2. Definitions.

(b) In these Regulations, words or expressions used herein and not defined at Section 1.19 (in Chapter 1), have the meanings assigned to them under the Act and the meanings commonly understood in Electrical Engineering.
Chapter 1
General
1.1. Introduction.
1.2 Objective
1.3 Scope
1.4 Structure of The OGC
(1) General : - This Chapter describes general features of OGC including definitions.
(1) General :
(2) Role of various organisations : This chapter defines the functions of the various organisations as are relevant to OGC.
(2) Role of various organisations :
(3) Planning Code for STS : - This Chapter specifies the technical and design criteria and procedures to be followed by the State Transmission Utility (STU) i.e. OPTCL in planning and development of the State Transmission System and by other Users connected or seeking connection to the Transmission System. This Chapter provides the policy to be adopted in the planning and development of bulk power transfer and associated State Transmission System. The Planning Code lays out the detailed information exchange required between the planning Agencies and the various participants of the Power System for load forecasting, generation availability and Power System planning etc. for the future years under study. The Planning Code stipulates the various criteria to be adopted during the planning process.
(3) Planning Code for STS :
(4) Connection Conditions : - This Chapter specifies the technical and design criteria and standards to be complied with by the Transmission Licensee and other Users connected or seeking connection to the Transmission System, to maintain uniformity and quality across the system. This includes
(4) Connection Conditions :
(a) Procedure for connection to the State Transmission System.
(b) Site responsibility schedule
(c) Connection Agreement
(5) Operating Code for State Grid : - This Chapter specifies the conditions under which the Transmission Licensee shall operate the Transmission System and other Users of the Transmission System shall operate their plant and/or systems for the generation and distribution of electricity in so far as necessary to protect the security and quality of supply and safe operation of the Transmission Licensee's Transmission System under both normal and abnormal operating conditions.
(5) Operating Code for State Grid :
(a) Operating Policy - This Operating Policy describes the operational philosophy to maintain efficient, secure and reliable grid operation and contains the following aspects/ Sections.
(a) Operating Policy
(i) System Security Aspects - This Section describes the general security aspects to be followed by generating companies and all Users of the Grid.
(i) System Security Aspects
(ii) Frequency and Voltage Management - This Section describes the method by which ail Users of the Transmission System shall co-operate with the State Load Despatch Centre (SLDC) for effective control of the system frequency and managing the voltage of the Transmission System.
(ii) Frequency and Voltage Management
(iii) Demand Estimation for Operational Purposes - This Section details with the procedures to estimate the demand by the various beneficiaries for their systems for the day/week/ month/year ahead, which shall be used for operational planning.
(iii) Demand Estimation for Operational Purposes
(iv) Demand Management - This Section identifies the methodology to be adopted for demand control by each beneficiary as a function of the frequency and deficit generation.
(iv) Demand Management
(v) Periodic Reports - This Section provides various provisions for reporting of the operating parameters of the Grid such as frequency, Voltage profile, etc.
(v) Periodic Reports
(vi) Operational Liaison - This Section sets out the requirement for the exchange of information in relation to normal operation and/or events in the grid.
(vi) Operational Liaison
(vii) Outage Planning - This Section contains procedure for outage planning relating to co-ordination of the outages for scheduled maintenance of the Transmission System, Generating Unit and Distribution System that will use the Transmission System.
(vii) Outage Planning
(viii) Recovery Procedures - This Section sets out the procedures to be adopted following a major grid disturbance, for Black Start and resynchronisation of islands, etc.
(viii) Recovery Procedures
(ix) Operational Event/Accident Reporting This Section states the procedure by which events are reported and the information exchange etc. take place.
(ix) Operational Event/Accident Reporting
(6) Scheduling & Despatch Code : - This Chapter specifies the procedure to be adopted for scheduling and despatch of generation of the Generating companies, CGPs. including Complementary Commercial Mechanisms, on a daily basis with the modality of the flow of information between the Generating companies and SLDC.
(6) Scheduling & Despatch Code :
(7) Monitoring of Generation and Drawal : - This Chapter specifies responsibilities of all Users in the monitoring of Generating Unit reliability and performance and SLDC's compliance with the scheduled drawal and injection.
(7) Monitoring of Generation and Drawal :
(8) Cross Boundary Safety : - This Chapter specifies safety when working across a control boundary.
(8) Cross Boundary Safety :
(9) Protection : - This Chapter specifies the co-ordination responsibility and minimum standards of protection that are required to be installed by Users of the Transmission System.
(9) Protection :
(10) Metering, Communication and Data Acquisition : - This Chapter specifies the minimum operational and commercial metering to meet the regulatory requirement.
(10) Metering, Communication and Data Acquisition :
(11) Management of OGC - This Chapter specifies the procedure for review/amendment and management of OGC.
(11) Management of OGC
(12) Data Registration : - This Chapter specifies list of all data required to be provided by Users to the SLDC/Transmission Licensee and vice versa .
(12) Data Registration :
(13) Miscellaneous : - This Chapter specifies about issue of Orders and Practice Directions, power to amend this OGC, saving the inherent power of the Commission and power to remove difficulties.
(13) Miscellaneous :
1.5 Interpretation
1.6 Free Governor Mode of Operation
1.7 Charge/payment For Reactive Energy Exchanges
1.8. Exemptions
1.9. Implementation And Operation Of The Ogc
1.10 General Requirements/limitations Of Ogc
1.11 Codal Responsibilities
1.12. Confidentiality
1.13 Procedures To Settle Dispute
1.14 Communication Between Users
1.15 Partial Invalidity
1.16 Directive
1.17 Review
1.18 Non-Compliance
1.19 Definitions
Word
Word
Meaning
Meaning
(1)
ABT Users
Such Users like Distribution Licensees, Trading
Licensees, Generators, Open Access Customers, EHT consumers and
HT consumers having contract demand of 5 MVA or more to whom
Availability Based Tariff is applicable.
(2)
Act
The Electricity Act, 2003
(3)
Agency
A term used in the various sections of the OGC
to refer to Users that utilise the State Transmission System.
(4)
Apparatus
Electrical Apparatus and includes all machines,
fittings, accessories and appliances in which conductors are
used.
(5)
Annexure or Appendix
An Annexure or an Appendix to a Chapter of the
Orissa Grid Code.
(6)
Area Load Despatch Centre (ALDC)
The Area Load Despatch Centre, as established
by SLDC to carry out the instructions of SLDC and perform all
the duties assigned to it in the OGC and Distribution Code.
(7)
Area of Supply
As defined in the concerned licence.
(8)
Automatic Voltage Regulator (AVR)
A continuously acting automatic excitation
control system to control the voltage of a Generating Unit
measured at the generator terminals.
(9)
Auto Transformer
Transformer connecting EHV lines/bus bars of
220 and 132 KV voltages.
(10)
Beneficiary
A person who has a share in State Generating
Station and Inter State Generating Station.
(11)
Black Start
The process of recovery from a total or partial
blackout of the Transmission System.
(12)
BIS
The Bureau of Indian Standards
(13)
Bulk Power Consumer
[A person to whom electricity is provided and
who has a dedicated supply at 33 KV and above]
(14)
Bulk Power Transmission Agreement (BPTA)
The Commercial Agreement between the
Transmission Licensee and a long Term Customer for the provision
of transmission service.
(15)
Capacitor
An electrical facility provided for generation
of reactive power.
(16)
Captive Generating Plant/CGP
Captive Generating Plant means a power plant
set up by any person to generate electricity primarily for his
own use and includes a power plant set up by any co-operative
society or association of persons for generating electricity
primarily for use of members of such co-operative society or
association.
(17)
CEA/Authority
The Central Electricity Authority.
(18)
CERC
The Central Electricity Regulatory Commission.
[(18)(1)
'Check Meter'
means a meter,which shall be connected to the
same core of the Current Transformer (CT) and Voltage
Transformer (VT) to which main meter is connected and shall be
used for accounting and billing of electricity in case of
failure of main meter]
(19)
Commercial Committee (CC)
It is a committee of the GCC as referred under
Chapter-6 (Annexure-I) of the OGC.
