8. Contingency Planning.

8.2. Objective.
8.3. Contingency Planning Procedure.
•  Partial system black out in the State due to multiple tripping of the Transmission lines emanating from power stations/sub-stations
•  Total black out in the State/Region
•  Synchronisation of system islands and system split
8.4. Restoration Procedure.
- Total System Black out
- Partial System Blackout
- Synchronisation of System Islands and System Split
8.5. Special Considerations.