7. Outage Planning.

7.2. Objective.
7.3. Outage Planning Process.
•  Major grid disturbance
•  System Isolation
•  Black out in the State
•  Any other event in the system that may have an adverse impact on system security by the proposed outage
7.4. Annual Outage Planning.
7.5. Availing of shutdowns schedule.