(20)
Commission/OERC
Orissa Electricity Regulatory Commission.
(21)
Central Transmission Utility (CTU)
Any Government Company, which the Central
Government may notify under Sub-section (1) of Section 38 of the
Act.
(22)
Connection
The electric lines and electrical equipment
used to effect a connection of a User's system to the
Transmission System.
(23)
Connection Agreement
An agreement between the Transmission Licensee
and a User setting out the terms relating to the connection to
and/ or use of the Transmission System which is referred at
Section 4.5.
(24)
Connection Conditions
The technical conditions to be complied with by
any User having a connection to the State Transmission System as
laid down in Chapter-4 'Connection Conditions' of the OGC.
(25)
Connection Point
A point at which a User's plant and/or
Apparatus connects to the State Transmission System.
(26)
Contact Person
A person notified by SLDC and Distribution
Company on their behalf to carry out responsibility as required
under Section 5-4 (4)(d)(v).
(27)
Control Person
A person identified as having responsibility
for cross-boundary safety under Chapter-8 of the OGC. Refer
Section 8.3.
(28)
Data Acquisition System (DAS)
A device provided to record the sequence of
operation in time, of the relays/ equipments/system parameters
at a location.
(29)
Demand
The Demand of active power in MW and reactive
power in MVAR of electricity unless otherwise stated.
(30)
Detailed Planning Data
As referred to Chapter 12 regarding Data
registration.
(31)
Despatch Schedule
The ex-power Plant net MW and MWH output of a
generating station, scheduled to be exported to the Grid from
time to time.
(32)
Directive
A policy directive issued by the State
Government of Orissa under Sections 37 & 108 of the Act.
(33)
Disconnect
The act of physically separating User or Bulk
Power Consumer's electrical equipment from the Transmission
System.
(34)
Disturbance Recorder (DR)
A device provided to record the behaviour of
the pre-selected digital and analog values of the system
parameters during an event.
(35)
Distribution Company
An organisation that is licensed, or exempt
from the requirements to be licensed to own and/or operate all
or part of the Distribution System in the State.
(36)
Distribution Licensee
A licensee authorized by the Commission to
operate and maintain the Distribution System in the State for
supplying electricity to the consumers in his Area of Supply.
(37)
Distribution System
"Distribution System" means the
system of wires and associated facilities between the delivery
points on the transmission lines or the generating station
connection and the point of connection to the installation of
the consumers.
(38)
Distribution System Operation & Control Centre (DSOCC)
The Distribution System Operation and Control
Centre as established by the Distribution Licensee to carry out
the functions as directed by the OGC and Distribution (Planning
and Operation) Code.
(39)
Drawl
The import from, or export to, State
Transmission System, of electrical energy and power or both
active/reactive powers.
(40)
Drawl Schedule
The ex-power Plant, MW that a Beneficiary is
scheduled to receive from the SGS and ISGS, including bilateral
exchanges from time to time.
(41)
Eastern Region/Region
Region comprising of the States of West Bengal,
Bihar, Orissa, Sikkim, Jharkhand and DVC for the integrated
operation of the electricity system.
(42)
Electricity Operator
Any person who owns and/or operates generating
plant or who holds a licence under Section 14 of the Act,
connected to the Transmission System and any bulk supplier.
(43)
Electricity Supply System (Grid)
The combination of the Transmission System,
Distribution System and Power Stations.
(44)
Eastern Regional Power Committee (ERPC)
Eastern Regional Power Committee established
under Section 2(55) of the Act by resolution by the Central
Government for facilitating the integrated operation of the
Power System in Eastern Region.
[(44)(1)
Energy Accounting and Audit Meters
Means meters used for accounting of the
electricity to various segments of electrical system so as to
carry out further analysis to determine the consumption and loss
of energy therein over a specified time period.]
(45)
ERLDC
Eastern Regional Load Despatch Centre
established under Sub-section (1) of Section 27 of the Act.
(46)
Event
An unscheduled or unplanned occurrence on the
Grid including faults, incidents and breakdowns.
(47)
Event Logger (EL)
A device provided to record the sequence of
operation in time, of the relays/ equipments at a location
during an event.
(48)
External Inter Connection/ Connection Point/Inter Connection
Point.
Electric lines and electrical equipment used
for the transmission of electricity between the State
Transmission System and the User's system.
(49)
Extra High Voltage (EHV)
Where the voltage exceeds 33,000 volts under
normal conditions, subject, however, to the percentage variation
allowed by the Authority.
(50)
Ex-power Plant
Net MW/MWH output of a generating Station,after
deducting auxiliary consumption and transformation losses.
(51)
Fault Locator (FL)
A device provided at the end of a transmission
line to measure/indicate the distance at which a line fault may
have occurred.
(52)
Flexible Alternating Current Transmission (FACT)
Facilities that enable power flows on A.C.
lines to be regulated, to control loop flows, line loadings,
etc.
(53)
Force Majeure
Any event which is beyond the control of the
Agencies involved which they could not foresee or with a
reasonable amount of diligence could not have foreseen or which
could not be prevented and which substantially affect the
performance by either Agency such as but not limited to-
(a) Acts of God, natural phenomena, including
but not limited to floods, droughts, earthquakes and epidemics;
(b) Acts of any Government domestic or foreign,
including but not limited to war declared or undeclared,
hostilities, priorities, quarantines, embargoes;
(c) Riot or civil commotion.
(d) Grid's failure not attributable to Agencies
involved.
(54)
Forced Outage
An outage of a Generating Unit or a
transmission facility due to a fault or other reasons, which has
not been planned.
(55)
Generator
An organisation(including Central/State or
other generating station, in which the State has a full share)
that generates electricity and who is subject to the OGC.
(56)
Generating Company
Generating Company means any company or body
corporate or association or body of individuals, whether
incorporated or not, or artificial juridical person,which owns
or operates or maintains a generating station.
(57)
Generating Unit
An electrical Generating Unit coupled to a
turbine within a Power Station together with all plants and
Apparatus at that Power Station (up to the Connection Point)
which relates exclusively to the operation of that
turbo-generator.
(58)
Good Utility Practices
Any of the practices, methods and acts engaged
in or approved by a significant portion of the electric utility
industry during the relevant time period which could have been
expected to accomplish the desired results at a reasonable cost
consistent with good business practices, reliably, safely and
with expedition.
(59)
Governor Droop
In relation to the operation of the governor of
a Generating Unit, the percentage drop in system frequency which
would cause the Generating Unit under free governor action to
change its output from zero to full load.
(60)
Grid Standards
Grid Standards specified by the Authority Under
Sub-section(d) of Section 73 of the Act.
(61)
Grid Co-ordination Committee/GCC
The Committee formed under Chapter 11.
(62)
GRIDCO
Grid Corporation of Orissa Limited registered
under the Companies Act, 1956, which is a deemed licensee under
the Act and is authorised to trade electricity for supply to the
Distribution Licensees. It can act as an intra State trader.
(63)
IE Rules
Indian Electricity Rules, 1956 and shall be
replaced by the Regulations which shall be specified by CEA
under Section 53 of the Act.
(64)
ICT
Transformer connecting EHV lines/bus bars of
400 and 220 KV voltages.
(65)
IEC
International Electro-Technical Commission.
(66)
Indian Electricity Grid Code (IEGC)
A document describing the philosophy and the
responsibilities for planning and operation of Indian Power
System specified by the CERC in accordance with Sub-section 1(h)
of Section 79 of the Act.
(67)
Independent Power Producer (IPP
A generating Company not owned/ controlled by
the Central/State Government.
[(67)(1)
'Interface Meter'
Means a meter used for a accounting and billing
of electricity, connected at the point of inter connection
between electrical systems of generating company, licensee and
consumers, directly connected to the Inter-State Transmission
System or Intra-State Transmission System who have to be covered
under ABT and have been permitted open access by the Appropriate
Commission.]
