Schedule
Form-A
Form-A
( See rule 7)
( See rule 7)
(Notice of commencement of Reconnaissance or prospecting operations)
(Notice of commencement of Reconnaissance or prospecting operations)
Important Instructions for Filling the Form
1.
1.
Type of Mineral Concession ---
Type of Mineral Concession ---
Reconnaissance Permit
Prospecting Licence
Prospecting License-cum-Mining Lease
2.
2.
IBM Registration Number
IBM Registration Number
3.
3.
Unique IBM Concession Number
Unique IBM Concession Number
Reconnaissance Permit
Prospecting License
Prospecting License-cum-Mining Lease
4.
4.
Name of the mineral or minerals for which Reconnaissance
Permit or prospecting license or prospecting license cum mining
lease has been granted:
Name of the mineral or minerals for which Reconnaissance
Permit or prospecting license or prospecting license cum mining
lease has been granted:
(Information will be system generated. Linked with Entry 5 and
6 of Form 'K'.)
5.
5.
Name and address of the permit holder or licensee:
Name and address of the permit holder or licensee:
(Information will be system Generated. Linked with Entry 5 and
6 of Form ‘K’.)
6.
6.
Particulars of Mineral Concession
Particulars of Mineral Concession
(Information will be system Generated. Linked with Entry 5 and
6 of Form ‘K’.)
7.
7.
Location of the Mineral Concession
Location of the Mineral Concession
(Information will be system Generated. Linked with Entry 5 and
6 of Form ‘K’.)
8.
8.
Particulars of Geologist employed for the Reconnaissance
Permit or Geologist and Mining Engineer employed for the
Prospecting Licenced area:
Particulars of Geologist employed for the Reconnaissance
Permit or Geologist and Mining Engineer employed for the
Prospecting Licenced area:
(i)
(i)
Name and address:
Name and address:
(ii)
(ii)
E-mail address:
E-mail address:
(iii)
(iii)
Phone Number and Mobile Number:
Phone Number and Mobile Number:
(iv)
(iv)
Qualification:
Qualification:
(v)
(v)
Date of Appointment:
Date of Appointment:
(vi)
(vi)
Nature of Appointment:
Nature of Appointment:
Whole Time
Part Time
9.
9.
Date of commencement of Reconnaissance Operation or
prospecting operations:
Date of commencement of Reconnaissance Operation or
prospecting operations:
Place:
Place:
Date:
Date:
Signature
Signature
Name in full:
Name in full:
Designation: Owner - Geologist - Mining Engineer
Designation: Owner - Geologist - Mining Engineer
Form - B
Form - B
[ See rule 9(1), 9(3) and 9(4)]
(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................)
(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................)
Important Instructions for Filling the Form
1.
1.
Type of Mineral Concession ---
Type of Mineral Concession ---
Reconnaissance Permit
Prospecting Licence
Prospecting License-cum-Mining Lease
2.
2.
IBM Registration Number
IBM Registration Number
3.
3.
Unique IBM Concession Number
Unique IBM Concession Number
Reconnaissance Permit
Prospecting License
Prospecting License-cum-Mining Lease
4.
4.
Name of the mineral or minerals for which Reconnaissance
Permit or prospecting license or prospecting license cum mining
lease has been granted:
Name of the mineral or minerals for which Reconnaissance
Permit or prospecting license or prospecting license cum mining
lease has been granted:
(Information will be system generated. Linked with Entry 5 and
6 of Form 'K'.)
5.
5.
Name and address of the permit holder or licensee:
Name and address of the permit holder or licensee:
(Information will be system Generated. Linked with Entry 5 and
6 of Form ‘K’.)
6.
6.
Particulars of Mineral Concession
Particulars of Mineral Concession
(Information will be system Generated. Linked with Entry 5 and
6 of Form ‘K’.)
7.
7.
Location of the Mineral Concession
Location of the Mineral Concession
(Information will be system Generated. Linked with Entry 5 and
6 of Form ‘K’.)
8.
8.
Status of reconnaissance - prospecting operation
Status of reconnaissance - prospecting operation
Please tick-mark the boxes whichever is applicable
Please tick-mark the boxes whichever is applicable
In Progress
[ ]
Completed
[ ]
Abandoned
[ ]
9.
9.
If reconnaissance-prospecting operation is
completed or abandoned, date of such completion or abandonment
If reconnaissance-prospecting operation is
completed or abandoned, date of such completion or abandonment
10.
10.
Total surface area covered by reconnaissance - prospecting work (hectares) as on date
Total surface area covered by reconnaissance - prospecting work (hectares) as on date
11.
11.
Reconnaissance survey work done
Reconnaissance survey work done
(A brief description of the work involved along with
particulars of the machines and instruments used would be given
against each of the following items)
(A brief description of the work involved along with
particulars of the machines and instruments used would be given
against each of the following items)
(i)
Regional Survey
_______________________________
(ii)
Aerial-photo-geological work
________________________________
12.
