(a) a surface plan showing location and number of the boundary pillars along with its latitude and longitude values, every surface feature within the mining lease boundaries, such as building, telephone, power transmission line, water pipeline, tramline, railway, road, river, water-course, reservoir, tank, bore-hole, shaft and incline opening, opencast working, dumps and dumping ground, the waste land, forest, sanctuaries, agricultural land and grazing land and subsidence on the surface beneficiation plants, tailing ponds and other workings within the lease;
(b) a surface geological plan of the area of leasehold showing-
(i) all the lithological units exposed in the area, in the pits, trenches and in any other openings made for prospecting and mining operations showing contact between lithological units;
(ii) structural details like strike, dip, fold, fault, plunge of ore body;
(iii) location of prospecting pits, trenches, boreholes and any other openings made for prospecting or mining operations;
(iv) existing mine workings, dumps, stacks of ore;
(v) section lines at regular intervals from one boundary to the other of the lease;
(vi) contour at not more than ten metres interval;
(vii) exploration limits such as G1, G2, G3 and G4 as per the United Nations Framework Classification;
(c) a transverse section or sections of the workings through the shaft or shafts and main adits indicating clearly the strike and dip of the vein, lode, reef, mineral bed or deposit at different points, and such sections of the strata sunk or driven through in the mine or proved by boreholes, as may be available;
(d) a longitudinal mine section or sections showing a vertical projection of the mine workings including outlines of all stoped out areas, where a reef, vein, lode or mineral bed or deposit or part thereof has dip exceeding thirty degrees from the horizontal plane:
(e) an underground plan, applicable for underground mines, showing-
(i) the position of the workings of the mine below ground;
(ii) every borehole and shaft (with depth), drive, cross-cut, winze, raise, excavation (stoped ground) and every tunnel and air passage connected therewith;
(iii) every pillar or block of mineral left for the support of any structure on the surface; and underground magazines, if any;
(iv) the general strike of the veins, lodes, reefs and mineral beds or deposits;
(v) the position of every dyke, fault and other geological disturbance with the amount and direction of throw.
(a) a key plan on a scale of 1: 50,000 incorporating the following:
i. an administrative surface map showing the boundary of the mining lease, and the adjoining area lying preferably within five kilometres thereof;
ii. contours at not more than twenty meters intervals;
iii. natural drainage system such as rivers, streams, nalahs, water reservoirs, ponds, lakes, irrigation dams and canals;
iv. roadways and railways;
v. places of historical and archaeological importance, monuments, places of worship, pilgrimage and of tourist interest;
vi. forests with tree density, sanctuaries, wastelands, agricultural lands, grazing lands;
vii. boundaries of all villages and towns with their population;
viii. predominant wind direction;
ix. any other relevant features:
(b) an environment plan of the area of mining lease inclusive of the adjoining area within five hundred meters of the boundary of a lease area on 1: 5000 scale incorporating the following:
(i) an administrative surface map showing the boundary of the mining lease;
(ii) contour lines at five meters intervals;
(iii) all features indicated in sub-clauses (iii) to (viii) of clause (a) above;
(iv) area occupied by mine workings, area deforested, area covered by dump with the height of the dump, processing plant, surface building, workshop, mining township;
(v) area reclaimed and area afforested, location of protective barriers, check dams erected to contain solid and liquid effluents generated by prospecting, mining, beneficiation or metallurgical operations carried out in the mine;
(vi) all pumping stations and the courses of discharge of mine water;
(vii) any other relevant features:
Section 32 • The Mineral Conservation and Development Rules, 2017
32. Types of plans and sections.
the-mineral-conservation-and-development-rules-2017-sec-32.json
•
Section 32
{
"act_title": "The Mineral Conservation and Development Rules, 2017",
"act_slug": "the-mineral-conservation-and-development-rules-2017",
"section_label": "Section",
"section": {
"number": "32",
"title": "32. Types of plans and sections.",
"chapter": null,
"content": "(a) a surface plan showing location and number of the boundary pillars along with its latitude and longitude values, every surface feature within the mining lease boundaries, such as building, telephone, power transmission line, water pipeline, tramline, railway, road, river, water-course, reservoir, tank, bore-hole, shaft and incline opening, opencast working, dumps and dumping ground, the waste land, forest, sanctuaries, agricultural land and grazing land and subsidence on the surface beneficiation plants, tailing ponds and other workings within the lease;\n(b) a surface geological plan of the area of leasehold showing-\n(i) all the lithological units exposed in the area, in the pits, trenches and in any other openings made for prospecting and mining operations showing contact between lithological units;\n(ii) structural details like strike, dip, fold, fault, plunge of ore body;\n(iii) location of prospecting pits, trenches, boreholes and any other openings made for prospecting or mining operations;\n(iv) existing mine workings, dumps, stacks of ore;\n(v) section lines at regular intervals from one boundary to the other of the lease;\n(vi) contour at not more than ten metres interval;\n(vii) exploration limits such as G1, G2, G3 and G4 as per the United Nations Framework Classification;\n(c) a transverse section or sections of the workings through the shaft or shafts and main adits indicating clearly the strike and dip of the vein, lode, reef, mineral bed or deposit at different points, and such sections of the strata sunk or driven through in the mine or proved by boreholes, as may be available;\n(d) a longitudinal mine section or sections showing a vertical projection of the mine workings including outlines of all stoped out areas, where a reef, vein, lode or mineral bed or deposit or part thereof has dip exceeding thirty degrees from the horizontal plane:\n(e) an underground plan, applicable for underground mines, showing-\n(i) the position of the workings of the mine below ground;\n(ii) every borehole and shaft (with depth), drive, cross-cut, winze, raise, excavation (stoped ground) and every tunnel and air passage connected therewith;\n(iii) every pillar or block of mineral left for the support of any structure on the surface; and underground magazines, if any;\n(iv) the general strike of the veins, lodes, reefs and mineral beds or deposits;\n(v) the position of every dyke, fault and other geological disturbance with the amount and direction of throw.\n(a) a key plan on a scale of 1: 50,000 incorporating the following:\ni. an administrative surface map showing the boundary of the mining lease, and the adjoining area lying preferably within five kilometres thereof;\nii. contours at not more than twenty meters intervals;\niii. natural drainage system such as rivers, streams, nalahs, water reservoirs, ponds, lakes, irrigation dams and canals;\niv. roadways and railways;\nv. places of historical and archaeological importance, monuments, places of worship, pilgrimage and of tourist interest;\nvi. forests with tree density, sanctuaries, wastelands, agricultural lands, grazing lands;\nvii. boundaries of all villages and towns with their population;\nviii. predominant wind direction;\nix. any other relevant features:\n(b) an environment plan of the area of mining lease inclusive of the adjoining area within five hundred meters of the boundary of a lease area on 1: 5000 scale incorporating the following:\n(i) an administrative surface map showing the boundary of the mining lease;\n(ii) contour lines at five meters intervals;\n(iii) all features indicated in sub-clauses (iii) to (viii) of clause (a) above;\n(iv) area occupied by mine workings, area deforested, area covered by dump with the height of the dump, processing plant, surface building, workshop, mining township;\n(v) area reclaimed and area afforested, location of protective barriers, check dams erected to contain solid and liquid effluents generated by prospecting, mining, beneficiation or metallurgical operations carried out in the mine;\n(vi) all pumping stations and the courses of discharge of mine water;\n(vii) any other relevant features:",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
"prev_section": "31",
"next_section": "33"
}