(68)
Inter-State Generating Station (ISGS)
A central and other generating station in which
two or more than two States have a share and whose scheduling is
to be co-ordinated by the RLDC.
(69)
Inter-State Transmission System (ISTS)
Inter-State Transmission System includes-
(i) Any system for the conveyance of
electricity by means of a main transmission line from the
territory of one State to another State,
(ii) The convenience of energy across the
territory of an intervening State as well as conveyance within
the State which is incidental to such inter-State transmission
of energy, and
(iii) The transmission of electricity within
the territory of State on a system built, owned, operated,
maintained or controlled by CTU.
(70)
Lean Period
That period when electrical demand is at its
lowest.
(71)
Licensee
The holder of a licence in the State of Orissa
who has been granted a license under Section 14 of the Act.
(72)
License
Any license granted by OERC under Section 14 of
the Act.
(73)
Load
The MW/MWH consumed by a utility/ installation.
(74)
Long Term Customer
A person availing or intending to avail access
to the STS for a period of 25 years or more and who has signed
BPTA with the Transmission Licensee.
(75)
Maximum Continuous Rating (MCR)
The normal rated full load MW output capacity
of a Generating Unit that can be sustained on a continuous basis
at specified conditions.
(76)
NALCO
National Aluminium Company Limited.
(77)
National Grid
The entire inter-connected electric power
network of the country, which would evolve after
inter-connection of regional grids.
(78)
Net Drawal Schedule
The Drawal Schedule of a Beneficiary after
deducting the apportioned transmission losses (estimated).
(79)
NTPC
National Thermal Power Corporation Limited.
(80)
OHPC
Orissa Hydro Power Corporation Limited.
(81)
Operation
A scheduled or planned action relating to the
operation of a system.
(82)
Operation Co-ordination Committee (OCC)
A committee of ERPC with members from all
constituents, which decides the operational aspects of the
regional grid.
(83)
Open Access
Open Access means the non-discriminatory
provision for the use of transmission lines or Distribution
System or associated facilities which such lines or system by
any licensee or consumer or a person engaged in generation in
accordance with the regulations specified by the Appropriate
Commission.
(84)
Open Access Customer
Open Access Customer means a consumer permitted
by the Commission to receive supply of electricity from a person
other than the Distribution Licensee of his Area of Supply, and
the expression includes a generating Company and licensee, who
has availed of or intends to avail of Open Access.
(85)
Operating Margin
Contingency reserve plus Operating Reserve.
(86)
Operating Range
The Operating Range of frequency and voltage as
specified under the operating code Chapter-5 of this OGC.
(87)
Operating Reserve
The additional output from a generating plant,
which must be realizable in realtime operation to correct any
system frequency fall to an acceptable level, in the event of a
loss of generation, or loss of import from an External
Interconnection, or mismatch between generation and demand.
(88)
Power System Operational Co-ordination Committee
[A committee of SLDC with members from all
Agencies, which decides the operational aspects of the State
grid as referred under Section 5.8(4)(i) of the O.G.C.]
(89)
OPGC
Orissa Power Generation Corporation Limited.
(90)
OPTCL
Orissa Power Transmission Corporation Limited.
(91)
Orissa Act
The Orissa Electricity Reform Act, 1995 as
referred u/s 185(3) of the Act.
(92)
Outage
The reduction of capacity or taking out of
service of a Generating Unit, Power Station or part of the
Transmission System or Distribution System.
(93)
Peak Period
That period in a day when electrical demand is
at it's highest.
(94)
Power Purchase Agreement or PPA
The agreement between a generator and the
licensee in which, subject to certain conditions, the licensee
agrees to purchase the electrical output of the generator's
Generating Unit and the generator agrees to provide services
from this unit.
(95)
Power Grid (POWER GRID)
The Power Grid Corporation of India Limited,
which has been notified as CTU.
(96)
Power Station
An installation of one or more Generating Units
(even when sited separately) owned and/or operated by the same
Generator and which may reasonably be considered as being
managed as a single integrated generating complex.
(97)
Power System
Power System means all aspects of generation,
transmission, distribution and supply of electricity and
includes one or more of the following namely :
(a) Generating stations;
(b) Transmission or main transmission lines;
(c) Sub-stations;
(d) Tie-lines
(e) Load despatch activities;
(f) Mains or distribution mains;
(g) Electric supply lines;
(h) Overhead lines;
(i) Service lines;
(i) Works.
(98)
Protection Co-ordination Committee (PCC)
It is a committee of the STU as referred under
Paragraphs 4.8, 5.2(8) and 9.4 of the OGC.
(99)
Reactor
An electrical facility specifically designed to
absorb Reactive Power.
(100)
Regional Transmission System
The combination of EHV electric lines and
electrical equipment owned or operated by Power Grid.
(101)
Regional Grid
The entire synchronously connected electric
power network of the concerned Region, comprising of ISTS., ISGS
and Intra State Systems.
(102)
Regional Load Despatch Centre (RLDC)
Regional Load Despatch Centre means the Centre
established under Sub-section (1) of Section 27 of the Act.
(103)
Section
A part of any Chapter of OGC, which is,
identified as covering a specific topic.
(104)
Single Line Diagram (SLD)
Diagrams, which are a schematic representation
of the HV/EHG Apparatus and the connections to all external
circuits at a connection, point incorporating its numbering
nomenclature and labelling.
(105)
System Operational Procedure (SOP).
Procedure for various system operational
activities as provided in the OGC.
(106)
Site Common Drawing
Drawings prepared for each Connection Point,
which incorporates layout drawings, electrical layout drawings,
common protection/control drawings and common service drawings.
(107)
Spinning Reserve
Part loaded generating capacity with some
reserve margin that is synchronized to the system and is ready
to provide increased generation at short notice pursuant to
despatch instruction or instantaneously in response to a
frequency drop.
(108)
State
The State of Orissa.
(109)
State Generating Station (SGS)
A generating station whose entire generation of
electricity is dedicated to the State.
(110)
State Load Despatch Centre/SLDC
This means the centre established under
Sub-section 31 of the Act.
(111)
Standard Planning Data
As referred to in Data Registration Section
under Chapter 12.
(112)
Standing Committee for Transmission Planning
A Committee constituted by the CEA to discuss,
review and finalise the proposals for expansion or modification
in the ISTS and associated intra-State systems.
(113)
State Transmission System
The transmission of electricity within the
territory of State on a system built, owned, operated,
maintained or controlled by STU/Transmission Licensee.
(114)
STU
State Transmission Utility notified by the
State Government of Orissa under Section 39 (1) of the Act.
OPTCL has been notified as the STU.
(115)
Static VAR Compensator (SVC)
An electrical facility designed for the purpose
of generating or absorbing reactive power.
(116)
Supervisory Control and Data Acquisition/ SCADA
The combination of transducers, communication
links and data processing systems, which provides information to
the SLDC on the operational State of the Transmission System and
the generator's Generating Units.
(117)
Supplier
A person authorised to sale electricity to
licensee(s) or consumer(s) under a license granted under the Act
and who is subject to the OGC.
(118)
Supply
Supply in relation to electricity, means the
sale of electricity to a licensee or consumer.
(119)
Technical Co-ordination Committee (TCC)
The committee set up by REB/RPC to Co-ordinate
the technical and commercial aspects of the operation of the
regional grid.
(120)
Time Block
Block of 15 minutes each for which special
energy meters record specified electrical parameters and
quantities with first Time Block starting at 00.00 Hrs.
(121)
Transmission Licence
The licence granted by the Commission to
transmit electricity in the State under Section 14 of the Act.
(122)
Transmission Licensee
A licensee authorised by the Commission to
establish or operate transmission lines.
(123)
Transmission System
Transmission System means the system consisting
of Extra High Voltage electric lines, having design voltage of
33 KV and higher owned and/or operated by the licensee for the
purposes of the transportation of electricity from one Power
Station to a substation or to another Power Station or between
substations or to or from any External Interconnection including
33/11 KV bays/equipment up to the interconnection with the
Distribution System, any plant and Apparatus and meters owned or
used in connection with transmission, and such buildings or part
thereof as may be required to accommodate such plant Apparatus,
other works and operating staff thereof.
