1. Short title and commencement.

Section 1

2. Application.

Section 2

3. Definitions.

Section 3

4. Prospecting to precede mining operations.

Section 4

5. Period for which prospecting license may be granted or renewed.

Section 5

6. Period for which leases may be granted or renewed.

Section 6

7. Minimum and maximum area for grant of a mining lease.

Section 7

8. Scheme of prospecting.

Section 8

9. Modification of scheme of prospecting.

Section 9

10. Prospecting operations to be carried out in accordance with scheme of prospecting.

Section 10

11. Report of prospecting operations.

Section 11

12. Mining plan as a pre-requisite to the grant of lease.

Section 12

13. Mining plan to be prepared by a recognised person.

Section 13

14. Grant recognition by State Government.

Section 14

15. Approval and submission of mining plan.

Section 15

16. Mining plan as a pre-requisite to the commencement of mining operations.

Section 16

17. Mining plan to be submitted by the existing lessee.

Section 17

18. Review of mining plan.

Section 18

19. Mining operations to be in accordance with mining plan.

Section 19

20. Prospecting and mining operations.

Section 20

21. System of working.

Section 21

22. Separate stacking of non-saleable granite.

Section 22

23. Notice for opening of a mine and intimation of existence of a mine.

Section 23

24. Abandonment or surrender of quarries.

Section 24

25. Notice of temporary discontinuance of work in quarries.

Section 25

26. Intimation of reopening of a quarry.

Section 26

27. Copies of plans and sections to be submitted.

Section 27

28. Preparation of plans.

Section 28

29. Protection of environment.

Section 29

30. Removal and utilisation of top soil.

Section 30

31. Storage of overburden, waste rock, etc.

Section 31

32. Reclamation and rehabilitation of lands.

Section 32

33. Precaution against air pollution.

Section 33

34. Discharge of effluents.

Section 34

35. Precaution against noise.

Section 35

36. Permissible limits and standard.

Section 36

37. Restoration of flora.

Section 37

38. Employment of mining engineer.

Section 38

39. Duties of mining engineer.

Section 39

40. Supply of materials, appliances and facilities.

Section 40

42. Notice of certain appointments.

Section 42

43. Records of bore-holes.

Section 43

44. Transfer of records of transferees.

Section 44

45. Copies of notices and returns to be maintained.

Section 45

46. Revision.

Section 46

47. Penalty.

Section 47

48. Facilities for undertaking research or training.

Section 48

49. Territorial jurisdiction.

Section 49

50. Obligation to supply other information.

Section 50

51. Provisions of these rules to be applicable to Government.

Section 51

52. Applicability of the provisions of Minor Mineral Concession Rules framed by the State Government.

Section 52

53. Delegation of powers.

Section 53

1. Type of the granite for which prospecting operations has been granted : (a) (b) 2. Name and address of the license : 3. Particulars of the prospecting license : (i)  Date of execution.................. (ii)  Period : Years........ From.........  to............. (iii) Area under license...............Hectares (iv)  No. and date assigned by State Government to Prospecting License. No...............Date.................

Section 1

11. Reserves of the mineral proved in the area. (a) Proved (b) Probable (c) Possible

Section 11

13. Number of workers employed in the Quarry Male Female Company Labour (Direct) Contract Labour Place............. Signature........................................... Date.............. Name in full......................................... Designation Owner/Agent/Mining Engineer/Manager

Section 13

5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non availability of labour, less demand, etc., and number of days of work stoppage for each of these factors. Reasons No. of days

Section 5

1. Name and Location of the Quarry/ Mine Name of Mine/Quarry: Village: Post Office: Taluka/Tehsil : District: State: 2. Name and address of the Lessee/Mine/Quarry Owner: 3. Lease details Area in hectares: Date of execution: Period (years): 4. No. of days the Quarry/Mine worked during the year: 5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non availability of labour, less demand, etc. and number of days of work stoppage for each of these factors. Reasons No. of days

Section 1