The Orissa Grid Code (OGC) Regulations, 2006
The Orissa Grid Code (OGC) Regulations, 2006
Sections
1. Short title, extent and commencement.
Section 12. Definitions.
Section 21. Net VArh and net payment may be positive or negative
Section 12. In case X 1 is positive and X 3 is negative, or vice-versa, there would be no payment under (i) above.
Section 23. In Case X 2 is positive and X 4 is negative, or vice-versa, there would be no payment under (ii) above.
Section 3
the-orissa-grid-code-ogc-regulations-2006.json
•
5 Sections
•
Odisha
{
"id": 21127,
"slug": "the-orissa-grid-code-ogc-regulations-2006",
"title": "The Orissa Grid Code (OGC) Regulations, 2006",
"short_title": "The Orissa Grid Code (OGC) Regulations, 2006",
"act_number": "Published vide Notification No. 17/2005-(Volume 3)",
"act_year": 2006,
"act_type": "STATE",
"location": "Odisha",
"law_status": "unknown",
"enactment_date": null,
"description": "The Orissa Grid Code (OGC) Regulations, 2006",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, extent and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(b) In these Regulations, words or expressions used herein and not defined at Section 1.19 (in Chapter 1), have the meanings assigned to them under the Act and the meanings commonly understood in Electrical Engineering.\nChapter 1\nGeneral\n1.1. Introduction.\n1.2 Objective\n1.3 Scope\n1.4 Structure of The OGC\n(1) General : - This Chapter describes general features of OGC including definitions.\n(1) General :\n(2) Role of various organisations : This chapter defines the functions of the various organisations as are relevant to OGC.\n(2) Role of various organisations :\n(3) Planning Code for STS : - This Chapter specifies the technical and design criteria and procedures to be followed by the State Transmission Utility (STU) i.e. OPTCL in planning and development of the State Transmission System and by other Users connected or seeking connection to the Transmission System. This Chapter provides the policy to be adopted in the planning and development of bulk power transfer and associated State Transmission System. The Planning Code lays out the detailed information exchange required between the planning Agencies and the various participants of the Power System for load forecasting, generation availability and Power System planning etc. for the future years under study. The Planning Code stipulates the various criteria to be adopted during the planning process.\n(3) Planning Code for STS :\n(4) Connection Conditions : - This Chapter specifies the technical and design criteria and standards to be complied with by the Transmission Licensee and other Users connected or seeking connection to the Transmission System, to maintain uniformity and quality across the system. This includes\n(4) Connection Conditions :\n(a) Procedure for connection to the State Transmission System.\n(b) Site responsibility schedule\n(c) Connection Agreement\n(5) Operating Code for State Grid : - This Chapter specifies the conditions under which the Transmission Licensee shall operate the Transmission System and other Users of the Transmission System shall operate their plant and/or systems for the generation and distribution of electricity in so far as necessary to protect the security and quality of supply and safe operation of the Transmission Licensee's Transmission System under both normal and abnormal operating conditions.\n(5) Operating Code for State Grid :\n(a) Operating Policy - This Operating Policy describes the operational philosophy to maintain efficient, secure and reliable grid operation and contains the following aspects/ Sections.\n(a) Operating Policy\n(i) System Security Aspects - This Section describes the general security aspects to be followed by generating companies and all Users of the Grid.\n(i) System Security Aspects\n(ii) Frequency and Voltage Management - This Section describes the method by which ail Users of the Transmission System shall co-operate with the State Load Despatch Centre (SLDC) for effective control of the system frequency and managing the voltage of the Transmission System.\n(ii) Frequency and Voltage Management\n(iii) Demand Estimation for Operational Purposes - This Section details with the procedures to estimate the demand by the various beneficiaries for their systems for the day/week/ month/year ahead, which shall be used for operational planning.\n(iii) Demand Estimation for Operational Purposes\n(iv) Demand Management - This Section identifies the methodology to be adopted for demand control by each beneficiary as a function of the frequency and deficit generation.\n(iv) Demand Management\n(v) Periodic Reports - This Section provides various provisions for reporting of the operating parameters of the Grid such as frequency, Voltage profile, etc.\n(v) Periodic Reports\n(vi) Operational Liaison - This Section sets out the requirement for the exchange of information in relation to normal operation and/or events in the grid.\n(vi) Operational Liaison\n(vii) Outage Planning - This Section contains procedure for outage planning relating to co-ordination of the outages for scheduled maintenance of the Transmission System, Generating Unit and Distribution System that will use the Transmission System.\n(vii) Outage Planning\n(viii) Recovery Procedures - This Section sets out the procedures to be adopted following a major grid disturbance, for Black Start and resynchronisation of islands, etc.\n(viii) Recovery Procedures\n(ix) Operational Event/Accident Reporting This Section states the procedure by which events are reported and the information exchange etc. take place.\n(ix) Operational Event/Accident Reporting\n(6) Scheduling & Despatch Code : - This Chapter specifies the procedure to be adopted for scheduling and despatch of generation of the Generating companies, CGPs. including Complementary Commercial Mechanisms, on a daily basis with the modality of the flow of information between the Generating companies and SLDC.\n(6) Scheduling & Despatch Code :\n(7) Monitoring of Generation and Drawal : - This Chapter specifies responsibilities of all Users in the monitoring of Generating Unit reliability and performance and SLDC's compliance with the scheduled drawal and injection.\n(7) Monitoring of Generation and Drawal :\n(8) Cross Boundary Safety : - This Chapter specifies safety when working across a control boundary.\n(8) Cross Boundary Safety :\n(9) Protection : - This Chapter specifies the co-ordination responsibility and minimum standards of protection that are required to be installed by Users of the Transmission System.\n(9) Protection :\n(10) Metering, Communication and Data Acquisition : - This Chapter specifies the minimum operational and commercial metering to meet the regulatory requirement.\n(10) Metering, Communication and Data Acquisition :\n(11) Management of OGC - This Chapter specifies the procedure for review/amendment and management of OGC.\n(11) Management of OGC\n(12) Data Registration : - This Chapter specifies list of all data required to be provided by Users to the SLDC/Transmission Licensee and vice versa .\n(12) Data Registration :\n(13) Miscellaneous : - This Chapter specifies about issue of Orders and Practice Directions, power to amend this OGC, saving the inherent power of the Commission and power to remove difficulties.\n(13) Miscellaneous :\n1.5 Interpretation\n1.6 Free Governor Mode of Operation\n1.7 Charge/payment For Reactive Energy Exchanges\n1.8. Exemptions\n1.9. Implementation And Operation Of The Ogc\n1.10 General Requirements/limitations Of Ogc\n1.11 Codal Responsibilities\n1.12. Confidentiality\n1.13 Procedures To Settle Dispute\n1.14 Communication Between Users\n1.15 Partial Invalidity\n1.16 Directive\n1.17 Review\n1.18 Non-Compliance\n1.19 Definitions\nWord\nWord\nMeaning\nMeaning\n(1)\nABT Users\nSuch Users like Distribution Licensees, Trading\n\t\t\t\t\tLicensees, Generators, Open Access Customers, EHT consumers and\n\t\t\t\t\tHT consumers having contract demand of 5 MVA or more to whom\n\t\t\t\t\tAvailability Based Tariff is applicable.\n(2)\nAct\nThe Electricity Act, 2003\n(3)\nAgency\nA term used in the various sections of the OGC\n\t\t\t\t\tto refer to Users that utilise the State Transmission System.\n(4)\nApparatus\nElectrical Apparatus and includes all machines,\n\t\t\t\t\tfittings, accessories and appliances in which conductors are\n\t\t\t\t\tused.\n(5)\nAnnexure or Appendix\nAn Annexure or an Appendix to a Chapter of the\n\t\t\t\t\tOrissa Grid Code.\n(6)\nArea Load Despatch Centre (ALDC)\nThe Area Load Despatch Centre, as established\n\t\t\t\t\tby SLDC to carry out the instructions of SLDC and perform all\n\t\t\t\t\tthe duties assigned to it in the OGC and Distribution Code.\n(7)\nArea of Supply\nAs defined in the concerned licence.\n(8)\nAutomatic Voltage Regulator (AVR)\nA continuously acting automatic excitation\n\t\t\t\t\tcontrol system to control the voltage of a Generating Unit\n\t\t\t\t\tmeasured at the generator terminals.\n(9)\nAuto Transformer\nTransformer connecting EHV lines/bus bars of\n\t\t\t\t\t220 and 132 KV voltages.\n(10)\nBeneficiary\nA person who has a share in State Generating\n\t\t\t\t\tStation and Inter State Generating Station.\n(11)\nBlack Start\nThe process of recovery from a total or partial\n\t\t\t\t\tblackout of the Transmission System.\n(12)\nBIS\nThe Bureau of Indian Standards\n(13)\nBulk Power Consumer\n[A person to whom electricity is provided and\n\t\t\t\t\twho has a dedicated supply at 33 KV and above]\n(14)\nBulk Power Transmission Agreement (BPTA)\nThe Commercial Agreement between the\n\t\t\t\t\tTransmission Licensee and a long Term Customer for the provision\n\t\t\t\t\tof transmission service.\n(15)\nCapacitor\nAn electrical facility provided for generation\n\t\t\t\t\tof reactive power.\n(16)\nCaptive Generating Plant/CGP\nCaptive Generating Plant means a power plant\n\t\t\t\t\tset up by any person to generate electricity primarily for his\n\t\t\t\t\town use and includes a power plant set up by any co-operative\n\t\t\t\t\tsociety or association of persons for generating electricity\n\t\t\t\t\tprimarily for use of members of such co-operative society or\n\t\t\t\t\tassociation.\n(17)\nCEA/Authority\nThe Central Electricity Authority.\n(18)\nCERC\nThe Central Electricity Regulatory Commission.\n[(18)(1)\n'Check Meter'\nmeans a meter,which shall be connected to the\n\t\t\t\t\tsame core of the Current Transformer (CT) and Voltage\n\t\t\t\t\tTransformer (VT) to which main meter is connected and shall be\n\t\t\t\t\tused for accounting and billing of electricity in case of\n\t\t\t\t\tfailure of main meter]\n(19)\nCommercial Committee (CC)\nIt is a committee of the GCC as referred under\n\t\t\t\t\tChapter-6 (Annexure-I) of the OGC.\n(20)\nCommission/OERC\nOrissa Electricity Regulatory Commission.\n(21)\nCentral Transmission Utility (CTU)\nAny Government Company, which the Central\n\t\t\t\t\tGovernment may notify under Sub-section (1) of Section 38 of the\n\t\t\t\t\tAct.\n(22)\nConnection\nThe electric lines and electrical equipment\n\t\t\t\t\tused to effect a connection of a User's system to the\n\t\t\t\t\tTransmission System.\n(23)\nConnection Agreement\nAn agreement between the Transmission Licensee\n\t\t\t\t\tand a User setting out the terms relating to the connection to\n\t\t\t\t\tand/ or use of the Transmission System which is referred at\n\t\t\t\t\tSection 4.5.\n(24)\nConnection Conditions\nThe technical conditions to be complied with by\n\t\t\t\t\tany User having a connection to the State Transmission System as\n\t\t\t\t\tlaid down in Chapter-4 'Connection Conditions' of the OGC.\n(25)\nConnection Point\nA point at which a User's plant and/or\n\t\t\t\t\tApparatus connects to the State Transmission System.\n(26)\nContact Person\nA person notified by SLDC and Distribution\n\t\t\t\t\tCompany on their behalf to carry out responsibility as required\n\t\t\t\t\tunder Section 5-4 (4)(d)(v).\n(27)\nControl Person\nA person identified as having responsibility\n\t\t\t\t\tfor cross-boundary safety under Chapter-8 of the OGC. Refer\n\t\t\t\t\tSection 8.3.\n(28)\nData Acquisition System (DAS)\nA device provided to record the sequence of\n\t\t\t\t\toperation in time, of the relays/ equipments/system parameters\n\t\t\t\t\tat a location.\n(29)\nDemand\nThe Demand of active power in MW and reactive\n\t\t\t\t\tpower in MVAR of electricity unless otherwise stated.\n(30)\nDetailed Planning Data\nAs referred to Chapter 12 regarding Data\n\t\t\t\t\tregistration.\n(31)\nDespatch Schedule\nThe ex-power Plant net MW and MWH output of a\n\t\t\t\t\tgenerating station, scheduled to be exported to the Grid from\n\t\t\t\t\ttime to time.\n(32)\nDirective\nA policy directive issued by the State\n\t\t\t\t\tGovernment of Orissa under Sections 37 & 108 of the Act.\n(33)\nDisconnect\nThe act of physically separating User or Bulk\n\t\t\t\t\tPower Consumer's electrical equipment from the Transmission\n\t\t\t\t\tSystem.\n(34)\nDisturbance Recorder (DR)\nA device provided to record the behaviour of\n\t\t\t\t\tthe pre-selected digital and analog values of the system\n\t\t\t\t\tparameters during an event.\n(35)\nDistribution Company\nAn organisation that is licensed, or exempt\n\t\t\t\t\tfrom the requirements to be licensed to own and/or operate all\n\t\t\t\t\tor part of the Distribution System in the State.\n(36)\nDistribution Licensee\nA licensee authorized by the Commission to\n\t\t\t\t\toperate and maintain the Distribution System in the State for\n\t\t\t\t\tsupplying electricity to the consumers in his Area of Supply.\n(37)\nDistribution System\n\"Distribution System\" means the\n\t\t\t\t\tsystem of wires and associated facilities between the delivery\n\t\t\t\t\tpoints on the transmission lines or the generating station\n\t\t\t\t\tconnection and the point of connection to the installation of\n\t\t\t\t\tthe consumers.\n(38)\nDistribution System Operation & Control Centre (DSOCC)\nThe Distribution System Operation and Control\n\t\t\t\t\tCentre as established by the Distribution Licensee to carry out\n\t\t\t\t\tthe functions as directed by the OGC and Distribution (Planning\n\t\t\t\t\tand Operation) Code.\n(39)\nDrawl\nThe import from, or export to, State\n\t\t\t\t\tTransmission System, of electrical energy and power or both\n\t\t\t\t\tactive/reactive powers.\n(40)\nDrawl Schedule\nThe ex-power Plant, MW that a Beneficiary is\n\t\t\t\t\tscheduled to receive from the SGS and ISGS, including bilateral\n\t\t\t\t\texchanges from time to time.\n(41)\nEastern Region/Region\nRegion comprising of the States of West Bengal,\n\t\t\t\t\tBihar, Orissa, Sikkim, Jharkhand and DVC for the integrated\n\t\t\t\t\toperation of the electricity system.\n(42)\nElectricity Operator\nAny person who owns and/or operates generating\n\t\t\t\t\tplant or who holds a licence under Section 14 of the Act,\n\t\t\t\t\tconnected to the Transmission System and any bulk supplier.\n(43)\nElectricity Supply System (Grid)\nThe combination of the Transmission System,\n\t\t\t\t\tDistribution System and Power Stations.\n(44)\nEastern Regional Power Committee (ERPC)\nEastern Regional Power Committee established\n\t\t\t\t\tunder Section 2(55) of the Act by resolution by the Central\n\t\t\t\t\tGovernment for facilitating the integrated operation of the\n\t\t\t\t\tPower System in Eastern Region.