(124)
User
A term utilized in various Sections of the OGC
to refer to the Persons including Beneficiaries, Generating
Stations, Licensees, Open Access Customers, EHT Consumers,
PG.C.I.L., other Regional and States using STS, as more
particularly identified in each Section of the OGC.
(125)
Utility
The electric lines or electrical plant,
including all lands, buildings, works and materials attached
thereto belonging to any person acting as a generating Company
or Licensee under provisions of the Act.
Chapter-2
Role of Various Organisations and Their Linkages
2.1.
2.2 RULE OF SLDC
(1) The SLDC shall be the apex body to ensure integrated operation of the Power System in the State.
(2) The State Load Despatch Centre shall comply with such principles, guidelines and methodologies in respect of wheeling and optimum scheduling and despatch of electricity as may be specified in the OGC.
(3) SLDC shall-
(a) be responsible for optimum scheduling and despatch of electricity within the State, in accordance with the contracts entered into with the licensees or the generating companies operating in Orissa;
(b) monitor grid operations;
(c) keep accounts of the quantity of electricity transmitted through the State grid;
(d) exercise supervision and control over the State Transmission System;
(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the OGC;
(f) shall comply with the directions of the RLDC;
(g) levy and collect such fees and charges from the generating companies and licensees using the intra State Transmission System as may be specified by the Commission;
(h) discharge the functions assigned to it under the provisions of the Act and these Regulations in an independent and unbiased manner.
(4) The State Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring stability of grid operations and for achieving the maximum economy and efficiency in the operation of the power system in the region under its control.
(5) Every licensee, generating company, generating station, substation and any other person connected with the operation of the power system shall comply with the directions issued by the State Load Despatch Centres.
(6) All directions issued by the State Load Despatch Centres to any Transmission Licensee of the State or any other licensee of the State or State Generating Company or substation in the State and shall be duly complied with by the licensee or generating company or sub-station.
(7) If any dispute arises with reference to the quality of electricity or safe, secure and integrated operation of the State grid or in relation to any direction given by the State Load Despatch Centre, it shall be referred to the Commission for decision. However, pending the decision of the Commission, the directions of the State Load Despatch Centre shall be complied with by the licensee or the Generating Company, as the case may be.
2.2.2
(1) System operation and control including intra-state transfer of power, covering contingency analysis and operational planning on real time basis;
(2) Scheduling/re-scheduling of generation;
(3) System restoration following grid disturbances;
(4) Metering and data collection;
(5) Compiling and furnishing data pertaining to system operation;
(6) Operation of state unscheduled interchange (Ul) pool account and State reactive energy account.
2.2.3
2.2.4
2.2.5
(a) The ALDC shall help in focused monitoring and control of Distribution System in its local area.
(b) Receive and carry out the instructions of SLDC.
(c) Co-ordinate with Distribution System Operation and Control Centre (DSOCC) and SLDC to streamline the operation and enhance case of operation efficiency.
2.2.6
(1) Availability of State Transmission System
(2) Availability and Plant Load Factor for SGS (Thermal),
(3) Capacity Index for SGS (Hydro).
2.3 Role of Stu
(a) To undertake transmission of electricity through the State Transmission System;
(b) To discharge all functions of planning and co-ordination relating to the State Transmission System with
(c) To ensure development of an efficient, co-ordinated and economical system of the State transmission lines for smooth flow of electricity from a generating station to the load centres;
(d) To provide non-discriminatory Open Access to its Transmission System for use by-
(i) Any licensee or generating Company on payment of the transmission charges; or
(ii) Any consumer as and when such Open Access is provided by the Commission under Sub-section (2) of Section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Commission.
2.4 Role of Transmission Licensee
(a) Build, maintain and operate an efficient, co-ordinated and economical Transmission System.
(b) Comply with the directions of SLDC.
(c) Provide Open Access as in 2.3. (1)(d) Above
2.5 Role of Distribution Licensee
(a) Develop and maintain an efficient, co-ordinated and economical Distribution System in his Area of Supply;
(b) Provide non-discriminatory Open Access to its Distribution System for use by
(i) Any licensee or generating Company on payment of the distribution charges; or
(ii) Any consumer as and when such Open Access is provided by the Commission under Sub-section (2) of Section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Commission.
Chapter-3
Planning Code for the State Transmission System
3.1.
3.2 Objective
(a) Development on a User's system already connected to the Transmission System.
(b) The introduction of a new Connection Point between the User's system and the Transmission System.
(c) A general increase in system capacity to remove operating constraints and maintain standards of security.
(d) Stability considerations.
(e) Cumulative effect of any of the above.
3.3 Scope
3.4 Planning Policy
(a) Perspective plan formulated by CEA.
(b) Electric Power Survey of India published by the CEA.
(c) Transmission Planning Criteria and guidelines issued by the CEA.
(d) Reports on National Electricity Policy, issued by Govt, of India, which are relevant for development of the State Transmission System.
(a) Central Transmission utility,
(b) State Government,
(c) Generating Companies,
(d) Regional Power Committee,
(e) Authority,
(f) Licensees,
(g) Any other person notified by the State Government in this behalf
3.5 Planning Criterion
General Policy
(a) As a general rule, the State Transmission System shall be capable of withstanding and be secured against the following contingency outages without necessitating load shedding or rescheduling of generation during steady State operation :
The above contingencies shall be considered assuming a pre-contingency system depletion (Planned outage) of another 220 kV D/C line or 400 kV S/C line in another corridor and not emanating from the same substation. All the Generating Units may operate within their reactive capability curves and the network voltage profile shall also be maintained within voltage lirtiits specified.
(b) The State Transmission System shall be capable of withstanding the loss most severe single system in feed without loss of stability.
(a) Loss of supply
(b) Prolonged operation of the system frequency below and above specified limits.
(c) Unacceptable high or low voltage
(d) System instability
(e) Unacceptable overloading of the State Transmission Systems element.
3.6 Planning Data Requirement
(a) Standard Planning Data
To enable the STU to discharge its responsibilities under the licence, to conduct system studies and prepare perspective plans for electricity demand, generation and transmission as detailed in Section 3.8 below, the Users shall furnish data to the STU from time to time as detailed under Data Registration Chapter in this OGC and categorised as Planning Data (PD).
(i) Standard planning data consists of details, which are expected to be normally sufficient for the STU to investigate the impact on the STS due to User development.
(ii) Standard planning data covering (a) preliminary project planning data (b) committed project planning data and (c) connected planning data should be furnished by the Distribution Licensees and Generating companies connected to the STS. This data shall be furnished to STU from time to time in the standard formats supplied by the STU.
(b) Detailed Planning Data
3.7 Implementation Of Transmission Plan
3.8 Perspective Plan
(a) Forecast the demand for power within the State in each of the succeeding five years and provide to the Commission details of the demand forecasts, data, methodology and assumptions on which the forecasts are based.
(b) Prepare a least cost generation plan for the State to meet the ten years load demand as per the forecast, after examining the economic, technical and environmental aspects of all available alternatives taking into account the existing contracted generation resources and effects of demand side management.
(c) Discharge all functions of planning and co-ordination relating to the State Transmission System compatible with the above load forecast and generation plan a long-term (10 years) plan for the Transmission System in accordance with Section 39 (2) (b) of the Act, compatible with the above load forecast and generation plan in consultation with CEA. Central Transmission Utility (CTU) shall have to be consulted in connection with systems to evacuate power from inter-State Transmission System.
3.9 Planning Standards And Procedures
3.10 Planning Responsibility
Chapter-4
Connection Conditions
4.1.
4.2 Objective
(1) All Users or prospective Users are treated equitably.
(2) Any new or modified connections, when established, shall neither suffer unacceptable effects due to its connections to the State Transmission System nor impose unacceptable effects on the system of any other connected Agency.
