LLM Advocates Logo
LLM Advocates
HOME
CATEGORIES ▼
Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
A-Z INDEX
HOME A-Z INDEX

CATEGORIES

Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
← Back to Chhattisgarh State Electricity Supply Code, 2011
Section 5 • Chhattisgarh State Electricity Supply Code, 2011

5. In case of 3 phase 4 wire LT meter for balanced load if during checking/testing meter is not found functioning in 1 phase and found functioning properly in other 2 phases then recorded consumption and demand be multiplied by 1.5 i.e. 50% additional to be billed based on recorded demand and consumption corresponding for two phases.

← Previous Section Section 4: 4. In case the meter became stop/defective from the date of connection or reliable consumption of sufficient period after connection is not available then average consumption of subsequent three billing month/ billing cycle period after installation of good meter, may be considered. ☰ Next Section Section 6: 6. If during checking/testing 3 phase 4 wire LT meter for balanced load is not found working properly in 2 phases but found working properly in third phase, the recorded demand and consumption be multiplied by 3 i.e. two times additional demand and consumption to be billed, corresponding to recorded demand and consumption of one phase. →
chhattisgarh-state-electricity-supply-code-2011-sec-5.json • Section 5
API ↗
{
    "act_title": "Chhattisgarh State Electricity Supply Code, 2011",
    "act_slug": "chhattisgarh-state-electricity-supply-code-2011",
    "section_label": "Section",
    "section": {
        "number": "5",
        "title": "5. In case of 3 phase 4 wire LT meter for balanced load if during checking/testing meter is not found functioning in 1 phase and found functioning properly in other 2 phases then recorded consumption and demand be multiplied by 1.5 i.e. 50% additional to be billed based on recorded demand and consumption corresponding for two phases.",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 7
    },
    "prev_section": "4",
    "next_section": "6"
}

Ready to Discuss Your Case?

GET STARTED
© 2026 LLM Advocates. All rights reserved.
RESOURCES ABOUT BLOGS FAQ CONTACT PRIVACY POLICY TERMS