a life saving instructions chart at the pool.\n(ii) place the safety/sanitary rules board at the pool.\n(iii) provide necessary fire fighting appliances in the premises which must be maintained in proper condition.\n(iv) not allow undesirable elements in the vicinity of the pool and shall take adequate precautions to prevent harassment of women.\n(v) require a beginner to wear red cap for easy identification.\n(vi) provide proper uniform to the life guards.\n(vii) install a Flag to indicate that a life guard is on duty.\n(viii) insure all the swimming pool users against any mishaps.\n(ix) display emergency contact numbers at a conspicuous place of the pool.\nRescue Equipment.\n(a) Band-Aids.\n(b) Sterile 100 x 100mm bandage compress.\n(c) Self-adhering gauze bandage.\n(d) Disposable gloves.\n(e) Chemical cold compress.\n(ii) The first-aid kit shall be prominently mounted in the swimming pool enclosure, or a sign stating its location shall be posted near the swimming pool. The first-aid kit shall be accessible when the swimming pool is open. Items which have a shelf life shall be within the period of expiry.\n(iii) An emergency response kit shall be provided which includes items like emergency survival blanket, 10cm (4 inch) offset bandage compress, rescue breather, ambu bags, gloves, wipes and a thunderbolt (low frequency) whistle with lanyard.\n(i) Life buoys (Ring Buoys). - Life Buoys of the following specifications shall be used in rescue operations in water.\n(a) Material: Cork with polyurethane covering. A grab line secured to life buoy at four equidistant points by cotton cord.\n(b) Dimension: Circular in shape with elliptical cross section.\n(c) Colour: Orange\n(d) Life Buoys shall be tested for strength and buoyancy.\n(e) Te type, date of test, manufacturer's batch number shall be marked on all life buoys by intelligible colour.\n(f) It shall be marked with Bureau of Indian Standard certification.\n(g) Reflectors in the form of strips shall be provided for use in night.\n(h) All other specifications shall conform to IS 5326 - 1969 and requirements under the Merchant Shipping Act, 1958 and the rules made there under.\n(i) Buoy surface shall resist weather and temperature extremes and shall feature an integral rope of 6mm diameter line that has a length of 1.5 times the maximum width of the pool or 15.2 m whichever is less for easy handling.\n(ii) Life Jacket. - Life Jackets (size 1) of the following specifications shall be used for providing means of safety for the wearers while performing rescue work connected with water.\n(a) Material - Unicellular plastic with Kapok fibber filler of first grade flotation quality.\n(b) Colour - Orange or light yellow\n(c) Design - It shall be provided with a collar or other suitable means for supporting the head of floating unconscious wearer above water. The buoyancy shall be obtained essentially by the use of buoyant materials as given in Bureau Of Indian Standard specifications.\n(d) Donning - It shall be capable of being donned and secured within 30 seconds by a wearer. After having been familiarized with the method of donning, the jacket shall fit securely the body of wearer. It shall afford reasonable comfort and to allow freedom of movement to the wearer both in and out of water.\n(e) All other specifications shall confirm to Bureau of Indian Standard 6685-1972;\n(f) The jacket shall be legibly marked with following information:-\n(A) Trade Mark of manufacturer;\n(B) Size and date of manufacturer;\n(C) \"Front\" and \"Back\" words in appropriate position where a possibility of confusion exists;\n(D) Self illuminated light may be provided for use in night;\n(E) Jacket shall be marked with Bureau of Indian Standard certification.\n(iii) Life vests (Buoyant Life vests). - It is like life jackets and are made of nylon and Poly ethylene foam and feature 3 buckles and open side with visible colours in red and blue.\n(iv) Rescue boards (Spine boards). - The most versatile and easy to handle board especially good for two guard rescues. Made of 5/8\" marine plywood with capped wood runners on the bottom and capped bombers. Head immobilizer secures to board with pressure sensitive Velcro for quick and accurate immobilization.\n(v) Emergency survival blanket. - This blanket shall be made of thermal material (blend of wool or manmade fibres) that retains 90% of body heat.\n(vi) Ring Buoy line (Throw rope or rescue lines). - Made from heavy duty floating line.\n(vii) Rescue cans. - Rescue can shall be constructed of rotationally molded polyethylene to be both light weight and durable.\n(viii) Rescue hook. - It shall meet International Red Cross specifications and features a blunt end life hook large enough to safely encircle a victim. It is made up of heavy duty aluminium mounted on a light, super tough, highly visible fibre glass pole with rubber end cap.\n(ix) Storm whistle. - Professional life guard whistle can be blown under water with whistle lanyards.\n(x) Underwater goggles. - One piece flexible Poly Vinyl Chloride frame with water tight seal.\n(xi) Emergency Eyewash Station. - This self contained system shall provide victims with immediate eye flushing with a sterile, soothing, normal saline wash that neutralizes varying quantities of acids or caustics depending on the concentration.\n(xii) Body flush station. - Self contained system for immediate body flushing with a sterile, buffered isotonic saline solution. It shall be fitted with highly visible back plate.\nEmergency Telephone and Emergency Contact List.\nDepth Markers.\n(ii) Depth markers shall indicate pool depth in metric system, and shall be of a colour that contrasts with the background. Numerals indicating depth shall be a minimum of 10cm high.\n(iii) In shallow areas, \"no diving\" markers or symbols at least 10cm high must be located at not more than 7.5 m intervals around the pool perimeter except at a zero-depth edge.",
"footnote": "",
"is_definition": false,
"sort_order": 119
},
{
"number": "25",
"title": "25. Water Quality.",
"chapter": null,
