(a) the sinking of trial shaft or borehole to a depth exceeding ten meters from the surface; or
(b) the extension of an existing shaft or borehole to a depth exceeding ten meters; or
(c) the sinking of a new shaft or boreholes commencing from underground workings:
Section 47 • The Mineral Conservation and Development Rules, 2017
47. Notice of shaft sinking and boreholes.
the-mineral-conservation-and-development-rules-2017-sec-47.json
•
Section 47
{
"act_title": "The Mineral Conservation and Development Rules, 2017",
"act_slug": "the-mineral-conservation-and-development-rules-2017",
"section_label": "Section",
"section": {
"number": "47",
"title": "47. Notice of shaft sinking and boreholes.",
"chapter": null,
"content": "(a) the sinking of trial shaft or borehole to a depth exceeding ten meters from the surface; or\n(b) the extension of an existing shaft or borehole to a depth exceeding ten meters; or\n(c) the sinking of a new shaft or boreholes commencing from underground workings:",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
"prev_section": "46",
"next_section": "48"
}