{
    "act_title": "The Mineral Conservation and Development Rules, 2017",
    "act_slug": "the-mineral-conservation-and-development-rules-2017",
    "section_label": "Section",
    "section": {
        "number": "75",
        "title": "75. Information source.",
        "chapter": null,
        "content": "Schedule\nForm-A\nForm-A\n( See rule 7)\n( See rule 7)\n(Notice of commencement of Reconnaissance or prospecting operations)\n(Notice of commencement of Reconnaissance or prospecting operations)\nImportant Instructions for Filling the Form\n1.\n1.\nType of Mineral Concession ---\nType of Mineral Concession ---\nReconnaissance Permit\nProspecting Licence\nProspecting License-cum-Mining Lease\n2.\n2.\nIBM Registration Number\nIBM Registration Number\n3.\n3.\nUnique IBM Concession Number\nUnique IBM Concession Number\nReconnaissance Permit\nProspecting License\nProspecting License-cum-Mining Lease\n4.\n4.\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\n(Information will be system generated. Linked with Entry 5 and\n\t\t\t\t6 of Form 'K'.)\n5.\n5.\nName and address of the permit holder or licensee:\nName and address of the permit holder or licensee:\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n6.\n6.\nParticulars of Mineral Concession\nParticulars of Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n7.\n7.\nLocation of the Mineral Concession\nLocation of the Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n8.\n8.\nParticulars of Geologist employed for the Reconnaissance\n\t\t\t\tPermit or Geologist and Mining Engineer employed for the\n\t\t\t\tProspecting Licenced area:\nParticulars of Geologist employed for the Reconnaissance\n\t\t\t\tPermit or Geologist and Mining Engineer employed for the\n\t\t\t\tProspecting Licenced area:\n(i)\n(i)\nName and address:\nName and address:\n(ii)\n(ii)\nE-mail address:\nE-mail address:\n(iii)\n(iii)\nPhone Number and Mobile Number:\nPhone Number and Mobile Number:\n(iv)\n(iv)\nQualification:\nQualification:\n(v)\n(v)\nDate of Appointment:\nDate of Appointment:\n(vi)\n(vi)\nNature of Appointment:\nNature of Appointment:\nWhole Time\nPart Time\n9.\n9.\nDate of commencement of Reconnaissance Operation or\n\t\t\t\tprospecting operations:\nDate of commencement of Reconnaissance Operation or\n\t\t\t\tprospecting operations:\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner - Geologist - Mining Engineer\nDesignation: Owner - Geologist - Mining Engineer\nForm - B\nForm - B\n[ See rule 9(1), 9(3) and 9(4)]\n(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................)\n(Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................)\nImportant Instructions for Filling the Form\n1.\n1.\nType of Mineral Concession ---\nType of Mineral Concession ---\nReconnaissance Permit\nProspecting Licence\nProspecting License-cum-Mining Lease\n2.\n2.\nIBM Registration Number\nIBM Registration Number\n3.\n3.\nUnique IBM Concession Number\nUnique IBM Concession Number\nReconnaissance Permit\nProspecting License\nProspecting License-cum-Mining Lease\n4.\n4.\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\nName of the mineral or minerals for which Reconnaissance\n\t\t\t\tPermit or prospecting license or prospecting license cum mining\n\t\t\t\tlease has been granted:\n(Information will be system generated. Linked with Entry 5 and\n\t\t\t\t6 of Form 'K'.)\n5.\n5.\nName and address of the permit holder or licensee:\nName and address of the permit holder or licensee:\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n6.\n6.\nParticulars of Mineral Concession\nParticulars of Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n7.\n7.\nLocation of the Mineral Concession\nLocation of the Mineral Concession\n(Information will be system Generated. Linked with Entry 5 and\n\t\t\t\t6 of Form ‘K’.)\n8.\n8.