12.
Geological Mapping including area covered and scale
Geological Mapping including area covered and scale
(i)
Geophysical
_____________________________
(ii)
Geochemical
_____________________________
(iii)
Test drilling: Number, area of influence meterage and sampling
_____________________________
(iv)
Nature and structure of the ore body
_____________________________
(v)
Analysis of the ores or minerals
_____________________________
13.
13.
Completion of prospecting work during the year:
Completion of prospecting work during the year:
14.
14.
(a)
(a)
Pitting
Pitting
(i)
Number of pits
_______________
(ii)
Depth (metres)
Average
_______________
Maximum
_______________
Minimum
_______________
(b)
(b)
Trenching
Trenching
(i)
Number of trenches
_______________
(ii)
Length (metres)
Average
_______________
Maximum
_______________
Minimum
_______________
(c)
(c)
Drilling
Drilling
Surface
Underground
(i)
Number of boreholes completed during the year.
_____________
_____________
(ii)
Number of boreholes in progress, if any
_____________
_____________
(iii)
Total annual drilling (metres)
_____________
_____________
(d)
(d)
Particulars of drilling machines:
Particulars of drilling machines:
Type
Make
Capacity
Number of drills
(e)
(e)
Exploratory mining, if any:
Exploratory mining, if any:
(1)
Number of levels
______________________________________________
(2)
Total development (metres)
______________________________________________
(3)
Mode of entry
______________________________________________
(4)
Quantity of ore produced with grade
______________________________________________
(f)
(f)
Number of samples analysed:
Number of samples analysed:
(1)
Main constituent (please specify)
____________________________________
(2)
Complete analysis
____________________________________
15.
15.
If abandoned
If abandoned
(iii)
(iii)
Date of abandonment
Date of abandonment
_______________________________
(iv)
(iv)
Reasons for abandonment
Reasons for abandonment
_______________________________
Note. - Please enclose a geological report describing the reconnaissance - prospecting operations undertaken so far along with the detailed geological plans and sections showing locations of (a) boreholes, (b) pits, (c) trenches, (d) shafts, (e) underground exploratory workings, (f) outcrops, (g) ore zones, (h) faults, (i) folds and other geological features.
Note.
The Report shall contain in the borehole logs and interpretation and the inferences drawn as a result of the study of the geology of the area and the interpretation of the borehole cores, pits, trenches, assay data, reserves of ore and contain results of complete analysis of at least two representative samples of ore and the blocks proposed for mining operations. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area.
Place:
Place:
Date:
Date:
Signature
Signature
Name in full:
Name in full:
Designation: Owner-Geologist-Mining Engineer
Designation: Owner-Geologist-Mining Engineer
Form - C
Form - C
(See rule 20, 29 and 49)
(Notice of intimation of opening-reopening of mine-change in the name of mine)
(Notice of intimation of opening-reopening of mine-change in the name of mine)
Important Instructions for Filling the Form
1.
1.
IBM Registration Number
IBM Registration Number
2.
2.
Mining Lease Code
Mining Lease Code
3.
3.
Mine Code
Mine Code
4.
4.
Name of mine - Old name of mine (in case of change in name)
Name of mine - Old name of mine (in case of change in name)
5.
5.
Name and address of the lessee-owner
Name and address of the lessee-owner
(Information will be system
generated. Linked with Entry 3 of Form 'K'.)
6.
6.
Date of opening-reopening of mine
Date of opening-reopening of mine
7.
7.
In case of reopening, date of discontinuation
In case of reopening, date of discontinuation
8.
8.
Particulars of the Mining Lease (ML)
Particulars of the Mining Lease (ML)
(Information will be system generated. Linked with Entry 4 of
Form 'K')
9.
9.
Location of the Mining Lease
Location of the Mining Lease
(Information will be system generated. Linked with Entry 4 of
Form 'K')
10.
10.
Name and address of previous owner
Name and address of previous owner
if any and the date of abandonment of Mine
Name Address E-mail Mobile no.
Name
Name
Address
Address
E-mail
E-mail
Mobile no.
Mobile no.
11.
Name and address of Agent of Mine
Name and address of Agent of Mine
Name Address E-mail Mobile no.
Name
Name
Address
Address
E-mail
E-mail
Mobile no.
Mobile no.
12.
12.
Particulars of Mining Engineer employed in the mine:
Particulars of Mining Engineer employed in the mine:
(Information will be system Generated. Linked with Entry 8 and
9 of Form 'H'.)
13.
13.
Particulars of Geologist employed in the mine
Particulars of Geologist employed in the mine
(Information will be system Generated. Linked with Entry 8 and
9 of Form 'H'.)
14.
14.