"content": "Disinfection.\n(ii) In order to prevent the transmission of contagious diseases, the water in the pool must have powerful and lasting disinfectant properties.\n(iii) Water in the swimming pool must comply with the following requirements for safety and swimmers' comfort, namely :-\n(a) The water shall be transparent, that is, the lane marked on the bottom of the pool shall be clearly visible and a dark object (measuring 0.30 m along each side) placed in the deepest part of the pool shall be easily discernible.\n(b) The water shall not irritate the eyes, skin, or muscle membranes.\n(c) The quantity of substances that oxidize in hot potassium permanganate in an alkaline medium, expressed as oxygen shall must not exceed the levels present in the water used to fill the swimming pool by more than 4mg/ltr.\n(d) The water shall not contain substances which may affect the health of swimmers.\n(e) The pH of pool water shall be contained between 7.2 and 8.0\n(f) In one millilitre of water, the number of aerobic bacterial revival at 37 degree centigrade shall be less than 100.\n(g) In 100 millilitre of water the number of total coliforms shall be less than 10 and no fecal coliforms shall be present. Millilitre samples taken from pool water shall be free of pathogenic staphylococcus germs.\n(h) The water shall be disinfected and also act as a disinfectant.\n(i) The water shall contain no pathogenic germs.\nDisinfectant Residual.\n(ii) Where bromine is used as a disinfectant, a bromine residual shall be maintained between 2.0 and 8.0 ppm. as total bromine. A bromine residual of at least 4.0 ppm. shall be maintained when the pool water temperature exceeds 30o C.\n(iii) Where chlorinated cyanurates are used, the cyanuric acid concentration shall not exceed 100 ppm.\n(iv) Where silver/copper or copper ion generators are used, the concentration of copper shall not exceed 1.3 ppm. and the concentration of silver shall not exceed 0.05 ppm.\n(v) Where ozone is used, the ambient air ozone concentration shall be less than 0.1 ppm. at all times either in the vicinity of the ozonator or at the pool water surface.\n(vi) For all other physical, chemical and bacteriological parameters, the quality of water used in swimming pools in continuous circulation type shall conform to IS 3328:1993.",
"footnote": "",
"is_definition": false,
"sort_order": 120
},
{
"number": "26",
"title": "26. Operation And Maintenance.",
"chapter": null,
"content": "(ii) The swimming pool shall be maintained free from sediment, lint, dirt and hair. The walls, ceilings, floors, equipment and the pool area shall be properly maintained so that they are protected from deterioration. Cracks and other defects in the pool, if appear, shall be repaired immediately. All equipment shall be maintained in proper condition, with all required components in place.\n(iii) Pool decks shall be rinsed daily. Indoor pool decks shall be disinfected at least weekly. No furniture, plants or other furnishings shall be placed within 1.2 m of the pool. This area shall be kept free from obstructions such as chairs, baby strollers and maintenance equipment.\n(iv) Floats or tubes not in use shall be removed from the pool. Safety ropes shall be kept in place except when the swimming pool is being used exclusively for lap swimming or competition.\n(v) Planting of trees or shrubs that attract insects near the pool and furnishing shall be situated away from the pool edge or shall be avoided.\n(vi) Starting platforms and starting blocks shall not be used for any other purpose other than competitive swimming activities. Starting blocks shall be securely anchored when in use but removed or prohibited from use when not being used in conjunction with competitive swimming or training.\nPerimeter Overflow and Skimmers.\nInlet Fittings.\nSecurity.\nBather Loads.\n(ii) The number of persons permissible within a swimming pool depending on the depth of the pool is as follows:-(a) Where depth is less than 1.0m, 1 bather per 2.2 square meter\n(b) Where depth is between 1.0m and 1.5 m, 1 bather per 2.7 square meter (c) Where depth is more than 1.5 m, 1 bather per 4.0 square meter\n(iii) In case of educational institutions, the number of persons within a swimming pool shall not exceed 30 in case of category-I and II pools and it shall not exceed 15 in case of category-III and IV pools which is subject to the full complement of swimming coach/instructor and life guards as prescribed in sub-rule (2) of rule 26.\n(iv) Except in swimming pools in single dwelling units, the bather load shall be pasted at the pool entrance or at a location where it can be seen by all bathers and shall be enforced by the pool manager.\n(v) No person shall be allowed to be in the pool for (except in swimming pools of single dwelling unit) more than one hour except with the consent of the life guard or the coach, as the case may be.\nOperational timings.\n(ii) Recycling of pool water shall not be made during the operational timings.\n(iii) The full contingent of personnel indicated in rule 24 shall be available during the operational timings.\nElectrical Systems.\nOperation of Mechanical Equipment.\n(ii) Recirculation pumps shall be kept in good repair and condition. The pump discharge or inlet supply line valve shall be adjusted as necessary to maintain the design flow rate.\n(iii) Filtration equipment.- The filtration flow rate shall not exceed the maximum filtration design flow rate specified by the filter manufacturer for public swimming pool usage. Where the filtration flow rate is not known or has not been determined, it shall not exceed 67 litre per minute per square foot of filter area for high-rate sand filters.\n(iv) Hair and Lint Strainers.- Hair and lint strainers shall be cleaned to prevent clogging of the suction line and cavitations. The pump shall be stopped before the strainer is opened to avoid drawing air into the pump and losing the prime.\n(v) Flow meters shall be maintained in an accurate operating condition and shall be readable.\n(vi) Vacuum and Pressure Gauges.- The lines leading to the gauges shall be bled occasionally to prevent blockage.