\nStatus of reconnaissance - prospecting operation\nStatus of reconnaissance - prospecting operation\nPlease tick-mark the boxes whichever is applicable\nPlease tick-mark the boxes whichever is applicable\nIn Progress\n[     ]\nCompleted\n[     ]\nAbandoned\n[     ]\n9.\n9.\nIf reconnaissance-prospecting operation is\n\t\t\t\tcompleted or abandoned, date of such completion or abandonment\nIf reconnaissance-prospecting operation is\n\t\t\t\tcompleted or abandoned, date of such completion or abandonment\n10.\n10.\nTotal surface area covered by reconnaissance - prospecting work (hectares) as on date\nTotal surface area covered by reconnaissance - prospecting work (hectares) as on date\n11.\n11.\nReconnaissance survey work done\nReconnaissance survey work done\n(A brief description of the work involved along with\n\t\t\t\tparticulars of the machines and instruments used would be given\n\t\t\t\tagainst each of the following items)\n(A brief description of the work involved along with\n\t\t\t\tparticulars of the machines and instruments used would be given\n\t\t\t\tagainst each of the following items)\n(i)\nRegional Survey\n_______________________________\n(ii)\nAerial-photo-geological work\n________________________________\n12.\n12.\nGeological Mapping including area covered and scale\nGeological Mapping including area covered and scale\n(i)\nGeophysical\n_____________________________\n(ii)\nGeochemical\n_____________________________\n(iii)\nTest drilling: Number, area of influence meterage and sampling\n_____________________________\n(iv)\nNature and structure of the ore body\n_____________________________\n(v)\nAnalysis of the ores or minerals\n_____________________________\n13.\n13.\nCompletion of prospecting work during the year:\nCompletion of prospecting work during the year:\n14.\n14.\n(a)\n(a)\nPitting\nPitting\n(i)\nNumber of pits\n_______________\n(ii)\nDepth (metres)\nAverage\n_______________\nMaximum\n_______________\nMinimum\n_______________\n(b)\n(b)\nTrenching\nTrenching\n(i)\nNumber of trenches\n_______________\n(ii)\nLength (metres)\nAverage\n_______________\nMaximum\n_______________\nMinimum\n_______________\n(c)\n(c)\nDrilling\nDrilling\nSurface\nUnderground\n(i)\nNumber of boreholes completed during the year.\n_____________\n_____________\n(ii)\nNumber of boreholes in progress, if any\n_____________\n_____________\n(iii)\nTotal annual drilling (metres)\n_____________\n_____________\n(d)\n(d)\nParticulars of drilling machines:\nParticulars of drilling machines:\nType\nMake\nCapacity\nNumber of drills\n(e)\n(e)\nExploratory mining, if any:\nExploratory mining, if any:\n(1)\nNumber of levels\n______________________________________________\n(2)\nTotal development (metres)\n______________________________________________\n(3)\nMode of entry\n______________________________________________\n(4)\nQuantity of ore produced with grade\n______________________________________________\n(f)\n(f)\nNumber of samples analysed:\nNumber of samples analysed:\n(1)\nMain constituent (please specify)\n____________________________________\n(2)\nComplete analysis\n____________________________________\n15.\n15.\nIf abandoned\nIf abandoned\n(iii)\n(iii)\nDate of abandonment\nDate of abandonment\n_______________________________\n(iv)\n(iv)\nReasons for abandonment\nReasons for abandonment\n_______________________________\nNote. - Please enclose a geological report describing the reconnaissance - prospecting operations undertaken so far along with the detailed geological plans and sections showing locations of (a) boreholes, (b) pits, (c) trenches, (d) shafts, (e) underground exploratory workings, (f) outcrops, (g) ore zones, (h) faults, (i) folds and other geological features.\nNote.\nThe Report shall contain in the borehole logs and interpretation and the inferences drawn as a result of the study of the geology of the area and the interpretation of the borehole cores, pits, trenches, assay data, reserves of ore and contain results of complete analysis of at least two representative samples of ore and the blocks proposed for mining operations. