3. In Case X 2 is positive and X 4 is negative, or vice-versa, there would be no payment under (ii) above.

Annexure-II to Chapter-5
Annexure-II to Chapter-5
Day ahead forecast of demand at inter-connection points
Day ahead forecast of demand at inter-connection points
To be furnished by 11:00 hrs of current day
To be furnished by 11:00 hrs of current day
(Ref-Section 5.4(1) and (4))
Hour/ Block
Day >
Name of S/S
Name of S/S
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Name of S/S
Total
1
MW
MVAr
2
MW
MVAr
3
MW
MVAr
4
MW
MVAr
5
MW
MVAr
6
MW
MVAr
7
MW
AVAr
8
MW
MVAr
9
MW
MVAr
10
MW
MVAr
11
MW
MVAr
12
MW
MVAr
13
MW
MVAr
14
MW
MVAr
15
MW
MVAr
16
MW
MVAr
17
MW
MVAr
18
MW
MVAr
19
MW
MVAr
20
MW
MVAr
21
MW
MVAr
22
MW
MVAr
23
MW
MVAr
24
MW
MVAr
.
MW
MVAr
96
MW
MVAr
Total (MU)
Signature of the Authorised signatory of the Licensee
Annexure-III to Chapter-5
Annexure-III to Chapter-5
Weekly a head forecast of demand at inter connection points for the next week (Monday to Sunday)
Weekly a head forecast of demand at inter connection points for the next week (Monday to Sunday)
To be furnished by Friday of each week
Name of the Distribution Company
(Ref-Section 5.4(1) and (4)
Sl. No.
Names of S/S->Hr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Total
1
MW
MVAr
2
MW
MVAr
3
MW
MVAr
4
MW
MVAr
5
MW
MVAr
6
MW
MVAr
7
MW
MVAr
8
MW
MVAr
9
MW
MVAr
.
MW
MVAr
.
MW
MVAr
N
MW
MVAr
Signature of Authorised signatory of the Licensee
Annexure-IV to Chapter-5
Annexure-IV to Chapter-5
Month ahead forecast of demand at inter-connection points for the next month
Month ahead forecast of demand at inter-connection points for the next month
To be furnished by 15th of current month
Name of the Distribution Company
(Ref-Section 5.4(1) and (4)
Sl. No.
Names of S/S->Hr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Total
1
MW
MVAr
2
MW
MVAr
3
MW
MVAr
4
MW
MVAr
5
MW
MVAr
6
MW
MVAr
7
MW
MVAr
8
MW
MVAr
9
MW
MVAr
.
MW
MVAr
.
MW
MVAr
N
MW
MVAr
Signature of Authorised signatory of the Licensee
Annexure-V to Chapter-5
Annexure-V to Chapter-5
Yearly (Month wise) requirement of Energy at inter-connection points for the next Financial Year
Yearly (Month wise) requirement of Energy at inter-connection points for the next Financial Year
To be furnished by 31st December of each year
To be furnished by 31st December of each year
(Ref-Section 5.4(1) and (4))
Name of The Distribution Company :-
For the Year
All Figures in MU
Sl. No.
Name of S/S
April
May
June
July
August
September
October
November
December
January
February
March
Total
1
2
3
4
5
6
7
N
Total
Signature of Authorised signatory of the Licensee
Annexure VI to Chapter-5
Annexure VI to Chapter-5
[Ref: Regulation 5.9(7)]
[Ref: Regulation 5.9(7)]
Incident Reporting
Incident Reporting
Date:................
Time:......................
(Voltage, Frequency, Flows, Generation, etc.)
Chapter-6
Scheduling and Despatch Code
6.1 Introduction.
(a) Demarcation of responsibilities between Various Users and SLDC in Scheduling and despatch.
(b) Procedure for scheduling and despatch
(c) Complementary Commercial Mechanism (Annexure-I to Chapter-6)
6.2 Objective
6.3 Scope
6.4 Demarcation of Responsibilities
6.5 Scheduling and Despatch Procedure - (1) Generation Scheduling
(i) Transmission System constraints from time to time.
(ii) Fifteen minutes block load requirements as estimated by SLDC.
(iii) The need to provide Operating Margins and reserves required to be maintained.
(iv) The availability of generation from State Generators, ISGS and CGPs together with constraints, if any, , in each case.
(v) Overall economy to the license and customers.
(2) Generation Despatch
(i) To switch a generator into or out of service.
(ii) Details of reserve to be carried on a unit.
(iii) To increase or decrease MVAr generation to assist with voltage profile.
(iv) To begin pre-planned Black Start procedures.
(v) To hold spinning reserve.
(vi) To hold Generating Units on standby.
(3) Communication with Generators
6.6 Action Required By Generators
6.7 Enhancement of Schedule and Despatch Procedure
6.8 Data Requirements
Annexure-1 to Chapter-6
Annexure-1 to Chapter-6
{Refer Clause 6.1 (c)}
{Refer Clause 6.1 (c)}
Complementary Commercial Mechanisms
Complementary Commercial Mechanisms
Chapter-7
Monitoring Of Generation And Drawal
7.1.