(3) By specifying minimum design criteria, to assist Users in their requirement to comply with licence obligations and hence ensure that a system of acceptable quality is maintained.
(4) The ownership and responsibility for all items of equipment is clearly specified in a schedule (Site Responsibility Schedule) for every site where a connection is made.
4.3 Scope
4.4 Procedure for Connection to And/or use of the Transmission System
(a) Report stating purpose of proposed connection and/or modification, connection site, Transmission Licensee to whose system connection is proposed Connection Point, description of Apparatus to be connected or modification to Apparatus already connected and Beneficiaries of the proposed connection.
(b) Datas as application and as listed in the Data Registration Chapter in this OGC
(c) Construction schedule and target completion date.
(d) An undertaking that the User shall abide by the OGC, IEGC and provisions of IE Rules and various standards including Grid Connectivity Standards made pursuant to the Act for installation and operation of the Apparatus.
(b) On receipt of the preliminary offer, the User shall indicate promptly whether the Transmission Licensee/STU should precede further to make a final offer within the extended time limit.
(a) if such proposed connection will violate any provision(s) under clause-15.3 to Appendix-4B to OERC (Conduct of Business) Regulations, 2004.
(b) If the proposed works stated in the application do not lie within the purview of the licence or do not conform to any provision of the OGC.
(c) If the applicant fails to give confirmation and undertakings according to Sections 4.4(1 )(d) of this Chapter.
4.5 Connection Agreements
(1) A condition requiring both parties to comply with the OGC;
(2) Details of connection, technical requirements with specific references to reactive power compensation/operation of Generating Units and Power Station, if any, and commercial arrangements, (in accordance with the relevant provision of Indian Electricity Grid Code wherever applicable).
(3) Details of any capital related payments arising from necessary reinforcement or extension of the system, data communication, RTU etc. and demarcation of the same between the concerned parties;
(4) A Site Responsibility Schedule as referred at Section 4.13(1);
(5) General philosophy, Guidelines etc. on protection and telemetry. A model Connection Agreement is placed at Annexure-1 to Chapter-4.
4.6 Procedure for Site Access, Site Operational Activities and Maintenance Standards
4.7 System performance
Transmission System Parameter variations
(1) General - Within the Power System, instantaneous values of. system frequency and voltage are subject to variation from their nominal value. All Agencies shall ensure that plant and Apparatus requiring service from/to the State Transmission System is of such design and construction that satisfactory operation will not be prevented by such variation.
(1) General
(2) Frequency variations - Rated frequency of the system shall be 50.0 Hz and shall normally be controlled within the limits as per regulations/Standards framed by the Authority subject to allowable limit as specified by the manufacturer.
(2) Frequency variations
(3) Voltage variations - (a) The variation of voltage may not be more than the voltage range specified in the regulations/Standards framed by the Authority.
(3) Voltage variations
(b) The Agency engaged in sub-transmission and distribution shall not depend upon the State Transmission System for reactive support when connected. The Agency shall estimate and provide the required reactive compensation in its transmission and distribution network to meet its full reactive power requirement, unless specifically agreed to with STU/Transmission Licensee.
(4) Harmonics - Total Voltage Harmonic Distortion (THD) in the Power System is required to be within the limit for various applications. (Refer IEEI Standard 519)
(4) Harmonics
Stage-1 :
Stage-2 :
Stage-3 :
(5) Insulation Co-ordination and Rupturing capacity of Switchgear - Insulation co-ordination of the User's equipment shall conform to applicable Indian Standards/Codes. Rupturing capacity of switchgear shall not be less than that notified by the Transmission Licensee/STU from time to time.
(5) Insulation Co-ordination and Rupturing capacity of Switchgear
4.8 User's and Transmission Licensee's Equipment at Connection Points - (1) General
(2) Sub-station Equipment
(b) All equipment shall be designed, manufactured and tested and certified in accordance with the quality assurance requirements as per IEC/BIS standards.
(c) Each connection between a User and State Transmission System shall be controlled by a circuit breaker capable of interrupting, at the Connection Point, the short circuit current as advised by Transmission Licensee in the specific Connection Agreement.
(3) Fault Clearance Times
(i) 100 milli seconds (ms) for 800 KV & 400 KV
(ii) 160 milli seconds (ms) for 220 KV & 132 KV
(b) Back-up protection shall be provided for required isolation/protection in the event of failure of the primary protection systems provided to meet the above fault clearance time requirements. If a Generating Unit is connected to the State Transmission System directly, it shall withstand, until clearing of the fault by back-up protection on the State Transmission System.
(4) Protection
4.9 Generating Units and Power Stations
4.10. Reactive Power Compensation
4.11 Data Communication Facilities
4.12. System Recording Instruments
4.13 Responsibilities For Operational Safety - (1) Site Responsibility Schedule
(a) For every connection to the Transmission System for which a Connection Agreement is required, a schedule of equipment shall be prepared by the Transmission Licensee with information supplied by the respective Users. This schedule, called a Site Responsibility Schedule, shall state the following for each item of equipment installed at the connection site :-
(i) The ownership of Plant/Apparatus
(ii) The responsibility for control of Plant/Apparatus
(iii) The responsibility for maintenance of Plant/Apparatus
(v) The responsibility for operation of Plant/Apparatus
(vi) The manager of the site.
(vii) The responsibility for all matters relating to safety of persons at site.
(b) The User owning the connection site shall provide reasonable access and other required facilities to another User whose equipment is installed at the connection site for installation, operation and maintenance etc.
(c) The format, principles and basic procedure to be used in the preparation of Site Responsibility Schedules shall be formulated by STU and shall be provided to each Agency/regional constituents for compliance.
(d) [All Agencies connected to or planning to connect to STS would ensure providing of RTU and other communication equipment, as specified by STU, for sending real-time data to nearest SCADA interface point of the transmission licensee at least before date of commercial operation of the generating stations or substation/ line being connected to STS.]
(2) Single Line Diagrams
(b) Whenever any equipment has been proposed to be changed, then concerned User shall intimate the necessary changes to Transmission Licensee and to all concerned. When the changes are implemented, changed Single Line Diagram shall be circulated by the User to SLDC/STU/ Transmission Licensees.
(3) Site Common Drawings
(b) The detailed drawings for the portion of the Agency and STU/ Transmission Licensee at each Connection Point shall be prepared individually and copies shall be handed over to other party.
(c) If any change in the drawing is found necessary, the details will be furnished to other party as soon as possible.
4.14 Schedule Of Assets Of State Grid
4.15 Connection Point - (1) Generator
(2) Distribution Company
(3) Eastern Regional Transmission System
[(4) Bulk Power Consumers
4.16 Data Requirements
4.17 Appendix of Chapter-4
Model Connection Agreement
-
Annexure-I to Chapter-4
General format for Site
Responsibility Schedule
-
Annexure-II to Chapter-4.
Annexure-I to Chapter-4
Annexure-I to Chapter-4
Connection Agreement
Connection Agreement
(Refer Section 4.5)
(Refer Section 4.5)
[1] .................................(Name of the Transmission Licensee) whose registered office is at....................AND
[2]........................................(Name of the company) whose registered office is at....................................(detailed address) therein after called "User"
[A]...............................................................................................................................................(Name and address of the Transmission Licensee) is a Transmission Licensee granted by the OERC as per the provision of the Electricity Act, 2003 (here after called as the 'Act') agreed to execute a Connection Agreement for the purpose export/import of power at 220 kV/132 kV to.............(name of the User)
[B]................................................(Name of the Distribution Company) (the User) is the holder of the Orissa Distribution Licence, (No) issued by OERC vide order dated.......
[C]...........................................(Name of the User i.e. Generator/CGP/Bulk Consumer) is the holder of the authorization issued by the State Government/Central Government/CERC/ OERC vide order No.........dated.
(i) Grid Code Compliance - It is agreed that the User............and (the Transmission Licensee) will abide by the provision of the Orissa Grid Code (OGC)/lndian Electricity Grid Code (IEGC) in force for the purpose of availing/evacuating power from/to (the Transmission Licensee) and to maintain a connectivity with the Transmission System network of .............(the Transmission Licensee).
