1. Short title and commencement.

Section 1

2. Applicability.

Section 2

3. Definitions.

Section 3

4. Scheme of reconnaissance or prospecting.

Section 4

5. Modification of scheme of reconnaissance or prospecting.

Section 5

6. Reconnaissance or prospecting operations to be carried out in accordance with scheme of reconnaissance or prospecting.

Section 6

7. Intimation about reconnaissance and prospecting operations.

Section 7

8. Inspection.

Section 8

9. Reports to be submitted by holder of a reconnaissance permit or prospecting license or prospecting license cum mining lease or any other authorised agency.

Section 9

10. Competent Authority.

Section 10

11. Mining operations under mining lease.

Section 11

12. Prospecting and mining operations.

Section 12

13. Open cast working.

Section 13

14. Separate stacking of non-saleable minerals.

Section 14

15. Underground mining operations.

Section 15

16. Sub-grade minerals to be brought to surface.

Section 16

17. Prohibition of reduction of blocks.

Section 17

18. Beneficiation studies to be carried out.

Section 18

19. Machinery and plant.

Section 19

20. Notice for opening of mine.

Section 20

21. Abandonment of mines.

Section 21

22. Mine Closure Plan.

Section 22

23. Submission of progressive mine closure plan.

Section 23

24. Submission of final mine closure plan.

Section 24

25. The modification of mine closure plan.

Section 25

26. Responsibility of holder of a mining lease.

Section 26

27. Financial assurance.

Section 27

28. Notice of temporary discontinuance of work in mines and obligations of lease holders.

Section 28

29. Intimation of reopening of a mine.

Section 29

30. Stoping of vein, etc.

Section 30

31. General requirements about plans and sections.

Section 31

32. Types of plans and sections.

Section 32

33. Copies of plans and sections to be submitted.

Section 33

34. Preparation of plans.

Section 34

35. Sustainable mining.

Section 35

36. Removal and utilisation of top soil.

Section 36

37. Storage of overburden, waste rock, etc.

Section 37

38. Precaution against ground vibrations.

Section 38

39. Control of surface subsidence.

Section 39

40. Precaution against air pollution.

Section 40

41. Discharge of toxic liquid.

Section 41

42. Precaution against noise.

Section 42

43. Permissible limits and standards.

Section 43

44. Restoration of flora.

Section 44

45. Monthly and annual returns.

Section 45

46. Notice of certain appointments.

Section 46

47. Notice of shaft sinking and boreholes.

Section 47

48. Records of shafts and boreholes.

Section 48

49. Change in name of mine to be notified.

Section 49

50. Notice of transfer of prospecting licence-cum-mining lease or mining lease.

Section 50

51. Notice of amalgamation of mining lease.

Section 51

52. Transfer of records to transferees.

Section 52

53. Copies of notices or returns and reports to be submitted to State Government.

Section 53

54. Copies of notices and returns and reports to be maintained.

Section 54

55. Employment of geologists and mining engineers.

Section 55

56. Duties of geologist.

Section 56

57. Duties of mining engineer.

Section 57

58. Power to issue directions.

Section 58

59. Examination of mineral deposits and taking of samples.

Section 59

60. Prohibition of deployment in certain cases.

Section 60

61. Revision.

Section 61

62. Penalty.

Section 62

63. Preservation of cores, etc.

Section 63

64. Facilities for undertaking research or training.

Section 64

65. Submission of records or reports regarding research in geology or mining.

Section 65

66. Territorial jurisdiction of Controller of Mines and Regional Controller.

Section 66

67. Obligation to supply other information.

Section 67

68. Provisions of these rules to be applicable to Central Government and State Governments.

Section 68

69. Exercise of powers.

Section 69

70. Saving of Act 33 of 1962.

Section 70

71. Review of format and manuals.

Section 71

72. Geological reports.

Section 72

73. Mining regulation web portal.

Section 73

74. Recording of regulatory functions.

Section 74

75. Information source.

Section 75

1. Type of ore produced:

Section 1

2. Production and Stocks of ROM ore at Mine-head

Section 2

4. Details of deductions made from sale value for computation of Ex-mine price (Rs.-Tonne)

Section 4

5. Sales- Dispatches effected for Domestic Purposes and for Exports:

Section 5

6. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.

Section 6

7. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.

Section 7

8. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.

Section 8

9. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.

Section 9

1. R.O.M production:

Section 1

2. Production, stocks and dispatches:-

Section 2

3. Details of deductions made from sale value for computation of Ex-mine price (Rs.- Unit)

Section 3

4. Sales- Dispatches effected for Domestic Purposes and for Exports:

Section 4

5. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.

Section 5

6. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.

Section 6

3. Employment and salary-wages paid #:

Section 3

1. Gun Powder

Section 1

2. Nitrate Mixture

Section 2

3. Nitro compound

Section 3

4. Liquid Oxygen soaked cartridges

Section 4

5. Slurry explosives (Mention different trade names)

Section 5

6. Detonators

Section 6

7. Fuse

Section 7

8. Plastic ignition cord

Section 8

9. Others (specify)

Section 9

1. Exploration

Section 1

2. Reserves and Resources estimated (in tonnes).

Section 2

3. Subgrade-Mineral Reject (in tonnes)

Section 3

4. Overburden and Waste (in m 3 )

Section 4

5. Trees planted- survival rate

Section 5

6. Type of Machinery.

Section 6

1. Type of ore produced:

Section 1

2. Production and Stocks of ROM ore at Mine-head

Section 2

4. Details of deductions made from sale value for computation of Ex-mine price (Rs. - Tonne)

Section 4

5. Sales- Despatches effected for Domestic Purposes and for Exports:

Section 5

6. Give reasons for increase-decrease in production-nil production, if any, during the year compared to the previous year.