7.2 Objective
7.3 Monitoring Procedure
(2) Generating Unit Tripping
(3) Monitoring of Drawal
(4) Data Requirements
Chapter-8
Cross Boundary Safety
8.1 Introduction.
8.2 Objective
8.3 Control Persons
8.4 Procedure
8.5 Special Considerations
Chapter-9
Protection
9.1 Introduction.
9.2 Objective
9.3 General Principles
9.4. Protection Co-Ordination
9.5 Fault Clearance Times
9.6 Generator Requirements
9.7 Transmission Line Requirements
(a) 400 kV Lines
(b) 220 kV Line
(c) 132 kV Line
9.8 Distribution Line Requirement
(1) Non-Parallel Radial Feeders - Non-directional time lag over current and earth fault relay with suitable settings to obtain discrimination between adjacent relay stations.
(1) Non-Parallel Radial Feeders
(2) Parallel Feeders/Ring Feeders - Directional time lag over current and earth fault relays.
(2) Parallel Feeders/Ring Feeders
(3) For long Feeders/Transformer Feeders - For long feeders or transformer feeders, the relays should Incorporate a high set instantaneous element.
(3) For long Feeders/Transformer Feeders
9.9 Transformer Requirements - (1) Generating Station/Transmission System
(2) Distribution System
9.10 Sub-Station Bus Bar and Fire Protection
9.11 Data Requirements
Chapter-10
Metering and Communication and Data Acquisition
[10.1 Introduction
(i) Interface Meters are - (a) the meters installed at the points of inter connection with Inter/ Intra State Transmission System for purpose of electricity accounting and billing.
(i) Interface Meters are
(b) the meters installed at the points of inter connection between the two licensees for purpose of electricity accounting and billing.
(c) the meters installed at the points of inter connection with Inter/Intra State Transmission System for a consumer who has been permitted open access by the Appropriate Commission for purpose of electricity accounting and billing.
(d) the meters installed at the points of inter connection with Distribution System for a consumer who has been permitted open access by the Appropriate Commission for purpose of electricity accounting and billing.
(ii) Energy Accounting and Auditing Meters - These are the meters installed to account for energy generated, transmitted, distributed and consumed in various segments of the power system and the energy loss.]
(ii) Energy Accounting and Auditing Meters
10.2 Objective
10.3 Generation Operational Metering
(i) Bus Voltage
(ii) Frequency
(iii) MW
(iv) MVAR
10.4 Transmission System Operational Metering
(i) Bus Voltage
(ii) Frequency
(iii) MW
(iv) MVAR
(v) Power Factor
(vi) Current
10.5 Supervisory Control And Data Acquisition (Scada)
10.6 Regulatory Requirements Of Special Energy Meters
(i) Average frequency for each successive 15- minute block, as a two-digit code (00 to 99 for frequency from 49.0 to 51.0 Hz).
(ii) Net Wh transmitted during each successive 15-minute block, up to second decimal, with plus/minus sign.
(iii) Cumulative Wh transmittal at each midnight, in six digits including one decimal.
(iv) Cumulative VArh transmittal for voltage high condition, at each midnight, in six digits including one decimal.
(v) Cumulative VArh transmittal for voltage low condition, at each midnight, in six digits including one decimal.
(vi) Date and Time Blocks of failure of VT supply on any phase, as a star (*) mark.
(i) Unique identification number of the meter
(ii) Date
(iii) Time
(iv) Cumulative Wh register reading
(v) Average frequency of the previous 15-minute block
(vi) Net Wh transmittal in the previous 15-minute block, with +/-sigr
(vii) Average percentage voltage
(viii) Reactive power, with +/-sign
(ix) Voltage-high VArh register reading
(x) Voltage-low VArh register reading
10.7 Communication
10.8 Data Acquisition
(i) MW generated in each Power Station
(ii) MW draw from External Interconnection
(iii) MVAr generated or absorbed in each Power Station
(iv) MVAr imported or exported from External Interconnection
(v) Voltage in all system buses
(vi) Frequency in Transmission System
(vii) MW & MV Ar flow in each transmission line
10.9 Agreed Procedure For Communication Ano Data Transmission
Data Requirement
[10.10. Application of CEA Regulations
Chapter-11
Management of The Orissa Grid Code
11.1 Management of OGC.
(1) The OGC and its amendments shall be finalized and notified adopting the prescribed procedure followed for regulations issued by OERC.
(2) The requests for amendments to modifications in the OGC and for removal of difficulties shall be addressed to Secretary, OGC, for periodic consideration, consultation and disposal.
(3) Any dispute or query regarding interpretation of OGC may be addressed to Secretary, OERC and clarification issued by the OERC shall be taken as final and binding on all concerned.
(4) The OERC shall specify the OGC for operation of the State Transmission System as per Section 86 (1) (h) of the Act, ensuring that they are consistent with the IEGC.
11.2 Grid Co-Ordination Committee (Gcc)
(i) Facilitating the implementation of these Regulations and the rules and procedures developed under the provisions of these Regulations.
(ii) Assessing and recommending remedial measures for issues that might arise during the course of implementation of provisions of these Regulations and the rules and procedures developed under the provisions of these Regulations
(iii) Periodical review of the OGC, in accordance with the provisions of the Act and these Regulations
(iv) Analyse any major grid disturbance soon after its occurrence.