Particulars of Manager employed in the mine
Particulars of Manager employed in the mine
(Information will be system Generated. Linked with Entry 8 and
9 of Form 'H'.)
15.
15.
Letter No. and date through which the mining plan was
approved by the Indian Bureau of Mines or State Government
concerned
Letter No. and date through which the mining plan was
approved by the Indian Bureau of Mines or State Government
concerned
Place:
Place:
Date:
Date:
Signature
Signature
Name in full:
Name in full:
Designation: Owner-Geologist-Mining Engineer
Designation: Owner-Geologist-Mining Engineer
Form - D
Form - D
[ See rule 21(2)]
(Notice of intention of abandonment of mine or part of the mine)
(Notice of intention of abandonment of mine or part of the mine)
Important Instructions for Filling the Form
1.
1.
IBM Registration Number
IBM Registration Number
2.
2.
Mining Lease Code
Mining Lease Code
3.
3.
Mine Code
Mine Code
4.
4.
Name of Mine
Name of Mine
5.
5.
Name and address of the lessee-owner
Name and address of the lessee-owner
(Information will be system
generated. Linked with Entry 3 of Form 'K'.)
6.
6.
Particulars of the Mining Lease (ML)
Particulars of the Mining Lease (ML)
(Information will be system generated. Linked with Entry 4 of
Form 'K')
7.
7.
Location of the Mining Lease
Location of the Mining Lease
(Information will be system generated. Linked with Entry 4 of
Form 'K')
8.
8.
Letter No. and date through which the Final
Mine Closure plan was approved by the Indian Bureau of Mines or
State Government concerned
Letter No. and date through which the Final
Mine Closure plan was approved by the Indian Bureau of Mines or
State Government concerned
9.
9.
Date of abandonment
Date of abandonment
10.
10.
Reasons for abandonment
Reasons for abandonment
[Please tick whichever is applicable]
i.
Lack of demand
ii.
Exhaustion of ore-mineral
iii.
Un-economic operations
iv.
Unable to obtain forest clearance
11.
11.
Upto date Total Resources of Mineral(s) in Mining Lease
area (in tonne) as per UNFC:
Upto date Total Resources of Mineral(s) in Mining Lease
area (in tonne) as per UNFC:
(A)
(A)
Mineral Reserve
Mineral Reserve
(i)
Proved Reserve (111)
(ii)
Probable Reserve (121 and 122)
(B)
(B)
Remaining Resources
Remaining Resources
(i)
Feasibility Mineral Resources (211)
(ii)
Pre Feasibility Mineral Resources (221 and 222)
(iii)
Measure Mineral Resources (331)
(iv)
Indicated Mineral Resources (332)
(v)
Inferred Mineral Resources (333)
(vi)
Reconnaissance Mineral Resources (334)
(C)
(C)
Total Resources (A + B) = .....................(tonnes)
Total Resources
12.
12.
Number of workers employed in the mine: Male Female
Number of workers employed in the mine: Male Female
(a)
Company labour
(b)
Contract labour
(c)
Total
Place:
Place:
Date:
Date:
Signature
Signature
Name in full:
Name in full:
Designation: Owner-Geologist-Mining Engineer
Designation: Owner-Geologist-Mining Engineer
Form - E
Form - E
[See rule 28(1) and 28(2)]
(Notice of temporary discontinuance of mine)
(Notice of temporary discontinuance of mine)
Important Instructions for Filling the Form
1.
1.
IBM Registration Number
IBM Registration Number
2.
2.
Mining Lease Code
Mining Lease Code
3.
3.
Mine Code
Mine Code
4.
4.
Name of Mine
Name of Mine
5.
5.
Name and address of the lessee-owner
Name and address of the lessee-owner
(Information will be system
generated. Linked with Entry 3 of Form 'K'.)
6.
6.
Particulars of the Mining Lease (ML)
Particulars of the Mining Lease (ML)
(Information will be system generated. Linked with Entry 4 of
Form 'K')
7.
7.
Location of the Mining Lease
Location of the Mining Lease
(Information will be system generated. Linked with Entry 4 of
Form 'K')
8.
8.
Date of temporary discontinuance
Date of temporary discontinuance
9.
9.
Reasons for temporary discontinuance
Reasons for temporary discontinuance
[Please tick whichever is applicable]
(i)
Lack of demand
(ii)
Non-availability of labour
(iii)
Rains
(iv)
Transport bottleneck
(v)
Strike-Lockout
(vi)
Operations becoming un-economic
(vii)
Other reasons (specify)
10.
10.
Probable date of re-opening of the mine
Probable date of re-opening of the mine
Place:
Place:
Date:
Date:
Signature
Signature
Name in full:
Name in full:
Designation: Owner - Geologist - Mining Engineer
Designation: Owner - Geologist - Mining Engineer
Form - F
Form - F
[See rule 30(2)]
(Notice of commencement of stoping)
(Notice of commencement of stoping)
Important Instructions for Filling the Form
1.
