The Bombay Lifts Rules, 1958

The Bombay Lifts Rules, 1958

Raw JSON API

Sections

1. Short title.

Section 1

2. Definitions.

Section 2

3. Permission for installing lift or for making additions or alterations [and by a declaration in Form A1 from the contractor to whom the applicant proposes to entrust the work of installing the lift or, as the case may be, of additions and alterations thereto] to lift installed.

Section 3

4. Licence for working lift.

Section 4

5. Licence for working lift not to be granted unless requirements laid down in the Schedule are complied with.

Section 5

6. Terms on which lifts shall be worked.

Section 6

7. Form of notice and order under section 8.

Section 8

8. Report of accidents.

Section 8

9. Unused lifts.

Section 9

10. Saving.

Section 10

1. Lift-wells.

Section 1

2. Lift-well enclosure.

Section 2

3. Lift-pits.

Section 3

5. Landing gates and doors.

Section 5

6. Locking devices for landing gates and doors.

Section 6

7. Lift-cars.

Section 7

8. Lift-car frame.

Section 8

9. Lift-car capacity.

Section 9

10. Load to be marked.

Section 10

11. Counter-weights.

Section 11

12. Guides.

Section 12

13. Buffers.

Section 13

14. Suspension ropes.

Section 14

15. Emergency Safety Devices.

Section 15

16. Overspeed Governor.

Section 16

17. Slack Rope Switch.

Section 17

18. Machine rooms and overhead structure.

Section 18

19. Overhead pulleys.

Section 19

20. Machine Supports.

Section 20

21. Lift Machines.

Section 21

23. Shafts.

Section 23

24. Controllers.

Section 24

25. Operation and Operating Device.

Section 25

26. Electric wiring.

Section 26

27. Terminal limit Switches.

Section 27

28. Ultimate or Final Limit Switches.

Section 28

29. Tests.

Section 29

30. Notices.

Section 30