(v) Examining problems raised by the Users, and
(vi) Investigate take action in case any Beneficiary is indulging in unfair gaming or collusion after getting reported from SLDC.
(vii) Initiate remedial action against persistent default payment of Ul and VAr charges reported by SLDC.
(viii) Decide utilisation of money remaining in the State reactive account (Refer Clause 7 of Complementary Commercial Mechanisms)
(ix) Audit the complete statement of the State Ul and the State Reactive Energy account tabled by SLDC by its Commercial Committee (a sub-committee of GCC).
(x) Such other matters as may be directed by the Commission from time to time.
(i) One member of the SLDC;
(ii) One member from State Transmission Utility i.e. OPTCL;
(iii) One member to represent the each of the generating companies in the State namely OHPC, OPGC and NTPC (TTPS);
(iv) One member to represent the Transmission Licensees in the State, other than the STU;
(v) One member to represent each of the Distribution Licensees in the State;
(vi) One member to represent GRIDCO,
(vii) One member to represent the Trading Licensees in the state (other than GRIDCO);
(viii) One representative of Captive Generating Plants from the State having installed capacity more than 100 MW;
(ix) One representative of PGCIL;
(x) One representative from ERLDC;
(xi) One representative from OERC as an observer and
(xii) Such other persons as may be nominated by the Commission.
(i) The concerned Director of STU, having the responsibility of looking after technical activities of STU shall be the member referred to in Section [11.2 (3)(ii)] above;
(ii) the member referred to in Section [11.2 (3)(ii)] above, shall be the head of SLDC;
(iii) the members referred to in clauses (iii), (iv), (v), (vi) and (vii) of Section 11.2 (3) above shall be nominated by their respective organizations;
(iv) Organizations referred under Sections [11,2(3)(iv)(vii) & (viii)] will be selected in rotation from among all such organizations in the State. The term of each such member, selected in rotation, shall be one (1) year :
Chapter-12
Data Registration
12.1 Introduction.
12.2 Objective
12.3 Responsibilities
12.4 Data Categories And Stages In Registration
12.5 Changes To Users Data
12.6 Data Not Supplied
12.7 Special Considerations
12.8 Appendices
Appendix
Appendix
Subject
Subject
Page
Page
A
Standard Planning Data
312
B
Detailed Planning Data
316
C
Operational Planning Data
325
D
Protection Data
328
E
Metering Data
328
Appendix-A
Appendix-A
Data Registration
Data Registration
Standard Planning Data
Standard Planning Data
Reference To:
Chapter 3 System Planning
Chapter-4 Connection Condition
A.1 Standard Planning Data (Generation)
A.1.1 Thermal (Coal/Fuel Linked)
A.1.1 Thermal (Coal/Fuel Linked)
A.1.1.1 General
A.1.1.1 General
i.
Site
Give location map to scale showing roads, railway lines,
transmission lines, rivers and reservoirs if any.
ii.
Coal linkage/Fuel (Like Liquid Natural Gas, Naptha etc.)
linkage
Give information on means of coal transport from colamines in
case of pitchead stations or means of coal carriage if coal is to
be brought from (distance). In case of other fuels, give details
of source of fuel and their transport.
iii.
Water Sources
Give information on availability of water for operation of the
Power Station.
iv.
Environmental
State whether forest, lands mining clearance areas are
affected.
v.
Site map (To scale)
Showing an area required for Power Station coal linkage, coal
yard, water pipe line, ash disposal area, colony etc.
vi.
Approximate period of construction.
A.1.1.2 Connection
A.1.1.2 Connection
i.
Point of Connection
Give Single Line Diagram of the proposed Connection with the
system.
ii.
Step up voltage for connection in K.V.
A.1.1.3 Station Capacity
A.1.1.3 Station Capacity
i.
Total Power Station capacity (MW).
State whether development will be carried out in phase and if
so, furnish details.
ii.
No. of units & unit size
MW
A.1.1.4 Generating Unit Data
A.1.1.4 Generating Unit Data
i.
Steam Generating Unit
State type, capacity, steam pressure, steam temperature etc.
ii.
Steam turbine
State type, and capacity.
iii.
Generator
a. Type
b. Rating (MVA)
c. Terminal voltage (kV)
d. Rated Power Factor
e. Reactive Power Capability (MVAr) in the range 0.95 of
leading and 0.85 lagging
f. Short Circuit Ratio
g. Direct axis transient reactance (% on MVA rating)
h. Direct axis sub-transient reactance (% on MVA rating)
i. Auxiliary Power Requirement (MW)
iv.
Generator Transformer
a. Type
b. Rated capacity (MVA)
c. Voltage Ratio (HV/LV)
d. Tap change Range (+% to - %) Percentage Impedance (Positive
Sequence at Full load)
A.1.2 Hydro Electrical
A.1.2 Hydro Electrical
A.1.2.1 General
A.1.2.1 General
i.
Site
Give location map to scale showing roads, railway lines, and
transmission lines.
ii.
Site map (To scale)
Showing proposed dam, reservoir area, water conductor system,
fore-bay, power house etc.
iii.
Submerged Area
Give information on area submerged, villages submerged,
submerged forest land, agricultural land etc.
iv.
Approximate period of construction.
A.1.2.2. Connection
A.1.2.2. Connection
i.
Point of Connection
Give Single Line Diagram proposed connection with the
Transmission System.
ii.