Section 6

7. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the year compared to the previous year.

Section 7

3. Employment and salary-wages paid #:

Section 3

3. Interest and Rent (Rs.)

Section 3

3. Interest and Rent (Rs.)

Section 3

1. Exploration

Section 1

2. Reserves and Resources estimated (in tonnes).

Section 2

1. Proved Mineral Reserve

Section 1

2. Probable mineral Reserve

Section 2

3. Total Reserves

Section 3

1. Feasibility mineral Resource

Section 1

2. Prefeasibility mineral resource

Section 2

3. Measured mineral resource

Section 3

4. Indicated mineral resource

Section 4

5. Inferred mineral resource

Section 5

6. Reconnaissance mineral resource

Section 6

7. Total remaining Resources

Section 7

3. Subgrade-Mineral Reject (in tonnes)

Section 3

4. Overburden and Waste (in m 3 )

Section 4

5. Trees planted- survival rate

Section 5

6. Type of Machinery.

Section 6

1. Production and Stocks of ROM ore

Section 1

2. Ex-mine price of the ore produced (Rs. per unit):

Section 2

3. Recoveries at Concentrator-Mill-Plant:

Section 3

4. Recovery at the Smelter-Mill-Plant:

Section 4

5. Sales during the year:

Section 5

6. Details of deductions made from sale value for computation of Ex-mine price (Rs.- Unit)

Section 6

7. Sales. - Dispatches of ore and concentrates effected for Domestic Purposes and for Exports:

Section 7

8. Give reasons for increase-decrease in production-nil production, if any, during the year compared to the previous year.

Section 8

9. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the year compared to the previous year.

Section 9

3. Employment and salary-wages paid #:

Section 3

1. Value of Fixed Assets* (Rs. .......................................)

Section 1

1. Value of Fixed Assets* (Rs. .......................................)

Section 1

2. Source of Finance (at the end of the year) :

Section 2

2. Source of Finance (at the end of the year) :

Section 2

3. Interest and Rent (Rs.)

Section 3

3. Interest and Rent (Rs.)

Section 3

1. Quantity and cost of material consumed during the year

Section 1

1. Quantity and cost of material consumed during the year

Section 1

2. Royalty, Rents and Payments made to DMF and NMET (Rs.):

Section 2

3. Compensation paid for felling trees during the year (Rs.)

Section 3

4. Depreciation on fixed assets (Rs.)

Section 4

5. Taxes and cesses

Section 5

6. Other expenses (Rs.) :

Section 6

1. Exploration

Section 1

2. Reserves and Resources estimated (in tonnes).

Section 2

1. Proved Mineral Reserve

Section 1

2. Probable mineral Reserve

Section 2

3. Total Reserves

Section 3

1. Feasibility mineral Resource

Section 1

2. Prefeasibility mineral resource

Section 2

3. Measured mineral resource

Section 3

4. Indicated mineral resource

Section 4

5. Inferred mineral resource

Section 5

6. Reconnaissance mineral resource

Section 6

7. Total remaining Resources

Section 7

3. Subgrade-Mineral Reject (in tonnes)

Section 3

4. Overburden and Waste (in m 3 )

Section 4

5. Trees planted- survival rate

Section 5

6. Type of Machinery.

Section 6

1. R.O.M production:

Section 1

2. Production, stocks and dispatches:-

Section 2

3. Details of deductions made from sale value for computation of Ex-mine price (Rs.- Unit)

Section 3

4. Sales- Dispatches effected for Domestic Purposes and for Exports:

Section 4

5. Give reasons for increase-decrease in production-nil production, if any, during the month compared to the previous month.

Section 5

6. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month.

Section 6

1. Category of applicant :

Section 1

2. Type of business-activity :

Section 2

3. Details of the applicant:

Section 3

4. Please give details of mines held at the time of applying for registration if any, or update the information due to any changes after registration, by the Individual-Association of Individuals - Firms or Company.

Section 4

5. Please give details of prospecting licence - prospecting licence cum mining lease held at the time of applying for registration, if any, or update the information due to any changes after registration, by the Individual- Association of Individuals - Firms or Company.

Section 5

6. Please give details of reconnaissance licence held at the time of applying for registration, if any, or update the information due to any changes after registration, by the Individual- Association of Individuals - Firms or Company.

Section 6

7. If engaged in mineral trading- storage and export, please give details of storage facilities owned at the time of applying for registration or update the information due to any changes after registration.

Section 7

8. If engaged in production or manufacturing through a mineral based industry, please give details of mineral consumption or update the information due to any changes after registration

Section 8

1. General Particulars

Section 1

2. Details of the Activity

Section 2

1. General Particulars

Section 1

2. Details of the Activity

Section 2

3. Information regarding end-use mineral based industries (other than iron and steel industry)

Section 3

4. Information Regarding Iron and Steel Industry

Section 4

5. Details of raw materials consumed in production {including Electricity (in KWh), Coal and Petroleum products}

Section 5

6. Source of supply