1.
IBM Registration Number
IBM Registration Number
2.
2.
Mining Lease Code
Mining Lease Code
3.
3.
Mine Code
Mine Code
4.
4.
Name of Mine
Name of Mine
5.
5.
Name and address of the lessee-owner
Name and address of the lessee-owner
(Information will be system
generated. Linked with Entry 3 of Form 'K'.)
6.
6.
Particulars of the Mining Lease (ML)
Particulars of the Mining Lease (ML)
(Information will be system generated. Linked with Entry 4 of
Form 'K')
7.
7.
Location of the Mining Lease
Location of the Mining Lease
(Information will be system generated. Linked with Entry 4 of
Form 'K')
8.
8.
Section-pit number
Section-pit number
(This is applicable in cases where
the main mine is divided into more than one
district-section-pit.)
9.
9.
Date on which it is proposed to commence stoping
Date on which it is proposed to commence stoping
10.
10.
Extent of development in the mine:
Extent of development in the mine:
(a)
Number of shafts-inclines-and its width-depth-length
_____________________________
(b)
Maximum depth and development
_____________________________
(c)
Number of levels with their extent
_____________________________
(d)
Total meterage of development
_____________________________
(e)
Total number of blocks developed including the total tonnage
and grade (excluding blocks already stoped out and already
permitted for stoping)
_____________________________
11.
Details of the blocks applied for stoping
Details of the blocks applied for stoping
(a)
Number and size of each block, their levels tonnage and grade
_____________________________
(b)
Method of stoping to be adopted –
(i)
A description of the method with stope preparation sequence of
operation appropriate drawings to illustrate the and extraction
_____________________________
(ii)
Rate of stoping contemplated in each block (monthly)
_____________________________
(iii)
Estimated recovery from each block
_____________________________
(iv)
Estimated dilution
_____________________________
(v)
Estimated tonnage and grade of ore to be extracted
_____________________________
12.
12.
Is this a first application for stoping for this mine?
Is this a first application for stoping for this mine?
If not, the following details may be furnished
If not, the following details may be furnished
(i)
Date of previous application(s) for stoping
_____________________________
(ii)
Date and reference of permission or refusal by this department
(mention blocks and their levels)
_____________________________
(iii)
Have all the blocks for which stoping permission
was granted, been stoped out? If not, mention the specific
blocks that are remaining to be stoped out, indicating the state
of stoping operations therein:
_____________________________
13.
13.
Rate of development and programme of forming additional
stope blocks simultaneously with the proposed stoping
Rate of development and programme of forming additional
stope blocks simultaneously with the proposed stoping
_____________________________
14.
14.
List of enclosures
List of enclosures
_____________________________
Place:
Place:
Date:
Date:
Signature
Signature
Name in full:
Name in full:
Designation: Owner - Geologist - Mining Engineer
Designation: Owner - Geologist - Mining Engineer
Form F1
Form F1
[See rule 45(5) (b) (i)]
For the month of ________20
Monthly Return
Monthly Return
[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]
(i) The Regional Controller of Mines
Indian Bureau of Mines
_________Region,
PIN:
(ii) The State Government
Part - I
(General and Labour)
(General and Labour)
1.
1.
Details of the Mine:
Details of the Mine:
(a)
Registration number allotted by
Indian Bureau of Mines
(to give registration number of the Lessee- Owner)
(b)
Mine Code (allotted by Indian Bureau of Mines )
Mine Code
(c)
Name of the Mineral
(d)
Name of Mine
(e)
Name(s) of other mineral(s),
if any, produced from the same mine
(f)
Location of the Mine :
Location of the Mine :
Village
Post Office
Tahsil-Taluk
District
State
PIN Code
Fax No. :
E-mail :
Phone No. :
Mobile :
2.
2.
Name and address of Lessee-Owner (along with fax no. and
e-mail):
Name and address of Lessee-Owner (along with fax no. and
e-mail):
Name of Lessee-Owner
Address
District
State
PIN Code
Fax No. :
E-mail:
Phone No. :
Mobile:
3.
3.
Details of Rent- Royalty - Dead Rent- DMF -NMET amount paid
in the month
Details of Rent- Royalty - Dead Rent- DMF -NMET amount paid
in the month
(i)
Rent paid (Rs.)
(ii)
Royalty paid (Rs.)
(iii)
Dead Rent paid (Rs.)
(iv)
Payment made to the DMF (Rs.)
(v)
Payment made to the NMET (Rs.)
4.
4.
Details on working of mine:
Details on working of mine:
(i)
Number of days the mine worked:
(ii)
Reasons for work stoppage in the mine during the
month (due to strike, lockout, heavy rain, non-availability of
labour, transport bottleneck, lack of demand, uneconomic
operations, etc.) and the number of days of work stoppage for
each reason separately
Reasons
No of days
5.