Step up voltage for Connection
KV
A.1.2.3. Station Capacity
A.1.2.3. Station Capacity
i.
Total Power Station capacity (MW)
State whether development is carried out in phases and if so
furnish details.
ii.
No of units & unit size
MW
A.1.2.4. Generating Unit Data
A.1.2.4. Generating Unit Data
i.
Operating Head (in Mtr.)
a. Maximum
b. Minimum
c. Average
ii.
Turbine State
Type and capacity
iii.
Generator
a. Type
b. Rating (MVA)
c. Terminal voltage (kV)
d. Rated Power Factor
e. Reactive Power Capability (MVAr) in the range 0.95 of
leading and 0.85 of lagging
f. Short Circuit Ratio
g. Direct axis transient reactance (% on rated MVA)
h. Direct axis sub-transient reactance (% on rated MVA)
i. Auxiliary Power Requirement (MW)
iv.
Generator Transformer
a. Type
b. Rated Capacity (MVA)
c. Voltage Ratio HV/LV
d. Tap change Range (+% to -%)
e. Percentage Impedance (Positive sequence at full load).
A.2 Standard Planning Data (Transmission)
Note - The compilation of the data is the internal matter of the Transmission Licensee, and as such the Transmission Licensee shall make arrangements for getting the required data from different departments of the Transmission Licensee to update its Standard Planning Data in the format given below :
i. Name of line (Indicating Power Stations and sub-stations to be connected).
ii. Voltage of line (KV).
iii. No. of circuits.
iv. Route length (Km).
v. Conductor sizes.
vi. Line parameters (pu values).
a. Resistance/Km.
b. Inductance/Km.
c. Susceptance/Km (B/2).
vii. Approximate power flow expected MW & MVAr.
viii. Terrain of route-Give information regarding nature of terrain i.e.forest land, fallow land, agricultural and river basin, hill slope etc.
ix. Route map (to Scale) - Furnish topographical map showing the proposed route showing existing power lines and telecommunication lines.
x. Purpose of Connection - Reference for scheme, wheeling to other Stats, etc.
xi. Approximate period of Construction.
A.3 Standard Planning Data Distribution
A.3.1 General
i. Area map (to scale)- Marking the area in the map of Orissa for which distribution licence is applied for.
ii. Consumer Data - Furnish categories of consumers, their numbers and connected loads.
iii. Reference to Electrical Divisions presently in charge of the distribution.
A.3.2 Connection
i. Points of Connection - Furnish Single Line Diagram showing points of connection.
ii. Voltage of supply at points of connection iii. Names of Grid Sub-station feeding the points of connection.
A.3.3. Lines and Substations
i. Line data- Furnish lengths of line and voltages within the Area.
ii. Sub-station data-Furnish details of 33/11 KV sub-stations,11/ 0.4 KV sub-stations, capacitor installations.
A.3.4 Loads
i. Loads drawn at points of connection.
ii. Details of loads fed at EHV, if any Give name of consumer,voltage of supply, contract demand and name of Grid Sub-station from which line is drawn, length of EHV line from Grid Sub-station to consumer's premises.
A.3.5 Demand Data (For all Loads 5 MW and above)
i. Type of load- State whether furnace loads, rolling mills, traction loads, other industrial loads, pumping loads etc.
ii. Rated voltage and phase.
iii. Electrical loading of equipment-State number and size of motors, types of drive and control arrangements.
iv. Sensitivity of load to voltage and frequency of supply.
v. Maximum Harmonic content of load.
vi. Average and maximum phase unbalance of load.
vii. Nearest sub-station from which load is to be fed.
viii. Location map (to scale)- Showing location of load with reference to lines and sub-stations in the vicinity.
A.3.6 Load Forecast Data
i. Peak load and energy forecast for each category of loads for each of the succeeding 10 years.
ii. Details of methodology and assumptions on which forecasts are based.
iii. If supply is received from more than one Sub-station, the Substation wise break up of peak load and energy projections for each category of loads for each of the succeeding 10 years along with estimated daily load curve.
iv. Details of loads 5 MW and above.
a. Name of prospective consumer.
b. Location and nature of load/complex.
Appendix-B
Appendix-B
Detailed Planning Data
Reference To
Chapter 3/system Planning
Chapter 4/connection Conditions
B.1 Detailed Planning Data (Generation)
Part 1. For Routine Submission
B.1.1 Thermal Power Stations (Coal Based)
B. 1.1.1 General
i. Name of Power Station
ii. Number and capacity of Generating Sets (MVA)
iii. Ratings of all major equipments (Boilers and major accessories, turbines, alternators, Generating Unit transformers etc.).
iv. Single Line Diagram of Power Station and switchyard
v. Relaying and metering diagram
vi. Neutral grounding of Generating Units.
vii. Excitation control (What type is used ? e.g. Thyristor, Fast Brush less ?)
viii. Earthing arrangements with earth resistance values
B.1.1.2 Protection and Metering
i. Full description including settings for all relays and protection systems installed on the Generating Unit, Generating Unit transformer, auxiliary transformer and electrical motor of major equipment listed, but not limited to, under SI.3 (General).
ii. Full description including settings for all relays installed on all outgoing feeders from Power Station switchyard, tie circuit breakers, incoming circuit breakers.
iii. Full description of inter-tripping of circuit breakers at the point or points of Connection with the Transmission System.
iv. Most probable fault clearance time for electrical faults on the User's system.
v. Full description of operational and commercial metering schemes.