\n(vii) Gas Chlorinators. - (a) The manager or operator shall post the telephone numbers of the appropriate emergency personnel to contact, in the event of a chlorine gas emergency;\n(b) Chlorine cylinders shall be stored indoors in the area designed for that purpose and away from a direct source of heat. They shall be chained or strapped to a rigid support to prevent accidental tipping. Cylinders shall not be moved unless the protection cap is secured over the valve. Gas mask, approved for use in a chlorine atmosphere, shall be kept outside the chlorine room in an unlocked container at all times. The gas mask canister shall be replaced regularly as per the manufacturer's recommendations;\n(c) Chlorinators, gas lines, injectors, vent lines and cylinders shall be checked daily for leaks. In case of a chlorine leak, corrective measures shall be undertaken only by trained persons wearing proper safety equipment. All other persons shall be evacuated from the dangerous area until conditions are again safe.\n(viii) Positive Displacement Feeders. - (a) Positive displacement feeders shall be periodically inspected and serviced.\n(b) When a chemical feeder is used with calcium hypochlorite solution, to minimize sludge accumulation in the unit, the lowest practicable concentration of solution shall be used, and in no case shall this concentration exceed five percent. If liquid chlorine solution is used, the dilution with water is not critical to the operation of the unit. After thoroughly rinsing with water, a small amount of mild acid solution may be fed through the unit periodically, to dissolve sludge accumulations.\n(ix) pH Adjustment.- (a) Soda ash or caustic soda shall be used to raise the pool water pH. Protective equipment and clothing, including rubber gloves and goggles, must be available for the handling and use of these chemicals.\n(b) Sodium bisulfate, carbon dioxide gas or muriatic acid shall be used to lower pool water pH. Carbon dioxide cylinders shall be securely chained or otherwise restrained in a manner that will prevent tipping. Protective equipment and clothing, including rubber gloves and goggles, must be available for handling these chemicals.\n(x) Miscellaneous Chemicals.- (a) Chemicals shall be kept covered and stored in the original, labelled container, away from flammables and heat and in a clean, dry, well-ventilated place which prevents unauthorized access to the chemicals.\n(b) If poly-phosphates are used for sequestering iron, the concentration of poly phosphates shall not exceed ten ppm.\n(xi) Acoustics. - Suitable arrangement shall be made to ensure that safety instructions can be heard, considering the noise level in peak hours.\n(xii) Monitoring and Reporting. - (a) Operation reports: The pool manager shall keep the daily record of swimming pool or other pool operational data.\n(b) Water quality testing. - Disinfectant residual and pH tests shall be made on samples collected from the shallow and deep areas of swimming pool, at least twice daily. Where chlorine is used as a disinfectant, testing for combined chlorine shall be performed at least daily. In addition, where chlorinated cyanurates are utilized as a chlorine disinfectant, testing for cyanuric acid concentration shall be performed at least daily. Where ozone is utilized, testing to determine the ozone concentration immediately above the pool water surface shall be performed monthly. Necessary testing kits should be made available for checking the pH and disinfectant residual. The person responsible for testing shall be thoroughly familiar with the procedure for checking. Records of water quality testing shall be kept intact.\n(c) Refuse disposal. - The equipment provided for the storage, collection, and disposal of refuse produced at a swimming pool or bathing beach shall be such that the creation of conditions detrimental to public health, such as rodent harbourage, insect breeding areas, odours, air pollution and accidents are prevented. All refuse shall be stored in water-tight, metal or rigid plastic containers having tight-fitting lids. Containers shall be provided as needed throughout food preparation areas and eating areas to provide for enough collection of trash.\n(xiii) Besides the specifications prescribed in these rules, the following Industrial Standard codes of practice shall also be followed and any breach thereof shall be deemed to be a breach of the requirements under these rules:-\n(a) 3328:1993 Quality tolerances for water for swimming pools (First Revision);\n(b) 6494:1988 Code of practice for water-proofing of underground water reservoirs and swimming pools;",
"footnote": "",
"is_definition": false,
"sort_order": 121
},
{
"number": "27",
"title": "27. Regulations for swimming pool users.",
"chapter": null,
"content": "Restrictions of user for enrollment.\n(ii) Person using the pool shall produce a self declaration that he is free from any chronic diseases like epilepsy, heart problem, severe respiratory illness, skin disease, venereal disease, or any other contagious disease, before using the pool.\n(iii) In case of swimming pool in amusement parks, a resident doctor who shall be a registered medical practitioner, shall be made available within the premises.\n(iv) In case of swimming pools in educational institutions, person using the pool shall produce a medical certificate from a registered medical practitioner that he is free from any chronic diseases like epilepsy, heart problem, severe respiratory illness, skin disease, venereal disease, or any other contagious disease, for enrolment to use the pool.\nThe pool manager shall not allow any person.\n(ii) to enter the pool in any apparel other than the recognized swim wear or the costume trunk;\n(iii) to enter the pool, if he has consumed alcohol;\n(iv) in the pool before educating him through a class the basic safety aspects of using the pool;\n(v) in the pool during lightning, thunder, raining and or any other natural calamity like storm, cyclone, earthquake etc and if any person is found in the pool during such times, he shall be evacuated immediately from the pool;\n(vi) either before or after entering the water of the pool, to use soap, oil or any substance or preparation whereby the water of the pool may be rendered turbid or unfit for use of the bathers;\n(vii) to enter who may willfully or otherwise, foul or pollute the water of the pool by spitting or in any other matter whatsoever;\n(viii) to use the pool, who suffers from temporary illness like cold, cough, fever etc.,\n(ix) to enter the pool or remain in the pool at any time other than the prescribed timings under the rules or to enter or remain on the premises surrounding the swimming pool fifteen minutes before or after the opening and closing hours;\n(x) accompanying any animal to enter the swimming pool or the premises surrounding the swimming pool thereto; and\n(xi) to use the pool before certifying the minimum water standard by testing daily and registering the same in a register kept for the purpose.