(i) Grid Code Compliance
(ii) Terms of agreement
(ii) Terms of agreement
(a) This agreement shall be deemed to have commenced from and shall continue until it is terminated. In case of an differences or disagreements between the Transmission Licensee and the User in regard to any changes required from time to time to the terms of this agreement the same shall be resolved amicably failing which the matters shall be referred to the OERC and the Commission's decision shall be final and binding.
(b) The term of this Agreement shall stand modified or terminated automatically as per the Regulations which OERC may issue from time to time in accordance with the functions and powers of the Commission under the Act. As soon as practicable following any Regulation of the Commission which has the effect of modifying the terms for this Agreement, the Transmission Licensee shall prepare a revised version of this agreement, incorporating the modified term and following Agreement between the Transmission Licensee and User that the revised version accurately reflects the relevant Regulation, the User shall execute the revised version.
(c) No User shall assign the Agreement or transfer or part with the benefits under the Agreement in favour of any other person/User without the express consent or approval of the Transmission Licensee.
(d) Any connection, which has been unauthorisedly transferred or parted with, shall be liable for disconnection after expiry of a seven days notice calling for explanation and considering the explanation submitted by him.
(e) The User agrees to bear the cost of stamp duty and all cost incidental to the execution of this agreement in full.
(iii) Details of Connection
(iii) Details of Connection
(a) System of supply voltage:
(b) Total contract demand:
(c) Phasing of the contract demand :
(d) Connection details:
(e) Details of reactive power compensation arrangement:
(f) Details of the scheme of the switching station/bay
i. Bus-bar arrangement: Three bus system/Two bus system/ main and transfer bus system, Bus-bar type
ii. Provision for future expansion
(g) Captive Generating Plant:
i. Rated capacity:
ii. Rated voltage level of generation :
iii. Quantum of surplus power to be evacuated:
iv. Details of the connectivity with the Transmission Licensee's network:
v. [Mode of communication connectivity with nearest SCADA interface point of the transmission licensee: Telephone /Fax / Carrier Communication / Broadband Communication/Internet/ other developed mode of communication.
(h) Communication arrangement: The User shall be required to provide voice and other communication facility as decided by SLDC.
(i) Metering Arrangement: The User shall provide meters for accounting and audit purposes as per the standard specified by CEA. [Details of operational/commercial (tariff) metering scheme to be provided.) Detail data are to be provided as per Chapter-12 (DATA REGISTRATION) of the State Grid Code (OGC).
(j) Other Charges :
i. Entry Charges and Exist Charges as fixed by the Transmission Licensee & approved by OERC to be paid where appropriate.
ii. Capital related payment arising from necessary reinforcement or extension of the System is to be paid.
(k) Site Responsibility Schedule:
(l) Protection Scheme:
i. Transmission line protection scheme: (please indicate the general philosophy of the scheme)
ii. 220 kV/132 kV feeder bay protection scheme: (please indicate the general philosophy of the scheme)
iii. General protection scheme adopted for the switching station: (please indicate the general philosophy of the scheme).
iv. Any other protection scheme provided:
(m) Documents forming part of this agreement:
i. Annexure-I: Data to be provided as per Chapter-12 of the OGC
ii. Annexure-II: Attested copies of the Transmission Licensee permission letter no date...........
iii. Annexure-II (to Chapter-4): Site Responsibility Schedule.
iv. Details of procedure necessary for Site Access, Site Operational Activities and maintenance Standards for equipments of the STU/Transmission Licensee at STU/Transmission Licensee premises and vice versa as Annexure-III
Signed by
Signed by
Signed by
Signed by
For & on behalf of User
For & on behalf of User
for & on behalf of the Transmission Licensee
for & on behalf of the Transmission Licensee
Witnesses : 1)
1)
2)
2)
Bhubaneswar
Date : The...........Day of......Month of ........ Year
Annexure-II to Chapter-4
Annexure-II to Chapter-4
Ref : Section- 4.13(1)(a)
Ref : Section- 4.13(1)(a)
Site Responsibility Schedule
Site Responsibility Schedule
Name of Power Station/Sub-station...........
Site
Owner.................................................................
Tel.
Number................................................................
Fax
Number.................................................................
Item of Plant/Apparatus
Plant Owner
Safety Responsibility
Control Responsibility
Operation Responsibility
Maintenance Responsibility
Remarks
1
2
3
4
5
6
7
.............. KV Switchyard
All equipment including bus bars
Feeders
Generating Units
Chapter 5
Operating Code For State Grid
5.1 Operating Policy.
5.2 System Security Aspects
(a) Under an emergency,and conditions in which such isolation would prevent a total grid collapse and/or would enable early restoration of power supply.
(b) When serious damage to a costly equipment is imminent and such isolation would prevent it.
(c) When such isolation is specifically instructed by SLDC. Complete synchronization of grid shall be restored as soon as the conditions again permit it. The restoration process shall be supervised by SLDC, as per operating procedures separately formulated.
5.3 Frequencies and voltage Management and Reactive Power Pricing - (1) Introduction
(2) Objective
(i) to define the responsibilities of all Users in contributing to frequency management;
(ii) to define the actions required enabling the Transmission Licensee to maintain Transmission System voltages and frequency within acceptable levels in accordance with IEGC, CEA guidelines, and Transmission Planning and Security Standards, as appropriate.
(3) Frequency Management
(ii) SLDC shall always endeavour to restrict net drawal to within the Drawai Schedule whenever system frequency is below 49.5 Hz. When frequency falls below 49.0 Hz, SLDC shall explore and utilize internal generation capacity and then requisite load shedding as agreed with distribution Companies, shall be carried out in the State by SLDC to curtail the overdrawal.
(iii) The recommended rate for changing the governor setting, i.e., supplementary control for increasing or decreasing the output (generation level) for all Generating Units, irrespective of their type and size, would be one (1.0) per cent per minute or as per manufacturer's limits. However, if frequency falls below 49.5 Hz, all partly loaded Generating Units shall pick up additional load at a faster rate, according to their capability.
(iv) Except under an emergency, or to prevent an imminent damage to costly equipment, no User shall suddenly reduce his Generating Unit output by more than one hundred (100) MW without prior intimation to and consent of the State Load Despatch Centre, particularly when frequency is falling or is below 49.0Hz. Similarly, no User shall cause a sudden increase in its load by more than one hundred (100 MW) without prior intimation to and consent of the State Load Despatch Centre.
(b) Responsibilities - SLDC shall monitor actual Drawal against Scheduled Drawal and regulate internal generation/demand to maintain this schedule. Generators, CGPs and bilateral Agencies shall follow the despatch instructions issued by SLDC. Distribution Companies and bilateral Agencies shall co-operate with SLDC in managing load on instruction from SLDC as required.
(b) Responsibilities
(c) Falling frequency - (i) Whenever system frequency is below 49.5 Hz, Grid through SLDC shall endeavour to restrict its net drawal from the regional grid within its Drawal Schedules. The generation at all SGS/CGPs (except those on peaking duty) shall be maximized, at least up to the level Which can be sustained, without waiting for an advise from SLDC. When the system frequency is below 49.0 Hz. requisite load shedding shall be carried out by SLDC by instructing distribution Companies as per prearranged Schedules.
(c) Falling frequency
(ii) [All Users shall provide automatic under-frequency and df/dt load shedding in their respective systems, to arrest frequency decline that could result in a collapse/disintegration of the grid, as per the plan separately finalised by the Protection Co-ordination Committee of the STU, and shall ensure its effective application to prevent cascade tripping of Generating Units in case of any contingency. All Users shall ensure that the above, under frequency and df/dt load shedding/islanding schemes are functional. However, in case of extreme contingencies, these relays may be temporarily kept out of service with prior consent of SLDC, which shall independently check and keep a record of its findings.]