B.1.1.3 Switchyard
i. Rated MVA
ii. Voltage Ratio
iii. Vector Group
iv. Positive sequence reactance for maximum, minimum, normal Tap. (% on MVA)
v. Positive sequence resistance for maximum, minimum, normal Tap. (% on MVA)
vi. Zero sequence reactance. (% on MVA)
vii. Tap changer Range (+%to- %) and steps
viii. Type of Tap changer. (OFF/ON)
i. Rated voltage (KV)
ii. Type of circuit breaker (MOCB/ABCB/SF6)
iii. Rated short circuit breaking current (kA) 3 phase
iv. Rated short circuit breaking current (kA) 1 phase
v. Rated short circuit making current (kA) 3 phase
vi. Rated short circuit making current (kA) 1 phase
vii. Provisions of auto reciosing with details
i. Busbar
ii. Switchgear
iii. Transformer bushings
iv. Transformer windings
B.1.1.4 Generating Units
(a) Parameters of Generating Units :-
i. Rated terminal voltage (KV)
ii. Rated MVA
iii. Rated MW
iv. Inertia constant (MW Sec./MVA) H
v. Short circuit ratio
vi. Direct axis synchronous reactance (% on MVA) X d
vii. Direct axis transient reactance (% on MVA) X' d
viii. Direct axis sub-transient reactance (% on MVA) X" d
ix. Quadrature axis synchronous reactance (% on MVA) X q
x. Quadrature axis transient reactance (% on MVA) X" q
xi. Quadrature axis sub-transient reactance (% on MVA) X" q
xii. Direct axis transient open circuit time constant (Sec) T" do
xiii. Direct axis sub-transient open circuit time constant (Sec) T" do
xiv. Quadrature axis transient open circuit time constant (Sec) T' qo
xv. Quadrature axis sub-transient open circuit time constant (Sec) T" qo
xvi. Stator resistance (Ohm) R a
xvii. Stator leakage reactance (Ohm) X 1
xviii Stator time constant (Sec)
xix. Rated field current (A)
xx. Open circuit saturation characteristic for various terminals giving the compounding current to achieve the same.
(b) Parameters of Excitation Control System
i. Type of excitation
ii. Maximum field voltage
iii. Minimum field voltage
iv. Rated field voltage
v. Details of excitation loop in block diagrams showing transfer functions of Individual elements using IEEE symbols.
vi. Dynamic characteristics of over-excitation limiter.
vii. Dynamic characteristics of under-excitation limiter.
(c) Parameters of Governor
i. Governor average gain (MW/Hz)
ii. Speeder motor settings range
iii. Time constant of steam or fuel governor valve
iv. Governor valve opening limits
v. Governor valve rate limits
vi. Time constant of turbine.
vii. Governor block diagram showing transfer functions of individual elements using IEEE symbols.
(d) Operational Parameters :-
i. Minimum notice required synchronising a Generating Unit from de-synchronisation.
ii. Minimum time between synchronising different Generating Units in a Power Station.
iii. The minimum block load requirements on synchronising
iv. Time required for synchronising a Generating Unit for the following conditions
a. Hot
b. Warm
c. Cold
v. Maximum Generating Unit loading rates for the following conditions
a. Hot
b. Warm
c. Cold
vi. Minimum load without oil support (MW)
B.1.2 Hydroelectric Stations
B.1.2.1 General
i; Name of Power Station
ii. No. and capacity of units (MVA)
iii. Ratings of all major equipment
a. Turbines (HP)
b. Generators (MVA)
c. Generators Transformers (MVA)
d. Auxiliary Transformers (MVA)
iv. Single Line Diagram of Power Station and switchyard
v. Relaying and metering diagram
vi. Neutral grounding of generator
vii. Excitation control
viii. Earthing arrangements with earth resistance values
ix. Reservoir Data
a. Salient features
b. Type of Reservoir
(i) Multipurpose
(ii) For Power
c. Operating Table with :-
(i) Area capacity curves, and
(ii) Unit capability at different net heads.
B.1.2.2 Protection
i. Full description including settings for all relays and protection systems installed on the Generating Unit, generator transformer, auxiliary transformer and electrical motor of major equipment included, but not limited to those listed, under SI.3 (General).
ii. Full description including settings for all relays installed on all outgoing feeders from Power Station switchyard, tie breakers, incoming breakers.
iii. Full description of inter-tripping of breakers at the point or points of connection with the Transmission System.
iv. Most probable fault clearance time for electrical faults on the User's system.