\nAppendix\nAppendix\nForm - I\nForm - I\nApplication for permission for construction of swimming pool\nApplication for permission for construction of swimming pool\n( see rule 3(1))\n(Name and address of the Owner/ Occupier of the Land/ Power of attorney holder/Lease Holder)*\n* Strike out the portions, which are not applicable.\n(a) A key-map of the area showing the site in relation to existing streets and street intersections, discharging clearly therein the boundaries of the site under reference and the adjoining lands owned or controlled by me.\n(b) A detailed site plan of the land for development to a scale of not less than 1:800.\n(c) A plan or plans of the swimming pool showing the ground plan, and the sectional and front elevation of the pool.\n(d) Clearance Certificate obtained from the Public Works Department, in case of swimming pools with diving facility.\n(e) The particulars in the Annexure.\nUndertaking\nUndertaking\n(i) I agree to not to proceed with the construction of the swimming pool until the local body grants permission for the construction.\n(ii) I agree to not to do any development otherwise than in accordance with plans which have been approved and any of the provisions of the relevant rules.\n(iii) I agree to keep one of the approved site plan and one set of copies of the sanctioned plan of the swimming pool at the site of the pool at all times when the construction is in progress and also agree to see that such plans are available and the construction is open at all reasonable times for the inspection of the Executive Authority or any officer authorised by him in that behalf.\n(iv) I agree to obtain the letter of acceptance of the completion report from the Executive Authority before making the pool functional.\n*Signature of the Owner/Occupier of the Land/Power of attorney Holder/Lease holder\n* Strike out the portions, which are not applicable.\nAnnexure\nAnnexure\nTo Be Completed by The Owner or Occupier of The Land or Power of Attorney Holder/lease Holder:\nName .... ....\nAddress .... ....\nTel. No. .... ....\n(a) Full address or location of the land to which this application relates and site area\nDoor/Plot No.\nTown Survey No./S.F.No.\nDivision or\nWard No. Road or Street name\nName of Local Authority\nSite area\n(b) State whether applicant owns or controls any adjoining land and if so give its location and extent.\n(c) State whether the proposal involves:\n(i) Swimming pool only\n(ii) New Building(s)\n(iii) Alteration, extension or addition to buildings\n(iv) Change of use.\nSignature of the Owner/Occupier of the Land/Power of attorney holder/Lease Holder\nForm - II\nForm - II\nAffidavit by the Applicant\nAffidavit by the Applicant\n( see rule 3(2)(a))\nDeponent\nDuly attested by the Notary Public\nForm III\nForm III\nPermission to Construct a Swimming Pool\nPermission to Construct a Swimming Pool\n( see rule 3(2)(b))\nThe Executive Authority,\n........................\n(Name and address of the Owner/Occupier of the Land/ Power of attorney holder/Lease Holder) *\nSignature of the Executive Authority\n(i) Every person engaged in the construction of swimming pool shall follow all the provisions contained in the said Rules.\n(ii) In case of violation of any of the provisions of the said Rules, the Executive authority shall not permit the continuance of construction of swimming pool.\nForm IV\nForm IV\nApplication for Grant of Permission to Operate Public Swimming Pool\nApplication for Grant of Permission to Operate Public Swimming Pool\n( see rule 3(3))\n(Name and address of the Owner/Occupier of the Land/ Power of attorney holder/Lease Holder) *\n(a) Concurrence obtained from the competent authority under clause (c) of sub-rule (2) of rule 3 of the Tamil Nadu Urban Local Bodies (Regulation and Monitoring of Swimming Pools) Rules, 2015 along with the approved plans;\n(b) Order granting permission for construction of the swimming pool obtained under clause (b) of sub-rule (2) of rule 3 of the said Rules in Form III along with the approved plans;\n(c) Completion Report of the swimming pool;\n(d) Particulars in the Annexure.\n* Strike out the portions, which are not applicable.\nUndertaking\nUndertaking\n(i) I agree to not to use the swimming pool until the Executive Authority grants permission for operating the pool.\n(ii) I agree to not to do anything otherwise than in accordance with plans which have been approved or in contravention of any provisions of the said rules.\n(iii) I agree to keep a copy of the permission granted in Form VI to operate the pool at the site of the pool at all times and keep the swimming pool open at the reasonable times for the inspection of the Executive Authority or the Inspecting Authority or any officer authorised by them in that behalf.\n*Signature of the Owner/Occupier of the Land/ Power of attorney Holder/Lease holder\n* Strike out the portions, which are not applicable.\nAnnexure\nAnnexure\nTo be completed by the owner/occupier of the land/power of attorney holder/lease holder:\nName .... ....\nAddress .... ....\nTel. No. .... ....\n(a) Full address or location of the land to which this application relates and site area\nDoor/Plot No.\nTown Survey No./S.F.No.\nDivision or Ward No.\nRoad or Street name\nName of Local Authority\nSite area\n(b) State whether applicant owns or controls any adjoining land and if so give its location and extent.\nState whether the proposal involves:\n(i) New Building(s)\n(ii) Alteration, extension or addition\n(iii) Change of use.\nExtent in Sq.mts. of the building\nPresent use of building.