5.
Average Daily Employment and Total Salary-Wages paid #:
Average Daily Employment and Total Salary-Wages paid #:
Work place
Work place
Direct
Direct
Contract
Contract
Total Salary-Wages (Rs.)
Total Salary-Wages (Rs.)
Male
Male
Female
Female
Male
Male
Female
Female
Direct
Direct
Contract
Contract
Below ground
Opencast
Above ground
Total
# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site
Part-II
(Production, Despatches and Stocks)
(Production, Despatches and Stocks)
(To be submitted separately for each mineral)
(Unit of Quantity in Tonnes)
Section 75 • The Mineral Conservation and Development Rules, 2017
75. Information source.
the-mineral-conservation-and-development-rules-2017-sec-75.json
•
Section 75
{
"act_title": "The Mineral Conservation and Development Rules, 2017",
"act_slug": "the-mineral-conservation-and-development-rules-2017",
"section_label": "Section",
"section": {
"number": "75",
"title": "75. Information source.",
"chapter": null,
"content": "Schedule\nForm-A\nForm-A\n( See rule 7)\n( See rule 7)\n(Notice of commencement of Reconnaissance or prospecting operations)\n(Notice of commencement of Reconnaissance or prospecting operations)\nImportant Instructions for Filling the Form\n1.\n1.\nType of Mineral Concession ---\nType of Mineral Concession ---\nReconnaissance Permit\nProspecting Licence\nProspecting License-cum-Mining Lease\n2.\n2.\nIBM Registration Number\nIBM Registration Number\n3.\n3.\nUnique IBM Concession Number\nUnique IBM Concession Number\nReconnaissance Permit\nProspecting License\nProspecting License-cum-Mining Lease\n4.\n4.\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\n(Information will be system generated. Linked with Entry 5 and\n\t\t\t\t6 of Form 'K'.)\n5.\n5.\nName and address of the permit holder or licensee:\nName and address of the permit holder or licensee:\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n6.\n6.\nParticulars of Mineral Concession\nParticulars of Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n7.\n7.\nLocation of the Mineral Concession\nLocation of the Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n8.\n8.\nParticulars of Geologist employed for the Reconnaissance\n\t\t\t\tPermit or Geologist and Mining Engineer employed for the\n\t\t\t\tProspecting Licenced area:\nParticulars of Geologist employed for the Reconnaissance\n\t\t\t\tPermit or Geologist and Mining Engineer employed for the\n\t\t\t\tProspecting Licenced area:\n(i)\n(i)\nName and address:\nName and address:\n(ii)\n(ii)\nE-mail address:\nE-mail address:\n(iii)\n(iii)\nPhone Number and Mobile Number:\nPhone Number and Mobile Number:\n(iv)\n(iv)\nQualification:\nQualification:\n(v)\n(v)\nDate of Appointment:\nDate of Appointment:\n(vi)\n(vi)\nNature of Appointment:\nNature of Appointment:\nWhole Time\nPart Time\n9.\n9.\nDate of commencement of Reconnaissance Operation or\n\t\t\t\tprospecting operations:\nDate of commencement of Reconnaissance Operation or\n\t\t\t\tprospecting operations:\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner - Geologist - Mining Engineer\nDesignation: Owner - Geologist - Mining Engineer\nForm - B\nForm - B\n[ See rule 9(1), 9(3) and 9(4)]\n(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................)\n(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................)\nImportant Instructions for Filling the Form\n1.\n1.\nType of Mineral Concession ---\nType of Mineral Concession ---\nReconnaissance Permit\nProspecting Licence\nProspecting License-cum-Mining Lease\n2.\n2.\nIBM Registration Number\nIBM Registration Number\n3.\n3.\nUnique IBM Concession Number\nUnique IBM Concession Number\nReconnaissance Permit\nProspecting License\nProspecting License-cum-Mining Lease\n4.\n4.\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\n(Information will be system generated. Linked with Entry 5 and\n\t\t\t\t6 of Form 'K'.)\n5.\n5.\nName and address of the permit holder or licensee:\nName and address of the permit holder or licensee:\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n6.\n6.\nParticulars of Mineral Concession\nParticulars of Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n7.\n7.\nLocation of the Mineral Concession\nLocation of the Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n8.\n8.\nStatus of reconnaissance - prospecting operation\nStatus of reconnaissance - prospecting operation\nPlease tick-mark the boxes whichever is applicable\nPlease tick-mark the boxes whichever is applicable\nIn Progress\n[ ]\nCompleted\n[ ]\nAbandoned\n[ ]\n9.\n9.\nIf reconnaissance-prospecting operation is\n\t\t\t\tcompleted or abandoned, date of such completion or abandonment\nIf reconnaissance-prospecting operation is\n\t\t\t\tcompleted or abandoned, date of such completion or abandonment\n10.\n10.