\n[(44)(1)\nEnergy Accounting and Audit Meters\nMeans meters used for accounting of the\n\t\t\t\t\telectricity to various segments of electrical system so as to\n\t\t\t\t\tcarry out further analysis to determine the consumption and loss\n\t\t\t\t\tof energy therein over a specified time period.]\n(45)\nERLDC\nEastern Regional Load Despatch Centre\n\t\t\t\t\testablished under Sub-section (1) of Section 27 of the Act.\n(46)\nEvent\nAn unscheduled or unplanned occurrence on the\n\t\t\t\t\tGrid including faults, incidents and breakdowns.\n(47)\nEvent Logger (EL)\nA device provided to record the sequence of\n\t\t\t\t\toperation in time, of the relays/ equipments at a location\n\t\t\t\t\tduring an event.\n(48)\nExternal Inter Connection/ Connection Point/Inter Connection\n\t\t\t\t\tPoint.\nElectric lines and electrical equipment used\n\t\t\t\t\tfor the transmission of electricity between the State\n\t\t\t\t\tTransmission System and the User's system.\n(49)\nExtra High Voltage (EHV)\nWhere the voltage exceeds 33,000 volts under\n\t\t\t\t\tnormal conditions, subject, however, to the percentage variation\n\t\t\t\t\tallowed by the Authority.\n(50)\nEx-power Plant\nNet MW/MWH output of a generating Station,after\n\t\t\t\t\tdeducting auxiliary consumption and transformation losses.\n(51)\nFault Locator (FL)\nA device provided at the end of a transmission\n\t\t\t\t\tline to measure/indicate the distance at which a line fault may\n\t\t\t\t\thave occurred.\n(52)\nFlexible Alternating Current Transmission (FACT)\nFacilities that enable power flows on A.C.\n\t\t\t\t\tlines to be regulated, to control loop flows, line loadings,\n\t\t\t\t\tetc.\n(53)\nForce Majeure\nAny event which is beyond the control of the\n\t\t\t\t\tAgencies involved which they could not foresee or with a\n\t\t\t\t\treasonable amount of diligence could not have foreseen or which\n\t\t\t\t\tcould not be prevented and which substantially affect the\n\t\t\t\t\tperformance by either Agency such as but not limited to-\n(a) Acts of God, natural phenomena, including\n\t\t\t\t\tbut not limited to floods, droughts, earthquakes and epidemics;\n(b) Acts of any Government domestic or foreign,\n\t\t\t\t\tincluding but not limited to war declared or undeclared,\n\t\t\t\t\thostilities, priorities, quarantines, embargoes;\n(c) Riot or civil commotion.\n(d) Grid's failure not attributable to Agencies\n\t\t\t\t\tinvolved.\n(54)\nForced Outage\nAn outage of a Generating Unit or a\n\t\t\t\t\ttransmission facility due to a fault or other reasons, which has\n\t\t\t\t\tnot been planned.\n(55)\nGenerator\nAn organisation(including Central/State or\n\t\t\t\t\tother generating station, in which the State has a full share)\n\t\t\t\t\tthat generates electricity and who is subject to the OGC.\n(56)\nGenerating Company\nGenerating Company means any company or body\n\t\t\t\t\tcorporate or association or body of individuals, whether\n\t\t\t\t\tincorporated or not, or artificial juridical person,which owns\n\t\t\t\t\tor operates or maintains a generating station.\n(57)\nGenerating Unit\nAn electrical Generating Unit coupled to a\n\t\t\t\t\tturbine within a Power Station together with all plants and\n\t\t\t\t\tApparatus at that Power Station (up to the Connection Point)\n\t\t\t\t\twhich relates exclusively to the operation of that\n\t\t\t\t\tturbo-generator.\n(58)\nGood Utility Practices\nAny of the practices, methods and acts engaged\n\t\t\t\t\tin or approved by a significant portion of the electric utility\n\t\t\t\t\tindustry during the relevant time period which could have been\n\t\t\t\t\texpected to accomplish the desired results at a reasonable cost\n\t\t\t\t\tconsistent with good business practices, reliably, safely and\n\t\t\t\t\twith expedition.\n(59)\nGovernor Droop\nIn relation to the operation of the governor of\n\t\t\t\t\ta Generating Unit, the percentage drop in system frequency which\n\t\t\t\t\twould cause the Generating Unit under free governor action to\n\t\t\t\t\tchange its output from zero to full load.\n(60)\nGrid Standards\nGrid Standards specified by the Authority Under\n\t\t\t\t\tSub-section(d) of Section 73 of the Act.\n(61)\nGrid Co-ordination Committee/GCC\nThe Committee formed under Chapter 11.\n(62)\nGRIDCO\nGrid Corporation of Orissa Limited registered\n\t\t\t\t\tunder the Companies Act, 1956, which is a deemed licensee under\n\t\t\t\t\tthe Act and is authorised to trade electricity for supply to the\n\t\t\t\t\tDistribution Licensees. It can act as an intra State trader.\n(63)\nIE Rules\nIndian Electricity Rules, 1956 and shall be\n\t\t\t\t\treplaced by the Regulations which shall be specified by CEA\n\t\t\t\t\tunder Section 53 of the Act.\n(64)\nICT\nTransformer connecting EHV lines/bus bars of\n\t\t\t\t\t400 and 220 KV voltages.\n(65)\nIEC\nInternational Electro-Technical Commission.\n(66)\nIndian Electricity Grid Code (IEGC)\nA document describing the philosophy and the\n\t\t\t\t\tresponsibilities for planning and operation of Indian Power\n\t\t\t\t\tSystem specified by the CERC in accordance with Sub-section 1(h)\n\t\t\t\t\tof Section 79 of the Act.\n(67)\nIndependent Power Producer (IPP\nA generating Company not owned/ controlled by\n\t\t\t\t\tthe Central/State Government.\n[(67)(1)\n'Interface Meter'\nMeans a meter used for a accounting and billing\n\t\t\t\t\tof electricity, connected at the point of inter connection\n\t\t\t\t\tbetween electrical systems of generating company, licensee and\n\t\t\t\t\tconsumers, directly connected to the Inter-State Transmission\n\t\t\t\t\tSystem or Intra-State Transmission System who have to be covered\n\t\t\t\t\tunder ABT and have been permitted open access by the Appropriate\n\t\t\t\t\tCommission.]\n(68)\nInter-State Generating Station (ISGS)\nA central and other generating station in which\n\t\t\t\t\ttwo or more than two States have a share and whose scheduling is\n\t\t\t\t\tto be co-ordinated by the RLDC.\n(69)\nInter-State Transmission System (ISTS)\nInter-State Transmission System includes-\n(i) Any system for the conveyance of\n\t\t\t\t\telectricity by means of a main transmission line from the\n\t\t\t\t\tterritory of one State to another State,\n(ii) The convenience of energy across the\n\t\t\t\t\tterritory of an intervening State as well as conveyance within\n\t\t\t\t\tthe State which is incidental to such inter-State transmission\n\t\t\t\t\tof energy, and\n(iii) The transmission of electricity within\n\t\t\t\t\tthe territory of State on a system built, owned, operated,\n\t\t\t\t\tmaintained or controlled by CTU.\n(70)\nLean Period\nThat period when electrical demand is at its\n\t\t\t\t\tlowest.\n(71)\nLicensee\nThe holder of a licence in the State of Orissa\n\t\t\t\t\twho has been granted a license under Section 14 of the Act.\n(72)\nLicense\nAny license granted by OERC under Section 14 of\n\t\t\t\t\tthe Act.\n(73)\nLoad\nThe MW/MWH consumed by a utility/ installation.\n(74)\nLong Term Customer\nA person availing or intending to avail access\n\t\t\t\t\tto the STS for a period of 25 years or more and who has signed\n\t\t\t\t\tBPTA with the Transmission Licensee.\n(75)\nMaximum Continuous Rating (MCR)\nThe normal rated full load MW output capacity\n\t\t\t\t\tof a Generating Unit that can be sustained on a continuous basis\n\t\t\t\t\tat specified conditions.\n(76)\nNALCO\nNational Aluminium Company Limited.\n(77)\nNational Grid\nThe entire inter-connected electric power\n\t\t\t\t\tnetwork of the country, which would evolve after\n\t\t\t\t\tinter-connection of regional grids.\n(78)\nNet Drawal Schedule\nThe Drawal Schedule of a Beneficiary after\n\t\t\t\t\tdeducting the apportioned transmission losses (estimated).\n(79)\nNTPC\nNational Thermal Power Corporation Limited.\n(80)\nOHPC\nOrissa Hydro Power Corporation Limited.\n(81)\nOperation\nA scheduled or planned action relating to the\n\t\t\t\t\toperation of a system.\n(82)\nOperation Co-ordination Committee (OCC)\nA committee of ERPC with members from all\n\t\t\t\t\tconstituents, which decides the operational aspects of the\n\t\t\t\t\tregional grid.\n(83)\nOpen Access\nOpen Access means the non-discriminatory\n\t\t\t\t\tprovision for the use of transmission lines or Distribution\n\t\t\t\t\tSystem or associated facilities which such lines or system by\n\t\t\t\t\tany licensee or consumer or a person engaged in generation in\n\t\t\t\t\taccordance with the regulations specified by the Appropriate\n\t\t\t\t\tCommission.\n(84)\nOpen Access Customer\nOpen Access Customer means a consumer permitted\n\t\t\t\t\tby the Commission to receive supply of electricity from a person\n\t\t\t\t\tother than the Distribution Licensee of his Area of Supply, and\n\t\t\t\t\tthe expression includes a generating Company and licensee, who\n\t\t\t\t\thas availed of or intends to avail of Open Access.\n(85)\nOperating Margin\nContingency reserve plus Operating Reserve.\n(86)\nOperating Range\nThe Operating Range of frequency and voltage as\n\t\t\t\t\tspecified under the operating code Chapter-5 of this OGC.\n(87)\nOperating Reserve\nThe additional output from a generating plant,\n\t\t\t\t\twhich must be realizable in realtime operation to correct any\n\t\t\t\t\tsystem frequency fall to an acceptable level, in the event of a\n\t\t\t\t\tloss of generation, or loss of import from an External\n\t\t\t\t\tInterconnection, or mismatch between generation and demand.\n(88)\nPower System Operational Co-ordination Committee\n[A committee of SLDC with members from all\n\t\t\t\t\tAgencies, which decides the operational aspects of the State\n\t\t\t\t\tgrid as referred under Section 5.8(4)(i) of the O.G.C.]\n(89)\nOPGC\nOrissa Power Generation Corporation Limited.\n(90)\nOPTCL\nOrissa Power Transmission Corporation Limited.\n(91)\nOrissa Act\nThe Orissa Electricity Reform Act, 1995 as\n\t\t\t\t\treferred u/s 185(3) of the Act.\n(92)\nOutage\nThe reduction of capacity or taking out of\n\t\t\t\t\tservice of a Generating Unit, Power Station or part of the\n\t\t\t\t\tTransmission System or Distribution System.\n(93)\nPeak Period\nThat period in a day when electrical demand is\n\t\t\t\t\tat it's highest.\n(94)\nPower Purchase Agreement or PPA\nThe agreement between a generator and the\n\t\t\t\t\tlicensee in which, subject to certain conditions, the licensee\n\t\t\t\t\tagrees to purchase the electrical output of the generator's\n\t\t\t\t\tGenerating Unit and the generator agrees to provide services\n\t\t\t\t\tfrom this unit.\n(95)\nPower Grid (POWER GRID)\nThe Power Grid Corporation of India Limited,\n\t\t\t\t\twhich has been notified as CTU.\n(96)\nPower Station\nAn installation of one or more Generating Units\n\t\t\t\t\t(even when sited separately) owned and/or operated by the same\n\t\t\t\t\tGenerator and which may reasonably be considered as being\n\t\t\t\t\tmanaged as a single integrated generating complex.\n(97)\nPower System\nPower System means all aspects of generation,\n\t\t\t\t\ttransmission, distribution and supply of electricity and\n\t\t\t\t\tincludes one or more of the following namely :\n(a) Generating stations;\n(b) Transmission or main transmission lines;\n(c) Sub-stations;\n(d) Tie-lines\n(e) Load despatch activities;\n(f) Mains or distribution mains;\n(g) Electric supply lines;\n(h) Overhead lines;\n(i) Service lines;\n(i) Works.\n(98)\nProtection Co-ordination Committee (PCC)\nIt is a committee of the STU as referred under\n\t\t\t\t\tParagraphs 4.8, 5.2(8) and 9.4 of the OGC.\n(99)\nReactor\nAn electrical facility specifically designed to\n\t\t\t\t\tabsorb Reactive Power.\n(100)\nRegional Transmission System\nThe combination of EHV electric lines and\n\t\t\t\t\telectrical equipment owned or operated by Power Grid.\n(101)\nRegional Grid\nThe entire synchronously connected electric\n\t\t\t\t\tpower network of the concerned Region, comprising of ISTS., ISGS\n\t\t\t\t\tand Intra State Systems.\n(102)\nRegional Load Despatch Centre (RLDC)\nRegional Load Despatch Centre means the Centre\n\t\t\t\t\testablished under Sub-section (1) of Section 27 of the Act.\n(103)\nSection\nA part of any Chapter of OGC, which is,\n\t\t\t\t\tidentified as covering a specific topic.\n(104)\nSingle Line Diagram (SLD)\nDiagrams, which are a schematic representation\n\t\t\t\t\tof the HV/EHG Apparatus and the connections to all external\n\t\t\t\t\tcircuits at a connection, point incorporating its numbering\n\t\t\t\t\tnomenclature and labelling.\n(105)\nSystem Operational Procedure (SOP).\nProcedure for various system operational\n\t\t\t\t\tactivities as provided in the OGC.\n(106)\nSite Common Drawing\nDrawings prepared for each Connection Point,\n\t\t\t\t\twhich incorporates layout drawings, electrical layout drawings,\n\t\t\t\t\tcommon protection/control drawings and common service drawings.\n(107)\nSpinning Reserve\nPart loaded generating capacity with some\n\t\t\t\t\treserve margin that is synchronized to the system and is ready\n\t\t\t\t\tto provide increased generation at short notice pursuant to\n\t\t\t\t\tdespatch instruction or instantaneously in response to a\n\t\t\t\t\tfrequency drop.\n(108)\nState\nThe State of Orissa.\n(109)\nState Generating Station (SGS)\nA generating station whose entire generation of\n\t\t\t\t\telectricity is dedicated to the State.\n(110)\nState Load Despatch Centre/SLDC\nThis means the centre established under\n\t\t\t\t\tSub-section 31 of the Act.\n(111)\nStandard Planning Data\nAs referred to in Data Registration Section\n\t\t\t\t\tunder Chapter 12.\n(112)\nStanding Committee for Transmission Planning\nA Committee constituted by the CEA to discuss,\n\t\t\t\t\treview and finalise the proposals for expansion or modification\n\t\t\t\t\tin the ISTS and associated intra-State systems.\n(113)\nState Transmission System\nThe transmission of electricity within the\n\t\t\t\t\tterritory of State on a system built, owned, operated,\n\t\t\t\t\tmaintained or controlled by STU/Transmission Licensee.\n(114)\nSTU\nState Transmission Utility notified by the\n\t\t\t\t\tState Government of Orissa under Section 39 (1) of the Act.\n\t\t\t\t\tOPTCL has been notified as the STU.\n(115)\nStatic VAR Compensator (SVC)\nAn electrical facility designed for the purpose\n\t\t\t\t\tof generating or absorbing reactive power.\n(116)\nSupervisory Control and Data Acquisition/ SCADA\nThe combination of transducers, communication\n\t\t\t\t\tlinks and data processing systems, which provides information to\n\t\t\t\t\tthe SLDC on the operational State of the Transmission System and\n\t\t\t\t\tthe generator's Generating Units.\n(117)\nSupplier\nA person authorised to sale electricity to\n\t\t\t\t\tlicensee(s) or consumer(s) under a license granted under the Act\n\t\t\t\t\tand who is subject to the OGC.\n(118)\nSupply\nSupply in relation to electricity, means the\n\t\t\t\t\tsale of electricity to a licensee or consumer.\n(119)\nTechnical Co-ordination Committee (TCC)\nThe committee set up by REB/RPC to Co-ordinate\n\t\t\t\t\tthe technical and commercial aspects of the operation of the\n\t\t\t\t\tregional grid.\n(120)\nTime Block\nBlock of 15 minutes each for which special\n\t\t\t\t\tenergy meters record specified electrical parameters and\n\t\t\t\t\tquantities with first Time Block starting at 00.00 Hrs.\n(121)\nTransmission Licence\nThe licence granted by the Commission to\n\t\t\t\t\ttransmit electricity in the State under Section 14 of the Act.\n(122)\nTransmission Licensee\nA licensee authorised by the Commission to\n\t\t\t\t\testablish or operate transmission lines.