\n(a) Total floor area of all buildings to which the application relates\nSignature of the Owner of the Land/Power of attorney holder/Lease Holder\nForm - V\nForm - V\nAffidavit by the Applicant\nAffidavit by the Applicant\n( see rule 3(3))\nDeponent\nDuly attested by the Notary Public\nForm - VI\nForm - VI\nPermission to Operate Public Swimming Pool\nPermission to Operate Public Swimming Pool\n( see rule 3(4))\nThe Executive Authority,\n........................\n(Name and address of the Owner/Occupier of the Land/ Power of attorney holder/Lease Holder) *\nSignature of the Executive Authority\n(i) Every person operating the swimming pool shall follow all the rule provisions contained in the said Rules.\n(ii) In case of violation of any of the provisions of the said Rules, the Executive authority shall not permit operation of the swimming pool.\nAnnexure - II\nAnnexure - II\n( see rule 19 (2) (i))\n( see rule 19 (2) (i))\nAll dimensions in metere.\nFIG. 1 Slope of Pool Floor\nAnnexure - II\nAnnexure - II\n( see rule 19 (2)(i))\nMinimum distance indicated\n<0.5\n-\n1\n3\nA - End wall to Tip of Board\n1\n1.5\n1.5\nB - Centre of board to sidewall or adjacent\n\t\t\t\tboard\n3\n3\n3.6\nC - Centre of board laterally to point of\n\t\t\t\trequired depth\n1.2\n1.2\n1.8\nD - Depth at end of board and for beyond 3.6 m\n2.8\n3\n3.6\nAnnexure - III\nAnnexure - III\n( see rule 19 (2) (ii))\nCross Section\nThe Table\nThe Table\nDimensions of swimming pools with diving facilities in excess of three meters in height\nDimensions of swimming pools with diving facilities in excess of three meters in height\nSl.No.\nDimensions\nDesignation\n5m\n7.5m\n10m\nPlatform\nPlatform\nPlatform\n(m, Min)\n(m, Min)\n(m, Min)\n(1)\n(1)\n(2)\n(2)\n(3)\n(3)\n(4)\n(4)\n(5)\n(5)\n(6)\n(6)\n(i)\nLength\n6.0\n6.0\n6.0\n(ii)\nWidth\n1.5\n1.5\n1.5\n(iii)\nFrom\n\t\t\t\tPlummet:\nA\n1.5\n1.5\n1.8\nback to pool\n\t\t\t\twall\n(iv)\nBack to\n\t\t\t\tplatform directly below\n-\n1.5\n1.5\n(v)\nFrom Plummet\n\t\t\t\tto pool wall at side\nB\n3.9\n4.5\n5.2\n(vi)\nFrom plummet\n\t\t\t\tto adjacent plummet\nC\n-\n-\n3.6\n(vii)\nFrom plummet\n\t\t\t\tto pool wall ahead\nD\n10.5\n11.0\n13.7\n(viii)\nOn plummet\n\t\t\t\tfrom board to ceiling overhead\nE\n3.6\n3.6\n3.6\n(ix)\nClear\n\t\t\t\toverhead behind and each side plummet\nF\n2.7\n3.0\n5.0\n(x)\nClear\n\t\t\t\toverhead ahead of plummet\nG\n5.0\n5.0\n5.0\n(xi)\nDepth of\n\t\t\t\twater at plummet\nH\n4.3\n4.5\n5.2\n(xii)\nBottom\n\t\t\t\tdistance ahead of plummet\nJ\n6.0\n8.0\n12.2\n(xiii)\nBottom depth\n\t\t\t\tahead of plummet\nK\n3.3\n4.0\n4.5\n(xiv)\nBottom\n\t\t\t\tdistance each side of plummet\nL\n3.6\n4.0\n4.3\n(xv)\nBottom depth\n\t\t\t\teach side of plummet\nM\n4.3\n4.5\n5.2\nAnnexure - XXI\nAnnexure - XXI\n[ See rule 65]\nInstallation of Closed Circuit Television units in public buildings\nInstallation of Closed Circuit Television units in public buildings",
"footnote": "",
"is_definition": false,
"sort_order": 122
},
{
"number": "1",
"title": "1. Definitions.",
"chapter": null,
"content": "(a) \"Commissioner\" means the Commissioner of a Municipal Corporation or a Municipality;\n(b)\" Executive Authority\" means the executive authority of a Municipality or a Town Panchayat;\n(c) \"public building\" means, any building where public have an access for any purpose and used as a -\n(i) higher secondary school or a college or a University or other similar educational institutions (including private institutions) ;\n(ii) hostel where more than 100 persons reside;\n(iii) hospital, nursing home, dispensary, clinic, maternity centre or any other similar institution, having a floor area of 500 square meter and above;\n(iv) boarding and lodging house or a star hotel;\n(v) choultry or marriage hall;\n(vi) cinema theater, amusement park, swimming pool, recreation centre, motion picture house, assembly hall, auditorium, exhibition hall, museum, skating rink, gymnasium, dance hall, recreation pier, stadium or bar;\n(vii) market for the display and sale of merchandise, shop or a store either wholesale or retail having a floor area of 500 square meter and above;\n(viii) bank, ATM Counter, Insurance company; (ix) jewellery shop;\n(ix) shopping mall, a building providing multiple services or facilities to the public like shopping, cinema theaters, restaurants, etc., for example a multiplex or a shopping complex;\n(x) petrol filling station;\n(xi) industry carrying the activities of production, manufacturing and services where more than 100 persons are employed;\n(xii) institution of information technology services, radio broadcasting station or television station;\n(xiii) place of religious worship or a place of religious, political or social congregation by the public or any class or section of the public, where more than 500 persons assemble at a time;\n(xiv) office of the Central Government or any State Government or any local authority or any body corporate owned or controlled by the Central Government or any State Government, where more than 100 persons are employed or having a floor area of 500 square meter and above ;\n(xv) office of any Quasi-Governmental organization or any Government undertaking controlled by the Central Government or any State Government, where more than 100 persons are employed or having a floor area of 500 square meter and above;\n(xvi) library, lecture room, public concert room, hotel, coffee house, eating house, club or a club room, having a floor area of 500 square meter and above ;\n(xvii) Bus Station or a Bus Terminal ; and\n(d) \"urban local body\" means a Municipal Corporation, a Municipality or a Town Panchayat.",
"footnote": "",
"is_definition": true,
"sort_order": 123
},
{
"number": "2",
"title": "2. Provision of Closed Circuit Television Units.",
"chapter": null,