\nTotal surface area covered by reconnaissance - prospecting work (hectares) as on date\nTotal surface area covered by reconnaissance - prospecting work (hectares) as on date\n11.\n11.\nReconnaissance survey work done\nReconnaissance survey work done\n(A brief description of the work involved along with\n\t\t\t\tparticulars of the machines and instruments used would be given\n\t\t\t\tagainst each of the following items)\n(A brief description of the work involved along with\n\t\t\t\tparticulars of the machines and instruments used would be given\n\t\t\t\tagainst each of the following items)\n(i)\nRegional Survey\n_______________________________\n(ii)\nAerial-photo-geological work\n________________________________\n12.\n12.\nGeological Mapping including area covered and scale\nGeological Mapping including area covered and scale\n(i)\nGeophysical\n_____________________________\n(ii)\nGeochemical\n_____________________________\n(iii)\nTest drilling: Number, area of influence meterage and sampling\n_____________________________\n(iv)\nNature and structure of the ore body\n_____________________________\n(v)\nAnalysis of the ores or minerals\n_____________________________\n13.\n13.\nCompletion of prospecting work during the year:\nCompletion of prospecting work during the year:\n14.\n14.\n(a)\n(a)\nPitting\nPitting\n(i)\nNumber of pits\n_______________\n(ii)\nDepth (metres)\nAverage\n_______________\nMaximum\n_______________\nMinimum\n_______________\n(b)\n(b)\nTrenching\nTrenching\n(i)\nNumber of trenches\n_______________\n(ii)\nLength (metres)\nAverage\n_______________\nMaximum\n_______________\nMinimum\n_______________\n(c)\n(c)\nDrilling\nDrilling\nSurface\nUnderground\n(i)\nNumber of boreholes completed during the year.\n_____________\n_____________\n(ii)\nNumber of boreholes in progress, if any\n_____________\n_____________\n(iii)\nTotal annual drilling (metres)\n_____________\n_____________\n(d)\n(d)\nParticulars of drilling machines:\nParticulars of drilling machines:\nType\nMake\nCapacity\nNumber of drills\n(e)\n(e)\nExploratory mining, if any:\nExploratory mining, if any:\n(1)\nNumber of levels\n______________________________________________\n(2)\nTotal development (metres)\n______________________________________________\n(3)\nMode of entry\n______________________________________________\n(4)\nQuantity of ore produced with grade\n______________________________________________\n(f)\n(f)\nNumber of samples analysed:\nNumber of samples analysed:\n(1)\nMain constituent (please specify)\n____________________________________\n(2)\nComplete analysis\n____________________________________\n15.\n15.\nIf abandoned\nIf abandoned\n(iii)\n(iii)\nDate of abandonment\nDate of abandonment\n_______________________________\n(iv)\n(iv)\nReasons for abandonment\nReasons for abandonment\n_______________________________\nNote. - Please enclose a geological report describing the reconnaissance - prospecting operations undertaken so far along with the detailed geological plans and sections showing locations of (a) boreholes, (b) pits, (c) trenches, (d) shafts, (e) underground exploratory workings, (f) outcrops, (g) ore zones, (h) faults, (i) folds and other geological features.\nNote.\nThe Report shall contain in the borehole logs and interpretation and the inferences drawn as a result of the study of the geology of the area and the interpretation of the borehole cores, pits, trenches, assay data, reserves of ore and contain results of complete analysis of at least two representative samples of ore and the blocks proposed for mining operations. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area.\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner-Geologist-Mining Engineer\nDesignation: Owner-Geologist-Mining Engineer\nForm - C\nForm - C\n(See rule 20, 29 and 49)\n(Notice of intimation of opening-reopening of mine-change in the name of mine)\n(Notice of intimation of opening-reopening of mine-change in the name of mine)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of mine - Old name of mine (in case of change in name)\nName of mine - Old name of mine (in case of change in name)\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nDate of opening-reopening of mine\nDate of opening-reopening of mine\n7.\n7.\nIn case of reopening, date of discontinuation\nIn case of reopening, date of discontinuation\n8.\n8.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n9.\n9.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n10.\n10.\nName and address of previous owner\nName and address of previous owner\nif any and the date of abandonment of Mine\nName Address E-mail Mobile no.\nName\nName\nAddress\nAddress\nE-mail\nE-mail\nMobile no.\nMobile no.\n11.\nName and address of Agent of Mine\nName and address of Agent of Mine\nName Address E-mail Mobile no.