\n(123)\nTransmission System\nTransmission System means the system consisting\n\t\t\t\t\tof Extra High Voltage electric lines, having design voltage of\n\t\t\t\t\t33 KV and higher owned and/or operated by the licensee for the\n\t\t\t\t\tpurposes of the transportation of electricity from one Power\n\t\t\t\t\tStation to a substation or to another Power Station or between\n\t\t\t\t\tsubstations or to or from any External Interconnection including\n\t\t\t\t\t33/11 KV bays/equipment up to the interconnection with the\n\t\t\t\t\tDistribution System, any plant and Apparatus and meters owned or\n\t\t\t\t\tused in connection with transmission, and such buildings or part\n\t\t\t\t\tthereof as may be required to accommodate such plant Apparatus,\n\t\t\t\t\tother works and operating staff thereof.\n(124)\nUser\nA term utilized in various Sections of the OGC\n\t\t\t\t\tto refer to the Persons including Beneficiaries, Generating\n\t\t\t\t\tStations, Licensees, Open Access Customers, EHT Consumers,\n\t\t\t\t\tPG.C.I.L., other Regional and States using STS, as more\n\t\t\t\t\tparticularly identified in each Section of the OGC.\n(125)\nUtility\nThe electric lines or electrical plant,\n\t\t\t\t\tincluding all lands, buildings, works and materials attached\n\t\t\t\t\tthereto belonging to any person acting as a generating Company\n\t\t\t\t\tor Licensee under provisions of the Act.\nChapter-2\nRole of Various Organisations and Their Linkages\n2.1.\n2.2 RULE OF SLDC\n(1) The SLDC shall be the apex body to ensure integrated operation of the Power System in the State.\n(2) The State Load Despatch Centre shall comply with such principles, guidelines and methodologies in respect of wheeling and optimum scheduling and despatch of electricity as may be specified in the OGC.\n(3) SLDC shall-\n(a) be responsible for optimum scheduling and despatch of electricity within the State, in accordance with the contracts entered into with the licensees or the generating companies operating in Orissa;\n(b) monitor grid operations;\n(c) keep accounts of the quantity of electricity transmitted through the State grid;\n(d) exercise supervision and control over the State Transmission System;\n(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the OGC;\n(f) shall comply with the directions of the RLDC;\n(g) levy and collect such fees and charges from the generating companies and licensees using the intra State Transmission System as may be specified by the Commission;\n(h) discharge the functions assigned to it under the provisions of the Act and these Regulations in an independent and unbiased manner.\n(4) The State Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring stability of grid operations and for achieving the maximum economy and efficiency in the operation of the power system in the region under its control.\n(5) Every licensee, generating company, generating station, substation and any other person connected with the operation of the power system shall comply with the directions issued by the State Load Despatch Centres.\n(6) All directions issued by the State Load Despatch Centres to any Transmission Licensee of the State or any other licensee of the State or State Generating Company or substation in the State and shall be duly complied with by the licensee or generating company or sub-station.\n(7) If any dispute arises with reference to the quality of electricity or safe, secure and integrated operation of the State grid or in relation to any direction given by the State Load Despatch Centre, it shall be referred to the Commission for decision. However, pending the decision of the Commission, the directions of the State Load Despatch Centre shall be complied with by the licensee or the Generating Company, as the case may be.\n2.2.2\n(1) System operation and control including intra-state transfer of power, covering contingency analysis and operational planning on real time basis;\n(2) Scheduling/re-scheduling of generation;\n(3) System restoration following grid disturbances;\n(4) Metering and data collection;\n(5) Compiling and furnishing data pertaining to system operation;\n(6) Operation of state unscheduled interchange (Ul) pool account and State reactive energy account.\n2.2.3\n2.2.4\n2.2.5\n(a) The ALDC shall help in focused monitoring and control of Distribution System in its local area.\n(b) Receive and carry out the instructions of SLDC.\n(c) Co-ordinate with Distribution System Operation and Control Centre (DSOCC) and SLDC to streamline the operation and enhance case of operation efficiency.\n2.2.6\n(1) Availability of State Transmission System\n(2) Availability and Plant Load Factor for SGS (Thermal),\n(3) Capacity Index for SGS (Hydro).\n2.3 Role of Stu\n(a) To undertake transmission of electricity through the State Transmission System;\n(b) To discharge all functions of planning and co-ordination relating to the State Transmission System with\n(c) To ensure development of an efficient, co-ordinated and economical system of the State transmission lines for smooth flow of electricity from a generating station to the load centres;\n(d) To provide non-discriminatory Open Access to its Transmission System for use by-\n(i) Any licensee or generating Company on payment of the transmission charges; or\n(ii) Any consumer as and when such Open Access is provided by the Commission under Sub-section (2) of Section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Commission.\n2.4 Role of Transmission Licensee\n(a) Build, maintain and operate an efficient, co-ordinated and economical Transmission System.\n(b) Comply with the directions of SLDC.\n(c) Provide Open Access as in 2.3. (1)(d) Above\n2.5 Role of Distribution Licensee\n(a) Develop and maintain an efficient, co-ordinated and economical Distribution System in his Area of Supply;\n(b) Provide non-discriminatory Open Access to its Distribution System for use by\n(i) Any licensee or generating Company on payment of the distribution charges; or\n(ii) Any consumer as and when such Open Access is provided by the Commission under Sub-section (2) of Section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Commission.\nChapter-3\nPlanning Code for the State Transmission System\n3.1.\n3.2 Objective\n(a) Development on a User's system already connected to the Transmission System.\n(b) The introduction of a new Connection Point between the User's system and the Transmission System.\n(c) A general increase in system capacity to remove operating constraints and maintain standards of security.\n(d) Stability considerations.\n(e) Cumulative effect of any of the above.\n3.3 Scope\n3.4 Planning Policy\n(a) Perspective plan formulated by CEA.\n(b) Electric Power Survey of India published by the CEA.\n(c) Transmission Planning Criteria and guidelines issued by the CEA.\n(d) Reports on National Electricity Policy, issued by Govt, of India, which are relevant for development of the State Transmission System.\n(a) Central Transmission utility,\n(b) State Government,\n(c) Generating Companies,\n(d) Regional Power Committee,\n(e) Authority,\n(f) Licensees,\n(g) Any other person notified by the State Government in this behalf\n3.5 Planning Criterion\nGeneral Policy\n(a) As a general rule, the State Transmission System shall be capable of withstanding and be secured against the following contingency outages without necessitating load shedding or rescheduling of generation during steady State operation :\nThe above contingencies shall be considered assuming a pre-contingency system depletion (Planned outage) of another 220 kV D/C line or 400 kV S/C line in another corridor and not emanating from the same substation. All the Generating Units may operate within their reactive capability curves and the network voltage profile shall also be maintained within voltage lirtiits specified.\n(b) The State Transmission System shall be capable of withstanding the loss most severe single system in feed without loss of stability.\n(a) Loss of supply\n(b) Prolonged operation of the system frequency below and above specified limits.\n(c) Unacceptable high or low voltage\n(d) System instability\n(e) Unacceptable overloading of the State Transmission Systems element.\n3.6 Planning Data Requirement\n(a) Standard Planning Data\nTo enable the STU to discharge its responsibilities under the licence, to conduct system studies and prepare perspective plans for electricity demand, generation and transmission as detailed in Section 3.8 below, the Users shall furnish data to the STU from time to time as detailed under Data Registration Chapter in this OGC and categorised as Planning Data (PD).\n(i) Standard planning data consists of details, which are expected to be normally sufficient for the STU to investigate the impact on the STS due to User development.\n(ii) Standard planning data covering (a) preliminary project planning data (b) committed project planning data and (c) connected planning data should be furnished by the Distribution Licensees and Generating companies connected to the STS. This data shall be furnished to STU from time to time in the standard formats supplied by the STU.\n(b) Detailed Planning Data\n3.7 Implementation Of Transmission Plan\n3.8 Perspective Plan\n(a) Forecast the demand for power within the State in each of the succeeding five years and provide to the Commission details of the demand forecasts, data, methodology and assumptions on which the forecasts are based.\n(b) Prepare a least cost generation plan for the State to meet the ten years load demand as per the forecast, after examining the economic, technical and environmental aspects of all available alternatives taking into account the existing contracted generation resources and effects of demand side management.\n(c) Discharge all functions of planning and co-ordination relating to the State Transmission System compatible with the above load forecast and generation plan a long-term (10 years) plan for the Transmission System in accordance with Section 39 (2) (b) of the Act, compatible with the above load forecast and generation plan in consultation with CEA. Central Transmission Utility (CTU) shall have to be consulted in connection with systems to evacuate power from inter-State Transmission System.\n3.9 Planning Standards And Procedures\n3.10 Planning Responsibility\nChapter-4\nConnection Conditions\n4.1.\n4.2 Objective\n(1) All Users or prospective Users are treated equitably.\n(2) Any new or modified connections, when established, shall neither suffer unacceptable effects due to its connections to the State Transmission System nor impose unacceptable effects on the system of any other connected Agency.\n(3) By specifying minimum design criteria, to assist Users in their requirement to comply with licence obligations and hence ensure that a system of acceptable quality is maintained.\n(4) The ownership and responsibility for all items of equipment is clearly specified in a schedule (Site Responsibility Schedule) for every site where a connection is made.\n4.3 Scope\n4.4 Procedure for Connection to And/or use of the Transmission System\n(a) Report stating purpose of proposed connection and/or modification, connection site, Transmission Licensee to whose system connection is proposed Connection Point, description of Apparatus to be connected or modification to Apparatus already connected and Beneficiaries of the proposed connection.\n(b) Datas as application and as listed in the Data Registration Chapter in this OGC\n(c) Construction schedule and target completion date.\n(d) An undertaking that the User shall abide by the OGC, IEGC and provisions of IE Rules and various standards including Grid Connectivity Standards made pursuant to the Act for installation and operation of the Apparatus.\n(b) On receipt of the preliminary offer, the User shall indicate promptly whether the Transmission Licensee/STU should precede further to make a final offer within the extended time limit.\n(a) if such proposed connection will violate any provision(s) under clause-15.3 to Appendix-4B to OERC (Conduct of Business) Regulations, 2004.\n(b) If the proposed works stated in the application do not lie within the purview of the licence or do not conform to any provision of the OGC.\n(c) If the applicant fails to give confirmation and undertakings according to Sections 4.4(1 )(d) of this Chapter.\n4.5 Connection Agreements\n(1) A condition requiring both parties to comply with the OGC;\n(2) Details of connection, technical requirements with specific references to reactive power compensation/operation of Generating Units and Power Station, if any, and commercial arrangements, (in accordance with the relevant provision of Indian Electricity Grid Code wherever applicable).\n(3) Details of any capital related payments arising from necessary reinforcement or extension of the system, data communication, RTU etc. and demarcation of the same between the concerned parties;\n(4) A Site Responsibility Schedule as referred at Section 4.13(1);\n(5) General philosophy, Guidelines etc. on protection and telemetry. A model Connection Agreement is placed at Annexure-1 to Chapter-4.\n4.6 Procedure for Site Access, Site Operational Activities and Maintenance Standards\n4.7 System performance\nTransmission System Parameter variations\n(1) General - Within the Power System, instantaneous values of. system frequency and voltage are subject to variation from their nominal value. All Agencies shall ensure that plant and Apparatus requiring service from/to the State Transmission System is of such design and construction that satisfactory operation will not be prevented by such variation.\n(1) General\n(2) Frequency variations - Rated frequency of the system shall be 50.0 Hz and shall normally be controlled within the limits as per regulations/Standards framed by the Authority subject to allowable limit as specified by the manufacturer.\n(2) Frequency variations\n(3) Voltage variations - (a) The variation of voltage may not be more than the voltage range specified in the regulations/Standards framed by the Authority.\n(3) Voltage variations\n(b) The Agency engaged in sub-transmission and distribution shall not depend upon the State Transmission System for reactive support when connected. The Agency shall estimate and provide the required reactive compensation in its transmission and distribution network to meet its full reactive power requirement, unless specifically agreed to with STU/Transmission Licensee.\n(4) Harmonics - Total Voltage Harmonic Distortion (THD) in the Power System is required to be within the limit for various applications. (Refer IEEI Standard 519)\n(4) Harmonics\nStage-1 :\nStage-2 :\nStage-3 :\n(5) Insulation Co-ordination and Rupturing capacity of Switchgear - Insulation co-ordination of the User's equipment shall conform to applicable Indian Standards/Codes. Rupturing capacity of switchgear shall not be less than that notified by the Transmission Licensee/STU from time to time.\n(5) Insulation Co-ordination and Rupturing capacity of Switchgear\n4.8 User's and Transmission Licensee's Equipment at Connection Points - (1) General\n(2) Sub-station Equipment\n(b) All equipment shall be designed, manufactured and tested and certified in accordance with the quality assurance requirements as per IEC/BIS standards.