"content": "Annexure - XXII\nAnnexure - XXII\n[ See rules 35 (5) and 63 (1)]\nRainwater Conservation\nRainwater Conservation\nWater Conservation:\nA. Rain Water Harvesting.\n(a) Non High Rise Buildings - Buildings of height up to 12m. - Following are the recommended designs that can be adopted in the non High Rise Buildings ie., Independent Houses and Apartments with Ground + two floor or Stilt + 3 floors and not more than 16 dwelling units).\n(a) Non High Rise Buildings - Buildings of height up to 12m.\n(i) In plots that are being developed/buildings with a dug (source) well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter and the overflow to be diverted to the source well. The rain falling on the driveway or paved setback areas (around campus) and from rooftop pipes that are not connected to the sump or source well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump/speed breaker arrangement and led to a recharge well. (Drawing 1A & 1D).\n(ii) In plots to be developed/buildings without an open well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter and the overflow to be diverted to a recharge well. The rain falling on the driveway or paved setback areas and from rooftop pipes that are not connected to the sump or recharge well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump/speed breaker arrangement and led to a recharge well. ( Drawing 1B & 1D)\n(iii) In plots to be developed/buildings where the setback area is very small, not enough to dig a recharge well or sewers, water line, electrical cable running below, rooftop water brought down by pipes should be led to percolation pits, one per pipe. (Drawing 1C)\n(b) Non High Rise Buildings more than 12m height and up to 18.3m heighrand Industries and Institutional Buildings. - In case of Non High Rise developments, Industries, Institutional Buildings as mentioned in all the above cases, rooftop water can be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter that is available in the market and the overflow to be diverted to either a dug (source) well or a recharge well depending on the availability of a source well. Depending on the need and relevance any combination of the above methods can be chosen.\n(b) Non High Rise Buildings more than 12m height and up to 18.3m heighrand Industries and Institutional Buildings.\n(i) In the above mentioned categories, rain falling on the setback areas as well as some of the rooftops will flow on the driveway itself and runoff to the streets and get wasted. This runoff should be intercepted by means of a bump/speed breaker arrangement constructed in one or more locations within the premises and discharged into suitably designed recharge well (s) located nearby. (Drawing 3A.)\n(Drawing 3A.)\n(ii) Rain falling on the setback areas as well as some of the rooftops will flow into the storm drains constructed along the periphery of the building, whose slope will always be towards the gate(s) in order to discharge the runoff onto the street. This flow within the drain can be intercepted inside the drain by a baffle wall and injected into several recharge wells located close to the drain. (Drawing 3B.)\n(Drawing 3B.)\n(c) High Rise Buildings (Residential/Commercial)\n(c) High Rise Buildings (Residential/Commercial)\n(i) In plots that are being developed/buildings with a source well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or an Special filter that is available in the market and the overflow to be diverted to the source well. The rain falling on the driveway or paved setback areas or from rooftop pipes not connected to the sump or source well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump and led to a recharge well. ( Drawing 2A & 2D)\n( Drawing 2A & 2D)\n(ii) In plots to be developed/buildings without an open well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter that is available in the market and the overflow to be diverted to a recharge well. The rain falling on the driveway, paved setback areas, and from rooftop pipes that are not connected to the sump or recharge well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump/speed breaker arrangement and led to a recharge well. (Drawing 2B, 2C & 2D)\n(Drawing 2B, 2C & 2D)\nB. Recycling Of Grey Water.\n(Drawing No.4B)\n(Drawing 4A)\n(Drawing 4B)\nDrawing-1A\nDrawing-1A\nDrawing-1B\nDrawing-1B\nDrawing-1C\nDrawing-1C\nDrawing-1D\nDrawing-1D\nDrawing-2A\nDrawing-2A\nDrawing-2B\nDrawing-2B\nDrawing-2C\nDrawing-2C\nDrawing-2D\nDrawing-2D\nDrawing-3A\nDrawing-3A\nDrawing-3B\nDrawing-3B\nDrawing-4A\nDrawing-4A\nDrawing-4B\nDrawing-4B\nAnnexure XXIII\nAnnexure XXIII\n[ See rule 20 (6)]\nCompletion Certificate Norms\nCompletion Certificate Norms\n(a) In respect of commercial buildings, the following items should have been completed in all respects. However, interior completion works, fixtures, flooring and partition need not be insisted.\n(i) Terrace Floor with weathering course including parapet wall\n(ii) Lift Machine Room, OHT and Stair-case Head room\n(iii) Electrical installations (switch boxes and fixtures not to be insisted)\n(iv) Sanitary and water supply installations (fixtures not to be insisted)\n(v) Sump for water storage\n(vi) Outer plastering of the building\n(vii) Frames for joinery\n(viii) No dowel rods left out in the building for vertical or horizontal expansion\n(ix) Completion of Internal Plastering and Flooring need not be insisted\n(b) In case of residential buildings, the following items shall have been completed in the said project to consider it for issue of Completion Certificate\n(i) Terrace Floor with weathering course including parapet wall\n(ii) Lift Machine Room, OHT and Stair-case Head room\n(iii) Electrical installations (switch boxes and fixture not to be insisted)\n(iv) Sanitary and Water Supply installations (fixtures not to be insisted)\n(v) Sump for Water storage\n(vi) Outer plastering of the building\n(vii) Frames for Joinery\n(viii) Kitchen (Provision on Modular Kitchen is permitted provided provision for water supply/drainage is made)\n(ix) Internal partition walls\n(x) No dowel rods left out in the building for vertical or horizontal expansion\n(xi) Completion of Internal Plastering and Flooring need not be insisted.\nCompletion Certificate Norms.\nSl. No\nSl. No\nParameters\nParameters\nNorms\nNorms\n1.\nDimension of the Building\nThe increase in the dimension of the building\n\t\t\t\tshall not exceed 0.30mts in length and 0.30mts in width.\n2.\nSet Backs\nThe reduction in setbacks is allowed on all\n\t\t\t\tsides by 0.30mts, subject to availability of minimum set back of\n\t\t\t\t1.20mts. in the event of prescribed minimum setback being 1.5m\n\t\t\t\tand by 0.20mts subject to availability of minimum set back of\n\t\t\t\t0.80mts. In the event of prescribed minimum setback being 1.0m\n3.