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area.\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner-Geologist-Mining Engineer\nDesignation: Owner-Geologist-Mining Engineer\nForm - C\nForm - C\n(See rule 20, 29 and 49)\n(Notice of intimation of opening-reopening of mine-change in the name of mine)\n(Notice of intimation of opening-reopening of mine-change in the name of mine)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of mine - Old name of mine (in case of change in name)\nName of mine - Old name of mine (in case of change in name)\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nDate of opening-reopening of mine\nDate of opening-reopening of mine\n7.\n7.\nIn case of reopening, date of discontinuation\nIn case of reopening, date of discontinuation\n8.\n8.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n9.\n9.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n10.\n10.\nName and address of previous owner\nName and address of previous owner\nif any and the date of abandonment of Mine\nName Address E-mail Mobile no.\nName\nName\nAddress\nAddress\nE-mail\nE-mail\nMobile no.\nMobile no.\n11.\nName and address of Agent of Mine\nName and address of Agent of Mine\nName Address E-mail Mobile no.\nName\nName\nAddress\nAddress\nE-mail\nE-mail\nMobile no.\nMobile no.\n12.\n12.\nParticulars of Mining Engineer employed in the mine:\nParticulars of Mining Engineer employed in the mine:\n(Information will be system Generated. Linked with Entry 8 and\n\t\t\t\t9 of Form 'H'.)\n13.\n13.\nParticulars of Geologist employed in the mine\nParticulars of Geologist employed in the mine\n(Information will be system Generated. Linked with Entry 8 and\n\t\t\t\t9 of Form 'H'.)\n14.\n14.\nParticulars of Manager employed in the mine\nParticulars of Manager employed in the mine\n(Information will be system Generated. Linked with Entry 8 and\n\t\t\t\t9 of Form 'H'.)\n15.\n15.\nLetter No. and date through which the mining plan was\n\t\t\t\tapproved by the Indian Bureau of Mines or State Government\n\t\t\t\tconcerned\nLetter No. and date through which the mining plan was\n\t\t\t\tapproved by the Indian Bureau of Mines or State Government\n\t\t\t\tconcerned\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner-Geologist-Mining Engineer\nDesignation: Owner-Geologist-Mining Engineer\nForm - D\nForm - D\n[ See rule 21(2)]\n(Notice of intention of abandonment of mine or part of the mine)\n(Notice of intention of abandonment of mine or part of the mine)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of Mine\nName of Mine\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n7.\n7.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n8.\n8.\nLetter No. and date through which the Final\n\t\t\t\tMine Closure plan was approved by the Indian Bureau of Mines or\n\t\t\t\tState Government concerned\nLetter No. and date through which the Final\n\t\t\t\tMine Closure plan was approved by the Indian Bureau of Mines or\n\t\t\t\tState Government concerned\n9.\n9.\nDate of abandonment\nDate of abandonment\n10.\n10.\nReasons for abandonment\nReasons for abandonment\n[Please tick whichever is applicable]\ni.\nLack of demand\nii.\nExhaustion of ore-mineral\niii.\nUn-economic operations\niv.\nUnable to obtain forest clearance\n11.\n11.\nUpto date Total Resources of Mineral(s) in Mining Lease\n\t\t\t\tarea (in tonne) as per UNFC:\nUpto date Total Resources of Mineral(s) in Mining Lease\n\t\t\t\tarea (in tonne) as per UNFC:\n(A)\n(A)\nMineral Reserve\nMineral Reserve\n(i)\nProved Reserve (111)\n(ii)\nProbable Reserve (121 and 122)\n(B)\n(B)\nRemaining Resources\nRemaining Resources\n(i)\nFeasibility Mineral Resources (211)\n(ii)\nPre Feasibility Mineral Resources (221 and 222)\n(iii)\nMeasure Mineral Resources (331)\n(iv)\nIndicated Mineral Resources (332)\n(v)\nInferred Mineral Resources (333)\n(vi)\nReconnaissance Mineral Resources (334)\n(C)\n(C)\nTotal Resources (A + B) = .....................