\n(c) Each connection between a User and State Transmission System shall be controlled by a circuit breaker capable of interrupting, at the Connection Point, the short circuit current as advised by Transmission Licensee in the specific Connection Agreement.\n(3) Fault Clearance Times\n(i) 100 milli seconds (ms) for 800 KV & 400 KV\n(ii) 160 milli seconds (ms) for 220 KV & 132 KV\n(b) Back-up protection shall be provided for required isolation/protection in the event of failure of the primary protection systems provided to meet the above fault clearance time requirements. If a Generating Unit is connected to the State Transmission System directly, it shall withstand, until clearing of the fault by back-up protection on the State Transmission System.\n(4) Protection\n4.9 Generating Units and Power Stations\n4.10. Reactive Power Compensation\n4.11 Data Communication Facilities\n4.12. System Recording Instruments\n4.13 Responsibilities For Operational Safety - (1) Site Responsibility Schedule\n(a) For every connection to the Transmission System for which a Connection Agreement is required, a schedule of equipment shall be prepared by the Transmission Licensee with information supplied by the respective Users. This schedule, called a Site Responsibility Schedule, shall state the following for each item of equipment installed at the connection site :-\n(i) The ownership of Plant/Apparatus\n(ii) The responsibility for control of Plant/Apparatus\n(iii) The responsibility for maintenance of Plant/Apparatus\n(v) The responsibility for operation of Plant/Apparatus\n(vi) The manager of the site.\n(vii) The responsibility for all matters relating to safety of persons at site.\n(b) The User owning the connection site shall provide reasonable access and other required facilities to another User whose equipment is installed at the connection site for installation, operation and maintenance etc.\n(c) The format, principles and basic procedure to be used in the preparation of Site Responsibility Schedules shall be formulated by STU and shall be provided to each Agency/regional constituents for compliance.\n(d) [All Agencies connected to or planning to connect to STS would ensure providing of RTU and other communication equipment, as specified by STU, for sending real-time data to nearest SCADA interface point of the transmission licensee at least before date of commercial operation of the generating stations or substation/ line being connected to STS.]\n(2) Single Line Diagrams\n(b) Whenever any equipment has been proposed to be changed, then concerned User shall intimate the necessary changes to Transmission Licensee and to all concerned. When the changes are implemented, changed Single Line Diagram shall be circulated by the User to SLDC/STU/ Transmission Licensees.\n(3) Site Common Drawings\n(b) The detailed drawings for the portion of the Agency and STU/ Transmission Licensee at each Connection Point shall be prepared individually and copies shall be handed over to other party.\n(c) If any change in the drawing is found necessary, the details will be furnished to other party as soon as possible.\n4.14 Schedule Of Assets Of State Grid\n4.15 Connection Point - (1) Generator\n(2) Distribution Company\n(3) Eastern Regional Transmission System\n[(4) Bulk Power Consumers\n4.16 Data Requirements\n4.17 Appendix of Chapter-4\nModel Connection Agreement\n-\nAnnexure-I to Chapter-4\nGeneral format for Site\nResponsibility Schedule\n-\nAnnexure-II to Chapter-4.\nAnnexure-I to Chapter-4\nAnnexure-I to Chapter-4\nConnection Agreement\nConnection Agreement\n(Refer Section 4.5)\n(Refer Section 4.5)\n[1] .................................(Name of the Transmission Licensee) whose registered office is at....................AND\n[2]........................................(Name of the company) whose registered office is at....................................(detailed address) therein after called \"User\"\n[A]...............................................................................................................................................(Name and address of the Transmission Licensee) is a Transmission Licensee granted by the OERC as per the provision of the Electricity Act, 2003 (here after called as the 'Act') agreed to execute a Connection Agreement for the purpose export/import of power at 220 kV/132 kV to.............(name of the User)\n[B]................................................(Name of the Distribution Company) (the User) is the holder of the Orissa Distribution Licence, (No) issued by OERC vide order dated.......\n[C]...........................................(Name of the User i.e. Generator/CGP/Bulk Consumer) is the holder of the authorization issued by the State Government/Central Government/CERC/ OERC vide order No.........dated.\n(i) Grid Code Compliance - It is agreed that the User............and (the Transmission Licensee) will abide by the provision of the Orissa Grid Code (OGC)/lndian Electricity Grid Code (IEGC) in force for the purpose of availing/evacuating power from/to (the Transmission Licensee) and to maintain a connectivity with the Transmission System network of .............(the Transmission Licensee).\n(i) Grid Code Compliance\n(ii) Terms of agreement\n(ii) Terms of agreement\n(a) This agreement shall be deemed to have commenced from and shall continue until it is terminated. In case of an differences or disagreements between the Transmission Licensee and the User in regard to any changes required from time to time to the terms of this agreement the same shall be resolved amicably failing which the matters shall be referred to the OERC and the Commission's decision shall be final and binding.\n(b) The term of this Agreement shall stand modified or terminated automatically as per the Regulations which OERC may issue from time to time in accordance with the functions and powers of the Commission under the Act. As soon as practicable following any Regulation of the Commission which has the effect of modifying the terms for this Agreement, the Transmission Licensee shall prepare a revised version of this agreement, incorporating the modified term and following Agreement between the Transmission Licensee and User that the revised version accurately reflects the relevant Regulation, the User shall execute the revised version.\n(c) No User shall assign the Agreement or transfer or part with the benefits under the Agreement in favour of any other person/User without the express consent or approval of the Transmission Licensee.\n(d) Any connection, which has been unauthorisedly transferred or parted with, shall be liable for disconnection after expiry of a seven days notice calling for explanation and considering the explanation submitted by him.\n(e) The User agrees to bear the cost of stamp duty and all cost incidental to the execution of this agreement in full.\n(iii) Details of Connection\n(iii) Details of Connection\n(a) System of supply voltage:\n(b) Total contract demand:\n(c) Phasing of the contract demand :\n(d) Connection details:\n(e) Details of reactive power compensation arrangement:\n(f) Details of the scheme of the switching station/bay\ni. Bus-bar arrangement: Three bus system/Two bus system/ main and transfer bus system, Bus-bar type\nii. Provision for future expansion\n(g) Captive Generating Plant:\ni. Rated capacity:\nii. Rated voltage level of generation :\niii. Quantum of surplus power to be evacuated:\niv. Details of the connectivity with the Transmission Licensee's network:\nv. [Mode of communication connectivity with nearest SCADA interface point of the transmission licensee: Telephone /Fax / Carrier Communication / Broadband Communication/Internet/ other developed mode of communication.\n(h) Communication arrangement: The User shall be required to provide voice and other communication facility as decided by SLDC.\n(i) Metering Arrangement: The User shall provide meters for accounting and audit purposes as per the standard specified by CEA. [Details of operational/commercial (tariff) metering scheme to be provided.) Detail data are to be provided as per Chapter-12 (DATA REGISTRATION) of the State Grid Code (OGC).\n(j) Other Charges :\ni. Entry Charges and Exist Charges as fixed by the Transmission Licensee & approved by OERC to be paid where appropriate.\nii. Capital related payment arising from necessary reinforcement or extension of the System is to be paid.\n(k) Site Responsibility Schedule:\n(l) Protection Scheme:\ni. Transmission line protection scheme: (please indicate the general philosophy of the scheme)\nii. 220 kV/132 kV feeder bay protection scheme: (please indicate the general philosophy of the scheme)\niii. General protection scheme adopted for the switching station: (please indicate the general philosophy of the scheme).\niv. Any other protection scheme provided:\n(m) Documents forming part of this agreement:\ni. Annexure-I: Data to be provided as per Chapter-12 of the OGC\nii. Annexure-II: Attested copies of the Transmission Licensee permission letter no date...........\niii. Annexure-II (to Chapter-4): Site Responsibility Schedule.\niv. Details of procedure necessary for Site Access, Site Operational Activities and maintenance Standards for equipments of the STU/Transmission Licensee at STU/Transmission Licensee premises and vice versa as Annexure-III\nSigned by\nSigned by\nSigned by\nSigned by\nFor & on behalf of User\nFor & on behalf of User\nfor & on behalf of the Transmission Licensee\nfor & on behalf of the Transmission Licensee\nWitnesses : 1)\n1)\n2)\n2)\nBhubaneswar\nDate : The...........Day of......Month of ........ Year\nAnnexure-II to Chapter-4\nAnnexure-II to Chapter-4\nRef : Section- 4.13(1)(a)\nRef : Section- 4.13(1)(a)\nSite Responsibility Schedule\nSite Responsibility Schedule\nName of Power Station/Sub-station...........\nSite\n\t\t\t\tOwner.................................................................\nTel.\n\t\t\t\tNumber................................................................\nFax\n\t\t\t\tNumber.................................................................\nItem of Plant/Apparatus\nPlant Owner\nSafety Responsibility\nControl Responsibility\nOperation Responsibility\nMaintenance Responsibility\nRemarks\n1\n2\n3\n4\n5\n6\n7\n.............. KV Switchyard\nAll equipment including bus bars\nFeeders\nGenerating Units\nChapter 5\nOperating Code For State Grid\n5.1 Operating Policy.\n5.2 System Security Aspects\n(a) Under an emergency,and conditions in which such isolation would prevent a total grid collapse and/or would enable early restoration of power supply.\n(b) When serious damage to a costly equipment is imminent and such isolation would prevent it.\n(c) When such isolation is specifically instructed by SLDC. Complete synchronization of grid shall be restored as soon as the conditions again permit it. The restoration process shall be supervised by SLDC, as per operating procedures separately formulated.\n5.3 Frequencies and voltage Management and Reactive Power Pricing - (1) Introduction\n(2) Objective\n(i) to define the responsibilities of all Users in contributing to frequency management;\n(ii) to define the actions required enabling the Transmission Licensee to maintain Transmission System voltages and frequency within acceptable levels in accordance with IEGC, CEA guidelines, and Transmission Planning and Security Standards, as appropriate.\n(3) Frequency Management\n(ii) SLDC shall always endeavour to restrict net drawal to within the Drawai Schedule whenever system frequency is below 49.5 Hz. When frequency falls below 49.0 Hz, SLDC shall explore and utilize internal generation capacity and then requisite load shedding as agreed with distribution Companies, shall be carried out in the State by SLDC to curtail the overdrawal.\n(iii) The recommended rate for changing the governor setting, i.e., supplementary control for increasing or decreasing the output (generation level) for all Generating Units, irrespective of their type and size, would be one (1.0) per cent per minute or as per manufacturer's limits. However, if frequency falls below 49.5 Hz, all partly loaded Generating Units shall pick up additional load at a faster rate, according to their capability.\n(iv) Except under an emergency, or to prevent an imminent damage to costly equipment, no User shall suddenly reduce his Generating Unit output by more than one hundred (100) MW without prior intimation to and consent of the State Load Despatch Centre, particularly when frequency is falling or is below 49.0Hz. Similarly, no User shall cause a sudden increase in its load by more than one hundred (100 MW) without prior intimation to and consent of the State Load Despatch Centre.\n(b) Responsibilities - SLDC shall monitor actual Drawal against Scheduled Drawal and regulate internal generation/demand to maintain this schedule. Generators, CGPs and bilateral Agencies shall follow the despatch instructions issued by SLDC. Distribution Companies and bilateral Agencies shall co-operate with SLDC in managing load on instruction from SLDC as required.\n(b) Responsibilities\n(c) Falling frequency - (i) Whenever system frequency is below 49.5 Hz, Grid through SLDC shall endeavour to restrict its net drawal from the regional grid within its Drawal Schedules. The generation at all SGS/CGPs (except those on peaking duty) shall be maximized, at least up to the level Which can be sustained, without waiting for an advise from SLDC. When the system frequency is below 49.0 Hz. requisite load shedding shall be carried out by SLDC by instructing distribution Companies as per prearranged Schedules.\n(c) Falling frequency\n(ii) [All Users shall provide automatic under-frequency and df/dt load shedding in their respective systems, to arrest frequency decline that could result in a collapse/disintegration of the grid, as per the plan separately finalised by the Protection Co-ordination Committee of the STU, and shall ensure its effective application to prevent cascade tripping of Generating Units in case of any contingency. All Users shall ensure that the above, under frequency and df/dt load shedding/islanding schemes are functional. However, in case of extreme contingencies, these relays may be temporarily kept out of service with prior consent of SLDC, which shall independently check and keep a record of its findings.]\n(d) Rising frequency - Under rising frequency conditions, SLDC shall take appropriate action to issue instructions to generators/CGPs, in co-ordination with ELRDC, to arrest the rising frequency and restore frequency within normal range. When the frequency is higher than 50.5 Hz, the actual net injection shall not exceed the scheduled despatch for that block, Also, while the frequency is above 50.5 Hz., the Generating Companies 'may (at their discretion) back down without waiting for an advibe from SLDC to restrict the frequency rise.\n(d) Rising frequency\n(4) Frequency Linked Pricing Operation\n(5) Voltage Management\n(ii) The Transmission Licensee shall co-ordinate with the distribution Companies to determine voltage levels at the External Inter Connection Points with distribution Companies. Distribution Companies shall participate in voltage management by regulating their Drawal as may be required. The Distribution Company shall endeavour to minimize the VAr Drawal at an External Inter Connection Point.