\nHeight of the Building\nIncrease in height of the building is permitted\n\t\t\t\tnot exceeding 3% of the building height approved as long as such\n\t\t\t\tincrease does not exceed 12m and does not constitute an\n\t\t\t\tadditional floor. In case of Institutional building if it does\n\t\t\t\tnot exceed 18.30mts.\n4.\nFSI Tolerance Limit\nFSI Tolerance limit will be maximum of 15sq.m\n\t\t\t\tover and above the permissible FSI.\n5.\nOver Head Tank\nChange in the location/Architectural orientation\n\t\t\t\tpermissible. In case of increase in the size of the over head\n\t\t\t\ttank necessary fees to be collected.\n6.\nInter connection between two flats\nPermissible as long as it satisfies parking\n\t\t\t\trequirement.\n7.\nChange in the position of the columns and\n\t\t\t\tintroduction of new columns in the stilt floor\nPermissible as long as it does not affect\n\t\t\t\tminimum parking lots required as per approved plan is left as car\n\t\t\t\tparking space. Movement and parking of required number of cars on\n\t\t\t\tground can be taken irrespective of certain deviations from the\n\t\t\t\tapproved plan, subject to conformity to DR provision relating to\n\t\t\t\tParking and Driveway.\n8.\nNon FSI area\nChange in location of incident use as long as\n\t\t\t\twithin non-FSI area permissible limit.\n9.\nVariation between document dimension and site\n\t\t\t\tdimension\nIf on site measurements area are less than\n\t\t\t\toriginally approved from PLR line, but even, this lesser set\n\t\t\t\tbacks on the site confirm to these rules.\n10.\nEntrance Arch/Pillar\nAs per the provision of these rules.\n11.\nPergola\nPermissible for elevation purpose in the terrace\n\t\t\t\tnot exceeding 10 % area of the respective floor Pergola\n\t\t\t\tprojections in other places will be treated as architectural\n\t\t\t\tfeatures, as per the provisions of these rules.\n12.\nRain Water Harvesting\nShould be provided.\n13.\nCompound wall constructed including the land\n\t\t\t\tleft for road widening\nNot permissible. Permanent compound wall to be\n\t\t\t\tconstructed as per the approved plan after leaving the street\n\t\t\t\talignment or road widening portion.\n(b) Norms for Non High Rise buildings up to 18.30m height and exceeding 16 dwelling units and exceeding 300 square meters of commercial building shall be regulated according to the table below::\nSl. No.\nSl. No.\nParameters\nParameters\nNorms\nNorms\n1.\nDimension of the building\nThe increase in the dimension of the building\n\t\t\t\tshall not exceed 0.30mts. In length and 0.30mts. in width.\n2.\nSet Backs/Distance Between Blocks.\n0.30mts. reduction in setbacks is allowed on all\n\t\t\t\tsides, subject to availability of minimum set back of 1.20mts. in\n\t\t\t\tthe event of prescribed minimum setback being 1.5m and by 0.20mts\n\t\t\t\tsubject to availability of minimum set back of 0.80mts. In the\n\t\t\t\tevent of prescribed minimum setback being 1.0m\n3.\nHeight of the Building\nIncrease in height of the building is Permitted\n\t\t\t\tnot exceeding 3% of the building height approved as long as such\n\t\t\t\tincrease does not exceed 18.30mts. and does not constitute an\n\t\t\t\tadditional floor. In such cases, additional setback for the\n\t\t\t\tadditional height increase shall not be insisted.\n4.\nFSI Tolerance Limit\nFSI Tolerance limit will be 0.03 of FSI or 50\n\t\t\t\tSq.mt. floor area whichever is higher over and above the\n\t\t\t\tpermissible FSI.\n5.\nOHT\nChange in the location/orientation permissible.\n\t\t\t\tIn case of increase in the size of the OHT, development charges\n\t\t\t\tto be collected.\n6.\nInter connection between two flats\nPermissible as long as it satisfies parking\n\t\t\t\trequirement.\n7.\nChange in the position of the columns and\n\t\t\t\tintroduction of new columns in the stilt floor.\nPermissible as long as it does not affect\n\t\t\t\tminimum 3.00mts. driveway for vehicular movement and the no. of\n\t\t\t\tminimum parking lots required as per approved plan is left as car\n\t\t\t\tparking space. Movement and parking of required number of cars on\n\t\t\t\tground can be taken irrespective of certain deviations from the\n\t\t\t\tapproved plan, subject to conformity to TNCBR provision relating\n\t\t\t\tto Parking and Driveway.\n8.\nNon FSI area\nChange in location of incidental use within\n\t\t\t\tnon-FSI area permissible limit.\n9.\nVariation between document dimension and site\n\t\t\t\tdimension\nIf on site measurements are less than originally\n\t\t\t\tapproved from PLR line, but even this lesser set backs on the\n\t\t\t\tsite conform to these rules- Permissible.\n10.\nEntrance Arch/Pillar\nAs per the provision of these rules.\n11.\nPergola\nPermissible for elevation purpose in the terrace\n\t\t\t\tnot exceeding 10% area of the respective floor.\n12.\nRain water harvesting\nShould be provided.\n13.\nCompound Wall constructed including the land\n\t\t\t\tleft for road widening.\nNot permissible.\nPermanent compound\n\t\t\t\twall to be constructed as per the approved plan after leaving the\n\t\t\t\tStreet Alignment or Road widening portion.\nHowever, the land left for road widening may be\n\t\t\t\tutilized for landscaping with temporary grill/ barbed wire\n\t\t\t\tfencing, with or without Dwarf wall not exceeding 0.60mts.\n\t\t\t\theight.\n14.\nFire license\nAs per the provisions of TNCBR\n15.\nOSR land\nAs the OSR space is vested with competent\n\t\t\t\tauthority or Local Body, no structure shall be constructed or\n\t\t\t\terected on OSR land.\n16.\nStructures permitted in the set back area\nAccess steps to Ground floor and ramps, (without\n\t\t\t\taffecting ventilation of Basement Floor) closed Well, Water and\n\t\t\t\tSewage Treatment Plant, Generator, Box type transformers are\n\t\t\t\tpermitted in the set back area subject to availability of minimum\n\t\t\t\tdriveway of 3.00mts. and parking requirements as per the approved\n\t\t\t\tplan.\n17.\nStructures permitted in the Terrace Floor\nAC Plant and Two toilets in every block are\n\t\t\t\tpermitted in the Terrace Floor Architectural feature in the\n\t\t\t\tperiphery on the top most floor (Terrace Floor) up to 3.00mts.