B.1.2.3 Switchyard
(a) Interconnecting Transformers
i. Rated MVA
ii. Voltage ratio
iii. Vector group
iv. Positive sequence reactance for maximum, minimum and normal tap (% on MVA).
v. Positive sequence resistance for maximum, minimum and normal Tap (% on MVA).
vi. Zero sequence reactance (% on MVA)
vii. Tap changer range (+% to -%) and steps
viii. Type of tap changer (OFF/ON)
(b) Switchgear (including circuit breakers, isolators on all circuits connected to the points of Connection
i. Rated voltage (KV)
ii. Type of Breaker (MOCB/ABCB/SF6)
iii. Rated short circuit breaking current (KA) 3 phase
(c) Lightning Arresters :
(d) Communications :
(e) Basic Insulation Level (KV)
i. Bus bar
ii. Switchgear
iii. Transformer bushings
iv. Transformer windings
B.1.2.4. Generating Units
(a) Parameters of generator
i. Rated terminal voltage (KV).
ii. Rated MVA
iii. Rated MW
iv. Intertia constant (MW see/MVA)H
v. Short circuit ratio
vi. Direct axis synchronous reactance (% on MVA) X d
vii. Direct axis transient reactance (% on MVA) X' d
viii. Direct axis sub-transient reactance (% on MVA) X" d
ix. Quadrature axis synchronous reactance (% on MVA) X q
x. Quadrature axis transient reactance (% on MVA) X" q
xi. Quadrature axis sub-transient reactance (% on MVA) X" q
xii. Direct axis transient open circuit time constant (Sec) T" do
xiii. Direct axis sub-transient open circuit time constant (Sec) T" do
xiv. Quadrature axis transient open circuit time constant (Sec) T' qo
xv. Quadrature axis sub-transient open circuit time constant (Sec) T" qo
xvi. Stator resistance (Ohm) R a
xvii. Stator leakage reactance (Ohm) X 1
xviii. Stator time constant (Sec)
xix Rated Field current (A)
xx. Open Circuit saturation characteristics of the generator for Various terminal voltages giving the compounding current to achieve this.
xxi. Type of Turbine .
xxii. Operating Head (Mtr.)
xxiii. Discharge with Full Gate Opening (cumecs)
xxiv. Speed Rise on total Load thrown off (%)
(b) Parameters of Excitation Control System :
(c) Parameters of Governor:
(d) Operational Parameter:
i. Minimum notice required synchronising a Generating Unit from de-synchronisation.
ii. Minimum time between synchronising different Generating Units in a Power Station.
iii. Minimum block load requirements on synchronising.
Part 2. FOR SUBMISSION ON REQUEST BY TRANSMISSION LICENSEE
B.1.3 Thermal Power Stations
B.1.3.1 General
i. Detailed Project report
ii. Status Report
a. Land
b. Coal
c. Water
d. Environmental clearance
e. Rehabilitation of displaced persons
iii. Techno-economics approval by CEA
iv. Approval of State Government/Government of India
v. Financial Tie-up
B.1.3.2 Connection
i. Reports of studies for parallel operation with the Transmission System
a. Short circuit studies
b. Stability studies
c. Load flow studies
ii. Proposed connection with Transmission System
a. Voltage
b. Number of circuits
c. Point of contact
B.1.4 Hydroelectric Power Stations
B.1.4.1 General
i. Detailed Project Report
ii. Status Report
a. Topographical survey
b. Geological survey
c. Land
d. Environmental clearance
e. Rehabilitation of displaced persons
iii. Techno-economic approval by CEA
iv. Approval of State Government/Government of India
v. Financial Tie-up
B.1.4.2. Connection
i. Reports of Studies for parallel operation with the Transmission System
a. Short circuit studies
b. Stability studies
c. Load flow studies
ii. Proposed connection with Transmission System
a. Voltage
b. Number of circuits
c. Point of Connection
B.2 Detailed System Data, Transmission
B.2.1 General
i. Single Line Diagram of the Transmission System down to 33 kV bus at grid Sub-station detailing :-
a. Name of Sub-station
b. Power Station, connected
c. Number and length of circuits
d. Interconnecting transformers
e. Sub-station bus layouts
f. Power transformers
g. Reactive compensation equipment
ii. Sub-station layout diagrams showing :-
a. Bus bar layouts
b. Electrical circuitry, lines, cables, transformers, switchgear, etc.
c. Phasing arrangements
d. Earthing arrangements
e. Switching facilities and interlocking arrangements
f. Operating voltages
g. Numbering and nomenclature :-
(i) Transformers
(ii) Circuits
(iii) Circuit breakers
(iv) Isolating switches
B.2.2 Line Parameters (For all circuits)
i. Designation of Line.
ii. Length of line (Km.)
iii. Number of circuits.
iv. Per Circuit values :-
a. Operating voltage (KV).
b. Positive Phase sequence reactance (pu on 100 MVA) X 1
c. Positive Phase sequence resistance (pu on 100 MVA) R 1
d. Positive Phase sequence susceptance (pu on 100 MVA) B 1
e. Zero Phase sequence reactance (pu on 100 MVA) X 0
f. Zero Phase sequence resistance (pu on 100 MVA) R 0
g. Zero Phase sequence susceptance (pu on 100 MVA) B 0
B.2.3. Transformer Parameters (For all transformers)
i. Rated MVA
ii. Voltage Ratio
iii. Vector Group
iv. Positive sequence reactance, maximum, minimum and normal (Pum on 100 MVA) X,
V. Positive sequence, resistance maximum, minimum and normal (pu on 100 MVA) R,.
vi. Zero sequence reactance (pu on 100 MVA)
vii. Tap change range (+% to -%) and steps
viii. Details of Tap changer (OFF/ON)
B.2.4 Equipment Details (For all Sub-stations)
i. Circuit Breakers
ii. Isolating switches
iii. Current Transformers
iv. Potential Transformers
B.2.5 Relaying and Metering
i. Relay protection installed for all transformers and feeders along with their settings and level of co-ordination with other Users.
ii. Metering details
B.2.6 System Studies
i. Load flow studies (peak and lean load for maximum hydro and maximum thermal generation).
ii. Transient stability studies for three phase fault in critical lines.
iii. Dynamic Stability Studies
iv. Short circuit studies (three phase and single phase to earth)
v. Transmission and distribution losses in the system.