(d) Rising frequency - Under rising frequency conditions, SLDC shall take appropriate action to issue instructions to generators/CGPs, in co-ordination with ELRDC, to arrest the rising frequency and restore frequency within normal range. When the frequency is higher than 50.5 Hz, the actual net injection shall not exceed the scheduled despatch for that block, Also, while the frequency is above 50.5 Hz., the Generating Companies 'may (at their discretion) back down without waiting for an advibe from SLDC to restrict the frequency rise.
(d) Rising frequency
(4) Frequency Linked Pricing Operation
(5) Voltage Management
(ii) The Transmission Licensee shall co-ordinate with the distribution Companies to determine voltage levels at the External Inter Connection Points with distribution Companies. Distribution Companies shall participate in voltage management by regulating their Drawal as may be required. The Distribution Company shall endeavour to minimize the VAr Drawal at an External Inter Connection Point.
(iii) SLDC shall continuously monitor 400/220/132 KV voltage levels at strategic sub-stations. SLDC in consultation with RLDC may issue directions for Switching in/out of all 400 KV bus and line Reactors throughout the grid/tap changing on all 400/220 KV ICTs shall also be done as per RLDC conveyed through SLDC's. In case of persistent voltage problem SLDC will interact with RLDC for remedial measure.
(iv) SLDC shall, in co-ordination with ELRDC, regulate voltage levels so that there is minimal reactive drawal from regional Transmission System.
(v) In general, the Beneficiaries shall endeavour to minimize the VAr Drawal at an interchange point when the voltage at that point is below 95% of rated, and shall not return VAr when the voltage is above 105%. Auto Transformer taps at the respective drawal points may be changed to control the VAr interchange as per a Beneficiaries' request to the SLDC, but only at reasonable intervals.
(vi) The SLDC shall take appropriate measures to control Transmission System voltages, which may include but not be limited to transformer tap changing and use of MVAr reserves with Generating Units and CGPs within technical limits agreed to between the Transmission Licensee and Generating Units/CGPs.
(vii) Generators and CGPs shall inform SLDC of their reactive reserve capability promptly on request.
(viii) Generators shall make available to SLDC the up-to-date capability curves for all Generating Units, as detailed in Chapter-4, indicating any restrictions, to allow accurate system studies and effective operation of the Transmission System. CGPs shall similiarly furnish the net reactive capability that will be available for export to/import from Transmission System.
(ix) All Generating Units shall normally have their Automatic Voltage Regulators (AVRs) in operation, with appropriate settings.In particular, if a Generating Unit of over fifty (50) MW size is required to be operated without its AVR in service, the SLDC shall be immediately intimated about the reason and duration, and its permission obtained. Power System Stabilizers (PSS) in AVRs of Generating Units (wherever provided), shall be got properly tuned by the respective Generating Unit owner as per a plan prepared for the purpose by the STU from time to time. STU will be allowed to carry out checking of PSS and further tuning it, wherever considered necessary.
(x) All Users shall make all possible efforts to ensure that the grid voltage always remains within the following Operating Range.
Voltage-(KV RMS
Voltage-(KV RMS
Nominal
Maximum
Minimum
400
420
360
220
245
200
132
145
120
(xi) All Users shall also facilitate identification, installation and commissioning of system protection schemes in the Power System to protect against situations such as voltage collapse and cascading. Such schemes would be finalized by the STU.
(6) Reactive Power Pricing Policy
(ii) The charge/payment for VArs, shall be at a nominal paise/KVA Arh rate as may be specified by OERC from time to time, and will be between the Beneficiary and the State pool account for VAr interchanges.
(iii) Notwithstanding the above, SLDC may direct a Beneficiary to curtail its VAr Drawal/injection in case the security of grid or safety of any equipment is endangered.
(iv) The SGS shall generate/absorb reactive power as per instructions of SLDC, within capability limits of the respective Generating Units, that is without sacrificing on the active generation required at that time. No payments shall be made to the generating Companies for such VAr generation/absorption.
(v) VAr exchange directly between two Beneficiaries on the interconnecting lines owned by them (singly or jointly) generally address or cause a local voltage problem, and generally do not have an impact on the voltage profile of the State grid. Accordingly, the management/control and commercial handling of the VAr exchanges on such lines shall be as per following provisions, on case-by-case basis :-
(a) The two concerned Beneficiaries may mutually agree not to have any charge/payment for VAr exchanges between them on an inter connecting line.
(b) The two concerned Beneficiaries may mutually agree to adopt a payment rate/scheme for VAr exchanges between them identical to or at variance from that specified by OERC for VAr exchanges with STS. If the agreed scheme requires any additional metering, the same shall be arranged by the concerned Beneficiaries.
(c) In case of a disagreement between the concerned Beneficiaries (e.g. one party wanting to have the charge/payment for VAr exchanges, and the other party refusing to have the scheme), the scheme as specified in Annexure-I to Chapter-5 shall be applied. The per KV Arh rate shall be as specified by OERC for VAr exchanges with State Transmission System.
(d) The computation and payments for such VAr exchanges shall be affected as mutually agreed between the two Beneficiaries.
(7) General
5.4 Demand Estimation For Operational Purposes - (1) Introduction
(b) The demand estimation is to be done on daily/weekly/monthly basis for current year.
(c) Each SLDC shall carry out its own demand estimation from the historical data.
(d) While the demand estimation for operational purposes is to be done on a daily/weekly/monthly basis initially, mechanisms and facilities at SLDC shall be created at the earliest to facilitate online estimation for daily operational use.
(2) Objective
(b) The demand estimates are to enable the SLDC to conduct system studies for Operational Planning purposes.
(3) Procedure
(4) Demand Estimation
(b) Distribution companies and other agencies involved in bilateral exchanges shall provide to the SLDC their estimates of demand/export for Active Power (MW), Reactive Power (MVAr) and Energy Consumption (MU) at each connection/External Interconnection Point on daily/weekly/monthly basis (Formats as per Annexures II, III, IV and V respectively). The distribution Companies shall intimate to the SLDC the methodology used in producing their forecasts.
(c) The SLDC shall use this data
(i) to assist in determination of the generation schedule for next day:
(ii) to determine the most onerous conditions affecting constraints and voltage performance for next week;
(iii) to check outage Plan viability for peak and lean periods for next month.
(d) (i) The data shall be in the form of 96 blocks (15 minutes) period averaged demand figure for that day, the weekly/monthly data shall be in the form of 24 hourly averaged demand figures for that week/month and yearly data shall be in the form of month wise energy requirement for the year. All the above data shall be in respect of each inter-connection point.
(ii) The demand/export estimates provided by the distribution companies and other Users involved in bilateral exchanges shall be updated as necessary and sent each month to the SLDC 15 days ahead on same daily/weekly/monthly basis.
(iii) The demand estimates shall be further updated and sent to SLDC in accordance with the provision of Chapter 6, Scheduling and Despatch.
(iv) The SLDC shall make its own demand forecast using hourly demand summation of each sub-station and CGP import/export figures provided under Chapter 7 or by using suitable computer programme, to compare with demand estimates provided by the Users.
(v) SLDC shall notify a Contact Person who shall be responsible for day ahead a demand forecast. The official and residential telephone numbers of the Contact Person shall be intimated to all the distribution companies. Similarly all the distribution companies shall notify the Contact Person with telephone numbers and intimate SLDC. In case of change of Contact Person, it should be intimated to SLDC and vice versa .
(vi) Distribution companies shall provide to SLDC estimates of load that may be shed, when required, in discrete blocks with the details of the arrangements of such load shedding.
(vii) While the demand estimation for operational purposes is to be done on a daily/weekly/monthly basis initially, mechanisms and facilities at SLDC shall be created at the earliest to facilitate on-line estimation for daily operational use.
(viii) All data shall be collected in accordance with procedures agreed between the SLDC and each User.
(ix) SLDC shall maintain a database of State demand on a fifteen minutes basis.