\n\t\t\t\theight is permissible subject to the condition that the portion\n\t\t\t\tconstructed over allowable 1.5mts. height parapet wall shall be\n\t\t\t\tnon continuous with solid portion not exceeding 50% of the\n\t\t\t\tsurface area.\n18.\nInstallation of Solar Energy System\n1/3rd area of the total terrace area to be\n\t\t\t\treserved for erecting Solar Photo Voltaic Panels. The approximate\n\t\t\t\tspace required for erecting Solar Voltaic Panel is 10 sq.mt for\n\t\t\t\tgenerating 1 KW of electricity.\n(c) Norms for High Rise buildings shall be regulated according to the table below::\nSl. No.\nSl. No.\nParameters\nParameters\nNorms\nNorms\n1.\nDimension of the building\nThe increase in the dimension of the building\n\t\t\t\tshall not exceed 0.30mts. in length and 0.30mts. in width.\n2.\nSet Backs/Distance Between Blocks.\nThe reduction of 0.30mts. In the set back space\n\t\t\t\tis permissible on all sides, subject to availability of minimum\n\t\t\t\t6.70mts., for the buildings of within 30mts. height. With\n\t\t\t\tincrease in height above 30mts. corresponding increase in setback\n\t\t\t\tto be insisted.\n3.\nHeight of the Building\nIncrease in height of\n\t\t\t\tthe building is permitted not exceeding 5% of the building height\n\t\t\t\tapproved as long as such increase does not constitute an\n\t\t\t\tadditional floor. In such cases, additional setback for the\n\t\t\t\tadditional height increase shall be insisted on pro- rata basis.\n\t\t\t\t(For instance, for a 30mts. height building with 5% increase in\n\t\t\t\theight the additional set back insisted will be 0.25mts.)\nHowever, the total height should be within the\n\t\t\t\theight permitted by AAI/IAF.\n4.\nFSI Tolerance Limit\nFSI Tolerance limit will be 0.03 of FSI or 50\n\t\t\t\tSq.mt., floor area whichever is higher over and above the\n\t\t\t\tpermissible FSI.\n5.\nArchitectural projection & service ducts\nService ducts up to 1.0mt. here and there and\n\t\t\t\tnot to the entire width and length of the building and\n\t\t\t\tArchitectural projection up to 0.60m. in width where it is\n\t\t\t\tcontinuous and up to 1.0mt. where it is dis- continuous are\n\t\t\t\tpermissible, subject to availability of minimum clear set back of\n\t\t\t\t6.70mts. where required set back is 7.0mts. and minimum clear set\n\t\t\t\tback of 7.70mts. where required set back is 8.0mts. and minimum\n\t\t\t\tset back of 8.70m. where required set back is 9.0mts.and so on\n6.\nOHT\nChange in the location/orientation permissible.\n\t\t\t\tIn case of increase in the size of the OHT, development charges\n\t\t\t\tto be collected.\n7.\nInter connection between two flats\nPermissible as long as it satisfies parking\n\t\t\t\trequirement.\n8.\nChange in the position of the columns and\n\t\t\t\tintroduction of new columns in the stilt floor.\nPermissible as long as it does not affect\n\t\t\t\tdriveway of minimum 3.00mts. for vehicular movement and the no.\n\t\t\t\tof minimum parking lots required as per approved plan and left as\n\t\t\t\tcar parking space. Movement and parking of required number of\n\t\t\t\tcars on ground can be taken irrespective of certain deviations\n\t\t\t\tfrom the approved plan, subject to conformity to TNCBR provision\n\t\t\t\trelating to Parking and Driveway.\n9.\nNon FSI area\nChange in location of incidental use within\n\t\t\t\tnon-FSI area permissible limit.\n10.\nVariation between document dimension and site\n\t\t\t\tdimension\nIf on site measurements are less than originally\n\t\t\t\tapproved from PLR line, but even this lesser set backs on the\n\t\t\t\tsite conform to these rules - Permissible.\n11.\nEntrance Arch/Pillar\nAs per the provision of these rules.\n12.\nPergola\nPermissible for elevation purpose in the terrace\n\t\t\t\tnot exceeding 10% area of the respective floor.\n13.\nRain water harvesting\nShould be provided.\n14.\nCompound Wall constructed including the land\n\t\t\t\tleft for road widening.\nNot permissible.\nPermanent compound\n\t\t\t\twall to be constructed as per the approved plan after leaving the\n\t\t\t\tStreet Alignment /Road widening portion.\nHowever, the land left for road widening may be\n\t\t\t\tutilized for landscaping with temporary grill/ barbed wire\n\t\t\t\tfencing, with or without Dwarf wall not exceeding 0.60mts.\n\t\t\t\theight.\n15.\nFire license\nCompliance Certificate from DF&RS is\n\t\t\t\trequired.\n16.\nOSR land\nAs the OSR space is vested with competent\n\t\t\t\tauthority/Local Body, no structure shall be constructed/erected\n\t\t\t\ton OSR land.\n17.\nStructures permitted in the set back area\nAccess steps to Ground floor and ramps, (without\n\t\t\t\taffecting ventilation of Basement Floor) closed Well, Water and\n\t\t\t\tSewage Treatment Plant, Generator, Box type transformers are\n\t\t\t\tpermitted in the set back area subject to availability of minimum\n\t\t\t\tset back of 6.7mts. and satisfying the parking requirements.\n18.\nStructures permitted in the Terrace Floor\nAC Plant and Two toilets in every block are\n\t\t\t\tpermitted in the Terrace Floor. Architectural feature in the\n\t\t\t\tperiphery on the top most floor (Terrace Floor) up to 3.00mts.\n\t\t\t\theight is permissible subject to the condition that the portion\n\t\t\t\tconstructed over allowable 1.5mts. height parapet wall shall be\n\t\t\t\tnon continuous with solid portion not exceeding 50% of the\n\t\t\t\tsurface area.\n19.\nInstallation of Solar Energy System\n1/3rd area of the total terrace area to be\n\t\t\t\treserved for erecting Solar Photo Voltaic Panels. The approximate\n\t\t\t\tspace required for erecting Solar Voltaic Panel is 10 sq.mt for\n\t\t\t\tgenerating 1 KW of electricity.",
"footnote": "",
"is_definition": false,
"sort_order": 124
}
],
"metadata": {
"Act ID": "Last Updated 5th March, 2020 [tn1001]",
"Act Number": "Published vide Notification No. G.O. Ms. No. 18, Municipal Administration and Water Supply (MA 1), Thai 21, Vilambi, Thiruvalluvar Aandu-2050, dated 04.02.2019",
"Enactment Date": "",
"Act Year": "2019",
"Short Title": "Tamil Nadu Combined Development and Building Rules, 2019",
"Type": "STATE",
"Location": "Tamil Nadu"
},
"updated_at": "2026-09-29 21:55:21"
}