(tonnes)\nTotal Resources\n12.\n12.\nNumber of workers employed in the mine: Male Female\nNumber of workers employed in the mine: Male Female\n(a)\nCompany labour\n(b)\nContract labour\n(c)\nTotal\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner-Geologist-Mining Engineer\nDesignation: Owner-Geologist-Mining Engineer\nForm - E\nForm - E\n[See rule 28(1) and 28(2)]\n(Notice of temporary discontinuance of mine)\n(Notice of temporary discontinuance of mine)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of Mine\nName of Mine\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n7.\n7.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n8.\n8.\nDate of temporary discontinuance\nDate of temporary discontinuance\n9.\n9.\nReasons for temporary discontinuance\nReasons for temporary discontinuance\n[Please tick whichever is applicable]\n(i)\nLack of demand\n(ii)\nNon-availability of labour\n(iii)\nRains\n(iv)\nTransport bottleneck\n(v)\nStrike-Lockout\n(vi)\nOperations becoming un-economic\n(vii)\nOther reasons (specify)\n10.\n10.\nProbable date of re-opening of the mine\nProbable date of re-opening of the mine\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner - Geologist - Mining Engineer\nDesignation: Owner - Geologist - Mining Engineer\nForm - F\nForm - F\n[See rule 30(2)]\n(Notice of commencement of stoping)\n(Notice of commencement of stoping)\nImportant Instructions for Filling the Form\n1.\n1.\nIBM Registration Number\nIBM Registration Number\n2.\n2.\nMining Lease Code\nMining Lease Code\n3.\n3.\nMine Code\nMine Code\n4.\n4.\nName of Mine\nName of Mine\n5.\n5.\nName and address of the lessee-owner\nName and address of the lessee-owner\n(Information will be system\n\t\t\t\tgenerated. Linked with Entry 3 of Form 'K'.)\n6.\n6.\nParticulars of the Mining Lease (ML)\nParticulars of the Mining Lease (ML)\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n7.\n7.\nLocation of the Mining Lease\nLocation of the Mining Lease\n(Information will be system generated. Linked with Entry 4 of\n\t\t\t\tForm 'K')\n8.\n8.\nSection-pit number\nSection-pit number\n(This is applicable in cases where\n\t\t\t\tthe main mine is divided into more than one\n\t\t\t\tdistrict-section-pit.)\n9.\n9.\nDate on which it is proposed to commence stoping\nDate on which it is proposed to commence stoping\n10.\n10.\nExtent of development in the mine:\nExtent of development in the mine:\n(a)\nNumber of shafts-inclines-and its width-depth-length\n_____________________________\n(b)\nMaximum depth and development\n_____________________________\n(c)\nNumber of levels with their extent\n_____________________________\n(d)\nTotal meterage of development\n_____________________________\n(e)\nTotal number of blocks developed including the total tonnage\n\t\t\t\tand grade (excluding blocks already stoped out and already\n\t\t\t\tpermitted for stoping)\n_____________________________\n11.\nDetails of the blocks applied for stoping\nDetails of the blocks applied for stoping\n(a)\nNumber and size of each block, their levels tonnage and grade\n_____________________________\n(b)\nMethod of stoping to be adopted –\n(i)\nA description of the method with stope preparation sequence of\n\t\t\t\toperation appropriate drawings to illustrate the and extraction\n_____________________________\n(ii)\nRate of stoping contemplated in each block (monthly)\n_____________________________\n(iii)\nEstimated recovery from each block\n_____________________________\n(iv)\nEstimated dilution\n_____________________________\n(v)\nEstimated tonnage and grade of ore to be extracted\n_____________________________\n12.\n12.\nIs this a first application for stoping for this mine?