6. If during checking/testing 3 phase 4 wire LT meter for balanced load is not found working properly in 2 phases but found working properly in third phase, the recorded demand and consumption be multiplied by 3 i.e. two times additional demand and consumption to be billed, corresponding to recorded demand and consumption of one phase.