\n(iii) SLDC shall continuously monitor 400/220/132 KV voltage levels at strategic sub-stations. SLDC in consultation with RLDC may issue directions for Switching in/out of all 400 KV bus and line Reactors throughout the grid/tap changing on all 400/220 KV ICTs shall also be done as per RLDC conveyed through SLDC's. In case of persistent voltage problem SLDC will interact with RLDC for remedial measure.\n(iv) SLDC shall, in co-ordination with ELRDC, regulate voltage levels so that there is minimal reactive drawal from regional Transmission System.\n(v) In general, the Beneficiaries shall endeavour to minimize the VAr Drawal at an interchange point when the voltage at that point is below 95% of rated, and shall not return VAr when the voltage is above 105%. Auto Transformer taps at the respective drawal points may be changed to control the VAr interchange as per a Beneficiaries' request to the SLDC, but only at reasonable intervals.\n(vi) The SLDC shall take appropriate measures to control Transmission System voltages, which may include but not be limited to transformer tap changing and use of MVAr reserves with Generating Units and CGPs within technical limits agreed to between the Transmission Licensee and Generating Units/CGPs.\n(vii) Generators and CGPs shall inform SLDC of their reactive reserve capability promptly on request.\n(viii) Generators shall make available to SLDC the up-to-date capability curves for all Generating Units, as detailed in Chapter-4, indicating any restrictions, to allow accurate system studies and effective operation of the Transmission System. CGPs shall similiarly furnish the net reactive capability that will be available for export to/import from Transmission System.\n(ix) All Generating Units shall normally have their Automatic Voltage Regulators (AVRs) in operation, with appropriate settings.In particular, if a Generating Unit of over fifty (50) MW size is required to be operated without its AVR in service, the SLDC shall be immediately intimated about the reason and duration, and its permission obtained. Power System Stabilizers (PSS) in AVRs of Generating Units (wherever provided), shall be got properly tuned by the respective Generating Unit owner as per a plan prepared for the purpose by the STU from time to time. STU will be allowed to carry out checking of PSS and further tuning it, wherever considered necessary.\n(x) All Users shall make all possible efforts to ensure that the grid voltage always remains within the following Operating Range.\nVoltage-(KV RMS\nVoltage-(KV RMS\nNominal\nMaximum\nMinimum\n400\n420\n360\n220\n245\n200\n132\n145\n120\n(xi) All Users shall also facilitate identification, installation and commissioning of system protection schemes in the Power System to protect against situations such as voltage collapse and cascading. Such schemes would be finalized by the STU.\n(6) Reactive Power Pricing Policy\n(ii) The charge/payment for VArs, shall be at a nominal paise/KVA Arh rate as may be specified by OERC from time to time, and will be between the Beneficiary and the State pool account for VAr interchanges.\n(iii) Notwithstanding the above, SLDC may direct a Beneficiary to curtail its VAr Drawal/injection in case the security of grid or safety of any equipment is endangered.\n(iv) The SGS shall generate/absorb reactive power as per instructions of SLDC, within capability limits of the respective Generating Units, that is without sacrificing on the active generation required at that time. No payments shall be made to the generating Companies for such VAr generation/absorption.\n(v) VAr exchange directly between two Beneficiaries on the interconnecting lines owned by them (singly or jointly) generally address or cause a local voltage problem, and generally do not have an impact on the voltage profile of the State grid. Accordingly, the management/control and commercial handling of the VAr exchanges on such lines shall be as per following provisions, on case-by-case basis :-\n(a) The two concerned Beneficiaries may mutually agree not to have any charge/payment for VAr exchanges between them on an inter connecting line.\n(b) The two concerned Beneficiaries may mutually agree to adopt a payment rate/scheme for VAr exchanges between them identical to or at variance from that specified by OERC for VAr exchanges with STS. If the agreed scheme requires any additional metering, the same shall be arranged by the concerned Beneficiaries.\n(c) In case of a disagreement between the concerned Beneficiaries (e.g. one party wanting to have the charge/payment for VAr exchanges, and the other party refusing to have the scheme), the scheme as specified in Annexure-I to Chapter-5 shall be applied. The per KV Arh rate shall be as specified by OERC for VAr exchanges with State Transmission System.\n(d) The computation and payments for such VAr exchanges shall be affected as mutually agreed between the two Beneficiaries.\n(7) General\n5.4 Demand Estimation For Operational Purposes - (1) Introduction\n(b) The demand estimation is to be done on daily/weekly/monthly basis for current year.\n(c) Each SLDC shall carry out its own demand estimation from the historical data.\n(d) While the demand estimation for operational purposes is to be done on a daily/weekly/monthly basis initially, mechanisms and facilities at SLDC shall be created at the earliest to facilitate online estimation for daily operational use.\n(2) Objective\n(b) The demand estimates are to enable the SLDC to conduct system studies for Operational Planning purposes.\n(3) Procedure\n(4) Demand Estimation\n(b) Distribution companies and other agencies involved in bilateral exchanges shall provide to the SLDC their estimates of demand/export for Active Power (MW), Reactive Power (MVAr) and Energy Consumption (MU) at each connection/External Interconnection Point on daily/weekly/monthly basis (Formats as per Annexures II, III, IV and V respectively). The distribution Companies shall intimate to the SLDC the methodology used in producing their forecasts.\n(c) The SLDC shall use this data\n(i) to assist in determination of the generation schedule for next day:\n(ii) to determine the most onerous conditions affecting constraints and voltage performance for next week;\n(iii) to check outage Plan viability for peak and lean periods for next month.\n(d) (i) The data shall be in the form of 96 blocks (15 minutes) period averaged demand figure for that day, the weekly/monthly data shall be in the form of 24 hourly averaged demand figures for that week/month and yearly data shall be in the form of month wise energy requirement for the year. All the above data shall be in respect of each inter-connection point.\n(ii) The demand/export estimates provided by the distribution companies and other Users involved in bilateral exchanges shall be updated as necessary and sent each month to the SLDC 15 days ahead on same daily/weekly/monthly basis.\n(iii) The demand estimates shall be further updated and sent to SLDC in accordance with the provision of Chapter 6, Scheduling and Despatch.\n(iv) The SLDC shall make its own demand forecast using hourly demand summation of each sub-station and CGP import/export figures provided under Chapter 7 or by using suitable computer programme, to compare with demand estimates provided by the Users.\n(v) SLDC shall notify a Contact Person who shall be responsible for day ahead a demand forecast. The official and residential telephone numbers of the Contact Person shall be intimated to all the distribution companies. Similarly all the distribution companies shall notify the Contact Person with telephone numbers and intimate SLDC. In case of change of Contact Person, it should be intimated to SLDC and vice versa .\n(vi) Distribution companies shall provide to SLDC estimates of load that may be shed, when required, in discrete blocks with the details of the arrangements of such load shedding.\n(vii) While the demand estimation for operational purposes is to be done on a daily/weekly/monthly basis initially, mechanisms and facilities at SLDC shall be created at the earliest to facilitate on-line estimation for daily operational use.\n(viii) All data shall be collected in accordance with procedures agreed between the SLDC and each User.\n(ix) SLDC shall maintain a database of State demand on a fifteen minutes basis.\n5.5 Demand Management - (1) Introduction\n(2) Manual Demand Disconnection\n(a) As mentioned elsewhere, the Distribution Licensees and other Users shall endeavour to restrict their net drawal from the grid to within their respective Drawal Schedules whenever the system frequency is below 49.5 Hz. When the frequency falls below 49.0 Hz, requisite load shedding (manual) shall be carried out to curtail the over-drawal.\n(b) Further, in case of certain contingencies and/or threat to system security, the SLDC may direct a User to decrease its drawal by a certain quantum. Such directions shall immediately be acted upon.\n(c) Each User shall make arrangements that will enable manual demand disconnection to take place, as instructed by the SLDC, under normal and/or contingent conditions.\n(d) The measures taken to reduce the Users drawal from the grid shall not be withdrawn as long as the frequency/voltage remains at a low level, unless specifically permitted by the SLDC.\n5.6 Periodic Reports - (1) Weekly Reports\n(a) Frequency profile\n(b) Voltage profile of selected substations\n(c) Major Generation and Transmission Outages\n(d) Transmission Constraints\n(e) Instances of persistent/significant non-compliance of OGC.\n(2) Other Reports\n(a) The SLDC shall prepare a quarterly report and shall issue to all the Users, which shall bring out the system constraints, reasons for not meeting the requirements, if any, of security standards and quality of service, along with details of various actions taken by different Users, and the Users responsible for causing the constraints.\n(b) The SLDC shall also provide information/report, which can be called for by Users in the interest of smooth operation of the State Transmission System.\n5.7 Operational Liaison - (1) Introduction\n(b) The operational liaison function is a mandatory built-in hierarchical function of the SLDC and Users, to facilitate quick transfer of information to operational staff. It will correlate the required inputs for optimisation of decision-making and actions.\n(2) Procedure for Operational Liaison - (a) Operations and events on the State Grid\n(ii) Immediately following an event on State grid, the SLDC will inform each User, whose system may, or will, experience an operational effect following the event, and give details of what has happened in the event but not the reasons why.\n(b) Operations and events on a User's System - (i) Before any operation is carried out on a User's System, the User will inform the SLDC, in case the State grid may, or will, experience an operational effect, and give details of the operation to be carried out.\n(b) Operations and events on a User's System\n(ii) Immediately following an event on an User's system, the User will inform the SLDC, in case the State Grid may, or will, experience an operational effect following the event, and give details of what has happened in the event but not the reasons why.\n5.8 OUTAGE PLANNING - (1) Introduction\n(a) This also sets out the procedure for preparation of outage schedule for the element of the State grid in a co-ordinated and optimal manner keeping in view the State system operating conditions and the balance of generation and demand, (list of elements of grid covered under these stipulations shall be prepared and be available with SLDC).\n(b) The generation out put and Transmission System should be adequate after taking into account the outages to achieve the Security Standards.\n(c) Annual outage plan shall be prepared in advance for the financial year by the SLDC and reviewed during the year on quarterly and monthly basis.\n(2) Objectives\n(b) To minimise surplus or deficits, if any, in the system requirement of power and energy and help operate system within Security Standards.\n(c) To optimise the transmission outages of the elements of the State Grid without adversely affecting the grid operation but taking into account the Generation Outage Schedule, outages of Distribution Licensees/STU systems and maintaining system security standards.\n(3) Scope\n(4) Outage Planning Process\n(b) All Distribution Licensees/STU, SGS shall provide SLDC their proposed outage programmes in writing for the next financial year by 1st August of each year. These shall contain identification of each Generating Unit/Line/ICT, the preferred date for each outage and its duration and where there is flexibility, the earliest start date and latest finishing date.\n(c) SLDC shall then come out with a draft outage programme for the next financial year before 30th November of each year for the State grid taking into account the available resources in an optimal manner and to maintain security standards. This will be done after carrying out necessary system studies and, if necessary, the outage programmes shall be rescheduled. Adequate balance between generation and load requirement shall be ensured while finalising outage programmes.\n(d) SLDC shall inform this draft outage programme to ERPC in writing by 30th November for each financial year.\n(e) ERPC will then come out with a draft outage programme for the next financial year by 31st December of each year for the regional grid.\n(f) The final outage plan shall be intimated to all regional constituents and RLDC for implementation latest by 31st January of each year as mutually decided in REB/RPC forum.\n(g) SLDC shall interact with all Users as necessary to review and optimise the draft plan, agree to any changes and produce an acceptable co-ordinated generation and transmission outage plan by 1st February each year.\n(h) SLDC shall release the finally agreed transmission outage plan, which takes ar,count of regional and User requirements, to all Users by 1st March each year.\n(i) The above annual outage plan shall be reviewed by SLDC on quarterly and monthly basis in consultation with ERLDC and Users who shall be informed by SLDC any proposed changes. SLDC shall review the monthly outage plan, generation schedule and other operational aspects related to system operation in the monthly Power System Operational Co-ordination Committee meeting to be held by SLDC.\n(j) In case of emergency in the system, viz ., loss of generation, break down of transmission line affecting the system, grid disturbances; system isolation SLDC may conduct studies again before clearance of the planned outage.\n(k) SLDC is authorized to defer the planned outage in case of any of the following, taking into account the statutory requirements:\n(l) The detailed generation and transmission outage programmes shall be based on the latest annual outage plan (with all adjustments made to date).\n(m) Users' requests for additional Outages will be considered by SLDC and accommodated to the extent possible.\n(n) SLDC shall inform Users promptly of any changes that affect them.\n(o) Each STU/SGS/Distribution Licensee shall obtain the final approval from SLDC prior to availing an outage.\n(5) Release of Circuit and Generation Units included in Outage Plan.