1. If main meter is stopped and check meter is found working, billing to be done as per check meter.

Section 1

2. If both meters found working and consumption difference between these two meters is within the permissible limit, billing be done as per consumption recorded by main meter.

Section 2

3. If both meters found working but consumption difference between these two meters is more than permissible limit, both meters to be tested and billing be done on the basis of consumption recorded by main meter considering its percentage error.

Section 3

1. On the basis of average of previous 3 months consumption if meter is found functioning correctly during such 3 months period and consumption is found uniform.

Section 1

2. On the basis of average of last 1 year consumption if meter is found functioning correctly during last one year and there is appreciable fluctuation in consumption.

Section 2

3. On the basis of consumption of corresponding month of previous . years-in case consumption found varying based on season and the meter is found functioning correctly during corresponding month of previous year.

Section 3

4. In case the meter became stop/defective from the date of connection or reliable consumption of sufficient period after connection is not available then average consumption of subsequent three billing month/ billing cycle period after installation of good meter, may be considered.

Section 4

5. In case of 3 phase 4 wire LT meter for balanced load if during checking/testing meter is not found functioning in 1 phase and found functioning properly in other 2 phases then recorded consumption and demand be multiplied by 1.5 i.e. 50% additional to be billed based on recorded demand and consumption corresponding for two phases.

Section 5

6. If during checking/testing 3 phase 4 wire LT meter for balanced load is not found working properly in 2 phases but found working properly in third phase, the recorded demand and consumption be multiplied by 3 i.e. two times additional demand and consumption to be billed, corresponding to recorded demand and consumption of one phase.

Section 6

7. If proper recorded data is available in memory of electronic meter through MRI/AMR, billing to decide based on available data, after computation.

Section 7

8. Meter to be tested, percentage error to be found out and billing be done based on percentage error arrived during testing.

Section 8

9. To substantiate the assessment wherever required licensee may consider other basis such as connected load, working hour and load factor, consumption of similar type of other connection, production data of industries approved by excise department etc.

Section 9

1. Industrial Service

Section 1

2. Commercial Service

Section 2

3. Agricultural Service

Section 3

4. Other Service Four

Section 4

1. Chhattisgarh State Electricity Supply Code, 2007

Section 1

2. Chhattisgarh State Electricity Regulatory Commission (Security Deposit) Regulations, 2005

Section 2

3. Chhattisgarh State Electricity Regulatory Commission (Procedure for Filing Appeal Before the Appellate Authority) Regulations, 2005

Section 3

1. In case of a partnership firm - The applicant shall furnish the partnership deed and an authorization in the name of the applicant for signing the requisition form and agreement.

Section 1

2. In case of public and/or private limited company - the applicant shall furnish a Memorandum and Articles of Association and Certificate of Incorporation alongwith an authorization in the name of the applicant for signing the requisition form and agreement.

Section 2

3. Other documents applicable only for select consumer categories :

Section 3

1. Proof of ownership of the premises:

Section 1

2. A map indicating the proposed location of the plant/office duly marked the area by red ink where supply is to be utilized and the point where supply is required. MoP should normally be scale of I Cm representing 1200 Cm.

Section 2

3. Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statute.

Section 3

4. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm.

Section 4

5. In case of partnership firm, partnership deed.

Section 5

6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.

Section 6

7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the licensee immediately.

Section 7

8. Letter of intent for production/enhancement in production may be furnished.

Section 8

9. List of equipments proposed to be installed alongwith the expected load.

Section 9

10. Resolution for authorized signatory.

Section 10

11. Registration from Industries Department.

Section 11

12. Extract of project report relevant to power and process requirements (in case of industries).

Section 12

13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.

Section 13

1. Copy of latest bill duly paid

Section 1

2. Proof of ownership/legal occupancy of premises

Section 2

3. No objection certificate from the existing consumer if available/possible

Section 3

4. Registered deed/Succession or legal heir certificate/Mutation deed/.....................

Section 4

5. NOC from other legal heir(s) in case connection is to be changed in the name of one of the legal heirs.

Section 5

1. A work completion certificate & test report from Licensed Electrical Contractor, if the consumer's installation has been altered.

Section 1

2. Resolution for authorized signatory.

Section 2

1. Site verification report

Section 1

2. Comments of concerned official

Section 2

1. For better result capacitors be installed at the terminal of individual motors matching to its capacity so that capacitors may be switched on/switched off alongwith the motor with supply.

Section 1

2. In case common capacitor is installed at one point for number of small motors, capacitor shall be switched off when there is only light and fan load in circuit or else it may affect the average monthly power factor due to over compensation during no load or less load period.

Section 2