\nName\nName\nAddress\nAddress\nE-mail\nE-mail\nMobile no.\nMobile no.\n12.\n12.\nParticulars of Mining Engineer employed in the mine:\nParticulars of Mining Engineer employed in the mine:\n(Information will be system Generated. Linked with Entry 8 and\n\t\t\t\t9 of Form 'H'.)\n13.\n13.\nParticulars of Geologist employed in the mine\nParticulars of Geologist employed in the mine\n(Information will be system Generated. Linked with Entry 8 and\n\t\t\t\t9 of Form 'H'.)\n14.\n14.\nParticulars of Manager employed in the mine\nParticulars of Manager employed in the mine\n(Information will be system Generated. Linked with Entry 8 and\n\t\t\t\t9 of Form 'H'.)\n15.\n15.\nLetter No. and date through which the mining plan was\n\t\t\t\tapproved by the Indian Bureau of Mines or State Government\n\t\t\t\tconcerned\nLetter No. and date through which the mining plan was\n\t\t\t\tapproved by the Indian Bureau of Mines or State Government\n\t\t\t\tconcerned\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner-Geologist-Mining Engineer\nDesignation: Owner-Geologist-Mining Engineer\nForm - D\nForm - D\n[ See rule 21(2)]\n(Notice of intention of abandonment of mine or part of the mine)\n(Notice of intention of abandonment of mine or part of the mine)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of Mine\nName of Mine\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n7.\n7.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n8.\n8.\nLetter No. and date through which the Final\n\t\t\t\tMine Closure plan was approved by the Indian Bureau of Mines or\n\t\t\t\tState Government concerned\nLetter No. and date through which the Final\n\t\t\t\tMine Closure plan was approved by the Indian Bureau of Mines or\n\t\t\t\tState Government concerned\n9.\n9.\nDate of abandonment\nDate of abandonment\n10.\n10.\nReasons for abandonment\nReasons for abandonment\n[Please tick whichever is applicable]\ni.\nLack of demand\nii.\nExhaustion of ore-mineral\niii.\nUn-economic operations\niv.\nUnable to obtain forest clearance\n11.\n11.\nUpto date Total Resources of Mineral(s) in Mining Lease\n\t\t\t\tarea (in tonne) as per UNFC:\nUpto date Total Resources of Mineral(s) in Mining Lease\n\t\t\t\tarea (in tonne) as per UNFC:\n(A)\n(A)\nMineral Reserve\nMineral Reserve\n(i)\nProved Reserve (111)\n(ii)\nProbable Reserve (121 and 122)\n(B)\n(B)\nRemaining Resources\nRemaining Resources\n(i)\nFeasibility Mineral Resources (211)\n(ii)\nPre Feasibility Mineral Resources (221 and 222)\n(iii)\nMeasure Mineral Resources (331)\n(iv)\nIndicated Mineral Resources (332)\n(v)\nInferred Mineral Resources (333)\n(vi)\nReconnaissance Mineral Resources (334)\n(C)\n(C)\nTotal Resources (A + B) = .....................(tonnes)\nTotal Resources\n12.\n12.\nNumber of workers employed in the mine: Male Female\nNumber of workers employed in the mine: Male Female\n(a)\nCompany labour\n(b)\nContract labour\n(c)\nTotal\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner-Geologist-Mining Engineer\nDesignation: Owner-Geologist-Mining Engineer\nForm - E\nForm - E\n[See rule 28(1) and 28(2)]\n(Notice of temporary discontinuance of mine)\n(Notice of temporary discontinuance of mine)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of Mine\nName of Mine\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n7.\n7.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n8.\n8.\nDate of temporary discontinuance\nDate of temporary discontinuance\n9.\n9.\nReasons for temporary discontinuance\nReasons for temporary discontinuance\n[Please tick whichever is applicable]\n(i)\nLack of demand\n(ii)\nNon-availability of labour\n(iii)\nRains\n(iv)\nTransport bottleneck\n(v)\nStrike-Lockout\n(vi)\nOperations becoming un-economic\n(vii)\nOther reasons (specify)\n10.\n10.\nProbable date of re-opening of the mine\nProbable date of re-opening of the mine\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner - Geologist - Mining Engineer\nDesignation: Owner - Geologist - Mining Engineer\nForm - F\nForm - F\n[See rule 30(2)]\n(Notice of commencement of stoping)\n(Notice of commencement of stoping)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of Mine\nName of Mine\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n7.\n7.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n8.\n8.\nSection-pit number\nSection-pit number\n(This is applicable in cases where\n\t\t\t\tthe main mine is divided into more than one\n\t\t\t\tdistrict-section-pit.)\n9.\n9.\nDate on which it is proposed to commence stoping\nDate on which it is proposed to commence stoping\n10.\n10.