{
    "act_title": "Chhattisgarh State Electricity Supply Code, 2011",
    "act_slug": "chhattisgarh-state-electricity-supply-code-2011",
    "section_label": "Section",
    "section": {
        "number": "5",
        "title": "5. In case of 3 phase 4 wire LT meter for balanced load if during checking/testing meter is not found functioning in 1 phase and found functioning properly in other 2 phases then recorded consumption and demand be multiplied by 1.5 i.e. 50% additional to be billed based on recorded demand and consumption corresponding for two phases.",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 7
    },
    "prev_section": "4",
    "next_section": "6"
}