5.5 Demand Management - (1) Introduction
(2) Manual Demand Disconnection
(a) As mentioned elsewhere, the Distribution Licensees and other Users shall endeavour to restrict their net drawal from the grid to within their respective Drawal Schedules whenever the system frequency is below 49.5 Hz. When the frequency falls below 49.0 Hz, requisite load shedding (manual) shall be carried out to curtail the over-drawal.
(b) Further, in case of certain contingencies and/or threat to system security, the SLDC may direct a User to decrease its drawal by a certain quantum. Such directions shall immediately be acted upon.
(c) Each User shall make arrangements that will enable manual demand disconnection to take place, as instructed by the SLDC, under normal and/or contingent conditions.
(d) The measures taken to reduce the Users drawal from the grid shall not be withdrawn as long as the frequency/voltage remains at a low level, unless specifically permitted by the SLDC.
5.6 Periodic Reports - (1) Weekly Reports
(a) Frequency profile
(b) Voltage profile of selected substations
(c) Major Generation and Transmission Outages
(d) Transmission Constraints
(e) Instances of persistent/significant non-compliance of OGC.
(2) Other Reports
(a) The SLDC shall prepare a quarterly report and shall issue to all the Users, which shall bring out the system constraints, reasons for not meeting the requirements, if any, of security standards and quality of service, along with details of various actions taken by different Users, and the Users responsible for causing the constraints.
(b) The SLDC shall also provide information/report, which can be called for by Users in the interest of smooth operation of the State Transmission System.
5.7 Operational Liaison - (1) Introduction
(b) The operational liaison function is a mandatory built-in hierarchical function of the SLDC and Users, to facilitate quick transfer of information to operational staff. It will correlate the required inputs for optimisation of decision-making and actions.
(2) Procedure for Operational Liaison - (a) Operations and events on the State Grid
(ii) Immediately following an event on State grid, the SLDC will inform each User, whose system may, or will, experience an operational effect following the event, and give details of what has happened in the event but not the reasons why.
(b) Operations and events on a User's System - (i) Before any operation is carried out on a User's System, the User will inform the SLDC, in case the State grid may, or will, experience an operational effect, and give details of the operation to be carried out.
(b) Operations and events on a User's System
(ii) Immediately following an event on an User's system, the User will inform the SLDC, in case the State Grid may, or will, experience an operational effect following the event, and give details of what has happened in the event but not the reasons why.
5.8 OUTAGE PLANNING - (1) Introduction
(a) This also sets out the procedure for preparation of outage schedule for the element of the State grid in a co-ordinated and optimal manner keeping in view the State system operating conditions and the balance of generation and demand, (list of elements of grid covered under these stipulations shall be prepared and be available with SLDC).
(b) The generation out put and Transmission System should be adequate after taking into account the outages to achieve the Security Standards.
(c) Annual outage plan shall be prepared in advance for the financial year by the SLDC and reviewed during the year on quarterly and monthly basis.
(2) Objectives
(b) To minimise surplus or deficits, if any, in the system requirement of power and energy and help operate system within Security Standards.
(c) To optimise the transmission outages of the elements of the State Grid without adversely affecting the grid operation but taking into account the Generation Outage Schedule, outages of Distribution Licensees/STU systems and maintaining system security standards.
(3) Scope
(4) Outage Planning Process
(b) All Distribution Licensees/STU, SGS shall provide SLDC their proposed outage programmes in writing for the next financial year by 1st August of each year. These shall contain identification of each Generating Unit/Line/ICT, the preferred date for each outage and its duration and where there is flexibility, the earliest start date and latest finishing date.
(c) SLDC shall then come out with a draft outage programme for the next financial year before 30th November of each year for the State grid taking into account the available resources in an optimal manner and to maintain security standards. This will be done after carrying out necessary system studies and, if necessary, the outage programmes shall be rescheduled. Adequate balance between generation and load requirement shall be ensured while finalising outage programmes.
(d) SLDC shall inform this draft outage programme to ERPC in writing by 30th November for each financial year.
(e) ERPC will then come out with a draft outage programme for the next financial year by 31st December of each year for the regional grid.
(f) The final outage plan shall be intimated to all regional constituents and RLDC for implementation latest by 31st January of each year as mutually decided in REB/RPC forum.
(g) SLDC shall interact with all Users as necessary to review and optimise the draft plan, agree to any changes and produce an acceptable co-ordinated generation and transmission outage plan by 1st February each year.
(h) SLDC shall release the finally agreed transmission outage plan, which takes ar,count of regional and User requirements, to all Users by 1st March each year.
(i) The above annual outage plan shall be reviewed by SLDC on quarterly and monthly basis in consultation with ERLDC and Users who shall be informed by SLDC any proposed changes. SLDC shall review the monthly outage plan, generation schedule and other operational aspects related to system operation in the monthly Power System Operational Co-ordination Committee meeting to be held by SLDC.
(j) In case of emergency in the system, viz ., loss of generation, break down of transmission line affecting the system, grid disturbances; system isolation SLDC may conduct studies again before clearance of the planned outage.
(k) SLDC is authorized to defer the planned outage in case of any of the following, taking into account the statutory requirements:
(l) The detailed generation and transmission outage programmes shall be based on the latest annual outage plan (with all adjustments made to date).
(m) Users' requests for additional Outages will be considered by SLDC and accommodated to the extent possible.
(n) SLDC shall inform Users promptly of any changes that affect them.
(o) Each STU/SGS/Distribution Licensee shall obtain the final approval from SLDC prior to availing an outage.
(5) Release of Circuit and Generation Units included in Outage Plan.
(6) Data Requirements
5.9 Recovery Procedures
5.10 Event Information - (1) Introduction
(2) Objective
(3) Scope
(4) Responsibility
(b) SLDC shall be responsible for collection and reporting of all necessary data to Users for monitoring, reporting and event analysis.
(5) Reportable Events
(i) Violation of security standards.
(ii) Grid indiscipline.
(iii) Non-compliance of SLDC's instructions.
(iv) System is landing/system split
(v) State black out/partial system black out
(vi) Protection failure on any element of the State systems.
(vii) Power System instability
(viii) Tripping of any element of the Regional grid.
(b) Typical examples of reportable incidents that could affect the State Transmission System are the following :
(i) Exceptionally high/low system voltage or frequency.
(ii) Serious equipments problem, e.g. major circuit, transformer or bus bar.
(iii) Loss of major Generating Unit.
(iv) Transmission System breakaway or Black Start.
(v) Major fir? incidents.
(vi) Equipment and transmission line overload.
(vii) Excessive Drawal deviations.
(viii) Minor equipment alarms.
(6) Reporting Procedure
(b) Within 1 (one) hour of being informed by the Reporting User, SLDC may ask for a written report on any incident.
(c) If the reporting incident cannot be classed as minor then the Reporting User shall submit an initial written report within two hours of asking for a written report by SLDC. This has to be further followed up by the submission of a comprehensive report within 48 hours of the submission of the initial written report.
(d) In the case of an event occurring in EHV system and generating equipment which was initially reported by STU/Transmission Licensee/ State Generator, SLDC will give a written report to ERLDC as stipulated in IEGC.
(e) SLDC may call for a report from any User on any reportable incident affecting other Users and the licensee in case the same is not reported by such User whose equipment might have been source of the reportable incident.
(7) Form of Written Reports :
(8) Major Failure
(9) Accident Reporting
Annexure-I
Annexure-I
[Refer Section 5.3(6)]
[Refer Section 5.3(6)]
Payment for Reactive Energy Exchanges on Beneficiary Owned Lines
Payment for Reactive Energy Exchanges on Beneficiary Owned Lines
Case-1
Case-2 :
(i) Net VArh received from Beneficiary-A while voltage is below 97% and
(ii) Net VArh supplied to Beneficiary-A while voltage is above 103%
Note : Net VArh and net payment may be positive or negative
Case-3
(i) Beneficiary-B pays to Beneficiary-A for X 1 or X 3 whichever is smaller in magnitude, and
(ii) Beneficiary-A pays to Beneficiary-B for X 2 or X 4 , whichever is smaller in magnitude.
Note :