\nIs this a first application for stoping for this mine?\nIf not, the following details may be furnished\nIf not, the following details may be furnished\n(i)\nDate of previous application(s) for stoping\n_____________________________\n(ii)\nDate and reference of permission or refusal by this department\n\t\t\t\t(mention blocks and their levels)\n_____________________________\n(iii)\nHave all the blocks for which stoping permission\n\t\t\t\twas granted, been stoped out? If not, mention the specific\n\t\t\t\tblocks that are remaining to be stoped out, indicating the state\n\t\t\t\tof stoping operations therein:\n_____________________________\n13.\n13.\nRate of development and programme of forming additional\n\t\t\t\tstope blocks simultaneously with the proposed stoping\nRate of development and programme of forming additional\n\t\t\t\tstope blocks simultaneously with the proposed stoping\n_____________________________\n14.\n14.\nList of enclosures\nList of enclosures\n_____________________________\nPlace:\nPlace:\nDate:\nDate:\nSignature\nSignature\nName in full:\nName in full:\nDesignation: Owner - Geologist - Mining Engineer\nDesignation: Owner - Geologist - Mining Engineer\nForm F1\nForm F1\n[See rule 45(5) (b) (i)]\nFor the month of ________20\nMonthly Return\nMonthly Return\n[To be used for minerals other than Copper, Gold, Lead, Pyrites, Tin, Tungsten, Zinc and precious and semi-precious stones]\n(i)    The Regional Controller of Mines\nIndian Bureau of Mines\n_________Region,\nPIN:\n(ii)   The State Government\nPart - I\n(General and Labour)\n(General and Labour)\n1.\n1.\nDetails of the Mine:\nDetails of the Mine:\n(a)\nRegistration number allotted by\n\t\t\t\tIndian Bureau of Mines\n(to give registration number of the Lessee- Owner)\n(b)\nMine Code (allotted by Indian Bureau of Mines )\nMine Code\n(c)\nName of the Mineral\n(d)\nName of Mine\n(e)\nName(s) of other mineral(s),\nif any, produced from the same mine\n(f)\nLocation of the Mine :\nLocation of the Mine :\nVillage\nPost Office\nTahsil-Taluk\nDistrict\nState\nPIN Code\nFax No. :\nE-mail :\nPhone No. :\nMobile :\n2.\n2.\nName and address of Lessee-Owner (along with fax no. and\n\t\t\t\te-mail):\nName and address of Lessee-Owner (along with fax no. and\n\t\t\t\te-mail):\nName of Lessee-Owner\nAddress\nDistrict\nState\nPIN Code\nFax No. :\nE-mail:\nPhone No. :\nMobile:\n3.\n3.\nDetails of Rent- Royalty - Dead Rent- DMF -NMET amount paid\n\t\t\t\tin the month\nDetails of Rent- Royalty - Dead Rent- DMF -NMET amount paid\n\t\t\t\tin the month\n(i)\nRent paid (Rs.)\n(ii)\nRoyalty paid (Rs.)\n(iii)\nDead Rent paid (Rs.)\n(iv)\nPayment made to the DMF (Rs.)\n(v)\nPayment made to the NMET (Rs.)\n4.\n4.\nDetails on working of mine:\nDetails on working of mine:\n(i)\nNumber of days the mine worked:\n(ii)\nReasons for work stoppage in the mine during the\n\t\t\t\tmonth (due to strike, lockout, heavy rain, non-availability of\n\t\t\t\tlabour, transport bottleneck, lack of demand, uneconomic\n\t\t\t\toperations, etc.) and the number of days of work stoppage for\n\t\t\t\teach reason separately\nReasons\nNo of days\n5.\n5.\nAverage Daily Employment and Total Salary-Wages paid #:\nAverage Daily Employment and Total Salary-Wages paid #:\nWork place\nWork place\nDirect\nDirect\nContract\nContract\nTotal Salary-Wages (Rs.)\nTotal Salary-Wages (Rs.)\nMale\nMale\nFemale\nFemale\nMale\nMale\nFemale\nFemale\nDirect\nDirect\nContract\nContract\nBelow ground\nOpencast\nAbove ground\nTotal\n# To include all employees exclusive to the mine and attached factory, workshop or mineral dressing plant at the mine site\nPart-II\n(Production, Despatches and Stocks)\n(Production, Despatches and Stocks)\n(To be submitted separately for each mineral)\n(Unit of Quantity in Tonnes)",
        "footnote": "",
        "is_definition": false,
        "sort_order": 74
    },
    "prev_section": "74",
    "next_section": "1"
}