\n(6) Data Requirements\n5.9 Recovery Procedures\n5.10 Event Information - (1) Introduction\n(2) Objective\n(3) Scope\n(4) Responsibility\n(b) SLDC shall be responsible for collection and reporting of all necessary data to Users for monitoring, reporting and event analysis.\n(5) Reportable Events\n(i) Violation of security standards.\n(ii) Grid indiscipline.\n(iii) Non-compliance of SLDC's instructions.\n(iv) System is landing/system split\n(v) State black out/partial system black out\n(vi) Protection failure on any element of the State systems.\n(vii) Power System instability\n(viii) Tripping of any element of the Regional grid.\n(b) Typical examples of reportable incidents that could affect the State Transmission System are the following :\n(i) Exceptionally high/low system voltage or frequency.\n(ii) Serious equipments problem, e.g. major circuit, transformer or bus bar.\n(iii) Loss of major Generating Unit.\n(iv) Transmission System breakaway or Black Start.\n(v) Major fir? incidents.\n(vi) Equipment and transmission line overload.\n(vii) Excessive Drawal deviations.\n(viii) Minor equipment alarms.\n(6) Reporting Procedure\n(b) Within 1 (one) hour of being informed by the Reporting User, SLDC may ask for a written report on any incident.\n(c) If the reporting incident cannot be classed as minor then the Reporting User shall submit an initial written report within two hours of asking for a written report by SLDC. This has to be further followed up by the submission of a comprehensive report within 48 hours of the submission of the initial written report.\n(d) In the case of an event occurring in EHV system and generating equipment which was initially reported by STU/Transmission Licensee/ State Generator, SLDC will give a written report to ERLDC as stipulated in IEGC.\n(e) SLDC may call for a report from any User on any reportable incident affecting other Users and the licensee in case the same is not reported by such User whose equipment might have been source of the reportable incident.\n(7) Form of Written Reports :\n(8) Major Failure\n(9) Accident Reporting\nAnnexure-I\nAnnexure-I\n[Refer Section 5.3(6)]\n[Refer Section 5.3(6)]\nPayment for Reactive Energy Exchanges on Beneficiary Owned Lines\nPayment for Reactive Energy Exchanges on Beneficiary Owned Lines\nCase-1\nCase-2 :\n(i) Net VArh received from Beneficiary-A while voltage is below 97% and\n(ii) Net VArh supplied to Beneficiary-A while voltage is above 103%\nNote : Net VArh and net payment may be positive or negative\nCase-3\n(i) Beneficiary-B pays to Beneficiary-A for X 1 or X 3 whichever is smaller in magnitude, and\n(ii) Beneficiary-A pays to Beneficiary-B for X 2 or X 4 , whichever is smaller in magnitude.\nNote :",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "1",
"title": "1. Net VArh and net payment may be positive or negative",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "2",
"title": "2. In case X 1 is positive and X 3 is negative, or vice-versa, there would be no payment under (i) above.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "3",
"title": "3. In Case X 2 is positive and X 4 is negative, or vice-versa, there would be no payment under (ii) above.",
"chapter": null,
"content": "Annexure-II to Chapter-5\nAnnexure-II to Chapter-5\nDay ahead forecast of demand at inter-connection points\nDay ahead forecast of demand at inter-connection points\nTo be furnished by 11:00 hrs of current day\nTo be furnished by 11:00 hrs of current day\n(Ref-Section 5.4(1) and (4))\nHour/ Block\nDay >\nName of S/S\nName of S/S\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\n-\nName of S/S\nTotal\n1\nMW\nMVAr\n2\nMW\nMVAr\n3\nMW\nMVAr\n4\nMW\nMVAr\n5\nMW\nMVAr\n6\nMW\nMVAr\n7\nMW\nAVAr\n8\nMW\nMVAr\n9\nMW\nMVAr\n10\nMW\nMVAr\n11\nMW\nMVAr\n12\nMW\nMVAr\n13\nMW\nMVAr\n14\nMW\nMVAr\n15\nMW\nMVAr\n16\nMW\nMVAr\n17\nMW\nMVAr\n18\nMW\nMVAr\n19\nMW\nMVAr\n20\nMW\nMVAr\n21\nMW\nMVAr\n22\nMW\nMVAr\n23\nMW\nMVAr\n24\nMW\nMVAr\n.\nMW\nMVAr\n96\nMW\nMVAr\nTotal (MU)\nSignature of the Authorised signatory of the Licensee\nAnnexure-III to Chapter-5\nAnnexure-III to Chapter-5\nWeekly a head forecast of demand at inter connection points for the next week (Monday to Sunday)\nWeekly a head forecast of demand at inter connection points for the next week (Monday to Sunday)\nTo be furnished by Friday of each week\nName of the Distribution Company\n(Ref-Section 5.4(1) and (4)\nSl. No.\nNames of S/S->Hr\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\n12\n13\n14\n15\n16\n17\n18\n19\n20\n21\n22\n23\n24\nTotal\n1\nMW\nMVAr\n2\nMW\nMVAr\n3\nMW\nMVAr\n4\nMW\nMVAr\n5\nMW\nMVAr\n6\nMW\nMVAr\n7\nMW\nMVAr\n8\nMW\nMVAr\n9\nMW\nMVAr\n.\nMW\nMVAr\n.\nMW\nMVAr\nN\nMW\nMVAr\nSignature of Authorised signatory of the Licensee\nAnnexure-IV to Chapter-5\nAnnexure-IV to Chapter-5\nMonth ahead forecast of demand at inter-connection points for the next month\nMonth ahead forecast of demand at inter-connection points for the next month\nTo be furnished by 15th of current month\nName of the Distribution Company\n(Ref-Section 5.4(1) and (4)\nSl. No.\nNames of S/S->Hr\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\n12\n13\n14\n15\n16\n17\n18\n19\n20\n21\n22\n23\n24\nTotal\n1\nMW\nMVAr\n2\nMW\nMVAr\n3\nMW\nMVAr\n4\nMW\nMVAr\n5\nMW\nMVAr\n6\nMW\nMVAr\n7\nMW\nMVAr\n8\nMW\nMVAr\n9\nMW\nMVAr\n.\nMW\nMVAr\n.\nMW\nMVAr\nN\nMW\nMVAr\nSignature of Authorised signatory of the Licensee\nAnnexure-V to Chapter-5\nAnnexure-V to Chapter-5\nYearly (Month wise) requirement of Energy at inter-connection points for the next Financial Year\nYearly (Month wise) requirement of Energy at inter-connection points for the next Financial Year\nTo be furnished by 31st December of each year\nTo be furnished by 31st December of each year\n(Ref-Section 5.4(1) and (4))\nName of The Distribution Company :-\nFor the Year\nAll Figures in MU\nSl. No.\nName of S/S\nApril\nMay\nJune\nJuly\nAugust\nSeptember\nOctober\nNovember\nDecember\nJanuary\nFebruary\nMarch\nTotal\n1\n2\n3\n4\n5\n6\n7\nN\nTotal\nSignature of Authorised signatory of the Licensee\nAnnexure VI to Chapter-5\nAnnexure VI to Chapter-5\n[Ref: Regulation 5.9(7)]\n[Ref: Regulation 5.9(7)]\nIncident Reporting\nIncident Reporting\nDate:................\nTime:......................\n(Voltage, Frequency, Flows, Generation, etc.)\nChapter-6\nScheduling and Despatch Code\n6.1 Introduction.\n(a) Demarcation of responsibilities between Various Users and SLDC in Scheduling and despatch.\n(b) Procedure for scheduling and despatch\n(c) Complementary Commercial Mechanism (Annexure-I to Chapter-6)\n6.2 Objective\n6.3 Scope\n6.4 Demarcation of Responsibilities\n6.5 Scheduling and Despatch Procedure - (1) Generation Scheduling\n(i) Transmission System constraints from time to time.\n(ii) Fifteen minutes block load requirements as estimated by SLDC.\n(iii) The need to provide Operating Margins and reserves required to be maintained.\n(iv) The availability of generation from State Generators, ISGS and CGPs together with constraints, if any, , in each case.\n(v) Overall economy to the license and customers.\n(2) Generation Despatch\n(i) To switch a generator into or out of service.\n(ii) Details of reserve to be carried on a unit.\n(iii) To increase or decrease MVAr generation to assist with voltage profile.\n(iv) To begin pre-planned Black Start procedures.\n(v) To hold spinning reserve.\n(vi) To hold Generating Units on standby.\n(3) Communication with Generators\n6.6 Action Required By Generators\n6.7 Enhancement of Schedule and Despatch Procedure\n6.8 Data Requirements\nAnnexure-1 to Chapter-6\nAnnexure-1 to Chapter-6\n{Refer Clause 6.1 (c)}\n{Refer Clause 6.1 (c)}\nComplementary Commercial Mechanisms\nComplementary Commercial Mechanisms\nChapter-7\nMonitoring Of Generation And Drawal\n7.1.\n7.2 Objective\n7.3 Monitoring Procedure\n(2) Generating Unit Tripping\n(3) Monitoring of Drawal\n(4) Data Requirements\nChapter-8\nCross Boundary Safety\n8.1 Introduction.\n8.2 Objective\n8.3 Control Persons\n8.4 Procedure\n8.5 Special Considerations\nChapter-9\nProtection\n9.1 Introduction.\n9.2 Objective\n9.3 General Principles\n9.4. Protection Co-Ordination\n9.5 Fault Clearance Times\n9.6 Generator Requirements\n9.7 Transmission Line Requirements\n(a) 400 kV Lines\n(b) 220 kV Line\n(c) 132 kV Line\n9.8 Distribution Line Requirement\n(1) Non-Parallel Radial Feeders - Non-directional time lag over current and earth fault relay with suitable settings to obtain discrimination between adjacent relay stations.\n(1) Non-Parallel Radial Feeders\n(2) Parallel Feeders/Ring Feeders - Directional time lag over current and earth fault relays.\n(2) Parallel Feeders/Ring Feeders\n(3) For long Feeders/Transformer Feeders - For long feeders or transformer feeders, the relays should Incorporate a high set instantaneous element.\n(3) For long Feeders/Transformer Feeders\n9.9 Transformer Requirements - (1) Generating Station/Transmission System\n(2) Distribution System\n9.10 Sub-Station Bus Bar and Fire Protection\n9.11 Data Requirements\nChapter-10\nMetering and Communication and Data Acquisition\n[10.1 Introduction\n(i) Interface Meters are - (a) the meters installed at the points of inter connection with Inter/ Intra State Transmission System for purpose of electricity accounting and billing.\n(i) Interface Meters are\n(b) the meters installed at the points of inter connection between the two licensees for purpose of electricity accounting and billing.\n(c) the meters installed at the points of inter connection with Inter/Intra State Transmission System for a consumer who has been permitted open access by the Appropriate Commission for purpose of electricity accounting and billing.\n(d) the meters installed at the points of inter connection with Distribution System for a consumer who has been permitted open access by the Appropriate Commission for purpose of electricity accounting and billing.\n(ii) Energy Accounting and Auditing Meters - These are the meters installed to account for energy generated, transmitted, distributed and consumed in various segments of the power system and the energy loss.]\n(ii) Energy Accounting and Auditing Meters\n10.2 Objective\n10.3 Generation Operational Metering\n(i) Bus Voltage\n(ii) Frequency\n(iii) MW\n(iv) MVAR\n10.4 Transmission System Operational Metering\n(i) Bus Voltage\n(ii) Frequency\n(iii) MW\n(iv) MVAR\n(v) Power Factor\n(vi) Current\n10.5 Supervisory Control And Data Acquisition (Scada)\n10.6 Regulatory Requirements Of Special Energy Meters\n(i) Average frequency for each successive 15- minute block, as a two-digit code (00 to 99 for frequency from 49.0 to 51.0 Hz).\n(ii) Net Wh transmitted during each successive 15-minute block, up to second decimal, with plus/minus sign.\n(iii) Cumulative Wh transmittal at each midnight, in six digits including one decimal.\n(iv) Cumulative VArh transmittal for voltage high condition, at each midnight, in six digits including one decimal.\n(v) Cumulative VArh transmittal for voltage low condition, at each midnight, in six digits including one decimal.\n(vi) Date and Time Blocks of failure of VT supply on any phase, as a star (*) mark.\n(i) Unique identification number of the meter\n(ii) Date\n(iii) Time\n(iv) Cumulative Wh register reading\n(v) Average frequency of the previous 15-minute block\n(vi) Net Wh transmittal in the previous 15-minute block, with +/-sigr\n(vii) Average percentage voltage\n(viii) Reactive power, with +/-sign\n(ix) Voltage-high VArh register reading\n(x) Voltage-low VArh register reading\n10.7 Communication\n10.8 Data Acquisition\n(i) MW generated in each Power Station\n(ii) MW draw from External Interconnection\n(iii) MVAr generated or absorbed in each Power Station\n(iv) MVAr imported or exported from External Interconnection\n(v) Voltage in all system buses\n(vi) Frequency in Transmission System\n(vii) MW & MV Ar flow in each transmission line\n10.9 Agreed Procedure For Communication Ano Data Transmission\nData Requirement\n[10.10. Application of CEA Regulations\nChapter-11\nManagement of The Orissa Grid Code\n11.1 Management of OGC.\n(1) The OGC and its amendments shall be finalized and notified adopting the prescribed procedure followed for regulations issued by OERC.\n(2) The requests for amendments to modifications in the OGC and for removal of difficulties shall be addressed to Secretary, OGC, for periodic consideration, consultation and disposal.\n(3) Any dispute or query regarding interpretation of OGC may be addressed to Secretary, OERC and clarification issued by the OERC shall be taken as final and binding on all concerned.\n(4) The OERC shall specify the OGC for operation of the State Transmission System as per Section 86 (1) (h) of the Act, ensuring that they are consistent with the IEGC.\n11.2 Grid Co-Ordination Committee (Gcc)\n(i) Facilitating the implementation of these Regulations and the rules and procedures developed under the provisions of these Regulations.\n(ii) Assessing and recommending remedial measures for issues that might arise during the course of implementation of provisions of these Regulations and the rules and procedures developed under the provisions of these Regulations\n(iii) Periodical review of the OGC, in accordance with the provisions of the Act and these Regulations\n(iv) Analyse any major grid disturbance soon after its occurrence.\n(v) Examining problems raised by the Users, and\n(vi) Investigate take action in case any Beneficiary is indulging in unfair gaming or collusion after getting reported from SLDC.\n(vii) Initiate remedial action against persistent default payment of Ul and VAr charges reported by SLDC.\n(viii) Decide utilisation of money remaining in the State reactive account (Refer Clause 7 of Complementary Commercial Mechanisms)\n(ix) Audit the complete statement of the State Ul and the State Reactive Energy account tabled by SLDC by its Commercial Committee (a sub-committee of GCC).\n(x) Such other matters as may be directed by the Commission from time to time.\n(i) One member of the SLDC;\n(ii) One member from State Transmission Utility i.e. OPTCL;\n(iii) One member to represent the each of the generating companies in the State namely OHPC, OPGC and NTPC (TTPS);\n(iv) One member to represent the Transmission Licensees in the State, other than the STU;\n(v) One member to represent each of the Distribution Licensees in the State;\n(vi) One member to represent GRIDCO,\n(vii) One member to represent the Trading Licensees in the state (other than GRIDCO);\n(viii) One representative of Captive Generating Plants from the State having installed capacity more than 100 MW;\n(ix) One representative of PGCIL;\n(x) One representative from ERLDC;\n(xi) One representative from OERC as an observer and\n(xii) Such other persons as may be nominated by the Commission.\n(i) The concerned Director of STU, having the responsibility of looking after technical activities of STU shall be the member referred to in Section [11.2 (3)(ii)] above;\n(ii) the member referred to in Section [11.2 (3)(ii)] above, shall be the head of SLDC;\n(iii) the members referred to in clauses (iii), (iv), (v), (vi) and (vii) of Section 11.2 (3) above shall be nominated by their respective organizations;\n(iv) Organizations referred under Sections [11,2(3)(iv)(vii) & (viii)] will be selected in rotation from among all such organizations in the State. The term of each such member, selected in rotation, shall be one (1) year :\nChapter-12\nData Registration\n12.1 Introduction.