10. Sanction.

(ii) the written permission shall be issued by the competent authority within 45 days after the receipt of the plan and all other requirements; and
(iii) while granting permission, the competent authority may impose such restrictions and conditions, which may be necessary under these rules.
(a) plastering and patch repairs;
(b) re-roofing or renewals of roof including roof of intermediate floors at the same height;
(c) flooring and re-flooring;
(d) opening and closing of windows, ventilators and doors not opening towards others properties and/or public road or property;
(e) replacing fallen bricks/stones
(f) construction or re-construction of sunshade not more than 75cms. in width within one's land and not overhanging over a public street;
(g) construction or re-construction of parapet not more than 1.5 m. in height and also construction or re-construction of boundary wall not exceeding 2 m
(h) white-washing, painting, etc. including erection of false ceiling in any floor at the permissible clear height provided the false ceiling in no way can be put to use as a loft etc.
(b) The landowner or lessee or power of attorney holder or developer who makes the development, the Registered Architect or Engineer on Record, and the Registered Construction Engineer on Record, shall be jointly and severally held responsible if any unauthorized construction, addition and alternation are done without prior permission of the competent authority.