B.2.7 Demand Data (For all Sub-stations)
i. Demand Profile (Peak and lean load)
B.2.8 Reactive Compensation Equipment
i. Type of equipment (Fixed or variable).
ii. Capacities and/or inductive rating or its Operating Range in MVAr
iii. Details of control
iv. Point of connection to the system.
B.3 Detailed Planning Data, Distribution
B.3.1 General
i. Distribution map (To scale) showing all lines up to 11 kV and sub-stations belonging to the Supplier.
ii. Single Line Diagram of Distribution System (Showing distribution lines from points of connection with the Transmission System, 33/11 KV Sub-stations, 11/0.4 KV Sub-stations, consumer bus if fed directly from the Transmission System).
iii. Numbering and nomenclature of lines and Sub-stations (Identified with feeding grid sub-stations of the Transmission System and concerned 33/11 KV Sub-station of Supplier).
B.3.2 Connection
i. Points of connection (Furnish details of existing arrangement of connection)
ii. Details of metering points of connection
B.3.3 Loads
i. Connected load - Furnish consumer details, Numbers of consumers category wise, details of loads 1 MW and above.
ii. Information on diversity of load and coincidence factor
iii. Daily demand profile (Current and forecast) on each 33/11 KV Sub-station.
iv. Cumulative demand profile of Distribution System (Current and forecast).
Appendix-C
Appendix-C
C. Operational Planning Data
C.1 Outage Planning Data
C.1 Outage Planning Data
Reference To : Chapter 5 Outage
Planning
Reference To : Chapter 5 Outage
Planning
C.1.1 Demand Estimates
C.1.1 Demand Estimates
Item
Item
To be submitted by
To be submitted by
i.
Estimated consumption of energy in million units
at each Connection/External Interconnection Point on monthly
basis and peak and lean demand in MW & MVAr at each
Connection/External Interconnection Point on weekly basis for the
period from April of next calendar year to March of following
calendar year.
31st December of current calendar year.
ii.
Estimated consumption of energy in MU at each
connection/External Interconnection Point on daily basis for
month ahead and 24 hourly averaged demand estimates in MW &
MVAr at each connection/External Interconnection Point for each
day of the month ahead (31 daily data items for MU for each
Connection Point, 31 x 24 hourly data items for MW and 31 x 24
hourly data items for MVAr for each Connection Point).
15th of Current month
iii.
Fifteen minutes block averaged demand estimates
in MW & MVAr at each connection/ External Interconnection
Point for the day ahead (96 data items for MW and 96 data items
for MVAr at each connection/External Interconnection Point)
10.00 Hours every day
C.1.2 Estimates of Load Shedding
C.1.2 Estimates of Load Shedding
Item
Item
To be submitted by
To be submitted by
i.
Details of discrete load blocks that may be shed to comply
with instructions issued by SLDC when required, from each
Connection Point.
Soon after connection is made.
C.1.3 Year Ahead Outage
Programme
C.1.3 Year Ahead Outage
Programme
(For the
period April to March)
C.1.3.1 Generators Outage Programme
C.1.3.1 Generators Outage Programme
Item
Item
To be submitted by
To be submitted by
i.
Identification of Generating Unit
1st August each year
ii.
MW, which will not be available as a result of outage.
1st August each year
iii.
Preferred start date and start time or range of start dates
and start times and period of outage.
1st August each year
iv.
If outages are required to meet statutory requirements, then
the latest date by which outage must be taken.
1st August each year
C.1.3.2 YEAR AHEAD ERLDC'S
OUTAGE PROGRAMME
C.1.3.2 YEAR AHEAD ERLDC'S
OUTAGE PROGRAMME
(Affecting Transmission System)
Item
Item
To be submitted by
To be submitted by
i.
MW, which will not be available as a result of outage from
Imports through external connections.
31st December each year
ii.
Start date and start time and period of outage
31st December each year
C.1.3.3 Year ahead CGP's outage programme
C.1.3.3 Year ahead CGP's outage programme
Item
Item
To be submitted by
To be submitted by
i.
MW, which will not be available as a result of outage
1st August each year
ii.
Start date and start time and period of outage
1st August each year
C.1.3.4 Year Ahead Distribution Company's outage programme
C.1.3.4 Year Ahead Distribution Company's outage programme
Item
Item
To be submitted by
To be submitted by
(i)
Loads in MW not available from any Connection Point
1st August each year
(ii)
Identification of Connection Point
1st August each year
(iii)
Period of suspension of drawal with start date and start time.
1st August each year
C.1.3.5 The Transmission Licensee's Overall Outage
Programme
C.1.3.5 The Transmission Licensee's Overall Outage
Programme
Item
Item
To be submitted by
To be submitted by
i.