\n12.2 Objective\n12.3 Responsibilities\n12.4 Data Categories And Stages In Registration\n12.5 Changes To Users Data\n12.6 Data Not Supplied\n12.7 Special Considerations\n12.8 Appendices\nAppendix\nAppendix\nSubject\nSubject\nPage\nPage\nA\nStandard Planning Data\n312\nB\nDetailed Planning Data\n316\nC\nOperational Planning Data\n325\nD\nProtection Data\n328\nE\nMetering Data\n328\nAppendix-A\nAppendix-A\nData Registration\nData Registration\nStandard Planning Data\nStandard Planning Data\nReference To:\nChapter 3 System Planning\nChapter-4 Connection Condition\nA.1 Standard Planning Data (Generation)\nA.1.1 Thermal (Coal/Fuel Linked)\nA.1.1 Thermal (Coal/Fuel Linked)\nA.1.1.1 General\nA.1.1.1 General\ni.\nSite\nGive location map to scale showing roads, railway lines,\n\t\t\t\ttransmission lines, rivers and reservoirs if any.\nii.\nCoal linkage/Fuel (Like Liquid Natural Gas, Naptha etc.)\n\t\t\t\tlinkage\nGive information on means of coal transport from colamines in\n\t\t\t\tcase of pitchead stations or means of coal carriage if coal is to\n\t\t\t\tbe brought from (distance). In case of other fuels, give details\n\t\t\t\tof source of fuel and their transport.\niii.\nWater Sources\nGive information on availability of water for operation of the\n\t\t\t\tPower Station.\niv.\nEnvironmental\nState whether forest, lands mining clearance areas are\n\t\t\t\taffected.\nv.\nSite map (To scale)\nShowing an area required for Power Station coal linkage, coal\n\t\t\t\tyard, water pipe line, ash disposal area, colony etc.\nvi.\nApproximate period of construction.\nA.1.1.2 Connection\nA.1.1.2 Connection\ni.\nPoint of Connection\nGive Single Line Diagram of the proposed Connection with the\n\t\t\t\tsystem.\nii.\nStep up voltage for connection in K.V.\nA.1.1.3 Station Capacity\nA.1.1.3 Station Capacity\ni.\nTotal Power Station capacity (MW).\nState whether development will be carried out in phase and if\n\t\t\t\tso, furnish details.\nii.\nNo. of units & unit size\nMW\nA.1.1.4 Generating Unit Data\nA.1.1.4 Generating Unit Data\ni.\nSteam Generating Unit\nState type, capacity, steam pressure, steam temperature etc.\nii.\nSteam turbine\nState type, and capacity.\niii.\nGenerator\na. Type\nb. Rating (MVA)\nc. Terminal voltage (kV)\nd. Rated Power Factor\ne. Reactive Power Capability (MVAr) in the range 0.95 of\n\t\t\t\tleading and 0.85 lagging\nf. Short Circuit Ratio\ng. Direct axis transient reactance (% on MVA rating)\nh. Direct axis sub-transient reactance (% on MVA rating)\ni. Auxiliary Power Requirement (MW)\niv.\nGenerator Transformer\na. Type\nb. Rated capacity (MVA)\nc. Voltage Ratio (HV/LV)\nd. Tap change Range (+% to - %) Percentage Impedance (Positive\n\t\t\t\tSequence at Full load)\nA.1.2 Hydro Electrical\nA.1.2 Hydro Electrical\nA.1.2.1 General\nA.1.2.1 General\ni.\nSite\nGive location map to scale showing roads, railway lines, and\n\t\t\t\ttransmission lines.\nii.\nSite map (To scale)\nShowing proposed dam, reservoir area, water conductor system,\n\t\t\t\tfore-bay, power house etc.\niii.\nSubmerged Area\nGive information on area submerged, villages submerged,\n\t\t\t\tsubmerged forest land, agricultural land etc.\niv.\nApproximate period of construction.\nA.1.2.2. Connection\nA.1.2.2. Connection\ni.\nPoint of Connection\nGive Single Line Diagram proposed connection with the\n\t\t\t\tTransmission System.\nii.\nStep up voltage for Connection\nKV\nA.1.2.3. Station Capacity\nA.1.2.3. Station Capacity\ni.\nTotal Power Station capacity (MW)\nState whether development is carried out in phases and if so\n\t\t\t\tfurnish details.\nii.\nNo of units & unit size\nMW\nA.1.2.4. Generating Unit Data\nA.1.2.4. Generating Unit Data\ni.\nOperating Head (in Mtr.)\na. Maximum\nb. Minimum\nc. Average\nii.\nTurbine State\nType and capacity\niii.\nGenerator\na. Type\nb. Rating (MVA)\nc. Terminal voltage (kV)\nd. Rated Power Factor\ne. Reactive Power Capability (MVAr) in the range 0.95 of\n\t\t\t\tleading and 0.85 of lagging\nf. Short Circuit Ratio\ng. Direct axis transient reactance (% on rated MVA)\nh. Direct axis sub-transient reactance (% on rated MVA)\ni. Auxiliary Power Requirement (MW)\niv.\nGenerator Transformer\na. Type\nb. Rated Capacity (MVA)\nc. Voltage Ratio HV/LV\nd. Tap change Range (+% to -%)\ne. Percentage Impedance (Positive sequence at full load).\nA.2 Standard Planning Data (Transmission)\nNote - The compilation of the data is the internal matter of the Transmission Licensee, and as such the Transmission Licensee shall make arrangements for getting the required data from different departments of the Transmission Licensee to update its Standard Planning Data in the format given below :\ni. Name of line (Indicating Power Stations and sub-stations to be connected).\nii. Voltage of line (KV).\niii. No. of circuits.\niv. Route length (Km).\nv. Conductor sizes.\nvi. Line parameters (pu values).\na. Resistance/Km.\nb. Inductance/Km.\nc. Susceptance/Km (B/2).\nvii. Approximate power flow expected MW & MVAr.\nviii. Terrain of route-Give information regarding nature of terrain i.e.forest land, fallow land, agricultural and river basin, hill slope etc.\nix. Route map (to Scale) - Furnish topographical map showing the proposed route showing existing power lines and telecommunication lines.\nx. Purpose of Connection - Reference for scheme, wheeling to other Stats, etc.\nxi. Approximate period of Construction.\nA.3 Standard Planning Data Distribution\nA.3.1 General\ni. Area map (to scale)- Marking the area in the map of Orissa for which distribution licence is applied for.\nii. Consumer Data - Furnish categories of consumers, their numbers and connected loads.\niii. Reference to Electrical Divisions presently in charge of the distribution.\nA.3.2 Connection\ni. Points of Connection - Furnish Single Line Diagram showing points of connection.\nii. Voltage of supply at points of connection iii. Names of Grid Sub-station feeding the points of connection.\nA.3.3. Lines and Substations\ni. Line data- Furnish lengths of line and voltages within the Area.\nii. Sub-station data-Furnish details of 33/11 KV sub-stations,11/ 0.4 KV sub-stations, capacitor installations.\nA.3.4 Loads\ni. Loads drawn at points of connection.\nii. Details of loads fed at EHV, if any Give name of consumer,voltage of supply, contract demand and name of Grid Sub-station from which line is drawn, length of EHV line from Grid Sub-station to consumer's premises.\nA.3.5 Demand Data (For all Loads 5 MW and above)\ni. Type of load- State whether furnace loads, rolling mills, traction loads, other industrial loads, pumping loads etc.\nii. Rated voltage and phase.\niii. Electrical loading of equipment-State number and size of motors, types of drive and control arrangements.\niv. Sensitivity of load to voltage and frequency of supply.\nv. Maximum Harmonic content of load.\nvi. Average and maximum phase unbalance of load.\nvii. Nearest sub-station from which load is to be fed.\nviii. Location map (to scale)- Showing location of load with reference to lines and sub-stations in the vicinity.\nA.3.6 Load Forecast Data\ni. Peak load and energy forecast for each category of loads for each of the succeeding 10 years.\nii. Details of methodology and assumptions on which forecasts are based.\niii. If supply is received from more than one Sub-station, the Substation wise break up of peak load and energy projections for each category of loads for each of the succeeding 10 years along with estimated daily load curve.\niv. Details of loads 5 MW and above.\na. Name of prospective consumer.\nb. Location and nature of load/complex.\nAppendix-B\nAppendix-B\nDetailed Planning Data\nReference To\nChapter 3/system Planning\nChapter 4/connection Conditions\nB.1 Detailed Planning Data (Generation)\nPart 1. For Routine Submission\nB.1.1 Thermal Power Stations (Coal Based)\nB. 1.1.1 General\ni. Name of Power Station\nii. Number and capacity of Generating Sets (MVA)\niii. Ratings of all major equipments (Boilers and major accessories, turbines, alternators, Generating Unit transformers etc.).\niv. Single Line Diagram of Power Station and switchyard\nv. Relaying and metering diagram\nvi. Neutral grounding of Generating Units.\nvii. Excitation control (What type is used ? e.g. Thyristor, Fast Brush less ?)\nviii. Earthing arrangements with earth resistance values\nB.1.1.2 Protection and Metering\ni. Full description including settings for all relays and protection systems installed on the Generating Unit, Generating Unit transformer, auxiliary transformer and electrical motor of major equipment listed, but not limited to, under SI.3 (General).\nii. Full description including settings for all relays installed on all outgoing feeders from Power Station switchyard, tie circuit breakers, incoming circuit breakers.\niii. Full description of inter-tripping of circuit breakers at the point or points of Connection with the Transmission System.\niv. Most probable fault clearance time for electrical faults on the User's system.\nv. Full description of operational and commercial metering schemes.\nB.1.1.3 Switchyard\ni. Rated MVA\nii. Voltage Ratio\niii. Vector Group\niv. Positive sequence reactance for maximum, minimum, normal Tap. (% on MVA)\nv. Positive sequence resistance for maximum, minimum, normal Tap. (% on MVA)\nvi. Zero sequence reactance. (% on MVA)\nvii. Tap changer Range (+%to- %) and steps\nviii. Type of Tap changer. (OFF/ON)\ni. Rated voltage (KV)\nii. Type of circuit breaker (MOCB/ABCB/SF6)\niii. Rated short circuit breaking current (kA) 3 phase\niv. Rated short circuit breaking current (kA) 1 phase\nv. Rated short circuit making current (kA) 3 phase\nvi. Rated short circuit making current (kA) 1 phase\nvii. Provisions of auto reciosing with details\ni. Busbar\nii. Switchgear\niii. Transformer bushings\niv. Transformer windings\nB.1.1.4 Generating Units\n(a) Parameters of Generating Units :-\ni. Rated terminal voltage (KV)\nii. Rated MVA\niii. Rated MW\niv. Inertia constant (MW Sec./MVA) H\nv. Short circuit ratio\nvi. Direct axis synchronous reactance (% on MVA) X d\nvii. Direct axis transient reactance (% on MVA) X' d\nviii. Direct axis sub-transient reactance (% on MVA) X\" d\nix. Quadrature axis synchronous reactance (% on MVA) X q\nx. Quadrature axis transient reactance (% on MVA) X\" q\nxi. Quadrature axis sub-transient reactance (% on MVA) X\" q\nxii. Direct axis transient open circuit time constant (Sec) T\" do\nxiii. Direct axis sub-transient open circuit time constant (Sec) T\" do\nxiv. Quadrature axis transient open circuit time constant (Sec) T' qo\nxv. Quadrature axis sub-transient open circuit time constant (Sec) T\" qo\nxvi. Stator resistance (Ohm) R a\nxvii. Stator leakage reactance (Ohm) X 1\nxviii Stator time constant (Sec)\nxix. Rated field current (A)\nxx. Open circuit saturation characteristic for various terminals giving the compounding current to achieve the same.\n(b) Parameters of Excitation Control System\ni. Type of excitation\nii. Maximum field voltage\niii. Minimum field voltage\niv. Rated field voltage\nv. Details of excitation loop in block diagrams showing transfer functions of Individual elements using IEEE symbols.\nvi. Dynamic characteristics of over-excitation limiter.\nvii. Dynamic characteristics of under-excitation limiter.\n(c) Parameters of Governor\ni. Governor average gain (MW/Hz)\nii. Speeder motor settings range\niii. Time constant of steam or fuel governor valve\niv. Governor valve opening limits\nv. Governor valve rate limits\nvi. Time constant of turbine.\nvii. Governor block diagram showing transfer functions of individual elements using IEEE symbols.\n(d) Operational Parameters :-\ni. Minimum notice required synchronising a Generating Unit from de-synchronisation.\nii. Minimum time between synchronising different Generating Units in a Power Station.\niii. The minimum block load requirements on synchronising\niv. Time required for synchronising a Generating Unit for the following conditions\na. Hot\nb. Warm\nc. Cold\nv. Maximum Generating Unit loading rates for the following conditions\na. Hot\nb. Warm\nc. Cold\nvi. Minimum load without oil support (MW)\nB.1.2 Hydroelectric Stations\nB.1.2.1 General\ni; Name of Power Station\nii. No. and capacity of units (MVA)\niii. Ratings of all major equipment\na. Turbines (HP)\nb. Generators (MVA)\nc. Generators Transformers (MVA)\nd. Auxiliary Transformers (MVA)\niv. Single Line Diagram of Power Station and switchyard\nv. Relaying and metering diagram\nvi. Neutral grounding of generator\nvii. Excitation control\nviii. Earthing arrangements with earth resistance values\nix. Reservoir Data\na. Salient features\nb. Type of Reservoir\n(i) Multipurpose\n(ii) For Power\nc. Operating Table with :-\n(i) Area capacity curves, and\n(ii) Unit capability at different net heads.\nB.1.2.2 Protection\ni. Full description including settings for all relays and protection systems installed on the Generating Unit, generator transformer, auxiliary transformer and electrical motor of major equipment included, but not limited to those listed, under SI.3 (General).\nii. Full description including settings for all relays installed on all outgoing feeders from Power Station switchyard, tie breakers, incoming breakers.\niii. Full description of inter-tripping of breakers at the point or points of connection with the Transmission System.\niv. Most probable fault clearance time for electrical faults on the User's system.\nB.1.2.3 Switchyard\n(a) Interconnecting Transformers\ni. Rated MVA\nii. Voltage ratio\niii. Vector group\niv. Positive sequence reactance for maximum, minimum and normal tap (% on MVA).\nv. Positive sequence resistance for maximum, minimum and normal Tap (% on MVA).\nvi. Zero sequence reactance (% on MVA)\nvii. Tap changer range (+% to -%) and steps\nviii. Type of tap changer (OFF/ON)\n(b) Switchgear (including circuit breakers, isolators on all circuits connected to the points of Connection\ni. Rated voltage (KV)\nii. Type of Breaker (MOCB/ABCB/SF6)\niii. Rated short circuit breaking current (KA) 3 phase\n(c) Lightning Arresters :\n(d) Communications :\n(e) Basic Insulation Level (KV)\ni. Bus bar\nii. Switchgear\niii. Transformer bushings\niv. Transformer windings\nB.1.2.4. Generating Units\n(a) Parameters of generator\ni. Rated terminal voltage (KV).\nii. Rated MVA\niii. Rated MW\niv. Intertia constant (MW see/MVA)H\nv. Short circuit ratio\nvi. Direct axis synchronous reactance (% on MVA) X d\nvii. Direct axis transient reactance (% on MVA) X' d\nviii. Direct axis sub-transient reactance (% on MVA) X\" d\nix. Quadrature axis synchronous reactance (% on MVA) X q\nx. Quadrature axis transient reactance (% on MVA) X\" q\nxi. Quadrature axis sub-transient reactance (% on MVA) X\" q\nxii. Direct axis transient open circuit time constant (Sec) T\" do\nxiii. Direct axis sub-transient open circuit time constant (Sec) T\" do\nxiv. Quadrature axis transient open circuit time constant (Sec) T' qo\nxv. Quadrature axis sub-transient open circuit time constant (Sec) T\" qo\nxvi. Stator resistance (Ohm) R a\nxvii. Stator leakage reactance (Ohm) X 1\nxviii. Stator time constant (Sec)\nxix Rated Field current (A)\nxx. Open Circuit saturation characteristics of the generator for Various terminal voltages giving the compounding current to achieve this.