\nExtent of development in the mine:\nExtent of development in the mine:\n(a)\nNumber of shafts-inclines-and its width-depth-length\n_____________________________\n(b)\nMaximum depth and development\n_____________________________\n(c)\nNumber of levels with their extent\n_____________________________\n(d)\nTotal meterage of development\n_____________________________\n(e)\nTotal number of blocks developed including the total tonnage\n\t\t\t\tand grade (excluding blocks already stoped out and already\n\t\t\t\tpermitted for stoping)\n_____________________________\n11.\nDetails of the blocks applied for stoping\nDetails of the blocks applied for stoping\n(a)\nNumber and size of each block, their levels tonnage and grade\n_____________________________\n(b)\nMethod of stoping to be adopted –\n(i)\nA description of the method with stope preparation sequence of\n\t\t\t\toperation appropriate drawings to illustrate the and extraction\n_____________________________\n(ii)\nRate of stoping contemplated in each block (monthly)\n_____________________________\n(iii)\nEstimated recovery from each block\n_____________________________\n(iv)\nEstimated dilution\n_____________________________\n(v)\nEstimated tonnage and grade of ore to be extracted\n_____________________________\n12.\n12.\nIs this a first application for stoping for this mine?\nIs this a first application for stoping for this mine?\nIf not, the following details may be furnished\nIf not, the following details may be furnished\n(i)\nDate of previous application(s) for stoping\n_____________________________\n(ii)\nDate and reference of permission or refusal by this department\n\t\t\t\t(mention blocks and their levels)\n_____________________________\n(iii)\nHave all the blocks for which stoping permission\n\t\t\t\twas granted, been stoped out? If not, mention the specific\n\t\t\t\tblocks that are remaining to be stoped out, indicating the state\n\t\t\t\tof stoping operations therein:\n_____________________________\n13.\n13.\nRate of development and programme of forming additional\n\t\t\t\tstope blocks simultaneously with the proposed stoping\nRate of development and programme of forming additional\n\t\t\t\tstope blocks simultaneously with the proposed stoping\n_____________________________\n14.\n14.\nList of enclosures\nList of enclosures\n_____________________________\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner - Geologist - Mining Engineer\nDesignation: Owner - Geologist - Mining Engineer\nForm F1\nForm F1\n[See rule 45(5) (b) (i)]\nFor the month of ________20\nMonthly Return\nMonthly Return\n[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]\n(i) The Regional Controller of Mines\nIndian Bureau of Mines\n_________Region,\nPIN:\n(ii) The State Government\nPart - I\n(General and Labour)\n(General and Labour)\n1.\n1.\nDetails of the Mine:\nDetails of the Mine:\n(a)\nRegistration number allotted by\n\t\t\t\tIndian Bureau of Mines\n(to give registration number of the Lessee- Owner)\n(b)\nMine Code (allotted by Indian Bureau of Mines )\nMine Code\n(c)\nName of the Mineral\n(d)\nName of Mine\n(e)\nName(s) of other mineral(s),\nif any, produced from the same mine\n(f)\nLocation of the Mine :\nLocation of the Mine :\nVillage\nPost Office\nTahsil-Taluk\nDistrict\nState\nPIN Code\nFax No. :\nE-mail :\nPhone No. :\nMobile :\n2.\n2.\nName and address of Lessee-Owner (along with fax no. and\n\t\t\t\te-mail):\nName and address of Lessee-Owner (along with fax no. and\n\t\t\t\te-mail):\nName of Lessee-Owner\nAddress\nDistrict\nState\nPIN Code\nFax No. :\nE-mail:\nPhone No. :\nMobile:\n3.\n3.\nDetails of Rent- Royalty - Dead Rent- DMF -NMET amount paid\n\t\t\t\tin the month\nDetails of Rent- Royalty - Dead Rent- DMF -NMET amount paid\n\t\t\t\tin the month\n(i)\nRent paid (Rs.)\n(ii)\nRoyalty paid (Rs.)\n(iii)\nDead Rent paid (Rs.)\n(iv)\nPayment made to the DMF (Rs.)\n(v)\nPayment made to the NMET (Rs.)\n4.\n4.\nDetails on working of mine:\nDetails on working of mine:\n(i)\nNumber of days the mine worked:\n(ii)\nReasons for work stoppage in the mine during the\n\t\t\t\tmonth (due to strike, lockout, heavy rain, non-availability of\n\t\t\t\tlabour, transport bottleneck, lack of demand, uneconomic\n\t\t\t\toperations, etc.) and the number of days of work stoppage for\n\t\t\t\teach reason separately\nReasons\nNo of days\n5.\n5.\nAverage Daily Employment and Total Salary-Wages paid #:\nAverage Daily Employment and Total Salary-Wages paid #:\nWork place\nWork place\nDirect\nDirect\nContract\nContract\nTotal Salary-Wages (Rs.)\nTotal Salary-Wages (Rs.)\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\nDirect\nDirect\nContract\nContract\nBelow ground\nOpencast\nAbove ground\nTotal\n# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site\nPart-II\n(Production, Despatches and Stocks)\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\n(Unit of Quantity in Tonnes)",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
"prev_section": "74",
"next_section": "1"
}