3. If both meters found working but consumption difference between these two meters is more than permissible limit, both meters to be tested and billing be done on the basis of consumption recorded by main meter considering its percentage error.
(B). When only main meter is installed the consumption of previous three years period or from the date of connection whichever is less need to be reviewed to know the trend of consumption and to arrive the conclusion about the month from which meter became defective. Any of the following method or its combination can be adopted to arrive to reasonable assessment of energy consumed during the period meter remained stop/defective.