\nxxi. Type of Turbine .\nxxii. Operating Head (Mtr.)\nxxiii. Discharge with Full Gate Opening (cumecs)\nxxiv. Speed Rise on total Load thrown off (%)\n(b) Parameters of Excitation Control System :\n(c) Parameters of Governor:\n(d) Operational Parameter:\ni. Minimum notice required synchronising a Generating Unit from de-synchronisation.\nii. Minimum time between synchronising different Generating Units in a Power Station.\niii. Minimum block load requirements on synchronising.\nPart 2. FOR SUBMISSION ON REQUEST BY TRANSMISSION LICENSEE\nB.1.3 Thermal Power Stations\nB.1.3.1 General\ni. Detailed Project report\nii. Status Report\na. Land\nb. Coal\nc. Water\nd. Environmental clearance\ne. Rehabilitation of displaced persons\niii. Techno-economics approval by CEA\niv. Approval of State Government/Government of India\nv. Financial Tie-up\nB.1.3.2 Connection\ni. Reports of studies for parallel operation with the Transmission System\na. Short circuit studies\nb. Stability studies\nc. Load flow studies\nii. Proposed connection with Transmission System\na. Voltage\nb. Number of circuits\nc. Point of contact\nB.1.4 Hydroelectric Power Stations\nB.1.4.1 General\ni. Detailed Project Report\nii. Status Report\na. Topographical survey\nb. Geological survey\nc. Land\nd. Environmental clearance\ne. Rehabilitation of displaced persons\niii. Techno-economic approval by CEA\niv. Approval of State Government/Government of India\nv. Financial Tie-up\nB.1.4.2. Connection\ni. Reports of Studies for parallel operation with the Transmission System\na. Short circuit studies\nb. Stability studies\nc. Load flow studies\nii. Proposed connection with Transmission System\na. Voltage\nb. Number of circuits\nc. Point of Connection\nB.2 Detailed System Data, Transmission\nB.2.1 General\ni. Single Line Diagram of the Transmission System down to 33 kV bus at grid Sub-station detailing :-\na. Name of Sub-station\nb. Power Station, connected\nc. Number and length of circuits\nd. Interconnecting transformers\ne. Sub-station bus layouts\nf. Power transformers\ng. Reactive compensation equipment\nii. Sub-station layout diagrams showing :-\na. Bus bar layouts\nb. Electrical circuitry, lines, cables, transformers, switchgear, etc.\nc. Phasing arrangements\nd. Earthing arrangements\ne. Switching facilities and interlocking arrangements\nf. Operating voltages\ng. Numbering and nomenclature :-\n(i) Transformers\n(ii) Circuits\n(iii) Circuit breakers\n(iv) Isolating switches\nB.2.2 Line Parameters (For all circuits)\ni. Designation of Line.\nii. Length of line (Km.)\niii. Number of circuits.\niv. Per Circuit values :-\na. Operating voltage (KV).\nb. Positive Phase sequence reactance (pu on 100 MVA) X 1\nc. Positive Phase sequence resistance (pu on 100 MVA) R 1\nd. Positive Phase sequence susceptance (pu on 100 MVA) B 1\ne. Zero Phase sequence reactance (pu on 100 MVA) X 0\nf. Zero Phase sequence resistance (pu on 100 MVA) R 0\ng. Zero Phase sequence susceptance (pu on 100 MVA) B 0\nB.2.3. Transformer Parameters (For all transformers)\ni. Rated MVA\nii. Voltage Ratio\niii. Vector Group\niv. Positive sequence reactance, maximum, minimum and normal (Pum on 100 MVA) X,\nV. Positive sequence, resistance maximum, minimum and normal (pu on 100 MVA) R,.\nvi. Zero sequence reactance (pu on 100 MVA)\nvii. Tap change range (+% to -%) and steps\nviii. Details of Tap changer (OFF/ON)\nB.2.4 Equipment Details (For all Sub-stations)\ni. Circuit Breakers\nii. Isolating switches\niii. Current Transformers\niv. Potential Transformers\nB.2.5 Relaying and Metering\ni. Relay protection installed for all transformers and feeders along with their settings and level of co-ordination with other Users.\nii. Metering details\nB.2.6 System Studies\ni. Load flow studies (peak and lean load for maximum hydro and maximum thermal generation).\nii. Transient stability studies for three phase fault in critical lines.\niii. Dynamic Stability Studies\niv. Short circuit studies (three phase and single phase to earth)\nv. Transmission and distribution losses in the system.\nB.2.7 Demand Data (For all Sub-stations)\ni. Demand Profile (Peak and lean load)\nB.2.8 Reactive Compensation Equipment\ni. Type of equipment (Fixed or variable).\nii. Capacities and/or inductive rating or its Operating Range in MVAr\niii. Details of control\niv. Point of connection to the system.\nB.3 Detailed Planning Data, Distribution\nB.3.1 General\ni. Distribution map (To scale) showing all lines up to 11 kV and sub-stations belonging to the Supplier.\nii. Single Line Diagram of Distribution System (Showing distribution lines from points of connection with the Transmission System, 33/11 KV Sub-stations, 11/0.4 KV Sub-stations, consumer bus if fed directly from the Transmission System).\niii. Numbering and nomenclature of lines and Sub-stations (Identified with feeding grid sub-stations of the Transmission System and concerned 33/11 KV Sub-station of Supplier).\nB.3.2 Connection\ni. Points of connection (Furnish details of existing arrangement of connection)\nii. Details of metering points of connection\nB.3.3 Loads\ni. Connected load - Furnish consumer details, Numbers of consumers category wise, details of loads 1 MW and above.\nii. Information on diversity of load and coincidence factor\niii. Daily demand profile (Current and forecast) on each 33/11 KV Sub-station.\niv. Cumulative demand profile of Distribution System (Current and forecast).\nAppendix-C\nAppendix-C\nC. Operational Planning Data\nC.1 Outage Planning Data\nC.1 Outage Planning Data\nReference To : Chapter 5 Outage\n\t\t\t\tPlanning\nReference To : Chapter 5 Outage\n\t\t\t\tPlanning\nC.1.1 Demand Estimates\nC.1.1 Demand Estimates\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nEstimated consumption of energy in million units\n\t\t\t\tat each Connection/External Interconnection Point on monthly\n\t\t\t\tbasis and peak and lean demand in MW & MVAr at each\n\t\t\t\tConnection/External Interconnection Point on weekly basis for the\n\t\t\t\tperiod from April of next calendar year to March of following\n\t\t\t\tcalendar year.\n31st December of current calendar year.\nii.\nEstimated consumption of energy in MU at each\n\t\t\t\tconnection/External Interconnection Point on daily basis for\n\t\t\t\tmonth ahead and 24 hourly averaged demand estimates in MW &\n\t\t\t\tMVAr at each connection/External Interconnection Point for each\n\t\t\t\tday of the month ahead (31 daily data items for MU for each\n\t\t\t\tConnection Point, 31 x 24 hourly data items for MW and 31 x 24\n\t\t\t\thourly data items for MVAr for each Connection Point).\n15th of Current month\niii.\nFifteen minutes block averaged demand estimates\n\t\t\t\tin MW & MVAr at each connection/ External Interconnection\n\t\t\t\tPoint for the day ahead (96 data items for MW and 96 data items\n\t\t\t\tfor MVAr at each connection/External Interconnection Point)\n10.00 Hours every day\nC.1.2 Estimates of Load Shedding\nC.1.2 Estimates of Load Shedding\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nDetails of discrete load blocks that may be shed to comply\n\t\t\t\twith instructions issued by SLDC when required, from each\n\t\t\t\tConnection Point.\nSoon after connection is made.\nC.1.3 Year Ahead Outage\n\t\t\t\tProgramme\nC.1.3 Year Ahead Outage\n\t\t\t\tProgramme\n(For the\n\t\t\t\tperiod April to March)\nC.1.3.1 Generators Outage Programme\nC.1.3.1 Generators Outage Programme\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nIdentification of Generating Unit\n1st August each year\nii.\nMW, which will not be available as a result of outage.\n1st August each year\niii.\nPreferred start date and start time or range of start dates\n\t\t\t\tand start times and period of outage.\n1st August each year\niv.\nIf outages are required to meet statutory requirements, then\n\t\t\t\tthe latest date by which outage must be taken.\n1st August each year\nC.1.3.2 YEAR AHEAD ERLDC'S\n\t\t\t\tOUTAGE PROGRAMME\nC.1.3.2 YEAR AHEAD ERLDC'S\n\t\t\t\tOUTAGE PROGRAMME\n(Affecting Transmission System)\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nMW, which will not be available as a result of outage from\n\t\t\t\tImports through external connections.\n31st December each year\nii.\nStart date and start time and period of outage\n31st December each year\nC.1.3.3 Year ahead CGP's outage programme\nC.1.3.3 Year ahead CGP's outage programme\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nMW, which will not be available as a result of outage\n1st August each year\nii.\nStart date and start time and period of outage\n1st August each year\nC.1.3.4 Year Ahead Distribution Company's outage programme\nC.1.3.4 Year Ahead Distribution Company's outage programme\nItem\nItem\nTo be submitted by\nTo be submitted by\n(i)\nLoads in MW not available from any Connection Point\n1st August each year\n(ii)\nIdentification of Connection Point\n1st August each year\n(iii)\nPeriod of suspension of drawal with start date and start time.\n1st August each year\nC.1.3.5 The Transmission Licensee's Overall Outage\n\t\t\t\tProgramme\nC.1.3.5 The Transmission Licensee's Overall Outage\n\t\t\t\tProgramme\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nReport on proposed outage programme to ELRDC\n30th November each year\nii.\nRelease of finally agreed outage plan\n1st March each year\nC.2 GENERATION SCHEDULING DATA\nC.2 GENERATION SCHEDULING DATA\nReference To :\nReference To :\nChapter 6 - Schedule and Despatch\nChapter 6 - Schedule and Despatch\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nDay ahead fifteen minutes block MW & MVAr availability\n\t\t\t\t(00.00 - 24.00 Hours) of all generator units.\n10.00 Hours every day\nii.\nDay ahead fifteen minutes block MW import/export from CGP's.\n10.00 Hours every day\niii.\nStatus of Generating Unit excitation AVR in service (Yes/No)\n10.00 Hours every day\niv.\nStatus of Generating Unit speed control system. Governor in\n\t\t\t\tservice (Yes/No).\n10.00 Hours every day\nv.\nSpinning reserve capability (MW)\n10.00 Hours every day\nvi.\nBacking down capability with/without oil support (MW)\n10.00 Hours every day\nvii.\nHydro reservoir levels and restrictions\n10.00 Hours every day\nviii.\nGenerating Units hourly summation outputs (MW)\n10.00 Hours every day\nix.\nDay ahead fifteen minutes block MW entitlements from Central\n\t\t\t\tsector generation and Chukha Hydro Power Station from ERLDC.\n11.00 Hours every day\nC.3 Capability Data\nC.3 Capability Data\nReference To : Chapter 5 - Frequency and Voltage Management\nReference To : Chapter 5 - Frequency and Voltage Management\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nGenerators shall submit to the SLDC up-to-date capability\n\t\t\t\tcurves for all Generating Units.\nOn receipt of request by the SLDC.\nii.\nCGPs shall submit to the licensee/ SLDC net return capability\n\t\t\t\tthat shall be available for export/import from Transmission\n\t\t\t\tSystem.\nOn receipt of request by the licensee/SLDC.\nC.4 Response to Frequency Change\nC.4 Response to Frequency Change\nReference To : Chapter 5 - Frequency and Voltage Management\nReference To : Chapter 5 - Frequency and Voltage Management\ni.\nPrimary response in MW at different levels of loads ranging\n\t\t\t\tfrom minimum generation to registered capacity for frequency\n\t\t\t\tchanges resulting in fully opening of governor valve.\nii.\nSecondary response in MW to frequency changes.\nC.5 Monitoring of Generation\nC.5 Monitoring of Generation\n[Reference to: Chapter-7-Monitoring of Generation and\n\t\t\t\tDrawal of Power Station of 5 Mw and Above.]\n[Reference to: Chapter-7-Monitoring of Generation and\n\t\t\t\tDrawal of Power Station of 5 Mw and Above.]\nItem\nItem\nTo be submitted\nTo be submitted\ni.\nGenerators shall provide hourly generation summation to SLDC.\nTo be submitted by real time basis.\nii.\nCGPs shall provide hourly export/ import MW to SLDC\nTo be submitted by real time basis.\niii.\nLogged readings of generators to SLDC\nAs required\niv.\nDetailed report of Generating Unit trippings on monthly basis.\nIn the first week of the succeeding month.\nC.6 Essential and Non-Essential\n\t\t\t\tLoad Data\nC.6 Essential and Non-Essential\n\t\t\t\tLoad Data\nReference To : Chapter 5 - Contingency Planning\nReference To : Chapter 5 - Contingency Planning\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nSchedule of essential and non-essential loads on each discrete\n\t\t\t\tload block for purposes of load shedding.\nAs soon as possible after connection.\nAppendix-D\nAppendix-D\nD. Protection Data\nReference To :\nChapter 9 - Protection\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nGenerators/CGPs shall submit details of\n\t\t\t\tprotection requirement and schemes installed by them as referred\n\t\t\t\tto in B.l. Detailed Planning Data under Sub-section \"Protection\n\t\t\t\tand Metering.\"\nAs applicable to Detailed Planning Data.\nii.\nThe licensee shall submit details of protection\n\t\t\t\tequipment and schemes installed by them as referred to in B.2.\n\t\t\t\tDetailed System Data, Transmission under Sub-section \"Relaying\n\t\t\t\tand Metering\" in relation to connection with any User.\nAs applicable to Detailed Planning Data.\nAppendix-E\nAppendix-E\nE. Metering Data\nReference To : Chapter-10 Metering\nItem\nItem\nTo be submitted by\nTo be submitted by\ni.\nGenerators/CGPs shall submit details of metering\n\t\t\t\tequipment and schemes installed by them as referred in B.1.\n\t\t\t\tDetailed Planning Data under Sub-section \"Protection and\n\t\t\t\tMetering\".\nAs applicable to Detailed Planning Data.\nii.\nThe transmission licensee shall submit details\n\t\t\t\tof metering equipment and schemes installed by them as referred\n\t\t\t\tin B.2. Detailed System Data, Transmission under Subsection\n\t\t\t\t\"Relaying and Metering\" in relation to connection with\n\t\t\t\tany User.\nAs applicable to Detailed Planning Data.\nChapter-13\nPeriodic Report\n(a) Frequency profile\n(b) Voltage profile\n(c) Major outage of Generating Unit\n(d) major outage of transmission line\n(e) Grid disturbance\nChapter-14\nMiscellaneous\n14.1.\n14.2 Saving of inherent power of the Commission\n(ii) Nothing in these Regulations shall bar the Commission from adopting in conformity with provisions of the Act, a procedure which is at variance with any of the provisions of these Regulations, if the Commission, in view of the special circumstances of a matter or a class of matters, deems it just or expedient for deciding such matter or class of matters.\n(iii) Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing with any matter or exercising any power under the Act for which no regulations have been framed, and the Commission may deal with such matters, powers and functions in a manner, as it considers just and appropriate.\n14.3 Powers to Remove Difficulties\n14.4 Power to Amend",
"footnote": "",
"is_definition": false,
"sort_order": 4
}
],
"metadata": {
"Act ID": "or373",
"Act Number": "Published vide Notification No. 17/2005-(Volume 3) - Engg., dated, 1st May 2006, Orissa Gazette Extraordinary No. 819 dated 14.6.2006",
"Enactment Date": "",
"Act Year": "2006",
"Short Title": "The Orissa Grid Code (OGC) Regulations, 2006",
"Type": "STATE",
"Location": "Odisha"
},
"updated_at": "2026-09-29 21:55:20"
}