Report on proposed outage programme to ELRDC
30th November each year
ii.
Release of finally agreed outage plan
1st March each year
C.2 GENERATION SCHEDULING DATA
C.2 GENERATION SCHEDULING DATA
Reference To :
Reference To :
Chapter 6 - Schedule and Despatch
Chapter 6 - Schedule and Despatch
Item
Item
To be submitted by
To be submitted by
i.
Day ahead fifteen minutes block MW & MVAr availability
(00.00 - 24.00 Hours) of all generator units.
10.00 Hours every day
ii.
Day ahead fifteen minutes block MW import/export from CGP's.
10.00 Hours every day
iii.
Status of Generating Unit excitation AVR in service (Yes/No)
10.00 Hours every day
iv.
Status of Generating Unit speed control system. Governor in
service (Yes/No).
10.00 Hours every day
v.
Spinning reserve capability (MW)
10.00 Hours every day
vi.
Backing down capability with/without oil support (MW)
10.00 Hours every day
vii.
Hydro reservoir levels and restrictions
10.00 Hours every day
viii.
Generating Units hourly summation outputs (MW)
10.00 Hours every day
ix.
Day ahead fifteen minutes block MW entitlements from Central
sector generation and Chukha Hydro Power Station from ERLDC.
11.00 Hours every day
C.3 Capability Data
C.3 Capability Data
Reference To : Chapter 5 - Frequency and Voltage Management
Reference To : Chapter 5 - Frequency and Voltage Management
Item
Item
To be submitted by
To be submitted by
i.
Generators shall submit to the SLDC up-to-date capability
curves for all Generating Units.
On receipt of request by the SLDC.
ii.
CGPs shall submit to the licensee/ SLDC net return capability
that shall be available for export/import from Transmission
System.
On receipt of request by the licensee/SLDC.
C.4 Response to Frequency Change
C.4 Response to Frequency Change
Reference To : Chapter 5 - Frequency and Voltage Management
Reference To : Chapter 5 - Frequency and Voltage Management
i.
Primary response in MW at different levels of loads ranging
from minimum generation to registered capacity for frequency
changes resulting in fully opening of governor valve.
ii.
Secondary response in MW to frequency changes.
C.5 Monitoring of Generation
C.5 Monitoring of Generation
[Reference to: Chapter-7-Monitoring of Generation and
Drawal of Power Station of 5 Mw and Above.]
[Reference to: Chapter-7-Monitoring of Generation and
Drawal of Power Station of 5 Mw and Above.]
Item
Item
To be submitted
To be submitted
i.
Generators shall provide hourly generation summation to SLDC.
To be submitted by real time basis.
ii.
CGPs shall provide hourly export/ import MW to SLDC
To be submitted by real time basis.
iii.
Logged readings of generators to SLDC
As required
iv.
Detailed report of Generating Unit trippings on monthly basis.
In the first week of the succeeding month.
C.6 Essential and Non-Essential
Load Data
C.6 Essential and Non-Essential
Load Data
Reference To : Chapter 5 - Contingency Planning
Reference To : Chapter 5 - Contingency Planning
Item
Item
To be submitted by
To be submitted by
i.
Schedule of essential and non-essential loads on each discrete
load block for purposes of load shedding.
As soon as possible after connection.
Appendix-D
Appendix-D
D. Protection Data
Reference To :
Chapter 9 - Protection
Item
Item
To be submitted by
To be submitted by
i.
Generators/CGPs shall submit details of
protection requirement and schemes installed by them as referred
to in B.l. Detailed Planning Data under Sub-section "Protection
and Metering."
As applicable to Detailed Planning Data.
ii.
The licensee shall submit details of protection
equipment and schemes installed by them as referred to in B.2.
Detailed System Data, Transmission under Sub-section "Relaying
and Metering" in relation to connection with any User.
As applicable to Detailed Planning Data.
Appendix-E
Appendix-E
E. Metering Data
Reference To : Chapter-10 Metering
Item
Item
To be submitted by
To be submitted by
i.
Generators/CGPs shall submit details of metering
equipment and schemes installed by them as referred in B.1.
Detailed Planning Data under Sub-section "Protection and
Metering".
As applicable to Detailed Planning Data.
ii.
The transmission licensee shall submit details
of metering equipment and schemes installed by them as referred
in B.2. Detailed System Data, Transmission under Subsection
"Relaying and Metering" in relation to connection with
any User.
As applicable to Detailed Planning Data.
Chapter-13
Periodic Report
(a) Frequency profile
(b) Voltage profile
(c) Major outage of Generating Unit
(d) major outage of transmission line
(e) Grid disturbance
Chapter-14
Miscellaneous
14.1.
14.2 Saving of inherent power of the Commission
(ii) Nothing in these Regulations shall bar the Commission from adopting in conformity with provisions of the Act, a procedure which is at variance with any of the provisions of these Regulations, if the Commission, in view of the special circumstances of a matter or a class of matters, deems it just or expedient for deciding such matter or class of matters.
(iii) Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing with any matter or exercising any power under the Act for which no regulations have been framed, and the Commission may deal with such matters, powers and functions in a manner, as it considers just and appropriate.
14.3 Powers to Remove Difficulties
14.4 Power to Amend